CN208183557U - A kind of prestressed fiber cloth reinforced device - Google Patents

A kind of prestressed fiber cloth reinforced device Download PDF

Info

Publication number
CN208183557U
CN208183557U CN201721457077.7U CN201721457077U CN208183557U CN 208183557 U CN208183557 U CN 208183557U CN 201721457077 U CN201721457077 U CN 201721457077U CN 208183557 U CN208183557 U CN 208183557U
Authority
CN
China
Prior art keywords
anchor slab
fiber cloth
clamping plate
ground tackle
tension ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721457077.7U
Other languages
Chinese (zh)
Inventor
卢春玲
李中洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guilin University of Technology
Original Assignee
Guilin University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guilin University of Technology filed Critical Guilin University of Technology
Priority to CN201721457077.7U priority Critical patent/CN208183557U/en
Application granted granted Critical
Publication of CN208183557U publication Critical patent/CN208183557U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of prestressed fiber cloth reinforced devices.The device includes two anchor slabs, two clamping plates, two tension ground tackles, two tensioning screw rods, two anchorage screws and fiber cloth.Fiber cloth winds 2 circles on anchor slab, and anchor slab is fixedly connected with clamping plate by stove bolt, and fiber cloth winds 2 circles on anchor slab and clamping plate.Anchor slab, clamping plate and tension ground tackle are fixedly connected by king-bolt.Tensioning screw rod is penetrated from the tensioning screw hole of tension ground tackle, tightens tensioning screw rod.Anchorage screw is worn to the anchorage screw hole in anchor slab.It synchronizes and tightens anchorage screw.Finally, unscrewing the king-bolt between tension ground tackle and clamping plate, tension ground tackle and tensioning screw rod are unloaded.The utility model consolidation effect is good, and simple structure is easy to operate.Tensioning screw rod and tension ground tackle are dismountable and reuse, save the cost.

Description

A kind of prestressed fiber cloth reinforced device
Technical field
The utility model belongs to the structural strengthenings such as science of bridge building, architectural engineering field, in particular to a kind of reinforced steel is mixed The prestressed fiber cloth reinforced device of the detachable tension ground tackle of solidifying knoll column.
Background technique
The local damage of building and bridge pier column due to structure, the reasons such as aging of material, so that original component can not The requirement for meeting bearing capacity needs to carry out reinforcement and strengthening to it.When reinforcing, by providing lateral confinement power to pier stud, make coagulation Soil is in three dimension stress state, to improve the ultimate bearing capacity and ductility of concrete.Currently, common prestressed reinforcement pier stud Method have prestress steel cuff, steel band, fiber cloth, steel strand wires etc..Relative to traditional reinforcement material, fiber-reinforced composite material Expect that (Fiber Reinforced Plastics, abbreviation FRP) has tensile strength high, elasticity modulus is high, and it is corrosion-resistant, it is good It the advantages that designability and work strong operability, is widely applied in steel bar concrete reinforcement.Common FRP material is to concrete The constraint of component belongs to " passive bound ", and only in the case where concrete sufficiently expands, FRP material just starts to play effect of contraction, deposits It is not in full use in the high-strength performance of a degree of Stress resort, FRP material.Pre-stress FRP cloth reinforcement technique is one Kind active reinforcement means, using the high-strength characteristic of FRP, the three dimension stress shape so that the concrete column of hoop constraint has the initiative State improves bearing capacity, shock resistance, energy dissipation capacity, the ductile performance of performance of concrete column confined.
Currently, the stretching and anchoring device of pre-stressed fiber cloth cloth reinforced concrete pier stud is mostly permanent, tension ground tackle Not reproducible utilization, higher cost.And anchorage is exposed at pier stud surface, not only influencing its durability also has centainly constructional appearance It influences.In addition, in common tension ground tackle fibre cloth winding be wound on intermediate plate perhaps on roller bearing when fiber cloth is wider or prestressing force compared with Greatly, intermediate plate or roller bearing bending deformation are larger when tensioning, so that expection is not achieved in fiber cloth prestress value.
Utility model content
The purpose of this utility model is to provide a kind of prestressed fiber cloth reinforced devices, using the device to fiber cloth After drawing anchoring, tension ground tackle can be easy to dismantle and be reused, save the cost;And pier stud does not have exposed anchorage after reinforcing, no Influence the appearance for being reinforced pier stud.Tension ground tackle rigidity is sufficiently large, it can be achieved that the biggish reinforcing of fiber cloth prestressing force, improves material Utilization rate.
In order to achieve the above purpose, technical scheme of the utility model is as follows: it is a kind of prestressed fiber cloth reinforced Device, including two anchor slabs, two clamping plates, two tension ground tackles, two tensioning screw rods, two anchorage screws and fiber cloth;Anchor Plate is made of the anchor slab anchor head and anchor slab body at both ends, and the anchor slab anchor head center at anchor slab both ends is each along fiber cloth package direction is parallel to An anchorage screw hole is opened, is descended with anchor slab at the center of both ends and opens anchor slab mounting hole perpendicular to fiber cloth direction;Anchor slab mounting hole Respectively open two tension ground tackle mounting holes in two sides;Both ends are perpendicular to anchor slab mounting hole pair with fiber cloth direction and anchor slab above and below clamping plate Position is answered to open clamping plate mounting hole and two tension ground tackle mounting holes, anchor slab body and clamping plate are along fiber cloth package direction both ends inverted arc Angle, tension ground tackle upper and lower ends open up two tension ground tackle mounting holes perpendicular to each correspondence in fiber cloth direction, and tension ground tackle is along flat Row opens up two tensioning screw rod holes in fiber cloth package direction.
The cutting within the scope of anchor slab body and clamping plate package fiber cloth, slot opening 2mm, groove depth 1mm, clear distance between slot and slot The notch position of 4mm, anchor slab body and clamping plate tow sides is interlaced.
Fiber cloth is wound to 2 circles with the anchor slab of anchor slab.Clamping plate is placed on anchor slab, and the anchor slab of the two is installed Hole and the alignment of clamping plate mounting hole, the clamping plate mounting hole that stove bolt passes through on anchor slab mounting hole and clamping plate on anchor slab fix the two Connection;Fiber cloth continues around 2 circle of anchor slab and clamping plate winding.Tension ground tackle is placed on clamping plate and by the tension ground tackle of the two Mounting hole alignment, king-bolt passes through tension ground tackle, three is fixedly connected by clamping plate with the tension ground tackle mounting hole on anchor slab;It will be with The fiber cloth that anchor slab, clamping plate and tension ground tackle connect surround and is reinforced Reinforced Concrete Pier Column one week.
Two tensioning screw rods are arranged in respectively in two tensioning screw rod holes of tension ground tackle or more.It synchronizes and tightens two tensioning Screw rod applies prestressing force to fiber cloth.Two anchorage screws are arranged in the anchorage screw hole in the anchor slab anchor head at anchor slab both ends respectively It is interior.It synchronizes and tightens two anchorage screws to keep the prestressing force in fiber cloth.
Anchor slab body and clamping plate plate thickness are 6 millimeters, and 50 millimeters of width, length is depending on the width of wrapped up in fiber cloth.Tensioning For anchorage with a thickness of 30 millimeters, width is 50 millimeters.The diameter of tensioning screw rod is 10 millimeters, and the diameter of anchorage screw is 16 millimeters. The diameter of king-bolt is 10 millimeters.The diameter of stove bolt is 5 millimeters.
After adopting the above technical scheme, being compared with prior art, the advantages of the utility model are as follows: (1) utilize this reality With novel dismountable pre-stressed fiber cloth stretching and anchoring device to fiber cloth stretch-draw anchor after, tension ground tackle and tensioning screw rod Can be easy to dismantle, it reuses, save the cost.And the Reinforced Concrete Pier Column cosmetic variation after reinforcing is little.(2) anchor slab and folder Cutting in plate face increases its frictional force between fiber cloth, improves anchorage to the clamping effect of fiber cloth, with package fibre The measure that dipping adhesive glue is smeared when tieing up cloth combines, and can effectively avoid the sliding phenomenon in fiber cloth stretching process.(3) tensioning Device is mutually separated with anchor, and tension ground tackle rigidity is sufficiently large, can avoid the anchorage when prestressing force is larger in stretching process Deformation is big, makes fiber cloth prestress value that expected problem be not achieved.(4) pre-stressed fiber cloth stretching and anchoring device construction letter It is single, easy to operate, save the cost.
Detailed description of the invention
Fig. 1 is that the pre-stressed fiber cloth in the utility model embodiment 1 when reinforcing Reinforced Concrete Pier Column and being square column adds Gu final use state diagram.
Fig. 2 be pre-stressed fiber cloth in the utility model embodiment 1 when reinforcing Reinforced Concrete Pier Column and being square column most Whole use state plan view.
Fig. 3 is that the pre-stressed fiber cloth in the utility model embodiment 1 when reinforcing Reinforced Concrete Pier Column and being square column adds Gu stretch-draw anchor status diagram.
Fig. 4 is the pre-stressed fiber cloth in the utility model embodiment 1 when reinforcing Reinforced Concrete Pier Column and being square column Draw anchoring status plan view.
Fig. 5 is that the pre-stressed fiber cloth in the utility model embodiment 2 when reinforcing Reinforced Concrete Pier Column and being cylinder adds Gu final use state diagram.
Fig. 6 be pre-stressed fiber cloth in the utility model embodiment 2 when reinforcing Reinforced Concrete Pier Column and being cylinder most Whole use state plan view.
Fig. 7 be pre-stressed fiber cloth in the utility model embodiment 2 when reinforcing Reinforced Concrete Pier Column and being cylinder most Whole use state elevation.
Fig. 8 is that the pre-stressed fiber cloth in the utility model embodiment 2 when reinforcing Reinforced Concrete Pier Column and being cylinder adds Gu stretch-draw anchor status diagram.
Fig. 9 is the pre-stressed fiber cloth in the utility model embodiment 2 when reinforcing Reinforced Concrete Pier Column and being cylinder Draw anchoring status plan view.
Figure 10 is the structural schematic diagram of anchor slab and anchorage screw in the utility model embodiment.
Figure 11 is the structural schematic diagram of the utility model embodiment middle clamp plate and stove bolt.
Figure 12 is the schematic diagram of the section structure of anchor slab body and clamping plate in the utility model embodiment.
Figure 13 is the structural schematic diagram of tension ground tackle, tensioning screw rod and king-bolt in the utility model embodiment.
Figure 14 is the fiber cloth schematic diagram that anchor slab, clamping plate and tension ground tackle are connected in the utility model embodiment 2.
Marked in the figure: 1- anchor slab;11- anchor slab anchor head;12- anchor slab body;111- anchorage screw hole;121- anchor slab mounting hole; 122- tension ground tackle mounting hole;2- clamping plate;21- stove bolt;22- notch;23- clamping plate mounting hole;3- tension ground tackle;31- tensioning Screw hole;32- king-bolt;4- tensioning screw rod;5- anchorage screw;6- fiber cloth;7- reinforced concrete square columns;8- reinforced concrete Native cylinder.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
Embodiment 1:
As shown in Fig. 1,2,3,4,10,11,12,13, the present embodiment is to reinforce object with reinforced concrete square columns 7, is utilized A kind of dismountable pre-stressed fiber cloth stretching and anchoring device of tension ground tackle reinforces it, and the width of fiber cloth 6 is 150mm.It is specific as follows:
A kind of prestressed fiber cloth reinforced device, it is characterised in that the device includes two anchor slabs, 1, two clamping plate 2, two 3, two tensioning screw rods 4 of a tension ground tackle and for keeping prestressed two anchorage screws 5 and fiber cloth 6;Anchor slab 1 is by two The anchor slab anchor head 11 and anchor slab body 12 at end form, and direction is wrapped up along fiber cloth 6 is parallel in 11 center of anchor slab anchor head at 1 both ends of anchor slab It respectively opens an anchorage screw hole 111, opens anchor slab mounting hole 121 perpendicular to 6 direction of fiber cloth at about 12 both ends center of anchor slab body; Respectively open two tension ground tackle mounting holes 122 in 121 two sides of anchor slab mounting hole;About 2 both ends of clamping plate are perpendicular to 6 direction of fiber cloth and anchor 121 corresponding position of anchor slab mounting hole opens clamping plate mounting hole 23 and two tension ground tackle mounting holes 122, anchor slab body 12 on plate body 12 Direction both ends inverted arc angle is wrapped up along fiber cloth 6 with clamping plate 2, in case it scratches fiber cloth 6.3 upper and lower ends of tension ground tackle perpendicular to Each correspondence in 6 direction of fiber cloth opens up two tension ground tackle mounting holes 122.Tension ground tackle 3 is opened along the package of fiber cloth 6 direction is parallel to If two tensioning screw rod holes 31.
Cutting in 6 range of fiber cloth, notch 22 width 2mm, groove depth 1mm, between slot and slot are wrapped up in anchor slab body 12 and clamping plate 2 Clear distance 4mm.Notice that the notch position of 2 tow sides of anchor slab body 12 and clamping plate is interlaced when cutting.
The steel plate is all made of Q235B grades and the above high-quality steel, wherein 2 plate of anchor slab body 12 and clamping plate with a thickness of 6 milli Rice, width are 50 millimeters, and length is depending on the width of wrapped up in fiber cloth 6.Tension ground tackle 3 uses aluminium alloy, with a thickness of 30 Millimeter, width are 50 millimeters.Tensioning screw rod 4 and anchorage screw 5 are all made of 12.9 grades of high-strength bolt, anti-shearing stress levels For 12.9GPa.The diameter of tensioning screw rod 4 is 10 millimeters, and the diameter of anchorage screw 5 is 16 millimeters.The diameter of king-bolt 32 is 10 Millimeter.The diameter of stove bolt 21 is 5 millimeters.
Steps are as follows for specific reinforcing:
(1) the reinforcing position on reinforced concrete square columns 7 is determined;With the line of ink marker, on its surface, pop-up need to carry out prestressing force carbon fiber The position range of Wei Bu package.The four corners of reinforced concrete square columns 7 are subjected to polishing chamfering with sander.
(2) it is polished 7 surface of reinforced concrete square columns, the processing such as filling-up hole.It needs to carry out in reinforced concrete square columns 7 Pre-stressed fiber cloth package boundary surface uniformly brushes one layer of epoxy adhesive layer.
(3) cutting length of fiber cloth 6 and cutting are determined.The perimeter of column at cutting length=parcel location of fiber cloth 6+ 4 times of the perimeter of clamping plate.
(4) cutting length of FRP cloth 4 and cutting are determined.Perimeter+bottom of column at carbon cloth cutting length=parcel location 1-2 times of the perimeter of plate.
(5) anchor slab body 12 and 2 surface of clamping plate uniformly apply glue, wind on anchor slab body 12 after 6 both ends gluing of fiber cloth 2 circles.Clamping plate 2 is placed on anchor slab 1, and the anchor slab mounting hole 121 of the two and clamping plate mounting hole 23 are aligned, stove bolt 21 is worn The two is fixedly connected by the anchor slab mounting hole 121 crossed on anchor slab 1 with the clamping plate mounting hole 23 on clamping plate 2;Fiber cloth 6 continue around 2 circle of anchor slab 1 and the winding of clamping plate 2, every one circle of winding check whether fiber cloth 6 is wrapped, do not smear the local coating of dipping adhesive glue.
(6) tension ground tackle 3 is placed on clamping plate 2 and is aligned the tension ground tackle mounting hole 122 of the two, king-bolt 32 is worn Cross tension ground tackle 3, three is fixedly connected by clamping plate 2 with the tension ground tackle mounting hole 122 on anchor slab 1.
(7) after the colloid solidification to be wound in the fiber cloth of anchor slab body 12 and clamping plate 2, will with anchor slab 1, clamping plate 2 and The fiber cloth 6 for drawing anchorage 3 to connect surround and is reinforced reinforced concrete square columns 7 one weeks.Two tensioning screw rods 4 are arranged in respectively In about 3 two tensioning screw rod holes 31 of tension ground tackle.It synchronizes and tightens two tensioning screw rods 4 to the application prestressing force of fiber cloth 6.
(8) after the prestressing force for being applied to fiber cloth 6 reaches predeterminated level.Dipping glue is filled into 6 surface of fiber cloth, And infiltrate it sufficiently.Two anchorage screws 5 are arranged in the anchorage screw hole 111 in the anchor slab anchor head 11 at 1 both ends of anchor slab respectively It is interior.It synchronizes and tightens two anchorage screws 5 to keep the prestressing force in fiber cloth 6.
(9) after the colloid solidification in fiber cloth 6, unscrew the king-bolt 32 between tension ground tackle 3 and clamping plate 2, unload and open Draw anchorage 3 and tensioning screw rod 4.Complete the reinforcing to reinforced concrete square columns 7.
Embodiment 2:
As shown in Fig. 5-14, the present embodiment is to reinforce object with Reinforced Concrete Circular Cylinder 8, removable using a kind of tension ground tackle The pre-stressed fiber cloth stretching and anchoring device unloaded reinforces it, and the width of fiber cloth 6 is 150mm.It is specific as follows:
A kind of prestressed fiber cloth reinforced device, it is characterised in that the device includes two anchor slabs, 1, two clamping plate 2, two 3, two tensioning screw rods 4 of a tension ground tackle and for keeping prestressed two anchorage screws 5 and fiber cloth 6;Anchor slab 1 is by two The anchor slab anchor head 11 and anchor slab body 12 at end form, and direction is wrapped up along fiber cloth 6 is parallel in 11 center of anchor slab anchor head at 1 both ends of anchor slab It respectively opens an anchorage screw hole 111, opens anchor slab mounting hole 121 perpendicular to 6 direction of fiber cloth at about 12 both ends center of anchor slab body; Respectively open two tension ground tackle mounting holes 122 in 121 two sides of anchor slab mounting hole;About 2 both ends of clamping plate are perpendicular to 6 direction of fiber cloth and anchor 121 corresponding position of anchor slab mounting hole opens clamping plate mounting hole 23 and two tension ground tackle mounting holes 122, anchor slab body 12 on plate body 12 Direction both ends inverted arc angle is wrapped up along fiber cloth 6 with clamping plate 2, in case it scratches fiber cloth 6.3 upper and lower ends of tension ground tackle perpendicular to Each correspondence in 6 direction of fiber cloth opens up two tension ground tackle mounting holes 122.Tension ground tackle 3 is opened along the package of fiber cloth 6 direction is parallel to If two tensioning screw rod holes 31.
Cutting in 6 range of fiber cloth, notch 22 width 2mm, groove depth 1mm, between slot and slot are wrapped up in anchor slab body 12 and clamping plate 2 Clear distance 4mm.Notice that the notch position of 2 tow sides of anchor slab body 12 and clamping plate is interlaced when cutting.
The steel plate is all made of Q235B grades and the above high-quality steel, and wherein anchor slab body 12 and 2 plate thickness of clamping plate are 6 millimeters, Width is 50 millimeters, and length is depending on the width of wrapped up in fiber cloth 6.Tension ground tackle 3 uses aluminium alloy, with a thickness of 30 millis Rice, 50 millimeters of width.Tensioning screw rod 4 and anchorage screw 5 are all made of 12.9 grades of high-strength bolt, and anti-shearing stress levels are 12.9GPa.The diameter of tensioning screw rod 4 is 10 millimeters, and the diameter of anchorage screw 5 is 16 millimeters.The diameter of king-bolt 32 is 10 millis Rice.21 diameters of stove bolt are 5 millimeters.
Steps are as follows for specific reinforcing:
(1) it is polished 8 surface of Reinforced Concrete Circular Cylinder, the processing such as filling-up hole.It needs to carry out in Reinforced Concrete Circular Cylinder 8 Pre-stressed fiber cloth package boundary surface uniformly brushes one layer of epoxy adhesive layer.
(2) cutting length of fiber cloth 6 and cutting are determined.The perimeter of column at cutting length=parcel location of fiber cloth 6+ 4 times of the perimeter of clamping plate.
(3) cutting length of FRP cloth 4 and cutting are determined.Perimeter+bottom of column at carbon cloth cutting length=parcel location 1-2 times of the perimeter of plate.
(4) anchor slab body 12 and 2 surface of clamping plate uniformly apply glue, wind on anchor slab body 12 after 6 both ends gluing of fiber cloth 2 circles.Clamping plate 2 is placed on anchor slab 1, and the anchor slab mounting hole 121 of the two and clamping plate mounting hole 23 are aligned, stove bolt 21 is worn The two is fixedly connected by the anchor slab mounting hole 121 crossed on anchor slab 1 with the clamping plate mounting hole 23 on clamping plate 2;Fiber cloth 6 continue around 2 circle of anchor slab 1 and the winding of clamping plate 2, every one circle of winding check whether fiber cloth 6 is wrapped, do not smear the local coating of dipping adhesive glue.
(5) tension ground tackle 3 is placed on clamping plate 2 and is aligned the tension ground tackle mounting hole 122 of the two, king-bolt 32 is worn Cross tension ground tackle 3, three is fixedly connected by clamping plate 2 with the tension ground tackle mounting hole 122 on anchor slab 1.
(6) after the colloid solidification to be wound in the fiber cloth of anchor slab body 12 and clamping plate 2, will with anchor slab 1, clamping plate 2 and The fiber cloth 6 for drawing anchorage 3 to connect surround and is reinforced Reinforced Concrete Circular Cylinder 8 one weeks.Two tensioning screw rods 4 are arranged in respectively In about 3 two tensioning screw rod holes 31 of tension ground tackle.It synchronizes and tightens two tensioning screw rods 4 to the application prestressing force of fiber cloth 6.
(7) after the prestressing force for being applied to fiber cloth 6 reaches predeterminated level.Dipping glue is filled into 6 surface of fiber cloth, And infiltrate it sufficiently.Two anchorage screws 5 are arranged in the anchorage screw hole 111 in the anchor slab anchor head 11 at 1 both ends of anchor slab respectively It is interior.It synchronizes and tightens two anchorage screws 5 to keep the prestressing force in fiber cloth 6.
(8) after the colloid solidification in fiber cloth 6, unscrew the king-bolt 32 between tension ground tackle 3 and clamping plate 2, unload and open Draw anchorage 3 and tensioning screw rod 4.Complete the reinforcing to Reinforced Concrete Circular Cylinder 8.
Specific embodiment described herein is given an example to the spirit of the present invention.Belonging to the utility model Those skilled in the art can do the similar mode of certain modify or supplement or adopts to described specific embodiment and substitute, But without departing from the spirit of the present application or beyond the scope of the appended claims.

Claims (1)

1. a kind of prestressed fiber cloth reinforced device, it is characterised in that the device includes two anchor slabs (1), two clamping plates (2), two A tension ground tackle (3), two tensioning screw rods (4), two anchorage screws (5) and fiber cloth (6);Anchor slab (1) by both ends anchor slab Anchor slab anchor head (11) center edge of anchor head (11) and anchor slab body (12) composition, anchor slab (1) both ends is parallel to fiber cloth (6) package side To respectively opening an anchorage screw hole (111), anchor slab body (12) opens anchor slab peace perpendicular to fiber cloth (6) direction at the center of both ends up and down It fills hole (121);Respectively open two tension ground tackle mounting holes (122) in anchor slab mounting hole (121) two sides;Both ends are vertical up and down for clamping plate (2) Clamping plate mounting hole (23) and two are opened in anchor slab mounting hole (121) corresponding position on fiber cloth (6) direction and anchor slab body (12) It draws anchorage installation hole (122), anchor slab body (12) and clamping plate (2) are along fiber cloth (6) package direction both ends inverted arc angle, tension ground tackle (3) upper and lower ends open up two tension ground tackle mounting holes (122), tension ground tackle (3) edge perpendicular to each correspondence in fiber cloth (6) direction It is parallel to fiber cloth (6) package direction and opens up two tensioning screw rod holes (31);
Cutting, notch (22) width 2mm, groove depth 1mm, slot and slot in anchor slab body (12) and clamping plate (2) package fiber cloth (6) range Between clear distance 4mm;The notch position of anchor slab body (12) and clamping plate (2) tow sides is interlaced;
Fiber cloth (6) is wound to 2 circles on the anchor slab body (12) of anchor slab (1), clamping plate (2) is placed on anchor slab (1), and by two The anchor slab mounting hole (121) and clamping plate mounting hole (23) of person is aligned, and stove bolt (21) passes through the anchor slab mounting hole on anchor slab (1) (121) the two is fixedly connected with the clamping plate mounting hole (23) on clamping plate (2);Fiber cloth (6) continues around anchor slab (1) and clamping plate (2) tension ground tackle (3) is placed on clamping plate (2) and is aligned the tension ground tackle mounting hole (122) of the two, big spiral shell by 2 circle of winding Bolt (32) passes through tension ground tackle (3), three is fixedly connected by clamping plate (2) with the tension ground tackle mounting hole (122) on anchor slab (1); The fiber cloth (6) connected with anchor slab (1), clamping plate (2) and tension ground tackle (3) is surround and is reinforced Reinforced Concrete Pier Column (7) One week;
Two tensioning screw rods (4) are arranged in tension ground tackle (3) respectively, and two tensioning screw rod holes (31) are interior up and down, synchronize and tighten two Root tensioning screw rod (4);Two anchorage screws (5) are arranged in the anchorage screw in the anchor slab anchor head (11) at anchor slab (1) both ends respectively In hole (111), synchronizes and tighten two anchorage screws (5);
Anchor slab body (12) and clamping plate (2) plate thickness are 6 millimeters, and width is 50 millimeters, length according to the width of wrapped up in fiber cloth (6) and It is fixed;Tension ground tackle (3) with a thickness of 30 millimeters, width is 50 millimeters;The diameter of tensioning screw rod (4) is 10 millimeters, anchorage screw (5) diameter is 16 millimeters, and the diameter of king-bolt (32) is 10 millimeters, and the diameter of stove bolt (21) is 5 millimeters.
CN201721457077.7U 2017-11-05 2017-11-05 A kind of prestressed fiber cloth reinforced device Expired - Fee Related CN208183557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721457077.7U CN208183557U (en) 2017-11-05 2017-11-05 A kind of prestressed fiber cloth reinforced device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721457077.7U CN208183557U (en) 2017-11-05 2017-11-05 A kind of prestressed fiber cloth reinforced device

Publications (1)

Publication Number Publication Date
CN208183557U true CN208183557U (en) 2018-12-04

Family

ID=64442455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721457077.7U Expired - Fee Related CN208183557U (en) 2017-11-05 2017-11-05 A kind of prestressed fiber cloth reinforced device

Country Status (1)

Country Link
CN (1) CN208183557U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359380A (en) * 2019-08-09 2019-10-22 上海悍马建筑科技有限公司 The three-dimensional tensioning equipment of concrete foundation cushion cap prestressing force

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359380A (en) * 2019-08-09 2019-10-22 上海悍马建筑科技有限公司 The three-dimensional tensioning equipment of concrete foundation cushion cap prestressing force

Similar Documents

Publication Publication Date Title
CN106382011B (en) Concrete structure pre-stressed carbon fiber plate tensioning rollering fastening system and method
CN102808517B (en) The prestress application device of the outer FRP muscle of reinforced concrete slab
CN108843037A (en) A kind of prestressed fiber cloth reinforced girder tensioning anchor and its construction method
CN102644384B (en) Anchoring device for reinforcing reinforced concrete beam by using FRP (Fiber Reinforce Plastic) strip and using method thereof
CN107905126A (en) A kind of detachable pre-stressed fiber cloth stretching and anchoring device
CN107794849A (en) Using the construction method of the prestressed fiber cloth reinforced post of detachable tension ground tackle
CN204311761U (en) A kind of prestressed carbon cloth reinforced concrete column tensioning equipment
CN107059665A (en) A kind of method of utilization pre-stress FRP cloth reinforced steel concrete pier stud
CN101074578B (en) Special anchoros for wedged variable-corrugated clamped sheets
CN104895251A (en) Wraparound type waveform anchor for fiber sheets and pre-tensioning method thereof
CN107842210A (en) The construction package and its method for applying prestressing force of CFRP plate multi-point support prestressed reinforcements
CN204357147U (en) The composite reinforcing structure of prestressed reinforced concrete construction flexural member
CN202745405U (en) Prestress application device for FRP ribs outside reinforced concrete slab body
CN101929131B (en) Method for reinforcing bonded prestressing force of transversely tensioning epoxy coating reinforcing steel bar of concrete beam slab
CN109025353A (en) A kind of device and construction method of pre-stress FRP sheet material reinforcement of rc beam
CN107268459A (en) A kind of construction method of prestressed fiber cloth reinforced Reinforced Concrete Pier Column
CN107059663A (en) A kind of device of utilization pre-stress FRP cloth reinforced steel concrete pier stud
CN208183557U (en) A kind of prestressed fiber cloth reinforced device
CN104100100B (en) The method of Tests of Reinforced Concrete Beams Strengthened With Cfrp-laminate is drawn in micro-varicose
CN103291082A (en) Wood beam reinforcing body external pre-stress construction method
CN205857786U (en) A kind of device using pre-stressed carbon fiber plate reinforcement
CN208857720U (en) A kind of prestressing force metal composite muscle reinforcement bridge structure
CN108252228A (en) A kind of prestressed fiber cloth reinforced device for reinforced steel concrete pier stud
CN203007855U (en) Stretch-draw anchoring system of pre-stress fiber composite plate
CN202047353U (en) Concrete bridge body of expressway or railway and prestressed concrete continuous box girder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181204

Termination date: 20211105