CN208180816U - Contact net adjusts tool - Google Patents
Contact net adjusts tool Download PDFInfo
- Publication number
- CN208180816U CN208180816U CN201820614098.3U CN201820614098U CN208180816U CN 208180816 U CN208180816 U CN 208180816U CN 201820614098 U CN201820614098 U CN 201820614098U CN 208180816 U CN208180816 U CN 208180816U
- Authority
- CN
- China
- Prior art keywords
- tube body
- tubule
- hook ring
- hole
- steel ruler
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 41
- 239000010959 steel Substances 0.000 claims abstract description 41
- 210000005239 tubule Anatomy 0.000 claims abstract description 32
- 238000009434 installation Methods 0.000 abstract description 15
- 238000005259 measurement Methods 0.000 description 8
- 238000000034 method Methods 0.000 description 8
- 230000015572 biosynthetic process Effects 0.000 description 6
- 238000013461 design Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of contact nets to adjust tool, including the first tube body, the second tube body and tubule, and one end of first tube body is equipped with the first hook ring, and one end of second tube body is equipped with the second hook ring;Second hook ring is fixedly connected with horizontal bracket;The inner hollow of first tube body, the second tube body, the both ends difference pivot bush unit of the tubule is in first tube body, the second tube body;The tubule and first tube body, the tubule and second tube body are respectively equipped with fixed device;The both ends of the tubule are respectively equipped with scale mark line;It is additionally provided with steel ruler, one end of the steel ruler is removably attachable to second hook ring by bolt.The utility model solves did not had any object of reference with the technical problem of range estimation adjustment in contact net installation in the past, and drastically reduced phenomenon of doing over again, and accelerates to regulate the speed, under the premise of guaranteeing quality safety, makes the more accurate standardization of installation data.
Description
Technical field
The utility model relates to the mounting technique fields of contact net, are specifically related to a kind of contact net adjustment tool.
Background technique
In contact network cantilever installation process, when adjusting positioning pipe, often temporarily positioning pipe is sling with iron wire, lower section
One people of remote station estimates the positioning pipe gradient, and after positioning ring installation, positioning pipe forms the phenomenon that is uneven, and estimates positioning pipe error
It is quite big, it is unable to ensure positioning pipe new line or design value of bowing, formation opening is nonstandard, and detail design requirement is not achieved, causes
Construction speed is slow, in operation without reference to, just do not become the unified installation method of height naturally, process can not improve,
It installs not accurate and delays the time, waste of manpower error formation occurs and does over again, and in adjustment, without rail, contact line
It under the premise of dropper, can not be adjusted, form the trend that later stage work amount increases.
Utility model content
The purpose of the utility model is to provide a kind of contact nets easy to carry, easy to operate to adjust tool, the adjustment
Tool solves did not had any object of reference with the technical problem of range estimation adjustment in contact net installation in the past, and was greatly reduced
Phenomenon of doing over again, improves economic benefit, accelerates to regulate the speed, under the premise of guaranteeing quality safety, make installation data more
Precision criterion, while reducing multinomial constructing operation link, the time is saved, installation effectiveness is improved;And to install
Product afterwards can reach unified standard.
To achieve the above objectives, the present invention adopts the following technical solutions:
A kind of contact net adjustment tool, including the first tube body, the second tube body and tubule, one end of first tube body are equipped with
One end of first hook ring, second tube body is equipped with the second hook ring;Second hook ring is fixedly connected with horizontal bracket;Described
The inner hollow of one tube body, the second tube body, the both ends difference pivot bush unit of the tubule is in first tube body, the second tube body;
The tubule and first tube body, the tubule and second tube body are respectively equipped with fixed device;The both ends of the tubule
It is respectively equipped with scale mark line;It is additionally provided with steel ruler, one end of the steel ruler is removably attachable to described second by bolt and hooks
Ring.
As a kind of perferred technical scheme, it should be noted that the horizontal bracket includes connecting rod, support frame and support
Platform, the connecting rod are fixedly connected on second hook ring;Support frame as described above is vertically fixedly connected on the connecting rod;The support
Platform is respectively arranged on the both ends of support frame as described above.
As a kind of perferred technical scheme, it should be further noted that being additionally provided with plummet bar on second tube body,
The plummet bar is equipped with small hook, and the small hooking enters the connecting rod, and the plummet bar is vertical with the connecting rod.
As a kind of perferred technical scheme, it should be further noted that the steel ruler is equipped with notch and adjustment hole,
The adjustment hole includes the first adjustment hole and the second adjustment hole, and the notch is set to first adjustment hole and described second and adjusts
Between hole;First adjustment hole is circular hole, and second adjustment hole includes round hole and coupled strip-shaped hole, the circle
The diameter in shape hole is greater than the diameter of nut, and the width of the strip-shaped hole is less than the diameter of the nut.
As a kind of perferred technical scheme, described thin it should be further noted that the fixed device is pin member
Pipe passes through the pin member with second tube body with first tube body, the tubule respectively to be fixed.
As a kind of perferred technical scheme, it should be further noted that the side of the tubule is equipped with protrusion.
The utility model has the beneficial effects that: it is easy to carry, easy to operate, do not have before solving in contact net installation
There is any object of reference with the technical problem of range estimation adjustment, and drastically reduce phenomenon of doing over again, improve economic benefit, accelerates
It regulates the speed, under the premise of guaranteeing quality safety, makes the more accurate standardization of installation data, while reducing multinomial construction behaviour
Make link, save the time, improves installation effectiveness;And the product after installation is enabled to reach unified standard.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model steel ruler.
Appended drawing reference: 1, the first hook ring;2, the first tube body;3, the second tube body;4, the second hook ring;5, tubule;6, horizontal branch
Frame;61, connecting rod;62, support frame;63, saddle;7, steel ruler;8, fixed device;9, notch;10, circular hole;11, round hole;12,
Strip-shaped hole.
Specific embodiment
Below with reference to attached drawing, the utility model will be further described, it should be noted that the present embodiment is with this skill
Premised on art scheme, the detailed implementation method and specific operation process are given, but the protection scope of the utility model is not
It is limited to the present embodiment.
As shown in Figure 1, a kind of contact net adjustment tool, including the first tube body 2, the second tube body 3 and tubule 5, described first
One end of tube body 2 is equipped with the first hook ring 1;One end of second tube body 3 is equipped with the second hook ring 4;It is fixed on second hook ring 4
It is connected with horizontal bracket 6;Distinguish pivot bush unit in the both ends of the inner hollow of first tube body 2, the second tube body 3, the tubule 5
In first tube body 2, the second tube body 3;The tubule 5 divides with first hook ring 1, the tubule 5 and second hook ring 4
Device She You not fixed;The both ends of the tubule 5 are respectively equipped with scale mark line, so that operation is precisely, close to first pipe
The length dimension data of the scale mark line of body 2 indicate the size that adjustment positioning pipe is open to locator contacts line, close to described
The length dimension data of the scale mark line of second tube body 3 indicate the size of adjustment structure height carrier cable to positioning pipe lower edge;
The tubule 5 can combine lengthening, be conveniently adjusted, and assembling stretches drawing conveniently, and length can adjust 2200mm, and execute-in-place is flexible and convenient,
Of length no more than 580mm, easy to carry after dismounting;It is additionally provided with steel ruler 7, one end of the steel ruler 7 is removably connected by bolt
It is connected to second hook ring 4, the length of the steel ruler 7 is that 500mm is installed to for measuring installation data convenient for one step of part
Position, while can also be used in the levelness of test position fix pipe.
It should be noted that the horizontal bracket 6 includes connecting rod 61, support frame 62 and saddle 63, the connecting rod 61
It is fixedly connected on second hook ring 4;Support frame as described above 62 is vertically fixedly connected on the connecting rod 61;The saddle 63 is distinguished
Set on the both ends of support frame as described above 62, the saddle 63 can be used for steel ruler 7 described in support, keep the levelness of steel ruler 7.The water
Flat bracket 6 can adjust the positive and negative positioning pipe gradient, is adjusted to positioning pipe self-assembling formation and bows, during the adjustment, first by the connection
Bar 61, support frame as described above 62 and the installation of the saddle 63 are fixed, when support frame as described above 62 and the connecting rod 61 reach design
Graduation position is adjusted, keeps the connecting rod 61 vertical with positioning pipe, after support frame as described above 62 and the connecting rod 61 are installed in place,
The steel ruler 7 is bolted by round hole 11 and the fixed link on second hook ring 4, and adjusting the steel ruler 7 can be with
The other end of the steel ruler 7, is finally put into the saddle 63, the steel ruler 7 is in by the activity rotation at any time of the circular hole of one end
Horizontality, positioning pipe also naturally horizontally, then just realize the horizontal bracket 6 to the positive and negative positioning pipe gradient with the steel ruler 7
Adjustment.
It should be noted that the lower end of the connecting rod 61 is additionally provided with repetition measurement bar, the repetition measurement bar is used to repetition measurement contact line
Pull-out location and opening verticality, when measurement enters the small hooking that repetition measurement bar upper end has on second hook ring 4
In the fixed link in face, after the repetition measurement bar is vertical, naturally droop to form verticality, upper end and carrier cable on same vertical guide,
Repetition measurement bar lower end is exactly the pull-out location of contact line, and when contact line is parallel with the repetition measurement bar, i.e., expression contact line is in vertical
State.
It should be further noted that being additionally provided with plummet bar on second tube body 3, the plummet bar is equipped with small hook, institute
It states small hooking and enters the connecting rod 61, and the plummet bar is vertical with the connecting rod 61.Due to will appear partially in adjustment
Askew error phenomenon, the utility model have made the plummet bar that can be used for positioning, and self-assembling formation verticality has one on mould tube
The matched use of the vertical mark point of verticality indicates the position of mould tube when the plummet bar is overlapped with the vertical mark point
It is just vertical to set.
As shown in Fig. 2, needing to further explain, the steel ruler 7 is equipped with notch 9 and adjustment hole, the notch 9
The gradient that can adjust positive and negative positioning pipe first passes through bolt and hooks the steel ruler 7 by strip-shaped hole 12 and described second in adjustment
Ring 4 is fixedly connected, and after the completion of connection, the other end of steel ruler 7 is put into 63 formation of the saddle level, then lacking steel ruler 7
Mouth 9 is put into be formed in the saddle 63 of the horizontal bracket 6 and bow, and the positioning pipe of the other end, which is formed, at the same time comes back, i.e., adjustable
The gradient of whole positive and negative positioning pipe, when plane is parallel with plane on steel ruler 7 on positioning pipe, i.e. the expression positioning pipe gradient is horizontal;Institute
Stating adjustment hole includes the first adjustment hole and the second adjustment hole, and the notch 9 is set to first adjustment hole and described second and adjusts
Between hole, first adjustment hole in 9 left side of notch is circular hole 10, is adjusting the position of the steel ruler 7 so that described
Notch 9 is put into when the saddle 63 formation is bowed, and can be stretched by the circular hole 10 and be drawn the steel ruler 7, to facilitate adjustment, just
In 7 activity of steel ruler;Second adjustment hole includes round hole 11 and coupled strip-shaped hole 12, the round hole 11
Diameter is greater than the diameter of nut, and the purpose being arranged in this way is the disassembly for the ease of bolt, can incite somebody to action after slightly unscrewing bolt
Bolt is moved on the position of the round hole 11 and removes;The width of the strip-shaped hole 12 is less than the diameter of the nut, purpose
It is in order to enable nut to lock the steel ruler 7 to avoid that steel ruler 7 is caused to be detached from second hook ring 4 in use
The problem of.
It should be further noted that the fixed device 8 is pin member, the tubule 5 and first tube body 2, institute
Tubule 5 is stated to fix by the pin member respectively with second tube body 3.
It needs to further explain, the side of the tubule 5 is equipped with protrusion, and the protrusion can extrude described first and hook
The inner wall of ring 1, second hook ring 4, to increase the frictional force of contact, prevent the tubule 5 in use stress and
It glides, to guarantee the accuracy of adjustment.
Embodiment 1
First hook ring is linked into the small ring under Messenger Wire base, keep plummet bar naturally vertical and with the plummet degree on mould tube
Vertical mark point is overlapped, it is ensured that carrier cable and contact line are in same vertical plane, are connect according to the requirement of installation by tubule adjusting
Touching line is open and leads high design height value;Positioning pipe is caught on the second hook ring later, with the lifting of positioning ring, is propped up by level
Positioning pipe is horizontal, come back, bow adjusting for frame and steel ruler, and to be adjusted to finish, once fasten by bolt can be obtained after forming
The product of unified standard.
Embodiment 2
In use, the level of positioning pipe is adjusted by horizontal bracket, specific adjustment process is as follows: first will connection
Bar, support frame and saddle installation fixation, support frame and connecting rod reach adjustment graduation position when design, make connecting rod and positioning
Pipe is vertical, and after support frame and connecting rod are installed in place, steel ruler is bolted by round hole and the fixed link on the second hook ring,
And adjust steel ruler can with one end circular hole at any time activity rotate, finally the other end of steel ruler is put into saddle, steel ruler be in water
Level state, positioning pipe with steel ruler also naturally horizontally.
Embodiment 3
In use, the level of positioning pipe adjusted by steel ruler, come back and bows, specific adjustment process is as follows:
In adjustment, first steel ruler is fixedly connected by strip-shaped hole with the second hook ring with bolt, after the completion of connection, by the other end of steel ruler
It is put into saddle and forms level, be then put into be formed in the saddle of the horizontal bracket by the notch of steel ruler and bow, at the same time separately
The positioning pipe of one end just forms new line, and when plane is parallel with plane on steel ruler on positioning pipe, i.e. expression positioning pipe is in level.
For those skilled in the art, it can be made various corresponding according to above technical solution and design
Change and modification, and all these change and modification should be construed as being included in the utility model claims protection scope it
It is interior.
Claims (6)
1. a kind of contact net adjusts tool, which is characterized in that including the first tube body, the second tube body and tubule, first tube body
One end be equipped with the first hook ring, one end of second tube body is equipped with the second hook ring;Second hook ring is fixedly connected with level
Bracket;The inner hollow of first tube body, the second tube body, the both ends difference pivot bush unit of the tubule is in first pipe
Body, the second tube body;The tubule and first tube body, the tubule and second tube body are respectively equipped with fixed device;Institute
The both ends for stating tubule are respectively equipped with scale mark line;It is additionally provided with steel ruler, one end of the steel ruler is detachably connected by bolt
In second hook ring.
2. contact net according to claim 1 adjusts tool, which is characterized in that the horizontal bracket includes connecting rod, branch
Support and saddle, the connecting rod are fixedly connected on second hook ring;Support frame as described above is vertically fixedly connected on the connection
Bar;The saddle is respectively arranged on the both ends of support frame as described above.
3. contact net according to claim 1 adjusts tool, which is characterized in that be additionally provided with plummet on second tube body
Bar, the plummet bar are equipped with small hook, and the small hooking enters the connecting rod, and the plummet bar is vertical with the connecting rod.
4. contact net according to claim 3 adjusts tool, which is characterized in that the steel ruler is equipped with notch and adjusting
Hole, the adjustment hole include the first adjustment hole and the second adjustment hole, and the notch is set to first adjustment hole and described second
Between adjustment hole;First adjustment hole is circular hole, and second adjustment hole includes round hole and coupled strip-shaped hole, institute
The diameter for stating round hole is greater than the diameter of nut, and the width of the strip-shaped hole is less than the diameter of the nut.
5. contact net according to claim 1 adjusts tool, which is characterized in that the fixed device is pin member, described
Tubule passes through the pin member with second tube body with first tube body, the tubule respectively to be fixed.
6. contact net according to claim 1 adjusts tool, which is characterized in that the side of the tubule is equipped with protrusion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820614098.3U CN208180816U (en) | 2018-04-26 | 2018-04-26 | Contact net adjusts tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820614098.3U CN208180816U (en) | 2018-04-26 | 2018-04-26 | Contact net adjusts tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208180816U true CN208180816U (en) | 2018-12-04 |
Family
ID=64431807
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820614098.3U Expired - Fee Related CN208180816U (en) | 2018-04-26 | 2018-04-26 | Contact net adjusts tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208180816U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112757969A (en) * | 2021-02-02 | 2021-05-07 | 中国神华能源股份有限公司神朔铁路分公司 | Contact line level adjustment tool and method |
-
2018
- 2018-04-26 CN CN201820614098.3U patent/CN208180816U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112757969A (en) * | 2021-02-02 | 2021-05-07 | 中国神华能源股份有限公司神朔铁路分公司 | Contact line level adjustment tool and method |
CN112757969B (en) * | 2021-02-02 | 2022-11-11 | 中国神华能源股份有限公司神朔铁路分公司 | Contact line horizontal adjusting tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208180816U (en) | Contact net adjusts tool | |
CN207863490U (en) | A kind of assembled vertical member installation locating connector | |
CN210665732U (en) | Intelligent detection device for soil moisture and nutrient change | |
CN207862479U (en) | A kind of single crystal growing furnace is with automatic crystal pulling liquid mouth away from accurate-location device | |
CN204487054U (en) | A kind of detent mechanism of auxiliary frame suspension device stay tube | |
CN109060424A (en) | The method for monitoring construction sea area concentration of suspension using sampler | |
CN209011502U (en) | A kind of sash fast standard erector | |
CN203688056U (en) | Force measuring apparatus for cantilever beam type weighing sensor | |
CN210662117U (en) | Support of environmental monitor | |
CN215213000U (en) | Supporting device for forming top of auxiliary frame based on door and window | |
CN208313309U (en) | The detection hanger of aluminum alloy pattern plate verticality | |
CN209457153U (en) | A kind of built-in fitting Fast Installation adjusting integrated apparatus | |
CN219530344U (en) | Security alarm installs fixed establishment | |
CN219491890U (en) | Steel pipe tower cross arm device convenient to install fast | |
CN215596979U (en) | Wall-attached type verticality measuring base | |
CN213749528U (en) | Device for detecting anti-leakage performance of metal corrugated pipe | |
CN109098404A (en) | A kind of sash fast standard erector | |
CN217819471U (en) | Land planning geological examination sampling device | |
CN206056716U (en) | A kind of survey tool of aluminum cell electrolyte level or aluminum level | |
CN204566046U (en) | A kind of 550kV bus housing slip flange assembling support | |
CN215891990U (en) | LNG gasification pressure regulating measurement sled | |
CN211436754U (en) | Positioner is used in coating of braided tube complex film | |
CN212897692U (en) | Positioning device for wall installation | |
CN220630742U (en) | Fishing rod capable of quickly installing fishing line | |
CN213533531U (en) | Accurate die carrier fixes a position |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181204 |