A kind of new waterproof climbing frame intelligence control system
Technical field
The utility model relates to climbing frame technical field, specially a kind of new waterproof climbing frame intelligence control system.
Background technique
Climbing frame is called hoisting frame, and it is main several to be divided into fluid pressure type, electrodynamic type, manpower hand pulling type etc. according to its power resources
Class, it is the new type scaffold system developed in recent years, is mainly used in high-layer shear force wall formula building, it can be past along building
Upper soaring or decline, this system make Construction Formwork & Scaffold Technology take on a new look completely:First is that need not translation frame;Second is that eliminating tearing open for scaffold
Dress process (primary assembling then use construction always finish), and not limited by depth of building, be greatly saved manpower and
Material, and have biggish change also for traditional scaffold in security standpoint, the great advantages for development in skyscraper are real
With a kind of novel specially new waterproof climbing frame intelligence control system.
But there are deficiencies below for the prior art:
1, it is unfavorable for the normal use of device vulnerable to the influence of electromagnetism inside power control cabinet;
2, control system can not carry out classification control, intelligent insufficient, cause to the first climbing frame, the second climbing frame control force
It is insufficient.
Utility model content
(One)The technical issues of solution
In view of the deficiencies of the prior art, the utility model provides a kind of new waterproof climbing frame intelligence control system, solves
It exists in the prior art vulnerable to electromagnetic effect, classification control, intelligent insufficient problem can not be carried out.
(Two)Technical solution
To achieve the above object, the utility model provides the following technical solutions:A kind of new waterproof climbing frame intelligent control system
System, including power control cabinet, power control cabinet front surface top, which is inlayed, is connected with industrial personal computer, left and right in the middle part of the power control cabinet front surface
Two sides are separately installed with a group alarm device, and power control cabinet front surface lower part arranged on left and right sides has been respectively fixedly connected with the first sub-control
Case and the second sub-control box, top is provided with digital signal generation circuit module in the power control cabinet, and the digital signal generates electricity
It is electrically connected with digital-to-analogue digital analog converter below the module of road, the digital analog converter bottom end is provided with PLC controller, described automatically controlled
Cabinet is installed on the first climbing frame side, and socket is connected with the second climbing frame at the top of first climbing frame, and first climbing frame passes through bottom
The fastening bolt of two sides is connect with earth's surface, another side lower part upper and lower of the first climbing frame be respectively arranged with pressure sensor and
Horizon sensor.
Preferably, top is fixedly connected by telescopic putter with the second climbing frame bottom end in first climbing frame.
Preferably, the pressure sensor, horizon sensor, telescopic putter, alarm input terminal are defeated with power control cabinet respectively
Outlet is electrically connected.
Preferably, the industrial personal computer output end by PLC controller respectively with the first sub-control box, the second sub-control box output end
It is electrically connected.
Preferably, bottom end is fixedly connected with electromagnetic shielding device in the power control cabinet.
Preferably, the fastening bolt is through inside the first climbing frame two sides, and extends into 20 centimetres of depths of earth's surface.
(Three)Beneficial effect
The utility model provides a kind of new waterproof climbing frame intelligence control system, has following beneficial effect:
(1)The utility model has by setting electromagnetic shielding device and eliminates electromagnetic radiation, electromagnetism is avoided to make internal system
At the effect centainly influenced, the problem of solving the influence inside power control cabinet vulnerable to electromagnetism, be unfavorable for the normal use of device,
The interior bottom end of power control cabinet is provided with electromagnetic shielding device, is disappeared by being electromagnetically shielded device to the electromagnetic radiation inside power control cabinet
It removes, meanwhile, the cable being electrically connected between power control cabinet inner components is set as components under the premise of meeting the requirements
Between connect distance length, cable is the main factor for leading to electromagnetic compatibility problem in system, in fact, cable is exactly one
Root efficiently receives and transmitting antenna, if connection is improper directly to launch the electromagnetic leakage emission signal in power control cabinet,
Unnecessary injury is caused to surrounding body, and electromagnetism can then cause breakdown effects to system, bring the increase of cost, by setting
The shielding action to power control cabinet inside electromagnetism is realized in the electromagnetic shielding device set and the setting to cable length.
(2)The utility model has intelligence by setting industrial personal computer, the first sub-control box, the second sub-control box and PLC controller
Change, the effect of classification control, classification control can not be carried out by solving control system, intelligent insufficient, be caused to the first climbing frame, the
The insufficient problem of two climbing frame control forces, inlays on power control cabinet top and is connected with industrial personal computer, in power control cabinet lower part arranged on left and right sides point
First sub-control box and the second sub-control box are not installed, industrial personal computer carries out the first sub-control box, the second sub-control box by PLC controller
Control, industrial personal computer to by telescopic putter, pressure sensor, horizon sensor, alarm transmission Lai digital signal collect
Storage, industrial personal computer itself handle the digital signal of a part, another part digital data transmission to the first sub-control box, the
Two sub-control box are handled, and realize that control system to the classification processing of data, improves treatment effeciency and accuracy, meanwhile, it is
The raising of system treatment effeciency and accuracy, so that being improved to the first climbing frame, the second climbing frame control force.
Detailed description of the invention
Fig. 1 is the utility model schematic elevation view;
Fig. 2 is the utility model power control cabinet appearance enlarged diagram;
Fig. 3 is the utility model power control cabinet schematic diagram of internal structure;
Fig. 4 is the utility model principle schematic diagram.
In figure:1 second climbing frame, 2 first climbing frames, 3 pressure sensors, 4 horizon sensors, 5 earth's surfaces, 6 telescopic putters, 7 electricity
Control cabinet, 8 fastening bolts, 9 alarms, 10 first sub-control box, 11 industrial personal computers, 12 second sub-control box, 13 digital analog converters, 14 electromagnetism
Shield device, 15 digital signal generation circuit modules, 16PLC controller.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figs 1-4, the utility model provides a kind of technical solution:A kind of new waterproof climbing frame intelligence control system,
Including power control cabinet 7,7 front surface top of power control cabinet, which is inlayed, is connected with industrial personal computer 11, and bottom end is fixedly connected with electromagnetic screen in power control cabinet 7
Device 14 is covered, the interior bottom end of power control cabinet 7 is provided with electromagnetic shielding device 14, by electromagnetic shielding device 14 to the electricity inside power control cabinet 7
Magnetic radiation is eliminated, meanwhile, the cable being electrically connected between 7 inner components of power control cabinet is in the premise met the requirements
Under, it is set as connecting the length of distance between components, cable is the main factor for leading to electromagnetic compatibility problem in system, thing
In reality, cable is exactly an efficient reception and transmitting antenna, if connection is improper directly to be sent out the electromagnetic leakage in power control cabinet
It penetrates signal to launch, unnecessary injury is caused to surrounding body, and electromagnetism can then cause breakdown effects to system, bring into
This increase realizes the shielding to 7 inside electromagnetism of power control cabinet by the electromagnetic shielding device 14 of setting and to the setting of cable length
Effect, 7 front surface of power control cabinet middle part arranged on left and right sides are separately installed with a group alarm device 9,7 front surface lower part left and right two of power control cabinet
Side has been respectively fixedly connected with the first sub-control box 10 and the second sub-control box 12, and top is provided with digital signal and generates electricity in power control cabinet 7
Road module 15 is electrically connected with digital-to-analogue digital analog converter 13,13 bottom of digital analog converter below digital signal generation circuit module 15
End is provided with PLC controller 16,11 output end of industrial personal computer by PLC controller 16 respectively with the first sub-control box 10, the second sub-control
12 output end of case is electrically connected, and power control cabinet 7 is installed on 2 side of the first climbing frame, and socket is connected with the second climbing frame at the top of the first climbing frame 2
1, top is fixedly connected by telescopic putter 6 with 1 bottom end of the second climbing frame in the first climbing frame 2, and the first climbing frame 2 passes through two sides of the bottom
Fastening bolt 8 is connect with earth's surface 5, and fastening bolt 8 extends into 5 two ten centimetres of depths of earth's surface through inside 2 two sides of the first climbing frame
Place, another side lower part upper and lower of the first climbing frame 2 are respectively arranged with pressure sensor 3 and horizon sensor 4, pressure sensor 3,
Horizon sensor 4, telescopic putter 6,9 input terminal of alarm are electrically connected with 7 output end of power control cabinet respectively, on 7 top of power control cabinet
It inlays and is connected with industrial personal computer 11, be separately installed with the first sub-control box 10 and the second sub-control box in 7 lower part arranged on left and right sides of power control cabinet
12, industrial personal computer 11 controls the first sub-control box 10, the second sub-control box 12 by PLC controller 16, and industrial personal computer 11 is to by stretching
The digital signal that contracting push rod 6, pressure sensor 3, horizon sensor 4, the transmission of alarm 9 come carries out collecting storage, industrial personal computer 11
Itself handles the digital signal of a part, another part digital data transmission to the first sub-control box 10, the second sub-control box
12 are handled, and realize that control system to the classification processing of data, improves treatment effeciency and accuracy, meanwhile, system processing
The raising of efficiency and accuracy, so that being improved to the first climbing frame 2,1 control force of the second climbing frame.
Working principle:It is connected with industrial personal computer 11 in use, inlaying on 7 top of power control cabinet, in 7 lower part of power control cabinet left and right two
Side is separately installed with the first sub-control box 10 and the second sub-control box 12, industrial personal computer 11 by PLC controller 16 to the first sub-control box 10,
Second sub-control box 12 is controlled, and industrial personal computer 11 is passed to by telescopic putter 6, pressure sensor 3, horizon sensor 4, alarm 9
Defeated next digital signal carries out collecting storage, and industrial personal computer 11 itself handles the digital signal of a part, another part number
Word signal is transmitted to the first sub-control box 10, the second sub-control box 12 is handled, and realizes that control system to the classification processing of data, mentions
High treatment effeciency and accuracy, meanwhile, the raising of system treatment effeciency and accuracy, so as to the first climbing frame 2, the second climbing frame
1 control force is improved, and during control system use, the interior bottom end of power control cabinet 7 is provided with electromagnetic shielding device 14, is passed through
Electromagnetic shielding device 14 eliminates the electromagnetic radiation inside power control cabinet 7, meanwhile, electricity is carried out between 7 inner components of power control cabinet
Property connection cable under the premise of meeting the requirements, be set as between components connect distance length, cable is led in system
The main factor of electromagnetic compatibility problem is caused, in fact, cable is exactly an efficient reception and transmitting antenna, if connection is improper
Directly the electromagnetic leakage emission signal in power control cabinet can be launched, unnecessary injury caused to surrounding body, and electromagnetism
Can then breakdown effects be caused to system, bring the increase of cost, by the electromagnetic shielding device 14 of setting and cable length set
It is fixed, realize the shielding action to 7 inside electromagnetism of power control cabinet.
It can to sum up obtain, the utility model passes through setting electromagnetic shielding device 14, industrial personal computer 11,10, second points of the first sub-control box
Case 12 and 16 structure of PLC controller are controlled, is solved and is existed in the prior art vulnerable to electromagnetic effect, classification control, intelligence can not be carried out
The problem of energyization deficiency.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.