CN208184272U - A kind of ruggedized construction that novel shaft tower main material cross is combined and spliced - Google Patents

A kind of ruggedized construction that novel shaft tower main material cross is combined and spliced Download PDF

Info

Publication number
CN208184272U
CN208184272U CN201820630919.2U CN201820630919U CN208184272U CN 208184272 U CN208184272 U CN 208184272U CN 201820630919 U CN201820630919 U CN 201820630919U CN 208184272 U CN208184272 U CN 208184272U
Authority
CN
China
Prior art keywords
main material
spliced
combined
shaft tower
former
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820630919.2U
Other languages
Chinese (zh)
Inventor
黄平
张志强
陈晔
陶祥海
徐达艺
黄国栋
欧英龙
李知城
林伟谊
陈宇
吴慧锋
吴飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Zhanjiang Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Zhanjiang Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Zhanjiang Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201820630919.2U priority Critical patent/CN208184272U/en
Application granted granted Critical
Publication of CN208184272U publication Critical patent/CN208184272U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a kind of ruggedized constructions that novel shaft tower main material cross is combined and spliced, including former main material and secondary main material;Wherein secondary main material and former main material form the combined and spliced structure of cross;The shape of secondary main material is consistent with former main material, is perpendicular type main material structure;The material of secondary main material is consistent with former main material;The pair main material surface covers anti-corrosion material.

Description

A kind of ruggedized construction that novel shaft tower main material cross is combined and spliced
Technical field
The utility model relates to transmission line of electricity field of reinforcement, combine more particularly, to a kind of novel shaft tower main material cross The ruggedized construction of splicing.
Background technique
Improve the intensity of built transmission line of electricity mainly by iron tower main material, steel tower tower seat board and the basis to transmission line of electricity into Row strengthening reconstruction.
In general, if old tower is exceeded the allowable stress of former main material rod piece by the load of existing checking computations, there may be Former iron tower main material intensity stress is unsatisfactory for current specifications requirement, needs to carry out consolidation process to shaft tower main material.
The thinking that shaft tower main material is reinforced is mainly in the additional same size in iron tower main material (former main material) back side (or than master Material specification is smaller) main material (secondary main material) composition cross combination angle iron component splicing main material Scheme of Strengthening.Specific main material adds Gu scheme needs to be determined according to factors such as size, the specification types of main material of steel tower tower body load.
Existing Scheme of Strengthening is often the method for directlying adopt replacement main material, is the transmission of electricity iron of single angle for main material Tower, if can have the shortcomings that difficulty of construction is big, costly, power off time is long using the method for replacement main material.
Summary of the invention
The purpose of this utility model is to solve said one or multiple defects, designs a kind of novel shaft tower main material cross combination The ruggedized construction of splicing.
To realize the above goal of the invention, the technical solution adopted is that:
A kind of ruggedized construction that novel shaft tower main material cross is combined and spliced, including former main material and secondary main material;Wherein secondary main material The combined and spliced structure of cross is formed with former main material.
Preferably, the shape of the secondary main material is consistent with former main material, is perpendicular type main material structure.
Preferably, the material of the secondary main material is consistent with former main material.
Preferably, the secondary main material surface covers anti-corrosion material.
Preferably, the former main material is all made of articulated manner with secondary main material and is fixed.
Compared with prior art, the beneficial effects of the present invention are:
1) without removing old master's material, newly added pair main material is in factory process and preservative treatment, site operation installation difficulty It is lower;
2) construction power off time is short, influences on the normal operation of power grid lower;
3) it avoids replacing iron tower main material on a large scale, construction investment is greatly reduced.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Specific embodiment
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;
Below in conjunction with drawings and examples, the present invention is further elaborated.
Embodiment 1
A kind of ruggedized construction that novel shaft tower main material cross is combined and spliced, referring to FIG. 1, including former main material and secondary main material; Wherein secondary main material and former main material form the combined and spliced structure of cross.
In the present embodiment, it is perpendicular type main material structure that the shape of the pair main material is consistent with former main material.
In the present embodiment, the material of the pair main material is consistent with former main material.
In the present embodiment, the pair main material surface covers anti-corrosion material.
In the present embodiment, the original main material is all made of articulated manner with secondary main material and is fixed.
Obviously, the above embodiments of the present invention is only to clearly illustrate example of the present invention, and not to be It is the restriction to embodiments of the present invention.For those of ordinary skill in the art, on the basis of the above description It can also make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all Made any modifications, equivalent replacements, and improvements etc. within the spirit and principles in the present invention should be included in right of the present invention It is required that protection scope within.

Claims (5)

1. a kind of ruggedized construction that novel shaft tower main material cross is combined and spliced, which is characterized in that including former main material and secondary main material;Its Middle pair main material and former main material form the combined and spliced structure of cross.
2. a kind of combined and spliced ruggedized construction of novel shaft tower main material cross according to claim 1, which is characterized in that institute The shape for stating secondary main material is consistent with former main material, is perpendicular type main material structure.
3. a kind of combined and spliced ruggedized construction of novel shaft tower main material cross according to claim 1, which is characterized in that institute The material for stating secondary main material is consistent with former main material.
4. a kind of combined and spliced ruggedized construction of novel shaft tower main material cross according to claim 1, which is characterized in that institute It states secondary main material surface and covers anti-corrosion material.
5. a kind of combined and spliced ruggedized construction of novel shaft tower main material cross according to claim 1, which is characterized in that institute It states former main material and is all made of articulated manner with secondary main material and be fixed.
CN201820630919.2U 2018-04-28 2018-04-28 A kind of ruggedized construction that novel shaft tower main material cross is combined and spliced Active CN208184272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820630919.2U CN208184272U (en) 2018-04-28 2018-04-28 A kind of ruggedized construction that novel shaft tower main material cross is combined and spliced

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820630919.2U CN208184272U (en) 2018-04-28 2018-04-28 A kind of ruggedized construction that novel shaft tower main material cross is combined and spliced

Publications (1)

Publication Number Publication Date
CN208184272U true CN208184272U (en) 2018-12-04

Family

ID=64431919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820630919.2U Active CN208184272U (en) 2018-04-28 2018-04-28 A kind of ruggedized construction that novel shaft tower main material cross is combined and spliced

Country Status (1)

Country Link
CN (1) CN208184272U (en)

Similar Documents

Publication Publication Date Title
CN208184272U (en) A kind of ruggedized construction that novel shaft tower main material cross is combined and spliced
CN101979774A (en) Partial external prestressed and fine-grain reinforcing steel bar fiber reinforced cementitious composite (FRCC) railway box girder
CN202380448U (en) Cambered service gate
CN207331426U (en) A kind of double box steel concrete binder bowstring arch bridges of railway
CN207498927U (en) A kind of fixed geotechnical grid
CN203125142U (en) Steel structure cross beam of numerical control gantry boring-milling machine
CN205296966U (en) Transmission line iron tower
CN207969298U (en) A kind of transom electronic shield structure of prefabricated cabin
CN209100555U (en) A kind of finished product bracket that subway engineering centre uses
CN207568298U (en) A kind of nested type reinforces steel tower
CN208309868U (en) A kind of buckling restrained brace device
CN203891514U (en) Main transformer framework for omitting end support in substation
CN103101843B (en) A kind of lifting appliance
CN204782193U (en) High -strength concrete door type pole
CN206814362U (en) A kind of multifunction combined electric apparatus installation tool
CN204199177U (en) Interior constraint reinforcing bar protection apparatus
CN108381520A (en) A kind of replaceable robot arm
CN205474883U (en) Carbon cloth of pier, angle steel reinforced structure
CN201857571U (en) Partial external prestressing and fine-grain reinforcing fiber reinforced cementitious composite (FRCC) railway box girder
CN108824840A (en) A kind of bracing means of ancient building
CN108010687A (en) A kind of transformer and its iron core
CN204827454U (en) Subway construction engineering construction shaft
CN207861813U (en) Improve the case structure of lift arm bearing load
CN203247702U (en) Steel structural support
CN204093872U (en) A kind of wind of metallic plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant