CN208183509U - A kind of bridge that civil small-scale quickly splices - Google Patents
A kind of bridge that civil small-scale quickly splices Download PDFInfo
- Publication number
- CN208183509U CN208183509U CN201820531120.8U CN201820531120U CN208183509U CN 208183509 U CN208183509 U CN 208183509U CN 201820531120 U CN201820531120 U CN 201820531120U CN 208183509 U CN208183509 U CN 208183509U
- Authority
- CN
- China
- Prior art keywords
- bridge
- sleeve
- connector sleeve
- rotator
- pitman shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of bridges that civil small-scale quickly splices, including the body of a bridge, support leg, fasten rotator, plate end to end, pitman shaft, small guardrail is arranged in the body of a bridge top, positioning sleeve is arranged in described body of a bridge one end, connector sleeve is arranged far from described positioning sleeve one end in the body of a bridge, the pitman shaft is set in the positioning sleeve on the connector sleeve and next body of a bridge, connecting rod baffle is arranged in described pitman shaft one end, tight fixed bolt is arranged far from connecting rod baffle one end in the pitman shaft, the fastening rotator is arranged close to the connector sleeve and the positioning sleeve both ends in the body of a bridge below, rotary shaft is set in the fastening rotator.Beneficial effect is: being not necessarily to a large amount of assists, easy to operate, support effect is good, and light-weight, adaptability is larger, is able to satisfy the requirement of most of areas and agricultural and sideline operation.
Description
Technical field
The utility model relates to bridge fields, more particularly to a kind of bridge that civil small-scale quickly splices.
Background technique
With the development of communication, there is more perfect transportation network in China overwhelming majority area, but some
Backward village, traffic conditions still allow of no optimist relatively, especially bridge problem.Also, carrying out some reclamation of wastelands, agricultural and sideline work
When industry, also there is demand to light bridge.The Chinese patent for comparing application number 201320712786.0 discloses a kind of civilian small
The bridge equipment that type quickly splices, bridge apparatus body, bridge including quickly splicing build manual operation wheel disc, splicing bridge
Operation panel display, the bridge apparatus body upper end quickly spliced be equipped with the bridge build manual operation wheel disc and
The splicing bridge operation panel display;Differential type fast forwarding and fast rewinding liquid is installed on the bridge apparatus body quickly spliced
Cylinder pressure;The differential type fast forwarding and fast rewinding hydraulic cylinder is connected to the bridge device drives three-phase motor quickly spliced;The fast Speed Pinyin
The bridge device drives three-phase motor connect is mounted among the bridge quickly spliced and the bridge storage equipment.It is above-mentioned special
Benefit needs a large amount of electronic equipments and mechanical device, and higher cost, operation difficulty is big, and bad adaptability, application range is small, therefore to set
Count a new bridge.Bridge designed by me is not necessarily to a large amount of assists, and easy to operate, support effect is good, light-weight,
Adaptability is larger, is able to satisfy the requirement of most of areas and agricultural and sideline operation.
Utility model content
The purpose of this utility model is that solve the above-mentioned problems and provides a kind of bridge that civil small-scale quickly splices
Beam.
The utility model achieves the above object through the following technical schemes:
A kind of bridge that civil small-scale quickly splices, including the body of a bridge, support leg, fastening rotator, end to end plate, connecting rod
Small guardrail is arranged in axis, the body of a bridge top, and positioning sleeve is arranged in described body of a bridge one end, and the body of a bridge is set far from described positioning sleeve one end
Connector sleeve is set, the pitman shaft, the pitman shaft are set in the positioning sleeve on the connector sleeve and next body of a bridge
Connecting rod baffle is arranged in one end, and tight fixed bolt is arranged far from connecting rod baffle one end in the pitman shaft, and the body of a bridge leans on
The fastening rotator is arranged in the nearly connector sleeve and the positioning sleeve both ends below, and rotation is arranged in the fastening rotator
Axis, sleeve is arranged in the rotary shaft, and the sleeve is arranged spring fastener close to described rotary shaft one end, sets in the sleeve
Threaded rod is set, the support leg is arranged in the threaded rod lower end, and setting manipulation hole in the support leg, described one end of plate end to end is set
The connector sleeve is set, the positioning sleeve is arranged far from described connector sleeve one end in the plate end to end.
In above structure, take one piece first described in plate end to end, the positioning sleeve on the plate end to end is directed at the bridge
The pitman shaft is passed through the connector sleeve and the positioning sleeve, then with the tight fixed bolt by the connector sleeve with it
Tightening is limited to the pitman shaft, detects gully height with wooden stick etc., the hard shaft insertion manipulation hole is made described
Support leg rotation, the threaded rod stretch out, and take out hard shaft when reaching required length, rotate the set around the rotary shaft
Cylinder is then laid flat the body of a bridge, continues to place next bridge until the spring fastener is stuck on the fastening rotator
Body repeats above-mentioned movement, and another plate end to end is finally taken out in completion splicing, by the connector sleeve on the plate end to end and most
The positioning sleeve on the body of a bridge is connected by the pitman shaft afterwards, is completed assembled.
In order to further ensure splicing speed and body of a bridge firmness, the small guardrail and the body of a bridge pass through electric welding.
In order to further ensure splicing speed and body of a bridge firmness, the connector sleeve and the body of a bridge pass through electric welding,
The positioning sleeve and the connector sleeve pass through electric welding.
In order to further ensure splicing speed and body of a bridge firmness, the pitman shaft and the connecting rod baffle pass through electricity
Weldering welding, the pitman shaft and the connector sleeve and the positioning sleeve are socketed, the tight fixed bolt and the connecting rod axle sleeve
It connects.
In order to further ensure splicing speed and body of a bridge firmness, the fastening rotator is tight by bolt with the body of a bridge
It is solidly connected, the rotary shaft and the fastening rotator are socketed by activity axis connection, the sleeve and the rotary shaft.
In order to further ensure splicing speed and body of a bridge firmness, the spring fastener and the sleeve are connected by spring
It connects, the threaded rod engages connection by screw thread with the sleeve, and the support leg and the threaded rod pass through electric welding.
In order to further ensure splicing speed and body of a bridge firmness, the plate end to end and the connector sleeve pass through electric welding weldering
It connects, the plate end to end and the positioning sleeve pass through electric welding.
Beneficial effect is: be not necessarily to a large amount of assists, easy to operate, support effect is good, light-weight, adaptability compared with
Greatly, it is able to satisfy the requirement of most of areas and agricultural and sideline operation, small guardrail and guarantee safety, and is convenient for carrying farm implements process, screw thread
Bar lower end blank prevents water flow from corroding screw thread.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for the bridge that a kind of civil small-scale described in the utility model quickly splices;
Fig. 2 is the top view for the bridge that a kind of civil small-scale described in the utility model quickly splices;
Fig. 3 is the plate top view end to end for the bridge that a kind of civil small-scale described in the utility model quickly splices.
The reference numerals are as follows:
1, the body of a bridge;2, small guardrail;3, rotator is fastened;4, sleeve;5, threaded rod;6, hole is manipulated;7, support leg;8, spring
Fastener;9, rotary shaft;10, connecting rod baffle;11, pitman shaft;12, positioning sleeve;13, tight fixed bolt;14, connector sleeve;15,
Plate end to end.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
As shown in Figure 1-Figure 3, a kind of bridge that civil small-scale quickly splices, including the body of a bridge 1, support leg 7, fastening rotator
3, small guardrail 2 is arranged in plate 15, pitman shaft 11,1 top of the body of a bridge end to end, and the body of a bridge 1 passes through for personnel, and small guardrail 2 is for safety
Positioning sleeve 12 is arranged in protection, 1 one end of the body of a bridge, and for positioning abutting joint, connector sleeve is arranged in remotely located 12 one end of set of the body of a bridge 1
14, for connecting installation, pitman shaft 11 is set, for connecting connector sleeve on connector sleeve 14 and next body of a bridge 1 in positioning sleeve 12
14 and installation set 12, connecting rod baffle 10 is arranged in 11 one end of pitman shaft, and for stopping and positioning, pitman shaft 11 is far from connection
Tight fixed bolt 13 is arranged in 10 one end of pole spacing plate, is used for tightening connection bar axis 11, the body of a bridge 1 is close to 12 both ends of connector sleeve 14 and positioning sleeve
Following setting fastening rotator 3 fastens in rotator 3 and rotary shaft is arranged for carrying rotary shaft 9 and locking spring fastener 8
9, it is rotated for band moving sleeve 4, sleeve 4 is set in rotary shaft 9, and for carrying threaded rod 5, sleeve 4 is set close to 9 one end of rotary shaft
Spring fastener 8 is set, fastening sleeve 4 is used for, threaded rod 5 is set in sleeve 4, for increasing the attainable height of support leg 7, spiral shell
Support leg 7 is arranged in 5 lower end of rasp bar, is used to support bridge, and setting manipulation hole 6 in support leg 7 drives for protruding into hard shaft
Threaded rod 5 rotates, and connector sleeve 14 is arranged in 15 one end of plate end to end, and positioning sleeve 12 is arranged far from 14 one end of connector sleeve in plate 15 end to end.
In above structure, a build tailgate 15 is taken first, and the positioning sleeve 12 on plate 15 end to end is directed at the connection on the body of a bridge 1
Pitman shaft 11 is passed through connector sleeve 14 and positioning sleeve 12, then limits tightening to pitman shaft 11 with tight fixed bolt 13 by set 14,
Gully height is detected with wooden stick etc., hard shaft, which is inserted into manipulation hole 6, rotates support leg 7, and threaded rod 5 stretches out, and reaches institute
It needs to take out hard shaft when length, around 9 turnbarrel 4 of rotary shaft, until spring fastener 8 is stuck on fastening rotator 3, with
After be laid flat the body of a bridge 1, continue to place next body of a bridge 1, repeat above-mentioned movement, complete splicing, other end tailgate 15 is finally taken out, by head
15 upper joint sleeve 14 of tailgate is connect with the positioning sleeve 12 on the last body of a bridge 1 by pitman shaft 11, is completed assembled.
In order to further ensure splicing speed and body of a bridge firmness, small guardrail 2 passes through electric welding, connector sleeve with the body of a bridge 1
14 pass through electric welding, pitman shaft 11 and connecting rod baffle 10 by electric welding, positioning sleeve 12 and connector sleeve 14 with the body of a bridge 1
By electric welding, pitman shaft 11 and connector sleeve 14 and positioning sleeve 12 are socketed, and tight fixed bolt 13 and pitman shaft 11 are socketed, tightly
Gu rotator 3 is bolted connection with the body of a bridge 1, rotary shaft 9 and fastening rotator 3 pass through activity axis connection, sleeve 4 and rotation
Shaft 9 is socketed, and spring fastener 8 is connect with sleeve 4 by spring, and threaded rod 5 engages connection by screw thread with sleeve 4, support
Foot 7 and threaded rod 5 are by electric welding, and plate 15 and connector sleeve 14 are by electric welding end to end, and plate 15 and positioning sleeve 12 are logical end to end
Cross electric welding.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry
It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this
The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change
And improvement, these various changes and improvements fall within the scope of the claimed invention.
Claims (7)
1. a kind of bridge that civil small-scale quickly splices, it is characterised in that: including the body of a bridge (1), support leg (7), fastening rotator
(3), small guardrail (2), the body of a bridge (1) one end setting is arranged in plate (15), pitman shaft (11), the body of a bridge (1) top end to end
Positioning sleeve (12), the body of a bridge (1) is far from the positioning sleeve (12) one end setting connector sleeve (14), and the connector sleeve (14) is under
The setting pitman shaft (11) in the positioning sleeve (12) on one body of a bridge (1), pitman shaft (11) one end setting
Connecting rod baffle (10), the pitman shaft (11) is far from described connecting rod baffle (10) one end setting tight fixed bolt (13), institute
It states the body of a bridge (1) and the fastening rotator (3) is set below close to the connector sleeve (14) and the positioning sleeve (12) both ends, it is described
It fastens in rotator (3) and rotary shaft (9) is set, sleeve (4) are set on the rotary shaft (9), the sleeve (4) is close to the rotation
Spring fastener (8) are arranged in shaft (9) one end, and threaded rod (5) are arranged in the sleeve (4), threaded rod (5) the lower end setting
The support leg (7), setting manipulation hole (6) on the support leg (7), the connector sleeve is arranged in described (15) one end of plate end to end
(14), the positioning sleeve (12) is arranged far from the connector sleeve (14) one end in the plate end to end (15).
2. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the small guardrail (2)
Pass through electric welding with the body of a bridge (1).
3. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the connector sleeve (14)
With the body of a bridge (1) by electric welding, the positioning sleeve (12) and the connector sleeve (14) pass through electric welding.
4. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the pitman shaft
(11) with the connecting rod baffle (10) by electric welding, the pitman shaft (11) and the connector sleeve (14) and described fixed
Position set (12) socket, the tight fixed bolt (13) and the pitman shaft (11) are socketed.
5. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the fastening rotator
(3) it is bolted connection with the body of a bridge (1), the rotary shaft (9) and the fastening rotator (3) are connected by movable axis
It connects, the sleeve (4) and the rotary shaft (9) are socketed.
6. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the spring fastener
(8) it is connect with the sleeve (4) by spring, the threaded rod (5) engages connection by screw thread with the sleeve (4), described
Support leg (7) and the threaded rod (5) pass through electric welding.
7. the bridge that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that: the plate end to end (15)
With the connector sleeve (14) by electric welding, the plate end to end (15) and the positioning sleeve (12) pass through electric welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820531120.8U CN208183509U (en) | 2018-04-12 | 2018-04-12 | A kind of bridge that civil small-scale quickly splices |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820531120.8U CN208183509U (en) | 2018-04-12 | 2018-04-12 | A kind of bridge that civil small-scale quickly splices |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208183509U true CN208183509U (en) | 2018-12-04 |
Family
ID=64433670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820531120.8U Expired - Fee Related CN208183509U (en) | 2018-04-12 | 2018-04-12 | A kind of bridge that civil small-scale quickly splices |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208183509U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440654A (en) * | 2018-12-18 | 2019-03-08 | 合肥成基铁路工程科技有限公司 | A kind of construction equipment and its construction method of achievable overpass beam of not closing a road to traffic |
CN109853354A (en) * | 2019-01-21 | 2019-06-07 | 吴增文 | A kind of interim bridge spanning the river structure of Construction of Hydropower Engineering and its construction method |
-
2018
- 2018-04-12 CN CN201820531120.8U patent/CN208183509U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440654A (en) * | 2018-12-18 | 2019-03-08 | 合肥成基铁路工程科技有限公司 | A kind of construction equipment and its construction method of achievable overpass beam of not closing a road to traffic |
CN109853354A (en) * | 2019-01-21 | 2019-06-07 | 吴增文 | A kind of interim bridge spanning the river structure of Construction of Hydropower Engineering and its construction method |
CN109853354B (en) * | 2019-01-21 | 2020-07-07 | 吴增文 | Temporary river-crossing bridge structure for hydropower engineering construction and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104314350B (en) | A kind of environmental protection transmission of electricity frame | |
CN208183509U (en) | A kind of bridge that civil small-scale quickly splices | |
CN208830758U (en) | A kind of ancient building bracing means | |
CN207069490U (en) | A kind of Improvement type connector for cable bridge | |
CN202597399U (en) | Bolt and connecting assembly with same | |
CN201927940U (en) | Ground wire lifting tool | |
CN201633775U (en) | Steering mechanism of pesticide-spraying agricultural truck with high ground clearance | |
CN208185682U (en) | A kind of adapter tube driving tool | |
CN203856812U (en) | Lock catch device | |
CN103401178A (en) | Support frame for replacing vibration damper | |
CN208273791U (en) | A kind of municipal administration gardens irrigator | |
CN214418704U (en) | Nondestructive thread tightening device | |
CN209213196U (en) | A kind of pipe collar with anti-drop function | |
CN202258849U (en) | Foldable insulating rod | |
CN208074268U (en) | A kind of prefabricated mat piece of municipal pipeline | |
CN207436670U (en) | A kind of wattle fencing frame | |
CN201766312U (en) | Adjustable supporting frame | |
CN206807346U (en) | Photovoltaic module support | |
CN203755783U (en) | Variation amplitude type hoop device | |
CN111055242A (en) | Special tool for fastening 110kV wiring board bolt in electrified manner | |
CN205960598U (en) | Novel cable adapter for electric power engineering | |
CN203398635U (en) | Bracing frame for replacing vibration damper | |
CN102477960B (en) | Manual high-altitude locking mechanism | |
CN209045004U (en) | A kind of teaching collapsible throwing net of assembled architecture | |
CN211818541U (en) | Fence with mist spraying and dust removing functions for construction site |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181204 Termination date: 20190412 |