CN208186404U - Pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system - Google Patents

Pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system Download PDF

Info

Publication number
CN208186404U
CN208186404U CN201820515408.6U CN201820515408U CN208186404U CN 208186404 U CN208186404 U CN 208186404U CN 201820515408 U CN201820515408 U CN 201820515408U CN 208186404 U CN208186404 U CN 208186404U
Authority
CN
China
Prior art keywords
powder
supply system
exhaust gas
pressure
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820515408.6U
Other languages
Chinese (zh)
Inventor
张吉国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zack (qingdao) Energy Equipment Co Ltd
Original Assignee
Zack (qingdao) Energy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zack (qingdao) Energy Equipment Co Ltd filed Critical Zack (qingdao) Energy Equipment Co Ltd
Priority to CN201820515408.6U priority Critical patent/CN208186404U/en
Application granted granted Critical
Publication of CN208186404U publication Critical patent/CN208186404U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of pulverized-coal fired boiler powder-supply systems from inerting and to stablize powder-supply system, including combustion control system, air accumulator, coal dust tower, measuring chute, boiler exhaust gas feeding pipe, the first gas supply under constant pressure pipeline and the second gas supply under constant pressure pipeline;Boiler exhaust gas feeding pipe is used to supply boiler exhaust gas to air accumulator, first gas supply under constant pressure piping connection air accumulator and measuring chute, second gas supply under constant pressure piping connection air accumulator and coal dust tower, it is provided with measuring chute pressure in combustion control system and stablizes setting value, first pressure transmitter is provided on measuring chute, shut-off valve is provided on second gas supply under constant pressure pipeline, combustion control system controls the aperture of shut-off valve according to the comparison result of design value and measured value to realize the control stable to pressure in measuring chute.Boiler exhaust gas can be delivered to coal dust tower and realize the safety that ensure that coal dust is stored in coal dust tower from inerting by the utility model, and can realize pressure stability contorting to measuring chute, realized the stabilization of coal dust, continuously supplied.

Description

Pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system
Technical field
The utility model belongs to coal powder boiler combustion stability contorting and coal dust tower inerting technical field more particularly to a kind of coal Powder boiler powder-supply system is from inerting and stablizes powder-supply system.
Background technique
Current pulverized-coal fired boiler powder-supply system by coal dust tower and measuring chute, powder falling rotary valve, powder supply rotary valve, compressed air system, Inert gas system, electric control system composition.
The effect of inert gas system is needed immediately when temperature, carbonomonoxide concentration rise to alarm limits in coal dust tower Automatic enable fills lazy system, to reduce air oxygen content and carbon monoxide content in coal dust tower, until reach inert atmosphere, to prevent The accidents such as fire, explosion only occur.But inert gas (mainly with carbon dioxide) needs to lay in advance to meet in emergency circumstances Needs, therefore inert gas system used in current powder-supply system is huger, and operation is complicated with monitoring system, and early period throws Enter and later period operating cost is high.It is limited based on storage level, therefore only can just be opened when encountering the exceeded alarm of temperature, carbon monoxide With filling lazy system.
Coal dust tower discharge valve is in feeding process, and compressed air broken arch is also carrying out simultaneously, to prevent coal during falling stop material Powder arch camber causes not powder falling or powder falling amount inadequate.And in actual moving process, compressed air broken arch and coal dust blanking operation It will cause pressure in measuring chute and larger fluctuation occur, and then affect the stability and continuity of powder supply, or even influence coal Powder burning, causes pressure in the burner hearth to fluctuate, is unfavorable for boiler continuous and steady operation.
Therefore be highly desirable to adopt an effective measure with ensure in coal dust tower steadily in the long term in inert atmosphere and gram The problem of taking measuring chute pressure oscillation in operational process.
Utility model content
The utility model is in place of avoiding above-mentioned the shortcomings of the prior art, to provide a kind of pulverized-coal fired boiler powder-supply system From inerting and stablize powder-supply system, to guarantee coal dust safe storage, stable operation of the boiler.
The technology employed by the present utility model is
A kind of pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system, including combustion control system, air accumulator, coal dust Tower, measuring chute, boiler exhaust gas feeding pipe, the first gas supply under constant pressure pipeline and the second gas supply under constant pressure pipeline;The boiler exhaust gas Feeding pipe be used for the air accumulator supply boiler exhaust gas, the boiler exhaust gas feeding pipe along boiler exhaust gas flow direction according to Secondary to be provided with gas cooler and Roots blower, Roots blower is extracted through gas cooler boiler exhaust gas after cooling and right Boiler exhaust gas is delivered to the air accumulator after being pressurizeed;The first gas supply under constant pressure pipeline is for connecting air accumulator and metering Storehouse, the part boiler exhaust gas after air accumulator pressure stabilizing are transported to the measuring chute;The second gas supply under constant pressure pipeline is for connecting Air accumulator and coal dust tower are connect, another part boiler exhaust gas after air accumulator pressure stabilizing is transported to the coal dust tower;The burning It is stored with measuring chute pressure in control system and stablizes setting value, first for detecting air pressure in measuring chute is provided on measuring chute Pressure transmitter, air pressure measured value real-time Transmission in the measuring chute that first pressure transmitter will test to the Combustion System System, shut-off valve is provided on the first gas supply under constant pressure pipeline, and combustion control system is worth gentle compacting according to measuring chute Stability Design The comparison result of measured value controls the aperture of the shut-off valve to realize the control stable to pressure in measuring chute.
The first steam-water separation is provided on boiler exhaust gas feeding pipe between the gas cooler and Roots blower Gas cooler boiler exhaust gas after cooling is just transported to Roots's drum by device after the dehydration of the first steam-water separator first Blower.
It is provided with the second steam-water separator on the first gas supply under constant pressure pipeline, the part boiler tail after air accumulator pressure stabilizing Gas is just transported to the measuring chute after the dehydration of the second steam-water separator first.
It is additionally provided with deduster on the first gas supply under constant pressure pipeline, the part boiler exhaust gas after air accumulator pressure stabilizing is successively The measuring chute is just transported to after the second steam-water separator, deduster.
The second pressure transmitter for detecting air pressure in air accumulator, second pressure transmitter are provided on the air accumulator Atmospheric pressure value real-time Transmission in the air accumulator that will test is to the combustion control system.
The first temperature on the spot is provided on boiler exhaust gas feeding pipe between the gas cooler and Roots blower It counts, is provided with pressure gauge on the spot on the boiler exhaust gas feeding pipe between the Roots blower and air accumulator.
It is provided with safety valve on the air accumulator, the second thermometer on the spot is additionally provided on the air accumulator.
The pulverized-coal fired boiler powder-supply system is from inerting and stable powder-supply system further includes compressed air feeding pipe, the pressure Contracting air feed conduit includes for supplying branch, the first compression to the first compressed air of air accumulator supply compressed air Air supply branch road is provided with the first pressure reducing valve.
The compressed air feeding pipe further includes for the second compressed air supply to deduster supply gas source Branch, the second compressed air supply branch road are provided with the second pressure reducing valve.
It is provided with pneumatic control valve on the second gas supply under constant pressure pipeline, another part boiler tail after air accumulator pressure stabilizing Gas is transferred to the coal dust tower after the pneumatic control valve;The compressed air feeding pipe further includes to the pneumatic tune The third compressed air for saving valve supply gas source supplies branch.
By adopting the above-described technical solution, being had the beneficial effect that acquired by the utility model
1, boiler exhaust gas after cooling can be injected into coal dust tower by the utility model, gradually decreased oxygen content and reached very To lower than the concentration for standardizing defined inert atmosphere requirement, realizes from inerting, inhibit coal dust oxidation, reduce the production of carbon monoxide It is raw, it prevents coal dust from generating superheating phenomenon, makes in coal dust tower in temperature, oxygen content, the lower inert atmosphere of carbonomonoxide concentration In, guarantee the safety of coal dust storage in coal dust tower.
2, pressure transmitter is installed at the measuring chute of the utility model, which being capable of real-time detection measuring chute Interior atmospheric pressure value and while will test fructufy, are transmitted to combustion control system, combustion control system by the pressure transmitter come The aperture for controlling shut-off valve stablizes the pressure in measuring chute in the range of setting value allows fluctuation, while substantially reduction is fallen The pressure oscillation in measuring chute caused by broken arch during powder falling of powder and compressed air, realize the stabilization of coal dust, continuous supply, It ensure that burning continuous and steady operation.
Detailed description of the invention
Fig. 1 is the systematic schematic diagram of the utility model.
Wherein,
1, boiler exhaust gas feeding pipe 2, the first gas supply under constant pressure pipeline 3, the second gas supply under constant pressure pipeline 4, air accumulator 5, Measuring chute 6, coal dust tower 7, gas cooler 8, first thermometer 9, the first steam-water separator 10, Roots blower on the spot 11, on the spot pressure gauge 12, the second steam-water separator 13, deduster 14, pneumatic control valve 15, second pressure transmitter 16, Second thermometer 17, first pressure transmitter 18, the first pressure reducing valve 19, the second pressure reducing valve 20, the first compressed air on the spot It supplies branch 21, the second compressed air supply branch 22, third compressed air and supplies branch 23, shut-off valve 24, root valve 25, safety valve
Specific embodiment
The utility model is described in further detail with specific embodiment with reference to the accompanying drawing, but the utility model It is not limited to these examples.
As shown in Figure 1, a kind of pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system, including combustion control system, Air accumulator 4, coal dust tower 6, measuring chute 5, boiler exhaust gas feeding pipe 1, the first gas supply under constant pressure pipeline 2 and the second gas supply under constant pressure pipe Road 3.The coal dust tower 6 supplies coal dust by measuring chute 5 described in material blanking tube road direction, and material blanking tube road is provided with discharge valve.
The boiler exhaust gas feeding pipe is used to supply boiler exhaust gas, the boiler exhaust gas supply pipe to the air accumulator 4 Curb boiler exhaust gas flow direction is disposed with gas cooler 7 and Roots blower 10, and gas cooler 7 is for reducing pot The temperature of furnace exhaust gas, Roots blower 10 extract through the boiler exhaust gas after cooling of gas cooler 7 and add to boiler exhaust gas The air accumulator 4 is delivered to after pressure.It is set on boiler exhaust gas feeding pipe between the gas cooler 7 and Roots blower 10 It is equipped with the first steam-water separator 9, by the boiler exhaust gas after cooling of gas cooler 7 first after the dehydration of the first steam-water separator 9 Just it is transported to the Roots blower 10.First steam-water separator 9 can be dehydrated boiler exhaust gas, reduce and enter coal The moisture of powder tower 6 and measuring chute 5 prevents coal dust dampness, agglomeration, influences coal dust flowing.
In addition, being provided on boiler exhaust gas feeding pipe between the gas cooler 7 and the first steam-water separator 9 One thermometer 8 on the spot, be provided on the boiler exhaust gas feeding pipe between the Roots blower 10 and air accumulator 4 root valve 24 and Pressure gauge 11 on the spot being connected with root valve 24.
Part pot of the first gas supply under constant pressure pipeline for connecting air accumulator 4 and measuring chute 5, after 4 pressure stabilizing of air accumulator Furnace exhaust gas is transported to the measuring chute 5.In addition, being provided with 12 He of the second steam-water separator on the first gas supply under constant pressure pipeline Deduster 13, the part boiler exhaust gas after 4 pressure stabilizing of air accumulator are successively just defeated after the second steam-water separator 12, deduster 13 It send to the measuring chute 5.
It is stored with measuring chute pressure in the combustion control system and stablizes setting value, is provided on measuring chute 5 for detecting The first pressure transmitter 17 of air pressure in measuring chute 5, the air pressure actual measurement in the measuring chute 5 that first pressure transmitter 17 will test It is worth real-time Transmission to the combustion control system, is provided with shut-off valve 23, combustion control system root on the first gas supply under constant pressure pipeline The aperture of the shut-off valve 23 is controlled according to the comparison result that measuring chute Stability Design is worth gentle compacting measured value to realize to measuring chute 5 The stable control of interior pressure.
Another portion of the second gas supply under constant pressure pipeline for connecting air accumulator 4 and coal dust tower 6, after steady 4 pressure of air accumulator Boiler exhaust gas is divided to be transported to the coal dust tower 6.
The pulverized-coal fired boiler powder-supply system is from inerting and stable powder-supply system further includes compressed air feeding pipe, and compression is empty Gas feeding pipe is in case of emergency maintaining the pressure in air accumulator 4, while as the deduster 13 and following pneumatic The gas source of regulating valve 14 plays a role.
Specifically, the compressed air feeding pipe includes for the of the air accumulator 4 supply compressed air One compressed air supplies branch 20, is provided with the first pressure reducing valve 18 on the first compressed air supply branch 20.The compressed air Feeding pipe further includes for supplying branch 21, second compression to the second compressed air of the deduster 13 supply gas source The second pressure reducing valve 19 is provided on air supply branch 21.It is provided with pneumatic control valve 14 on the second gas supply under constant pressure pipeline 3, Another part boiler exhaust gas after 4 pressure stabilizing of air accumulator is transferred to the coal dust tower 6 after the pneumatic control valve 14, pneumatically Regulating valve 14 is used to control to adjust the exhaust gas volumn in injection coal dust tower 6, to achieve effective control powder supply pressure.The compressed air Feeding pipe further includes supplying branch 22 to the third compressed air of the pneumatic control valve 14 supply gas source.
The second pressure transmitter 15 for detecting air pressure in air accumulator 4 is provided on the air accumulator 4, second pressure becomes The atmospheric pressure value real-time Transmission in air accumulator 4 for sending device 15 will test is to the combustion control system.It is arranged on the air accumulator 4 There is safety valve 25, after the pressure in air accumulator 4 is more than setting pressure, safety valve 25 opens the gas in automatic-discharging air accumulator 4 Body guarantees safety to prevent 4 superpressure of air accumulator.The second thermometer 16 on the spot are additionally provided on the air accumulator 4.
In addition, equal at the boiler exhaust gas air inlet of the air accumulator 4, boiler exhaust gas gas outlet and compressed air inlet port It is provided with shut-off valve, each shut-off valve is connected with the combustion control system, by combustion control system according to second pressure pick-up The pressure measured value of the various pressure test parts such as device 15, on the spot pressure gauge controls the aperture of each shut-off valve, so that in air accumulator 4 Pressure is maintained to a lesser extent fluctuation, utmostly to ensure the stabilization, continuous of powder supply amount.
Certainly, the powder-supply system in the utility model not only includes a coal dust tower 6 and a measuring chute 5, can be with Multiple coal dust towers 6 and multiple measuring chutes 5 are set, thus by the first gas supply under constant pressure pipeline 2 carry out branch with to multiple measuring chutes 5 into Row boiler exhaust gas supply, by the second gas supply under constant pressure pipeline 3 carry out branch with to multiple coal dust towers 6 carry out boiler exhaust gas supply, one A coal dust tower 6 corresponds to a measuring chute 5 and supplies coal dust.
In the utility model pulverized-coal fired boiler powder-supply system from inerting process be by the boiler tail of oxygen content low (3%~6%) Gas is injected after processing in coal dust tower 6, is reached and is maintained to keep inert atmosphere in coal dust tower 6, inhibits coal dust oxidation, reduce by an oxygen Change carbon generation, achieve the purpose that safe and stable storage coal dust, at the same can substantially reduce inert gas system scale, invest and Operating cost.Powder-supply system in the utility model, using the boiler exhaust gas Jing Guo inerting, injects measuring chute from while inerting In 5, the pressure oscillation as caused by broken arch or powder falling in operational process is substantially weakened, keeps powder supply more continuous, stable, favorably Pressure oscillation is monitored in the continuous and steady operation of boiler, while by the pressure transmitter on measuring chute 5 to control each shut-off valve Aperture, by the pressure in measuring chute 5 stablize in the range of running setting value and allowing to fluctuate (fluctuation range can maintain ± Within 15mbar), to reach, boiler internal furnace pressure oscillation is small, combustion stablized purpose.
The part that do not address in the utility model uses or uses for reference prior art and can be realized.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relatively important Property.
Specific embodiment described herein is only the spiritual example explanation to the utility model.This is practical Novel person of ordinary skill in the field can make various modifications or additions to the described embodiments or adopt It is substituted with similar mode, but without departing from the spirit of the present application or surmounts model defined in the appended claims It encloses.

Claims (9)

1. a kind of pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system, which is characterized in that including combustion control system, storage Gas tank, coal dust tower, measuring chute, boiler exhaust gas feeding pipe, the first gas supply under constant pressure pipeline and the second gas supply under constant pressure pipeline;It is described Boiler exhaust gas feeding pipe is used to supply boiler exhaust gas to the air accumulator, and the boiler exhaust gas feeding pipe is along boiler exhaust gas stream Dynamic direction is disposed with gas cooler and Roots blower, and Roots blower is extracted through gas cooler boiler after cooling Tail gas is simultaneously delivered to the air accumulator after pressurizeing to boiler exhaust gas;The first gas supply under constant pressure pipeline is for connecting air accumulator And measuring chute, the part boiler exhaust gas after air accumulator pressure stabilizing are transported to the measuring chute;The second gas supply under constant pressure pipeline For connecting air accumulator and coal dust tower, another part boiler exhaust gas after air accumulator pressure stabilizing is transported to the coal dust tower;Institute It states and is stored with the stable setting value of measuring chute pressure in combustion control system, be provided on measuring chute for detecting air pressure in measuring chute First pressure transmitter, air pressure measured value real-time Transmission in the measuring chute that first pressure transmitter will test to the combustion Burn control system, be provided with shut-off valve on the first gas supply under constant pressure pipeline, combustion control system according to measuring chute Stability Design value and The comparison result of air pressure measured value controls the aperture of the shut-off valve to realize the control stable to pressure in measuring chute.
2. a kind of pulverized-coal fired boiler powder-supply system according to claim 1 is from inerting and stablizes powder-supply system, which is characterized in that It is provided with the first steam-water separator on boiler exhaust gas feeding pipe between the gas cooler and Roots blower, by flue gas Cooler boiler exhaust gas after cooling is just transported to the Roots blower after the dehydration of the first steam-water separator first.
3. a kind of pulverized-coal fired boiler powder-supply system according to claim 1 is from inerting and stablizes powder-supply system, which is characterized in that It is provided with the second steam-water separator on the first gas supply under constant pressure pipeline, the part boiler exhaust gas after air accumulator pressure stabilizing passes through first The measuring chute is just transported to after the dehydration of second steam-water separator.
4. a kind of pulverized-coal fired boiler powder-supply system according to claim 3 is from inerting and stablizes powder-supply system, which is characterized in that It is additionally provided with deduster on the first gas supply under constant pressure pipeline, the part boiler exhaust gas after air accumulator pressure stabilizing is successively through the second vapour The measuring chute is just transported to after separator, deduster.
5. a kind of pulverized-coal fired boiler powder-supply system according to claim 1 is from inerting and stablizes powder-supply system, which is characterized in that The second pressure transmitter for detecting air pressure in air accumulator is provided on the air accumulator, second pressure transmitter will test Air accumulator in atmospheric pressure value real-time Transmission to the combustion control system.
6. a kind of pulverized-coal fired boiler powder-supply system according to claim 1 is from inerting and stablizes powder-supply system, which is characterized in that The first thermometer on the spot, sieve are provided on boiler exhaust gas feeding pipe between the gas cooler and Roots blower Pressure gauge on the spot is provided on boiler exhaust gas feeding pipe between thatch air blower and air accumulator.
7. a kind of pulverized-coal fired boiler powder-supply system according to claim 4 is from inerting and stablizes powder-supply system, which is characterized in that The pulverized-coal fired boiler powder-supply system is from inerting and stable powder-supply system further includes compressed air feeding pipe, and the compressed air supplies It include for supplying branch, the supply of the first compressed air to the first compressed air of air accumulator supply compressed air to pipeline Branch road is provided with the first pressure reducing valve.
8. a kind of pulverized-coal fired boiler powder-supply system according to claim 7 is from inerting and stablizes powder-supply system, which is characterized in that The compressed air feeding pipe further includes supplying branch for supplying the second compressed air of gas source to the deduster, described Second compressed air supply branch road is provided with the second pressure reducing valve.
9. a kind of pulverized-coal fired boiler powder-supply system according to claim 7 is from inerting and stablizes powder-supply system, which is characterized in that It is provided with pneumatic control valve on the second gas supply under constant pressure pipeline, described in another part boiler exhaust gas warp after air accumulator pressure stabilizing The coal dust tower is transferred to after pneumatic control valve;The compressed air feeding pipe further includes supplying to the pneumatic control valve The third compressed air of gas source supplies branch.
CN201820515408.6U 2018-04-12 2018-04-12 Pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system Expired - Fee Related CN208186404U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820515408.6U CN208186404U (en) 2018-04-12 2018-04-12 Pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820515408.6U CN208186404U (en) 2018-04-12 2018-04-12 Pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system

Publications (1)

Publication Number Publication Date
CN208186404U true CN208186404U (en) 2018-12-04

Family

ID=64436822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820515408.6U Expired - Fee Related CN208186404U (en) 2018-04-12 2018-04-12 Pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system

Country Status (1)

Country Link
CN (1) CN208186404U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386866A (en) * 2018-04-12 2018-08-10 扎克(青岛)船用设备有限公司 Pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386866A (en) * 2018-04-12 2018-08-10 扎克(青岛)船用设备有限公司 Pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system
CN108386866B (en) * 2018-04-12 2023-11-24 扎克(青岛)船用设备有限公司 Self-inerting and stable powder supply system of pulverized coal boiler

Similar Documents

Publication Publication Date Title
US9573775B2 (en) Powder supply apparatus and powder supply method
CN208186404U (en) Pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system
CN208475369U (en) Coal-burning boiler pulverized coal preparation system
CN105347040A (en) Pressure feed type high-pressure dense-phase pneumatic conveying device and pneumatic conveying method
CN110345507A (en) A kind of coal-fired boiler combustion Automatic Optimal control device
US4541572A (en) Pulverizing, drying and transporting system for injecting a pulverized fuel into a blast furnace
CN108386866A (en) Pulverized-coal fired boiler powder-supply system is from inerting and stablizes powder-supply system
CN206872677U (en) A kind of preform sinters furnace pressure automatic control system
CN105531538B (en) There are three the combustion oxygen type boiler unit of combustion zone and its operating methods for tool
US4008042A (en) Coal heating temperature control
CN114774608B (en) Non-fluctuation furnace changing device of hot blast stove
CN105841488A (en) Load adjustment and low-nitrogen combustion method and device for fluidized bed boiler
CA1055872A (en) Coal heater temperature control
CN201535612U (en) Feedback insulated tube for combustion-regulating system of concentrate-drying kiln
CN109340809A (en) The control system and method for high volatile fine coal preparation and drying process
CN209725840U (en) A kind of cement kiln oxygen-enriching device nitrogen effective use system
CN209213914U (en) A kind of heater for rolling steel combustion control device
CN111703900B (en) Pneumatic conveying method
CN203980327U (en) Stablize coal dust feeding system
US4054274A (en) Method and apparatus for avoiding the emission of carbon monoxide from converter exhaust gases
CN218936400U (en) Coal conveying control system for helping stable operation of boiler
CN201434578Y (en) Drying furnace gas inlet system for coal injection and pulverized coal preparation
CN221197977U (en) Drying device for fertilizer
CN110953879A (en) Roller kiln
EP3188805A1 (en) Prevention of combustion in storage silos

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181204

Termination date: 20200412