CN205975960U CN201620891909.5U CN201620891909U CN205975960U CN 205975960 U CN205975960 U CN 205975960U CN 201620891909 U CN201620891909 U CN 201620891909U CN 205975960 U CN205975960 U CN 205975960U
Authority
CN
China
Prior art keywords
steel plate
cavity
column
precast concrete
cuboid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620891909.5U
Other languages
Chinese (zh)
Inventor
张延年
李晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201620891909.5U priority Critical patent/CN205975960U/en
Application granted granted Critical
Publication of CN205975960U publication Critical patent/CN205975960U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型涉及一种新型装配式梁‑柱节点连接装置,属于建筑技术领域,包括一个“钢制长方体空心柱”、“工字钢”以及“带空腔的矩形钢板”;“工字钢”分别与“钢制长方体空心柱”的侧面通过焊接连接,“带空腔的长方体钢板”分别与“工字钢”通过焊接连接;将此连接装置预制到混凝土柱中,与柱形成整体;将与“带空腔的长方体钢板”的空腔厚度相同的“长方体钢板”,预埋到预制混凝土叠合梁中,在连接时将其插入到“空腔”当中,“带空腔的长方体钢板”的两个侧面均设有螺栓孔,以便于连接后的固定,能有效改善施工繁琐、定位难度大、受力性能不足等缺点,具有节点受力性能好、定位精确简单、施工快捷方便等优点,有良好的应用前景。

The utility model relates to a novel assembled beam-column node connection device, which belongs to the field of construction technology and includes a "steel cuboid hollow column", "I-shaped steel" and "rectangular steel plate with cavity";"I-shaped steel " are respectively connected to the side of the "steel cuboid hollow column" by welding, and the "cuboid steel plate with cavity" is respectively connected to the "I-beam" by welding; this connection device is prefabricated into the concrete column to form a whole with the column; The "cuboid steel plate" with the same cavity thickness as the "cuboid steel plate with cavity" is pre-embedded into the precast concrete composite beam, and inserted into the "cavity" when connecting, the "cuboid steel plate with cavity" Bolt holes are provided on both sides of the "steel plate" to facilitate fixing after connection, which can effectively improve the shortcomings of cumbersome construction, difficult positioning, and insufficient mechanical performance. It has good mechanical performance of nodes, accurate and simple positioning, and quick and convenient construction. And other advantages, has a good application prospect.

Description

一种新型装配式梁-柱节点连接装置A new type of prefabricated beam-column joint connection device

技术领域technical field

本实用新型涉及建筑技术领域,特别是涉及一种新型装配式梁-柱节点连接装置。The utility model relates to the technical field of buildings, in particular to a novel assembled beam-column node connection device.

背景技术Background technique

在装配整体式框架结构实际施工过程中,预制构件连接处往往是施工的难点所在,吊装构件不易进行施工定位,进而降低施工质量和装配效率;对装配整体式框架结构而言,梁—柱连接又是施工关键所在,目前梁—柱连接的钢筋连接多采用机械套筒连接、焊接连接或湿式连接等形式;机械套筒连接要求梁端伸出钢筋与柱节点处伸出钢筋精确对中,实际操作中难度较大;焊接连接,需将焊接机械搬运到安装层,焊接过程中的焊缝质量较难控制;湿式连接,节点处的混凝土浇筑量大,同样存在施工效率低的弊病。装配式建筑由于为混凝土结构,要求在预留预埋时,尺寸、位置尽量精确,否则要重新开槽、开洞,增加施工难度,甚至影响结构。In the actual construction process of the assembled integral frame structure, the connection of prefabricated components is often the difficult point of construction, and the hoisting components are not easy to carry out construction positioning, thereby reducing the construction quality and assembly efficiency; for the assembled integral frame structure, the beam-column connection It is also the key point of construction. At present, the reinforcement connection of beam-column connection mostly adopts the form of mechanical sleeve connection, welding connection or wet connection. The actual operation is more difficult; for welding connection, the welding machine needs to be transported to the installation layer, and the quality of the weld seam is difficult to control during the welding process; for wet connection, the amount of concrete poured at the node is large, and there is also the disadvantage of low construction efficiency. As the prefabricated building is a concrete structure, it is required that the size and position should be as accurate as possible when pre-embedding. Otherwise, slots and holes will be re-grooved, which will increase the difficulty of construction and even affect the structure.

实用新型内容Utility model content

针对现有现象造成的弊端,本实用新型提供了一种新型装配式梁-柱节点连接装置,Aiming at the disadvantages caused by the existing phenomenon, the utility model provides a new type of assembled beam-column joint connection device,

该连接装置在起到定位作用的同时,又具有一定的受力能力,可广泛应用于装配整体式框架结构中,采用该装置后,梁柱的安装具有安装简便、易于精确定位、梁下支撑数量大大减少、施工快捷方便、节点受力性能好、不影响节点美观等优点。The connection device not only plays a role in positioning, but also has a certain force-bearing capacity, and can be widely used in the assembly of integral frame structures. The number is greatly reduced, the construction is quick and convenient, the joints have good mechanical performance, and the appearance of the joints is not affected.

本实用新型采用的技术方案如下:The technical scheme that the utility model adopts is as follows:

本实用新型新型装配式梁-柱节点连接装置,包括预制混凝土柱、预制混凝土叠合梁、钢制长方体空心柱、工字钢、带空腔的长方体钢板、预制混凝土叠合梁中预埋的长方体钢板、螺栓孔、全灌浆套筒、预制混凝土柱中的预留钢筋和预制混凝土叠合梁中的预留钢筋;The new assembled beam-column node connection device of the utility model includes prefabricated concrete columns, prefabricated concrete composite beams, steel cuboid hollow columns, I-beams, cuboid steel plates with cavities, and pre-buried in prefabricated concrete composite beams. Cuboid steel plates, bolt holes, fully grouted sleeves, reserved reinforcement in precast concrete columns and reserved reinforcement in precast concrete composite beams;

其中,四块工字钢分别与钢制长方体空心柱的四个侧面通过焊接连接,四个带空腔的长方体钢板分别与四个工字钢连接;将此连接装置预制到混凝土柱中,与柱形成整体;将与带空腔的长方体钢板的空腔厚度相同的长方体钢板,预制到混凝土叠合梁中,与预制混凝土叠合梁形成整体,预制混凝土叠合梁中预埋的长方体钢板和带空腔的长发体钢板的两个侧面均设有螺栓孔,并且螺栓孔的位置要对应,螺栓通过螺栓孔连接预制混凝土叠合梁中预埋的长方体钢板和带空腔的长发体钢板,全灌浆套筒连接预制混凝土柱中的预留钢筋和预制混凝土叠合梁中的预留钢筋。Among them, the four I-beams are respectively connected to the four sides of the steel rectangular hollow column by welding, and the four cuboid steel plates with cavities are respectively connected to the four I-beams; this connecting device is prefabricated into the concrete column, and The column forms a whole; the cuboid steel plate with the same cavity thickness as the cuboid steel plate with cavity is prefabricated into the concrete composite beam, and forms a whole with the precast concrete composite beam, and the pre-embedded cuboid steel plate and Bolt holes are provided on both sides of the long-haired steel plate with a cavity, and the positions of the bolt holes should be corresponding. The bolts connect the pre-embedded cuboid steel plate in the precast concrete composite beam and the long-haired body with a cavity through the bolt holes. Steel plates, fully grouted sleeves connect reserved reinforcement in precast concrete columns and reserved reinforcement in precast concrete composite beams.

所述的钢制长方体空心柱与四个工字钢的连接以及四个带空腔的矩形钢板与四个工字钢的连接均采用焊接连接;The connection between the steel cuboid hollow column and the four I-beams and the connection between the four rectangular steel plates with cavities and the four I-beams are all connected by welding;

所述的预制混凝土叠合梁中预埋的长方体钢板的尺寸、形状、厚度均与带空腔的长方体钢板的空腔形状、尺寸、厚度等相一致;The size, shape and thickness of the pre-embedded cuboid steel plate in the precast concrete composite beam are all consistent with the cavity shape, size and thickness of the cavity cuboid steel plate;

所述的带空腔的长方体钢板和预制混凝土叠合梁中预埋的长方体钢板的两个侧面均设有螺栓孔,并且螺栓孔的位置要对应,以此保证长方体钢板在插入到带空腔的长方体钢板时两者螺栓孔能重合对应;Both sides of the cuboid steel plate with cavity and the pre-embedded cuboid steel plate in the prefabricated concrete composite beam are provided with bolt holes, and the positions of the bolt holes should correspond to ensure that the cuboid steel plate is inserted into the cavity When the cuboid steel plate is used, the bolt holes of the two can coincide and correspond;

所述的长方体钢板插入到空腔中后,需在其一侧的螺栓孔插入螺栓直至在另一侧的螺栓孔中伸出,并加以螺母拧紧,以便于固定住此连接装置;After the cuboid steel plate is inserted into the cavity, a bolt needs to be inserted into the bolt hole on one side until it protrudes from the bolt hole on the other side, and then tightened with a nut so as to fix the connecting device;

所述的预制混凝土柱相连接的梁,采用叠合梁;The beams connected by the prefabricated concrete columns adopt composite beams;

所述的新型装配式梁-柱节点连接装置的预制混凝土柱中预留钢筋,预留钢筋固定设置在预制混凝土柱与预制混凝土叠合梁上,并且预制混凝土柱与预制混凝土叠合梁上的钢筋通过套筒连接;In the prefabricated concrete column of the new prefabricated beam-column node connection device, steel bars are reserved, and the reserved steel bars are fixedly arranged on the precast concrete column and the precast concrete composite beam, and the precast concrete column and the precast concrete composite beam Steel bars are connected by sleeves;

所述的预制混凝土柱上的预留钢筋与预制混凝土叠合梁上的预留钢筋连接采用的全灌浆套筒,灌浆结构在进行灌浆时,要采用其专用的接头灌浆料;灌浆结构在进行养护时,养护龄期不少于28天。The full grouting sleeve used for the connection between the reserved steel bars on the precast concrete columns and the reserved steel bars on the precast concrete composite beams, when the grouting structure is grouted, its special joint grouting material should be used; the grouting structure is being carried out When curing, the curing age is not less than 28 days.

本实用新型的有益效果:The beneficial effects of the utility model:

本实用新型采用新型装配式梁-柱节点连接装置后,梁柱的安装具有安装简便、易于精确定位、梁下支撑数量大大减少、施工快捷方便、节点受力性能好、不影响节点美观等优点,而且新型装配式梁-柱节点连接装置在起到定位作用的同时,又具有一定的受力能力,可广泛应用于装配整体式框架结构中。After the utility model adopts the new assembled beam-column node connection device, the beam-column installation has the advantages of simple installation, easy precise positioning, greatly reduced number of supports under the beam, quick and convenient construction, good mechanical performance of the nodes, and does not affect the beauty of the nodes, etc. , and the new prefabricated beam-column joint connection device not only plays a positioning role, but also has a certain force capacity, and can be widely used in the assembled integral frame structure.

附图说明Description of drawings

图1为所述新型装配式梁-柱节点连接装置在预制混凝土柱和预制混凝土叠合梁中的示意图;图中,1为预制混凝土柱、2为预制混凝土叠合梁、3为钢制长方体空心柱、4为工字钢、5为带空腔的长方体钢板、6为预制混凝土叠合梁中预埋的长方体钢板、7为螺栓孔、8为全灌浆套筒、9为预制混凝土柱中的预留钢筋、10为预制混凝土叠合梁中的预留钢筋、11为螺栓;Fig. 1 is a schematic diagram of the new prefabricated beam-column node connection device in precast concrete columns and precast concrete composite beams; in the figure, 1 is a prefabricated concrete column, 2 is a precast concrete composite beam, and 3 is a steel cuboid Hollow column, 4 is I-beam, 5 is cuboid steel plate with cavity, 6 is cuboid steel plate embedded in precast concrete composite beam, 7 is bolt hole, 8 is full grouting sleeve, 9 is precast concrete column 10 is the reserved steel bar in the precast concrete composite beam, and 11 is the bolt;

图2为使用所述新型装配式梁-柱节点连接装置的梁-柱连接立体示意图;Fig. 2 is a beam-column connection perspective schematic diagram using the novel fabricated beam-column node connection device;

图3为使用所述新型装配式梁-柱节点连接装置的梁-柱连接侧面示意图;图中,11为螺栓;Fig. 3 is a schematic side view of the beam-column connection using the novel fabricated beam-column node connection device; in the figure, 11 is a bolt;

图4为所述新型装配式梁-柱节点连接装置在预制混凝土柱中的位置示意图;Fig. 4 is a schematic diagram of the position of the novel fabricated beam-column node connecting device in the prefabricated concrete column;

图5为所述新型装配式梁-柱节点连接装置中所采用的预制混凝土叠合梁的构造示意图;Fig. 5 is the structure schematic diagram of the prefabricated concrete composite beam adopted in the novel prefabricated beam-column node connecting device;

图6为所述新型装配式梁-柱节点连接装置具体构造示意图。Fig. 6 is a schematic diagram of the specific structure of the novel fabricated beam-column node connection device.

具体实施方式detailed description

以下结合附图和实施例对本实用新型进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

本实施例新型装配式梁—柱节点连接装置如图1、图2、图3、图4、图5和图6所示,包括预制混凝土柱1、预制混凝土叠合梁2、 钢制长方体空心柱3、 工字钢4、 带空腔的长方体钢板5、预制混凝土叠合梁中预埋的长方体钢板6、螺栓孔7、全灌浆套筒8、预制混凝土柱中的预留钢筋9、预制混凝土叠合梁中的预留钢筋10、螺栓11;As shown in Figure 1, Figure 2, Figure 3, Figure 4, Figure 5 and Figure 6, the new prefabricated beam-column joint connection device of this embodiment includes a prefabricated concrete column 1, a prefabricated concrete composite beam 2, a steel cuboid hollow Column 3, I-beam 4, cuboid steel plate with cavity 5, cuboid steel plate pre-embedded in precast concrete composite beam 6, bolt hole 7, full grouting sleeve 8, reserved steel bar in precast concrete column 9, prefabricated Reserved steel bars 10 and bolts 11 in the concrete composite beam;

其中,四块工字钢4分别与钢制长方体空心柱4的四个侧面通过焊接连接,四个带空腔的长方体钢板5分别与四个工字钢4连接;将此连接装置预制到混凝土柱1中,与柱形成整体;将与带空腔的长方体钢板5的空腔厚度相同的长方体钢板6,预制到混凝土叠合梁2中,与预制混凝土叠合梁2形成整体,预制混凝土叠合梁2中预埋的长方体钢板6和带空腔的长发体钢板5的两个侧面均设有螺栓孔7,并且螺栓孔7的位置要对应,螺栓11通过螺栓孔7连接预制混凝土叠合梁2中预埋的长方体钢板6和带空腔的长发体钢板5,全灌浆套筒8连接预制混凝土柱1中的预留钢筋9和预制混凝土叠合梁2中的预留钢筋10。Among them, four I-beams 4 are respectively connected to the four sides of the steel cuboid hollow column 4 by welding, and four cuboid steel plates 5 with cavities are respectively connected to four I-beams 4; the connecting device is prefabricated into the concrete In the column 1, it is integrated with the column; the cuboid steel plate 6 with the same cavity thickness as the cuboid steel plate 5 with the cavity is prefabricated into the concrete composite beam 2, and forms an integral body with the precast concrete composite beam 2, and the precast concrete composite beam Both sides of the pre-embedded cuboid steel plate 6 in the composite beam 2 and the elongated steel plate 5 with a cavity are provided with bolt holes 7, and the positions of the bolt holes 7 should correspond to each other. The cuboid steel plate 6 pre-buried in the composite beam 2 and the elongated steel plate 5 with a cavity, the full grouting sleeve 8 connects the reserved steel bar 9 in the precast concrete column 1 and the reserved steel bar 10 in the precast concrete composite beam 2 .

所述的钢制长方体空心柱3与四个工字钢4的连接以及四个带空腔的矩形钢板5与四个工字钢4的连接均采用焊接连接;The connection between the steel rectangular parallelepiped hollow column 3 and the four I-beams 4 and the connection between the four rectangular steel plates 5 with cavities and the four I-beams 4 all adopt welding connection;

所述的预制混凝土叠合梁2中预埋的长方体钢板6的尺寸、形状、厚度均与带空腔的长方体钢板5的空腔形状、尺寸、厚度等相一致;The size, shape and thickness of the pre-embedded cuboid steel plate 6 in the precast concrete composite beam 2 are consistent with the cavity shape, size and thickness of the cavity cuboid steel plate 5;

所述的带空腔的长方体钢板5和预制混凝土叠合梁2中预埋的长方体钢板6的两个侧面均设有螺栓孔7,并且螺栓孔7的位置要对应,以此保证长方体钢板6在插入到带空腔的长方体钢板5时两者螺栓孔7能重合对应;Both sides of the cuboid steel plate 5 with a cavity and the cuboid steel plate 6 embedded in the precast concrete composite beam 2 are provided with bolt holes 7, and the positions of the bolt holes 7 should correspond to ensure that the cuboid steel plate 6 When inserted into the cuboid steel plate 5 with a cavity, the bolt holes 7 of the two can overlap and correspond;

所述的长方体钢板6插入到空腔中后,需在其一侧的螺栓孔7插入螺栓直至在另一侧的螺栓孔中伸出,并加以螺母拧紧,以便于固定住此连接装置;After the cuboid steel plate 6 is inserted into the cavity, a bolt needs to be inserted into the bolt hole 7 on one side until it protrudes from the bolt hole on the other side, and the nut is tightened to facilitate fixing the connecting device;

所述的预制混凝土柱1相连接的梁,采用叠合梁;The beams connected by the prefabricated concrete columns 1 are composite beams;

所述的新型装配式梁-柱节点连接装置的预制混凝土柱1中预留钢筋9,预留钢筋固定设置在预制混凝土柱1与预制混凝土叠合梁2上,并且预制混凝土柱1与预制混凝土叠合梁2上的钢筋通过套筒8连接;In the prefabricated concrete column 1 of the new prefabricated beam-column node connection device, steel bars 9 are reserved, and the reserved steel bars are fixedly arranged on the precast concrete column 1 and the precast concrete composite beam 2, and the precast concrete column 1 and the precast concrete The steel bars on the composite beam 2 are connected through the sleeve 8;

所述的预制混凝土柱1上的预留钢筋9与预制混凝土叠合梁2上的预留钢筋10连接采用的全灌浆套筒8,灌浆结构在进行灌浆时,要采用其专用的接头灌浆料;灌浆结构在进行养护时,养护龄期不少于28天。The full grouting sleeve 8 used to connect the reserved steel bars 9 on the precast concrete column 1 with the reserved steel bars 10 on the precast concrete composite beam 2, when the grouting structure is grouted, its special joint grouting material should be used ; When the grouting structure is being maintained, the maintenance period should not be less than 28 days.

Claims (2)

1. a kind of novel fabricated beam-column joint attachment means, including precast concrete column, precast concrete composite beam, steel Pre-buried cuboid steel plate, spiral shell in cuboid open tubular column, I-steel, the cuboid steel plate with cavity, precast concrete composite beam The reserved steel bar in reserved steel bar and precast concrete composite beam in keyhole, full grout sleeve, precast concrete column;Wherein, Four blocks of I-steel pass through to be welded to connect with four sides of steel cuboid open tubular column respectively, four cuboid steel plates with cavity It is connected with four I-steel respectively;By prefabricated for this attachment means in concrete column, integral with cylindricality;By with the length with cavity The cavity thickness identical cuboid steel plate of cube steel plate, prefabricated in concrete composite beam, with precast concrete composite beam shape Integral, two sides of pre-buried cuboid steel plate in precast concrete composite beam and the long hair body steel plate with cavity are equipped with Bolt hole, and the position of bolt hole will be corresponding to, bolt is connected pre-buried rectangular in precast concrete composite beam by bolt hole Body steel plate and the long hair body steel plate with cavity, full grout sleeve connects reserved steel bar and precast concrete in precast concrete column Reserved steel bar in composite beam.
2. novel fabricated beam-column joint attachment means according to claim 1 it is characterised in that:Described steel is long The connection of cube open tubular column and four I-steel and four rectangular steel plates with cavity are all adopted with the connection of four I-steel It is welded to connect;
Novel fabricated beam-column joint attachment means according to claim 1 it is characterised in that:Described concrete The size of cuboid steel plate pre-buried in native composite beam, shape, cavity shape, chi all with the cuboid steel plate with cavity for the thickness Very little, thickness etc. is consistent;
Novel fabricated beam-column joint attachment means according to claim 1 it is characterised in that:Described with cavity In cuboid steel plate and precast concrete composite beam, two sides of pre-buried cuboid steel plate are equipped with bolt hole, and bolt The position in hole will be corresponding to, with this ensure cuboid steel plate when being inserted into the cuboid steel plate with cavity both bolt hole can overlap Corresponding;
Novel fabricated beam-column joint attachment means according to claim 1 it is characterised in that:Described cuboid steel After plate is inserted in cavity, bolt need to be inserted until stretching out in the bolt hole of opposite side by the bolt hole in its side, and in addition Nut screwing clamping, in order to fix this attachment means;
Novel fabricated beam-column joint attachment means according to claim 1 it is characterised in that:Described concrete The beam that earth pillar is connected, using composite beam;
Novel fabricated beam-column joint attachment means according to claim 1 it is characterised in that:Described new assembling Reserved steel bar in the precast concrete column of formula beam-column joint attachment means, reserved steel bar be fixedly installed on precast concrete column with On precast concrete composite beam, and precast concrete column passes through sleeve connection with the reinforcing bar on precast concrete composite beam;
Novel fabricated beam-column joint attachment means according to claim 1 it is characterised in that:Described concrete The full grout sleeve that reserved steel bar on reserved steel bar on earth pillar and precast concrete composite beam is connected by, grouting structure exists When being in the milk, its special joint grouting material to be adopted;When carrying out maintenance, curing age is no less than 28 days grouting structure.
CN201620891909.5U 2016-08-17 2016-08-17 Novel assembled roof beam post nodal connection device Withdrawn - After Issue CN205975960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620891909.5U CN205975960U (en) 2016-08-17 2016-08-17 Novel assembled roof beam post nodal connection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620891909.5U CN205975960U (en) 2016-08-17 2016-08-17 Novel assembled roof beam post nodal connection device

Publications (1)

Publication Number Publication Date
CN205975960U true CN205975960U (en) 2017-02-22

Family

ID=58030761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620891909.5U Withdrawn - After Issue CN205975960U (en) 2016-08-17 2016-08-17 Novel assembled roof beam post nodal connection device

Country Status (1)

Country Link
CN (1) CN205975960U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284654A (en) * 2016-08-17 2017-01-04 沈阳建筑大学 Novel fabricated beam column node connection device
CN108342937A (en) * 2018-03-14 2018-07-31 安徽省交通控股集团有限公司 A kind of prefabricated pier, the floated tubular Crossing brace connection structure of plate
CN110552423A (en) * 2018-05-30 2019-12-10 罗大威 Dry method connecting joint for assembling type building concrete beam, column and concrete node member
CN112359966A (en) * 2020-10-27 2021-02-12 广州地铁设计研究院股份有限公司 Connecting joint of superposed beam and concrete column and construction method thereof
CN113323268A (en) * 2021-05-25 2021-08-31 江苏大学 Section steel connecting joint between assembled beams and construction method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284654A (en) * 2016-08-17 2017-01-04 沈阳建筑大学 Novel fabricated beam column node connection device
CN106284654B (en) * 2016-08-17 2019-02-26 沈阳建筑大学 Prefabricated beam-column connection device
CN108342937A (en) * 2018-03-14 2018-07-31 安徽省交通控股集团有限公司 A kind of prefabricated pier, the floated tubular Crossing brace connection structure of plate
CN108342937B (en) * 2018-03-14 2024-03-01 安徽省交通控股集团有限公司 Prefabricated pier and plate suspension type cylindrical shear support connection structure
CN110552423A (en) * 2018-05-30 2019-12-10 罗大威 Dry method connecting joint for assembling type building concrete beam, column and concrete node member
CN112359966A (en) * 2020-10-27 2021-02-12 广州地铁设计研究院股份有限公司 Connecting joint of superposed beam and concrete column and construction method thereof
CN112359966B (en) * 2020-10-27 2022-04-29 广州地铁设计研究院股份有限公司 Connecting joint of superposed beam and concrete column and construction method thereof
CN113323268A (en) * 2021-05-25 2021-08-31 江苏大学 Section steel connecting joint between assembled beams and construction method thereof

Similar Documents

Publication Publication Date Title
CN106284654A (en) Novel fabricated beam column node connection device
CN103883034B (en) A kind of fabricated shear wall of belt edge confining part and wall-beam syndeton
CN102995756B (en) Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method
CN103184762B (en) Multi-story/high-rise fabricated steel structural prestressed supporting system capable of realizing rigid connection of joints
CN105780923A (en) Assembly structure of prefabricated concrete beam and concrete-filled steel tube column
CN202925762U (en) Novel reinforced concrete superposed beam
CN106284655B (en) Precast concrete beam stud connects connecting node and connection method
CN105133791A (en) Construction method for prefabricated thick plate steel rib concrete column variable cross-section transformation node structure
CN115680116B (en) Assembled frame beam column connection node and construction method thereof
CN103696514A (en) T-frame component and lightweight concrete body fabricated shear wall and connection structure thereof
CN108625477A (en) A kind of assembled beam-column node and its construction method
CN111335464A (en) A beam-column connection node of a prefabricated concrete structure and its construction method
CN102912862A (en) Prefabricated assembly type frame-shear wall-beam plane outer connection structure
CN107869150A (en) A kind of prefabrication and assembly construction post and reinforced concrete foundation attachment structure and construction method
CN114000585A (en) Precast concrete beam column connecting joint and connecting method
CN108252407A (en) A building with prefabricated reinforced concrete supports
CN106759858B (en) A kind of connecting node and preparation method of H profile steel beam and rectangular steel-tube concrete column
CN115030315A (en) Semi-prefabricated angle steel framework type concrete column-beam column joint and construction method
CN204753812U (en) Reinforced concrete frame structure
CN103711232A (en) L-shaped frame component and lightweight concrete wall prefabricated type shear wall and connection construction method
CN205637120U (en) Assembly structure of precast concrete beam and steel core concrete column
CN204357000U (en) A kind of precast and assembled reinforced concrete spinous process of the seventh cervical vertebra frame
CN208183954U (en) A kind of prefabricated assembled bean column node construction
CN103696513A (en) Prefabricated shear wall with crossed frame member and lightweight concrete wall bodies and connection construction method
CN107366354A (en) Prefabricated PC beam column dry method connecting node

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170222

Effective date of abandoning: 20190226

AV01 Patent right actively abandoned