CN208183509U - A kind of bridge that civil small-scale quickly splices - Google Patents

A kind of bridge that civil small-scale quickly splices Download PDF

Info

Publication number
CN208183509U
CN208183509U CN201820531120.8U CN201820531120U CN208183509U CN 208183509 U CN208183509 U CN 208183509U CN 201820531120 U CN201820531120 U CN 201820531120U CN 208183509 U CN208183509 U CN 208183509U
Authority
CN
China
Prior art keywords
bridge
sleeve
connector sleeve
rotator
pitman shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820531120.8U
Other languages
Chinese (zh)
Inventor
冯晓满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yuding Construction Engineering Co Ltd
Original Assignee
Jiangsu Yuding Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yuding Construction Engineering Co Ltd filed Critical Jiangsu Yuding Construction Engineering Co Ltd
Priority to CN201820531120.8U priority Critical patent/CN208183509U/en
Application granted granted Critical
Publication of CN208183509U publication Critical patent/CN208183509U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridges that civil small-scale quickly splices, including the body of a bridge, support leg, fasten rotator, plate end to end, pitman shaft, small guardrail is arranged in the body of a bridge top, positioning sleeve is arranged in described body of a bridge one end, connector sleeve is arranged far from described positioning sleeve one end in the body of a bridge, the pitman shaft is set in the positioning sleeve on the connector sleeve and next body of a bridge, connecting rod baffle is arranged in described pitman shaft one end, tight fixed bolt is arranged far from connecting rod baffle one end in the pitman shaft, the fastening rotator is arranged close to the connector sleeve and the positioning sleeve both ends in the body of a bridge below, rotary shaft is set in the fastening rotator.Beneficial effect is: being not necessarily to a large amount of assists, easy to operate, support effect is good, and light-weight, adaptability is larger, is able to satisfy the requirement of most of areas and agricultural and sideline operation.

Description

A kind of bridge that civil small-scale quickly splices
Technical field
The utility model relates to bridge fields, more particularly to a kind of bridge that civil small-scale quickly splices.
Background technique
With the development of communication, there is more perfect transportation network in China overwhelming majority area, but some Backward village, traffic conditions still allow of no optimist relatively, especially bridge problem.Also, carrying out some reclamation of wastelands, agricultural and sideline work When industry, also there is demand to light bridge.The Chinese patent for comparing application number 201320712786.0 discloses a kind of civilian small The bridge equipment that type quickly splices, bridge apparatus body, bridge including quickly splicing build manual operation wheel disc, splicing bridge Operation panel display, the bridge apparatus body upper end quickly spliced be equipped with the bridge build manual operation wheel disc and The splicing bridge operation panel display;Differential type fast forwarding and fast rewinding liquid is installed on the bridge apparatus body quickly spliced Cylinder pressure;The differential type fast forwarding and fast rewinding hydraulic cylinder is connected to the bridge device drives three-phase motor quickly spliced;The fast Speed Pinyin The bridge device drives three-phase motor connect is mounted among the bridge quickly spliced and the bridge storage equipment.It is above-mentioned special Benefit needs a large amount of electronic equipments and mechanical device, and higher cost, operation difficulty is big, and bad adaptability, application range is small, therefore to set Count a new bridge.Bridge designed by me is not necessarily to a large amount of assists, and easy to operate, support effect is good, light-weight, Adaptability is larger, is able to satisfy the requirement of most of areas and agricultural and sideline operation.
Utility model content
The purpose of this utility model is that solve the above-mentioned problems and provides a kind of bridge that civil small-scale quickly splices Beam.
The utility model achieves the above object through the following technical schemes:
A kind of bridge that civil small-scale quickly splices, including the body of a bridge, support leg, fastening rotator, end to end plate, connecting rod Small guardrail is arranged in axis, the body of a bridge top, and positioning sleeve is arranged in described body of a bridge one end, and the body of a bridge is set far from described positioning sleeve one end Connector sleeve is set, the pitman shaft, the pitman shaft are set in the positioning sleeve on the connector sleeve and next body of a bridge Connecting rod baffle is arranged in one end, and tight fixed bolt is arranged far from connecting rod baffle one end in the pitman shaft, and the body of a bridge leans on The fastening rotator is arranged in the nearly connector sleeve and the positioning sleeve both ends below, and rotation is arranged in the fastening rotator Axis, sleeve is arranged in the rotary shaft, and the sleeve is arranged spring fastener close to described rotary shaft one end, sets in the sleeve Threaded rod is set, the support leg is arranged in the threaded rod lower end, and setting manipulation hole in the support leg, described one end of plate end to end is set The connector sleeve is set, the positioning sleeve is arranged far from described connector sleeve one end in the plate end to end.
In above structure, take one piece first described in plate end to end, the positioning sleeve on the plate end to end is directed at the bridge The pitman shaft is passed through the connector sleeve and the positioning sleeve, then with the tight fixed bolt by the connector sleeve with it Tightening is limited to the pitman shaft, detects gully height with wooden stick etc., the hard shaft insertion manipulation hole is made described Support leg rotation, the threaded rod stretch out, and take out hard shaft when reaching required length, rotate the set around the rotary shaft Cylinder is then laid flat the body of a bridge, continues to place next bridge until the spring fastener is stuck on the fastening rotator Body repeats above-mentioned movement, and another plate end to end is finally taken out in completion splicing, by the connector sleeve on the plate end to end and most The positioning sleeve on the body of a bridge is connected by the pitman shaft afterwards, is completed assembled.
In order to further ensure splicing speed and body of a bridge firmness, the small guardrail and the body of a bridge pass through electric welding.
In order to further ensure splicing speed and body of a bridge firmness, the connector sleeve and the body of a bridge pass through electric welding, The positioning sleeve and the connector sleeve pass through electric welding.
In order to further ensure splicing speed and body of a bridge firmness, the pitman shaft and the connecting rod baffle pass through electricity Weldering welding, the pitman shaft and the connector sleeve and the positioning sleeve are socketed, the tight fixed bolt and the connecting rod axle sleeve It connects.
In order to further ensure splicing speed and body of a bridge firmness, the fastening rotator is tight by bolt with the body of a bridge It is solidly connected, the rotary shaft and the fastening rotator are socketed by activity axis connection, the sleeve and the rotary shaft.
In order to further ensure splicing speed and body of a bridge firmness, the spring fastener and the sleeve are connected by spring It connects, the threaded rod engages connection by screw thread with the sleeve, and the support leg and the threaded rod pass through electric welding.
In order to further ensure splicing speed and body of a bridge firmness, the plate end to end and the connector sleeve pass through electric welding weldering It connects, the plate end to end and the positioning sleeve pass through electric welding.
Beneficial effect is: be not necessarily to a large amount of assists, easy to operate, support effect is good, light-weight, adaptability compared with Greatly, it is able to satisfy the requirement of most of areas and agricultural and sideline operation, small guardrail and guarantee safety, and is convenient for carrying farm implements process, screw thread Bar lower end blank prevents water flow from corroding screw thread.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for the bridge that a kind of civil small-scale described in the utility model quickly splices;
Fig. 2 is the top view for the bridge that a kind of civil small-scale described in the utility model quickly splices;
Fig. 3 is the plate top view end to end for the bridge that a kind of civil small-scale described in the utility model quickly splices.
The reference numerals are as follows:
1, the body of a bridge;2, small guardrail;3, rotator is fastened;4, sleeve;5, threaded rod;6, hole is manipulated;7, support leg;8, spring Fastener;9, rotary shaft;10, connecting rod baffle;11, pitman shaft;12, positioning sleeve;13, tight fixed bolt;14, connector sleeve;15, Plate end to end.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
As shown in Figure 1-Figure 3, a kind of bridge that civil small-scale quickly splices, including the body of a bridge 1, support leg 7, fastening rotator 3, small guardrail 2 is arranged in plate 15, pitman shaft 11,1 top of the body of a bridge end to end, and the body of a bridge 1 passes through for personnel, and small guardrail 2 is for safety Positioning sleeve 12 is arranged in protection, 1 one end of the body of a bridge, and for positioning abutting joint, connector sleeve is arranged in remotely located 12 one end of set of the body of a bridge 1 14, for connecting installation, pitman shaft 11 is set, for connecting connector sleeve on connector sleeve 14 and next body of a bridge 1 in positioning sleeve 12 14 and installation set 12, connecting rod baffle 10 is arranged in 11 one end of pitman shaft, and for stopping and positioning, pitman shaft 11 is far from connection Tight fixed bolt 13 is arranged in 10 one end of pole spacing plate, is used for tightening connection bar axis 11, the body of a bridge 1 is close to 12 both ends of connector sleeve 14 and positioning sleeve Following setting fastening rotator 3 fastens in rotator 3 and rotary shaft is arranged for carrying rotary shaft 9 and locking spring fastener 8 9, it is rotated for band moving sleeve 4, sleeve 4 is set in rotary shaft 9, and for carrying threaded rod 5, sleeve 4 is set close to 9 one end of rotary shaft Spring fastener 8 is set, fastening sleeve 4 is used for, threaded rod 5 is set in sleeve 4, for increasing the attainable height of support leg 7, spiral shell Support leg 7 is arranged in 5 lower end of rasp bar, is used to support bridge, and setting manipulation hole 6 in support leg 7 drives for protruding into hard shaft Threaded rod 5 rotates, and connector sleeve 14 is arranged in 15 one end of plate end to end, and positioning sleeve 12 is arranged far from 14 one end of connector sleeve in plate 15 end to end.
In above structure, a build tailgate 15 is taken first, and the positioning sleeve 12 on plate 15 end to end is directed at the connection on the body of a bridge 1 Pitman shaft 11 is passed through connector sleeve 14 and positioning sleeve 12, then limits tightening to pitman shaft 11 with tight fixed bolt 13 by set 14, Gully height is detected with wooden stick etc., hard shaft, which is inserted into manipulation hole 6, rotates support leg 7, and threaded rod 5 stretches out, and reaches institute It needs to take out hard shaft when length, around 9 turnbarrel 4 of rotary shaft, until spring fastener 8 is stuck on fastening rotator 3, with After be laid flat the body of a bridge 1, continue to place next body of a bridge 1, repeat above-mentioned movement, complete splicing, other end tailgate 15 is finally taken out, by head 15 upper joint sleeve 14 of tailgate is connect with the positioning sleeve 12 on the last body of a bridge 1 by pitman shaft 11, is completed assembled.
In order to further ensure splicing speed and body of a bridge firmness, small guardrail 2 passes through electric welding, connector sleeve with the body of a bridge 1 14 pass through electric welding, pitman shaft 11 and connecting rod baffle 10 by electric welding, positioning sleeve 12 and connector sleeve 14 with the body of a bridge 1 By electric welding, pitman shaft 11 and connector sleeve 14 and positioning sleeve 12 are socketed, and tight fixed bolt 13 and pitman shaft 11 are socketed, tightly Gu rotator 3 is bolted connection with the body of a bridge 1, rotary shaft 9 and fastening rotator 3 pass through activity axis connection, sleeve 4 and rotation Shaft 9 is socketed, and spring fastener 8 is connect with sleeve 4 by spring, and threaded rod 5 engages connection by screw thread with sleeve 4, support Foot 7 and threaded rod 5 are by electric welding, and plate 15 and connector sleeve 14 are by electric welding end to end, and plate 15 and positioning sleeve 12 are logical end to end Cross electric welding.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change And improvement, these various changes and improvements fall within the scope of the claimed invention.

Claims (7)

1. a kind of bridge that civil small-scale quickly splices, it is characterised in that: including the body of a bridge (1), support leg (7), fastening rotator (3), small guardrail (2), the body of a bridge (1) one end setting is arranged in plate (15), pitman shaft (11), the body of a bridge (1) top end to end Positioning sleeve (12), the body of a bridge (1) is far from the positioning sleeve (12) one end setting connector sleeve (14), and the connector sleeve (14) is under The setting pitman shaft (11) in the positioning sleeve (12) on one body of a bridge (1), pitman shaft (11) one end setting Connecting rod baffle (10), the pitman shaft (11) is far from described connecting rod baffle (10) one end setting tight fixed bolt (13), institute It states the body of a bridge (1) and the fastening rotator (3) is set below close to the connector sleeve (14) and the positioning sleeve (12) both ends, it is described It fastens in rotator (3) and rotary shaft (9) is set, sleeve (4) are set on the rotary shaft (9), the sleeve (4) is close to the rotation Spring fastener (8) are arranged in shaft (9) one end, and threaded rod (5) are arranged in the sleeve (4), threaded rod (5) the lower end setting The support leg (7), setting manipulation hole (6) on the support leg (7), the connector sleeve is arranged in described (15) one end of plate end to end (14), the positioning sleeve (12) is arranged far from the connector sleeve (14) one end in the plate end to end (15).
2. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the small guardrail (2) Pass through electric welding with the body of a bridge (1).
3. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the connector sleeve (14) With the body of a bridge (1) by electric welding, the positioning sleeve (12) and the connector sleeve (14) pass through electric welding.
4. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the pitman shaft (11) with the connecting rod baffle (10) by electric welding, the pitman shaft (11) and the connector sleeve (14) and described fixed Position set (12) socket, the tight fixed bolt (13) and the pitman shaft (11) are socketed.
5. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the fastening rotator (3) it is bolted connection with the body of a bridge (1), the rotary shaft (9) and the fastening rotator (3) are connected by movable axis It connects, the sleeve (4) and the rotary shaft (9) are socketed.
6. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the spring fastener (8) it is connect with the sleeve (4) by spring, the threaded rod (5) engages connection by screw thread with the sleeve (4), described Support leg (7) and the threaded rod (5) pass through electric welding.
7. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the plate end to end (15) With the connector sleeve (14) by electric welding, the plate end to end (15) and the positioning sleeve (12) pass through electric welding.
CN201820531120.8U 2018-04-12 2018-04-12 A kind of bridge that civil small-scale quickly splices Expired - Fee Related CN208183509U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820531120.8U CN208183509U (en) 2018-04-12 2018-04-12 A kind of bridge that civil small-scale quickly splices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820531120.8U CN208183509U (en) 2018-04-12 2018-04-12 A kind of bridge that civil small-scale quickly splices

Publications (1)

Publication Number Publication Date
CN208183509U true CN208183509U (en) 2018-12-04

Family

ID=64433670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820531120.8U Expired - Fee Related CN208183509U (en) 2018-04-12 2018-04-12 A kind of bridge that civil small-scale quickly splices

Country Status (1)

Country Link
CN (1) CN208183509U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440654A (en) * 2018-12-18 2019-03-08 合肥成基铁路工程科技有限公司 A kind of construction equipment and its construction method of achievable overpass beam of not closing a road to traffic
CN109853354A (en) * 2019-01-21 2019-06-07 吴增文 A kind of interim bridge spanning the river structure of Construction of Hydropower Engineering and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440654A (en) * 2018-12-18 2019-03-08 合肥成基铁路工程科技有限公司 A kind of construction equipment and its construction method of achievable overpass beam of not closing a road to traffic
CN109853354A (en) * 2019-01-21 2019-06-07 吴增文 A kind of interim bridge spanning the river structure of Construction of Hydropower Engineering and its construction method
CN109853354B (en) * 2019-01-21 2020-07-07 吴增文 Temporary river-crossing bridge structure for hydropower engineering construction and construction method thereof

Similar Documents

Publication Publication Date Title
CN104314350B (en) A kind of environmental protection transmission of electricity frame
CN208183509U (en) A kind of bridge that civil small-scale quickly splices
CN208830758U (en) A kind of ancient building bracing means
CN207069490U (en) A kind of Improvement type connector for cable bridge
CN202597399U (en) Bolt and connecting assembly with same
CN201927940U (en) Ground wire lifting tool
CN201633775U (en) Steering mechanism of pesticide-spraying agricultural truck with high ground clearance
CN208185682U (en) A kind of adapter tube driving tool
CN203856812U (en) Lock catch device
CN103401178A (en) Support frame for replacing vibration damper
CN208273791U (en) A kind of municipal administration gardens irrigator
CN214418704U (en) Nondestructive thread tightening device
CN209213196U (en) A kind of pipe collar with anti-drop function
CN202258849U (en) Foldable insulating rod
CN208074268U (en) A kind of prefabricated mat piece of municipal pipeline
CN207436670U (en) A kind of wattle fencing frame
CN201766312U (en) Adjustable supporting frame
CN206807346U (en) Photovoltaic module support
CN203755783U (en) Variation amplitude type hoop device
CN111055242A (en) Special tool for fastening 110kV wiring board bolt in electrified manner
CN205960598U (en) Novel cable adapter for electric power engineering
CN203398635U (en) Bracing frame for replacing vibration damper
CN102477960B (en) Manual high-altitude locking mechanism
CN209045004U (en) A kind of teaching collapsible throwing net of assembled architecture
CN211818541U (en) Fence with mist spraying and dust removing functions for construction site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181204

Termination date: 20190412