CN208183954U - A kind of prefabricated assembled bean column node construction - Google Patents
A kind of prefabricated assembled bean column node construction Download PDFInfo
- Publication number
- CN208183954U CN208183954U CN201820682141.XU CN201820682141U CN208183954U CN 208183954 U CN208183954 U CN 208183954U CN 201820682141 U CN201820682141 U CN 201820682141U CN 208183954 U CN208183954 U CN 208183954U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- prefabricated
- column
- composite beam
- shape steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 235000010627 Phaseolus vulgaris Nutrition 0.000 title claims 4
- 244000046052 Phaseolus vulgaris Species 0.000 title claims 4
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 37
- 239000010959 steel Substances 0.000 claims abstract description 37
- 239000002131 composite material Substances 0.000 claims abstract description 33
- 210000003781 tooth socket Anatomy 0.000 claims 3
- 238000005266 casting Methods 0.000 claims 1
- 238000011065 in-situ storage Methods 0.000 claims 1
- 210000002435 tendon Anatomy 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
Landscapes
- Reinforcement Elements For Buildings (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
本实用新型公开了一种预制装配式梁柱节点构造,包括预制柱和叠合梁,叠合梁的顶面为粗糙的叠合面,叠合梁上沿其长度均布有多个箍筋,箍筋的下半部分位于叠合梁内,预制柱中梁柱结合处设置有两块竖向设置且相对设置的型钢板,型钢板的一端预埋入预制柱内,型钢板的另一端伸出预制柱,其中型钢板上伸出预制柱的部分下部沿其长度均布有多个齿槽,齿槽与上述箍筋呈一一对应设置;叠合梁与预制柱之间通过箍筋与齿槽相互卡合的方式相连固定,架立筋端部焊接于型钢板上并且架立筋与箍筋的上半部分绑扎好后现场浇筑混凝土形成现浇梁。本实用新型可以免去绑扎叠合梁上部支座负筋,同时提高连接节点的结构承载力、刚度以及抗震延性,便于施工且施工质量好。
The utility model discloses a prefabricated assembled beam-column joint structure, which comprises a prefabricated column and a composite beam. The lower part of the rib is located in the laminated beam. Two vertical and opposite profiled steel plates are arranged at the junction of the beam and column in the prefabricated column. One end of the profiled steel plate is pre-embedded in the precast column, and the other end of the profiled steel plate protrudes Prefabricated column, the lower part of the prefabricated column protruding from the steel plate has a plurality of tooth grooves evenly distributed along its length, and the tooth grooves are set in one-to-one correspondence with the above-mentioned stirrups; The grooves are connected and fixed by means of interlocking, the ends of the vertical bars are welded on the steel plate and the upper part of the vertical bars and the stirrups are bound, and then the concrete is poured on site to form a cast-in-place beam. The utility model can eliminate the binding of the negative tendons of the upper support of the composite beam, and at the same time improve the structural bearing capacity, rigidity and seismic ductility of the connecting nodes, which is convenient for construction and has good construction quality.
Description
技术领域technical field
本实用新型涉及一种梁柱节点构造,更具体地说,涉及一种预制装配式梁柱节点构造。The utility model relates to a beam-column joint structure, in particular to a prefabricated assembled beam-column joint structure.
背景技术Background technique
近年来,国家大力推广建筑工业化、预制化。就混凝土框架结构而言,其预制构件包括了预制柱、叠合梁和叠合板。叠合梁顶面为粗糙的叠合面,箍筋的下半部分位于叠合梁内,而上半部分位于现浇梁内。预制柱的层间柱段在工厂中预制,在梁柱节点叠合梁上部支座负筋穿过预制柱,节点现浇混凝土。混凝土现浇节点连接具有整体性、抗震性好,外形美观等优点,但是现场绑扎支座负筋以及现浇连接具有施工繁琐、施工效率低、施工质量人为因素影响大,不利于建筑产业化发展,因此需要发明一种方便快捷、质量可控的混凝土叠合梁与预制柱连接节点。In recent years, the country has vigorously promoted the industrialization and prefabrication of buildings. As far as the concrete frame structure is concerned, its prefabricated components include prefabricated columns, laminated beams and laminated slabs. The top surface of the composite beam is a rough composite surface, the lower half of the stirrup is located in the composite beam, and the upper half is located in the cast-in-place beam. The interstory column section of the prefabricated column is prefabricated in the factory, and the negative reinforcement of the upper support of the composite beam passes through the prefabricated column at the beam-column node, and the concrete is cast in place at the node. The connection of concrete cast-in-place joints has the advantages of integrity, good earthquake resistance, and beautiful appearance. However, the on-site binding of the negative reinforcement of the support and the cast-in-place connection have cumbersome construction, low construction efficiency, and great influence of human factors on construction quality, which is not conducive to the development of construction industrialization. , so it is necessary to invent a convenient, quick and quality-controllable joint between concrete composite beams and prefabricated columns.
发明内容Contents of the invention
1.实用新型要解决的技术问题1. The technical problems to be solved by the utility model
本实用新型的目的在于克服上述的不足,提供了一种预制装配式梁柱节点构造,采用本实用新型的技术方案,可以免去绑扎叠合梁上部支座负筋,同时提高连接节点的结构承载力、刚度以及抗震延性,便于施工且施工质量好。The purpose of the utility model is to overcome the above-mentioned deficiencies, and provide a prefabricated assembly beam-column joint structure. By adopting the technical scheme of the utility model, it is possible to avoid binding the negative reinforcement of the upper support of the composite beam, and at the same time improve the structure of the connection node. Bearing capacity, rigidity and seismic ductility, easy construction and good construction quality.
2.技术方案2. Technical solution
为达到上述目的,本实用新型提供的技术方案为:In order to achieve the above object, the technical solution provided by the utility model is:
本实用新型的一种预制装配式梁柱节点构造,包括预制柱和叠合梁,所述的叠合梁的顶面为粗糙的叠合面,叠合梁上沿其长度均布有多个箍筋,箍筋的下半部分位于叠合梁内,所述的预制柱中梁柱结合处设置有两块竖向设置且相对设置的型钢板,型钢板的一端预埋入预制柱内,型钢板的另一端伸出预制柱,其中型钢板上伸出预制柱的部分下部沿其长度均布有多个齿槽,齿槽与上述箍筋呈一一对应设置;所述的叠合梁与预制柱之间通过箍筋与齿槽相互卡合的方式相连固定,焊接于型钢板上的架立筋与箍筋的上半部分绑扎好后现场浇筑混凝土将现浇梁与叠合梁连接为一体。A prefabricated assembled beam-column joint structure of the present utility model includes a prefabricated column and a composite beam, the top surface of the composite beam is a rough composite surface, and a plurality of stirrups are uniformly distributed along its length on the composite beam , the lower half of the stirrup is located in the laminated beam, and the beam-column joint in the prefabricated column is provided with two vertically arranged and opposite profiled steel plates, one end of the profiled steel plate is pre-embedded in the prefabricated column, and the profiled steel plate The other end of the prefabricated column protrudes, and the lower part of the prefabricated column protruding from the shaped steel plate has a plurality of tooth grooves evenly distributed along its length, and the tooth grooves and the above-mentioned stirrups are set in one-to-one correspondence; the composite beam and the prefabricated The columns are connected and fixed through the interlocking of the stirrups and the tooth grooves. The erecting bars welded on the profiled steel plate and the upper part of the stirrups are tied up, and then the concrete is poured on site to connect the cast-in-place beams and the composite beams as a whole. .
更进一步地,所述的型钢板的另一端伸出柱边1/3叠合梁的长度。Further, the other end of the shaped steel plate protrudes from the column side by 1/3 of the length of the laminated beam.
更进一步地,所述的型钢板贯穿于预制柱内,型钢板的两端均伸出柱边1/3叠合梁的长度。Furthermore, the profiled steel plate runs through the prefabricated column, and both ends of the profiled steel plate protrude from the column edge by 1/3 of the length of the laminated beam.
3.有益效果3. Beneficial effect
采用本实用新型提供的技术方案,与已有的公知技术相比,具有如下有益效果:Adopting the technical solution provided by the utility model, compared with the existing known technology, has the following beneficial effects:
(1)本实用新型的一种预制装配式梁柱节点构造,其通过预埋于预制柱上的型钢板与叠合梁上的箍筋卡合连接形成骨架,并承受梁上部的负弯矩,操作过程方便快捷,节约了劳动的消耗成本,而且整体性和受力性能优越,简化了施工工序,降低施工难度,构件尺寸精度高,易于控制,改善现场卫生条件,提高生产效率,可批量生产;(1) A prefabricated beam-column joint structure of the present utility model, which forms a skeleton by snapping and connecting the shaped steel plate embedded on the prefabricated column and the stirrup on the composite beam, and bears the negative bending moment on the upper part of the beam , the operation process is convenient and quick, saving labor consumption costs, and the integrity and mechanical performance are superior, the construction process is simplified, the construction difficulty is reduced, the component size accuracy is high, easy to control, the on-site sanitation condition is improved, the production efficiency is increased, and it can be batched Production;
(2)本实用新型的一种预制装配式梁柱节点构造,其叠合梁与预制柱之间通过箍筋与齿槽相互卡合的方式相连固定,可实现快速定位连接的目的。(2) A prefabricated assembled beam-column joint structure of the present invention, the laminated beam and the prefabricated column are connected and fixed by interlocking the stirrup and the tooth groove, which can realize the purpose of fast positioning and connection.
附图说明Description of drawings
图1为本实用新型的一种预制装配式梁柱节点构造的结构示意图;Fig. 1 is a structural schematic diagram of a prefabricated assembled beam-column joint structure of the present invention;
图2为本实用新型的一种预制装配式梁柱节点构造中型钢板的安装结构示意图;Fig. 2 is a schematic diagram of the installation structure of a prefabricated assembled beam-column joint structure medium-sized steel plate of the present invention;
图3为本实用新型的一种预制装配式梁柱节点构造中叠合梁的结构示意图。Fig. 3 is a structural schematic diagram of a composite beam in a prefabricated assembled beam-column joint structure of the present invention.
示意图中的标号说明:1、预制柱;2、叠合梁;3、箍筋;4、型钢板;41、齿槽。Explanation of the labels in the schematic diagram: 1. Prefabricated column; 2. Laminated beam; 3. Stirrup; 4. Shaped steel plate; 41. Alveolar.
具体实施方式Detailed ways
为进一步了解本实用新型的内容,结合附图和实施例对本实用新型作详细描述。In order to further understand the content of the utility model, the utility model is described in detail in conjunction with the accompanying drawings and embodiments.
实施例Example
结合图1、图2和图3,本实施例的一种预制装配式梁柱节点构造,包括预制柱1和叠合梁2,叠合梁2的顶面为粗糙的叠合面,叠合梁2上沿其长度均布有多个箍筋3,箍筋3的下半部分位于叠合梁2内,预制柱1中梁柱结合处设置有两块竖向设置且相对设置的型钢板4,型钢板4的一端预埋入预制柱1内,型钢板4的另一端伸出预制柱1,本实施例型钢板4的另一端伸出柱边1/3叠合梁的长度,具体到本实施例中型钢板4贯穿于预制柱1内,型钢板4的两端均伸出柱边1/3叠合梁的长度;其中型钢板4上伸出预制柱1的部分下部沿其长度均布有多个齿槽41,齿槽41与上述箍筋3呈一一对应设置;叠合梁2与预制柱1之间通过箍筋3与齿槽41相互卡合的方式相连固定,可实现快速定位连接的目的,焊接于型钢板4上的架立筋与箍筋3的上半部分绑扎好后现场浇筑混凝土将现浇梁与叠合梁2连接为一体;通过预埋于预制柱上的型钢板与叠合梁2上的箍筋卡合连接形成骨架,并承受梁上部的负弯矩,操作过程方便快捷,节约了劳动的消耗成本,而且整体性和受力性能优越,简化了施工工序,降低施工难度,构件尺寸精度高,易于控制,改善现场卫生条件,提高生产效率,可批量生产。Referring to Figure 1, Figure 2 and Figure 3, a prefabricated beam-column joint structure of this embodiment includes a prefabricated column 1 and a composite beam 2, the top surface of the composite beam 2 is a rough composite surface, and the composite A plurality of stirrups 3 are evenly distributed along the length of the beam 2, and the lower half of the stirrups 3 is located in the laminated beam 2, and two vertical and opposite shaped steel plates are arranged at the junction of the beam and column in the prefabricated column 1 4. One end of the profiled steel plate 4 is pre-embedded in the prefabricated column 1, and the other end of the profiled steel plate 4 extends out of the prefabricated column 1. In this embodiment, the other end of the profiled steel plate 4 extends out of the column edge by 1/3 of the length of the laminated beam. Specifically In this embodiment, the medium-shaped steel plate 4 runs through the prefabricated column 1, and both ends of the shaped steel plate 4 protrude from the column edge by 1/3 of the length of the laminated beam; A plurality of tooth grooves 41 are evenly distributed, and the tooth grooves 41 are set in one-to-one correspondence with the above-mentioned stirrups 3; To achieve the purpose of fast positioning and connection, the vertical bars welded on the profile steel plate 4 and the upper part of the stirrup 3 are bound, and then the concrete is poured on site to connect the cast-in-place beam and the composite beam 2 as a whole; The profiled steel plate on the top and the stirrups on the composite beam 2 are snapped and connected to form a skeleton, and bear the negative bending moment on the upper part of the beam. The construction process is simplified, the construction difficulty is reduced, the dimensional accuracy of the components is high, it is easy to control, the sanitation conditions on the site are improved, the production efficiency is improved, and it can be mass-produced.
构建时先将两块型钢板4预埋入预制柱1内,并要求两块型钢板4相对设置,两块型钢板4竖向设置,并且两块型钢板的一端均伸出柱边1/3叠合梁的长度;放线定位好预制柱1,吊装叠合梁2,叠合梁2的端部贴合柱边向上吊装,使得叠合梁2上的箍筋3与型钢板上的齿槽41相卡固定,再将架立筋与箍筋3的上半部分绑扎,架立筋端部焊接于型钢板4上,最后现场浇筑混凝土将现浇梁与叠合梁2连接为一体,完成梁柱节点连接。During construction, two shaped steel plates 4 are pre-embedded into the prefabricated column 1, and the two shaped steel plates 4 are required to be arranged oppositely, the two shaped steel plates 4 are vertically arranged, and one end of the two shaped steel plates protrudes from the column edge 1/ 3 The length of the composite beam; the prefabricated column 1 is set out and positioned, and the composite beam 2 is hoisted. The tooth groove 41 is locked and fixed, and then the upper part of the erecting bar is bound to the stirrup 3, and the end of the erecting bar is welded to the profile steel plate 4, and finally the concrete is poured on site to connect the cast-in-place beam and the composite beam 2 into one , completing the beam-to-column connection.
本实用新型的一种预制装配式梁柱节点构造,可以免去绑扎叠合梁上部支座负筋,同时提高连接节点的结构承载力、刚度以及抗震延性,便于施工且施工质量好。A prefabricated assembled beam-column joint structure of the utility model can eliminate the binding of negative ribs on the upper support of the composite beam, and at the same time improve the structural bearing capacity, rigidity and seismic ductility of the joint joint, which is convenient for construction and has good construction quality.
以上示意性的对本实用新型及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本实用新型的实施方式之一,实际的结构并不局限于此。所以,如果本领域的普通技术人员受其启示,在不脱离本实用新型创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本实用新型的保护范围。The above schematically describes the utility model and its implementation, which is not restrictive, and what is shown in the accompanying drawings is only one implementation of the utility model, and the actual structure is not limited thereto. Therefore, if a person of ordinary skill in the art is inspired by it, and without departing from the purpose of the invention of the utility model, without creatively designing a structural mode and an embodiment similar to the technical solution, it shall belong to the utility model. protected range.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820682141.XU CN208183954U (en) | 2018-05-09 | 2018-05-09 | A kind of prefabricated assembled bean column node construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820682141.XU CN208183954U (en) | 2018-05-09 | 2018-05-09 | A kind of prefabricated assembled bean column node construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208183954U true CN208183954U (en) | 2018-12-04 |
Family
ID=64429229
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820682141.XU Expired - Fee Related CN208183954U (en) | 2018-05-09 | 2018-05-09 | A kind of prefabricated assembled bean column node construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208183954U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112936508A (en) * | 2019-12-11 | 2021-06-11 | 南京林业大学 | Manufacturing method of laminated beam for reinforcing UHPC-NC interface bonding by adopting dentate structure |
| CN113605540A (en) * | 2021-06-30 | 2021-11-05 | 江苏晟功建设集团有限公司 | Assembled steel-concrete structure column-beam unbonded prestressed node structure and construction method |
| CN117211149A (en) * | 2023-08-17 | 2023-12-12 | 北京城建集团有限责任公司 | A kind of steel-concrete structural type simply supported and then continuous composite beam and its construction method |
-
2018
- 2018-05-09 CN CN201820682141.XU patent/CN208183954U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112936508A (en) * | 2019-12-11 | 2021-06-11 | 南京林业大学 | Manufacturing method of laminated beam for reinforcing UHPC-NC interface bonding by adopting dentate structure |
| CN113605540A (en) * | 2021-06-30 | 2021-11-05 | 江苏晟功建设集团有限公司 | Assembled steel-concrete structure column-beam unbonded prestressed node structure and construction method |
| CN117211149A (en) * | 2023-08-17 | 2023-12-12 | 北京城建集团有限责任公司 | A kind of steel-concrete structural type simply supported and then continuous composite beam and its construction method |
| CN117211149B (en) * | 2023-08-17 | 2026-04-17 | 北京城建集团有限责任公司 | A steel-concrete composite beam with a simple-supported-then-continuous structure and its construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103883034B (en) | A kind of fabricated shear wall of belt edge confining part and wall-beam syndeton | |
| CN103243817B (en) | A kind of assembled beam-column attachment means | |
| WO2015131792A1 (en) | Building structure and construction method for same | |
| CN105143570B (en) | Building structure and construction method thereof | |
| CN103397705A (en) | Connection structure of building composite floor slab and steel bar truss shear wall | |
| CN105133791A (en) | Construction method for prefabricated thick plate steel rib concrete column variable cross-section transformation node structure | |
| CN107217787B (en) | Built-in profiled sheet groove structure's assembled even roof beam | |
| CN209260922U (en) | Band girder rib laminated floor slab pre-tensioning system connecting joint structure | |
| CN208618627U (en) | A kind of precast floor slab and its connection structure | |
| CN108571071A (en) | Prefabricated PC beams of concrete column connected node and construction method | |
| CN103981803A (en) | Prefabricated assembled combination type door-shaped pillar and construction method thereof | |
| CN105220792A (en) | A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof | |
| CN208183954U (en) | A kind of prefabricated assembled bean column node construction | |
| CN205975960U (en) | Novel assembled roof beam post nodal connection device | |
| CN205875394U (en) | Antidetonation concrete beam column that dry process is connected | |
| CN109208823A (en) | It is a kind of can quick assembling built-in steel-case formula steel core concrete column and its production technology | |
| CN211548015U (en) | Prefabricated assembled steel-concrete composite beam | |
| CN204357000U (en) | A kind of precast and assembled reinforced concrete spinous process of the seventh cervical vertebra frame | |
| CN104797762B (en) | Building and construction method thereof | |
| CN203905214U (en) | Assembled type blend coupled wall system | |
| CN207647033U (en) | A kind of precast reinforced basket structure | |
| CN208167965U (en) | A kind of prefabricated assembled bean column node construction with connector | |
| CN205224289U (en) | Connection structure of precast concrete roof beam and girder steel | |
| CN208502067U (en) | A kind of partial precast assembly prestress steel reinforced concrete hybrid beam | |
| CN204149320U (en) | The producing device of steel bar framework of box beam |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181204 Termination date: 20210509 |