CN208174267U - High power intelligent electricity generation system based on same period load control - Google Patents

High power intelligent electricity generation system based on same period load control Download PDF

Info

Publication number
CN208174267U
CN208174267U CN201820462925.1U CN201820462925U CN208174267U CN 208174267 U CN208174267 U CN 208174267U CN 201820462925 U CN201820462925 U CN 201820462925U CN 208174267 U CN208174267 U CN 208174267U
Authority
CN
China
Prior art keywords
power source
backup power
load
utility grid
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820462925.1U
Other languages
Chinese (zh)
Inventor
何林
许林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGZHOU FUKANGSI ELECTRICAL MACHINE CO Ltd
Original Assignee
YANGZHOU FUKANGSI ELECTRICAL MACHINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANGZHOU FUKANGSI ELECTRICAL MACHINE CO Ltd filed Critical YANGZHOU FUKANGSI ELECTRICAL MACHINE CO Ltd
Priority to CN201820462925.1U priority Critical patent/CN208174267U/en
Application granted granted Critical
Publication of CN208174267U publication Critical patent/CN208174267U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

High power intelligent electricity generation system based on same period load control.It is related to technical field of generators, more particularly to the improvement to stand-by generator control system.Whether can have a power failure regardless of alternating current can in real time carry out backup power source staying in operation test.Including test device, the test device is placed between the utility grid and the backup power source, it is electrically connected load in the utility grid, chopper switch is equipped between the load and the utility grid, the test device is separately connected the utility grid and backup power source;Band is carried out under the non-power failure of alternating current carries test, since utility grid does not have a power failure, Switching Power Supply still works, relay power starts timing, the load capacity of backup power source can be tested at any time, avoiding backup power source from not having to cause for a long time, backup power source load capacity is degenerated and backup power source is run with load during the test, can be tested the true load capacity of backup power source in use, be extended the service life of backup power source.

Description

High power intelligent electricity generation system based on same period load control
Technical field
The utility model relates to technical field of generators, more particularly to the improvement to stand-by generator control system.
Background technique
Now, many local not shorts of electricity, some single important events important equipments need multiple power supplies to ensure, and conventional Backup power source group is not worked in the case that alternating current has electricity, and backup power source starts power transmission after mains failure.It is continuous for a long time in alternating current In the case where electricity, backup power source is not to be switched on or only under no-load running, such case is very unfavorable to generating set.
Utility model content
The utility model in view of the above problems, provide whether one kind can have a power failure regardless of alternating current can be in real time to standby electricity Source stay in the high power intelligent electricity generation system based on same period load control of operation test.
The technical solution of the utility model is:Including test device, the test device is placed in utility grid and standby electricity Between source, it is electrically connected load in the utility grid, chopper switch K is equipped between the load and the utility grid, it is described Test device is separately connected the utility grid and backup power source;
The test device includes Switching Power Supply, relay, coil one and coil two, and the input terminal of the Switching Power Supply connects It connects on the utility grids, the input terminal of the output end connection relay of the Switching Power Supply, the output end connection of the relay Coil one, the coil two are connect with the backup power source;
It is equipped with switch KM2 between the coil two and the backup power source, is equipped with and opens between the backup power source and load Close KM1 and switch KM3, the one control switch KM1 of coil and switch KM2, the two control switch KM3 of coil.
It is separately connected between the backup power source and the load by independent cable one and cable two, the cable one It is equipped with switch KM3, the cable two is equipped with switch KM1.
The relay is the time relay of model JS-11A/11, and the Switching Power Supply is model S-100-24 switch Power supply.
When the utility model carries out band load test under the non-power failure of alternating current, it is first shut off chopper switch K and to load Circuit power loss, automatic switching to backup power source is powered at this time, but since utility grid does not have a power failure, Switching Power Supply is still Work, relay power start timing, coil one also it is electric, switch KM1 closure when coil one must be electric, KM2 is in coil one Disconnection when obtaining electric carries out so that forming access by switch KM1 between backup power source and load with load test, relay meter When the time arrive after disconnect, coil one disconnects from Switching Power Supply, one power loss of coil, and switch KM1 disconnection, switch KM2 is closed, line Circle two it is electric, backup power source and load between by KM3 formation access, powering load, complete at this time entire backup power source and Chopper switch K, automatic switching to utility grid powering load are closed in the detection of interlock circuit.It can test at any time so standby With the load capacity of power supply, avoiding backup power source from not having to cause for a long time, backup power source load capacity is degenerated and backup power source is being tested In the process it is run with load, the true load capacity of backup power source in use can be tested, extend backup power source Service life.
Detailed description of the invention
Fig. 1 is the utility model structure diagram,
Fig. 2 is the utility model electrical schematic diagram.
Specific embodiment
The utility model is as shown in Figs. 1-2, including test device, and the test device is placed in utility grid and backup power source Between, it is electrically connected load in the utility grid, chopper switch K, the survey are equipped between the load and the utility grid Trial assembly, which is set, is separately connected the utility grid and backup power source;It is realized when utility grid does not power off to standby using test device It is tested with the run with load of power supply, that is need to cut off the disconnecting link between load and utility grid in test device work Switch K causes load circuit power failure phenomenon, is carried using backup power source band, can be started at this time when utility grid does not have a power failure Backup power source carries out band and carries test, and the band for capableing of real-time perfoming backup power source carries test, and backup power source is avoided to shut down because of long-time The problem of bring backup power source damages.
The test device includes Switching Power Supply, relay, coil one and coil two, and the input terminal of the Switching Power Supply connects It connects on the utility grids, the input terminal of the output end connection relay of the Switching Power Supply, the output end connection of the relay Coil one, the coil two are connect with the backup power source;
It is equipped with switch KM2 between the coil two and the backup power source, is equipped with and opens between the backup power source and load Close KM1 and switch KM3, the one control switch KM1 of coil and switch KM2, the two control switch KM3 of coil.
It is separately connected between the backup power source and the load by independent cable one and cable two, the cable one It is equipped with switch KM3, the cable two is equipped with switch KM1;When carrying out band load test under the non-power failure of alternating current, close first It closing chopper switch K and makes load circuit power loss, automatic switching to backup power source is powered at this time, but since utility grid is not stopped Electricity, therefore Switching Power Supply still works, relay power start timing, coil one also it is electric, switch KM1 coil one it is electric when It is closed, KM2 is disconnected when coil one obtains electric, so that forming access by switch KM1 between backup power source and load, is carried out Band carries test, and relay timing time disconnects after arriving, and coil one disconnects from Switching Power Supply, one power loss of coil, and switch KM1 is disconnected It opens, switch KM2 closure, coil two must be electric, forms access by KM3 between backup power source and load, and powering load is complete at this time At the detection of entire backup power source and interlock circuit, chopper switch K, automatic switching to utility grid powering load are closed.This Sample can test the load capacity of backup power source at any time, and backup power source is avoided not have to that backup power source load capacity is caused to be degenerated for a long time And backup power source is run with load during the test, can test the true band of backup power source in use and carry energy Power extends the service life of backup power source.
When utility grid has a power failure, Switching Power Supply stops working, one power loss of coil, and switch KM2 is closed, and coil two is from spare Obtained at power supply it is electric so that switch KM3 obtain it is electric, load by closure KM3 and backup power source between form access, utilize standby electricity Source power supply is until city power recovery powers.
The relay is the time relay of model JS-11A/11, and the Switching Power Supply is model S-100-24 switch Power supply.

Claims (3)

1. based on the high power intelligent electricity generation system of same period load control, including test device, which is characterized in that the test dress It is placed between utility grid and backup power source, load, the load and the utility grid is electrically connected in the utility grid Between be equipped with chopper switch K, the test device is separately connected the utility grid and backup power source;
The test device includes Switching Power Supply, relay, coil one and coil two, and the input terminal of the Switching Power Supply is connected to In utility grid, the input terminal of the output end connection relay of the Switching Power Supply, the output end of the relay connects coil One, the coil two is connect with the backup power source;
It is equipped with switch KM2 between the coil two and the backup power source, switch KM1 is equipped between the backup power source and load With switch KM3, the one control switch KM1 of coil and switch KM2, the two control switch KM3 of coil.
2. the high power intelligent electricity generation system according to claim 1 based on same period load control, which is characterized in that described It is separately connected between backup power source and the load by independent cable one and cable two, the cable one is equipped with switch KM3, the cable two are equipped with switch KM1.
3. the high power intelligent electricity generation system according to claim 1 or 2 based on same period load control, which is characterized in that The relay is the time relay of model JS-11A/11, and the Switching Power Supply is model S-100-24 Switching Power Supply.
CN201820462925.1U 2018-04-03 2018-04-03 High power intelligent electricity generation system based on same period load control Expired - Fee Related CN208174267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820462925.1U CN208174267U (en) 2018-04-03 2018-04-03 High power intelligent electricity generation system based on same period load control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820462925.1U CN208174267U (en) 2018-04-03 2018-04-03 High power intelligent electricity generation system based on same period load control

Publications (1)

Publication Number Publication Date
CN208174267U true CN208174267U (en) 2018-11-30

Family

ID=64371448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820462925.1U Expired - Fee Related CN208174267U (en) 2018-04-03 2018-04-03 High power intelligent electricity generation system based on same period load control

Country Status (1)

Country Link
CN (1) CN208174267U (en)

Similar Documents

Publication Publication Date Title
CN106655478B (en) Low-voltage emergency safety power supply system of household garbage power plant and control method thereof
CN203071637U (en) DC power supply connection control apparatus
CN204376520U (en) A kind of multiple feed selection circuit
CN104079065A (en) Method for making mobile power generation system be connected into power grid for operation in synchronous grid connection mode
CN112072741B (en) Method and device for realizing one-key starting of household energy storage system
CN205666679U (en) UPS of bypass automatic switch -over type
CN210536349U (en) Full-automatic uninterrupted power supply dual-power supply system
CN208174267U (en) High power intelligent electricity generation system based on same period load control
CN204316175U (en) Uninterruption power source
CN102545370A (en) Power supply device for control system of wind driven generator
CN106602598B (en) A kind of intelligent power supply system of the accessory power supply of grid-connection device
CN203339768U (en) Backup energy storage power supply for photovoltaic and mains supply complementary input
CN204967410U (en) Zero -power direct current UPS switched systems
CN210273512U (en) Micro-grid control system
CN114629154A (en) Micro-grid-based energy storage system maintenance device and control method
CN211377605U (en) Uninterrupted parallel operation grid-connected system of medium-voltage power supply vehicle
CN208127982U (en) intelligent load management device
CN205921447U (en) Gas turbine test platform power supply system
CN105207343A (en) Control circuit for conversion of two power sources
CN110518815A (en) A kind of distribution terminal electric power controller and method
CN205509924U (en) Photovoltaic power generation control system of autonomic formula
CN204794348U (en) Uninterrupted power source on -line maintenance device for distributed control system
CN204557177U (en) For the automatic continuous controller for electric consumption of numerically-controlled machine
CN204008725U (en) Vacuum circuit breaker debugging termination
CN213027535U (en) UPS maintenance bypass topology circuit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181130

CF01 Termination of patent right due to non-payment of annual fee