CN208174267U - High power intelligent electricity generation system based on same period load control - Google Patents
High power intelligent electricity generation system based on same period load control Download PDFInfo
- Publication number
- CN208174267U CN208174267U CN201820462925.1U CN201820462925U CN208174267U CN 208174267 U CN208174267 U CN 208174267U CN 201820462925 U CN201820462925 U CN 201820462925U CN 208174267 U CN208174267 U CN 208174267U
- Authority
- CN
- China
- Prior art keywords
- power source
- backup power
- load
- utility grid
- switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
High power intelligent electricity generation system based on same period load control.It is related to technical field of generators, more particularly to the improvement to stand-by generator control system.Whether can have a power failure regardless of alternating current can in real time carry out backup power source staying in operation test.Including test device, the test device is placed between the utility grid and the backup power source, it is electrically connected load in the utility grid, chopper switch is equipped between the load and the utility grid, the test device is separately connected the utility grid and backup power source;Band is carried out under the non-power failure of alternating current carries test, since utility grid does not have a power failure, Switching Power Supply still works, relay power starts timing, the load capacity of backup power source can be tested at any time, avoiding backup power source from not having to cause for a long time, backup power source load capacity is degenerated and backup power source is run with load during the test, can be tested the true load capacity of backup power source in use, be extended the service life of backup power source.
Description
Technical field
The utility model relates to technical field of generators, more particularly to the improvement to stand-by generator control system.
Background technique
Now, many local not shorts of electricity, some single important events important equipments need multiple power supplies to ensure, and conventional
Backup power source group is not worked in the case that alternating current has electricity, and backup power source starts power transmission after mains failure.It is continuous for a long time in alternating current
In the case where electricity, backup power source is not to be switched on or only under no-load running, such case is very unfavorable to generating set.
Utility model content
The utility model in view of the above problems, provide whether one kind can have a power failure regardless of alternating current can be in real time to standby electricity
Source stay in the high power intelligent electricity generation system based on same period load control of operation test.
The technical solution of the utility model is:Including test device, the test device is placed in utility grid and standby electricity
Between source, it is electrically connected load in the utility grid, chopper switch K is equipped between the load and the utility grid, it is described
Test device is separately connected the utility grid and backup power source;
The test device includes Switching Power Supply, relay, coil one and coil two, and the input terminal of the Switching Power Supply connects
It connects on the utility grids, the input terminal of the output end connection relay of the Switching Power Supply, the output end connection of the relay
Coil one, the coil two are connect with the backup power source;
It is equipped with switch KM2 between the coil two and the backup power source, is equipped with and opens between the backup power source and load
Close KM1 and switch KM3, the one control switch KM1 of coil and switch KM2, the two control switch KM3 of coil.
It is separately connected between the backup power source and the load by independent cable one and cable two, the cable one
It is equipped with switch KM3, the cable two is equipped with switch KM1.
The relay is the time relay of model JS-11A/11, and the Switching Power Supply is model S-100-24 switch
Power supply.
When the utility model carries out band load test under the non-power failure of alternating current, it is first shut off chopper switch K and to load
Circuit power loss, automatic switching to backup power source is powered at this time, but since utility grid does not have a power failure, Switching Power Supply is still
Work, relay power start timing, coil one also it is electric, switch KM1 closure when coil one must be electric, KM2 is in coil one
Disconnection when obtaining electric carries out so that forming access by switch KM1 between backup power source and load with load test, relay meter
When the time arrive after disconnect, coil one disconnects from Switching Power Supply, one power loss of coil, and switch KM1 disconnection, switch KM2 is closed, line
Circle two it is electric, backup power source and load between by KM3 formation access, powering load, complete at this time entire backup power source and
Chopper switch K, automatic switching to utility grid powering load are closed in the detection of interlock circuit.It can test at any time so standby
With the load capacity of power supply, avoiding backup power source from not having to cause for a long time, backup power source load capacity is degenerated and backup power source is being tested
In the process it is run with load, the true load capacity of backup power source in use can be tested, extend backup power source
Service life.
Detailed description of the invention
Fig. 1 is the utility model structure diagram,
Fig. 2 is the utility model electrical schematic diagram.
Specific embodiment
The utility model is as shown in Figs. 1-2, including test device, and the test device is placed in utility grid and backup power source
Between, it is electrically connected load in the utility grid, chopper switch K, the survey are equipped between the load and the utility grid
Trial assembly, which is set, is separately connected the utility grid and backup power source;It is realized when utility grid does not power off to standby using test device
It is tested with the run with load of power supply, that is need to cut off the disconnecting link between load and utility grid in test device work
Switch K causes load circuit power failure phenomenon, is carried using backup power source band, can be started at this time when utility grid does not have a power failure
Backup power source carries out band and carries test, and the band for capableing of real-time perfoming backup power source carries test, and backup power source is avoided to shut down because of long-time
The problem of bring backup power source damages.
The test device includes Switching Power Supply, relay, coil one and coil two, and the input terminal of the Switching Power Supply connects
It connects on the utility grids, the input terminal of the output end connection relay of the Switching Power Supply, the output end connection of the relay
Coil one, the coil two are connect with the backup power source;
It is equipped with switch KM2 between the coil two and the backup power source, is equipped with and opens between the backup power source and load
Close KM1 and switch KM3, the one control switch KM1 of coil and switch KM2, the two control switch KM3 of coil.
It is separately connected between the backup power source and the load by independent cable one and cable two, the cable one
It is equipped with switch KM3, the cable two is equipped with switch KM1;When carrying out band load test under the non-power failure of alternating current, close first
It closing chopper switch K and makes load circuit power loss, automatic switching to backup power source is powered at this time, but since utility grid is not stopped
Electricity, therefore Switching Power Supply still works, relay power start timing, coil one also it is electric, switch KM1 coil one it is electric when
It is closed, KM2 is disconnected when coil one obtains electric, so that forming access by switch KM1 between backup power source and load, is carried out
Band carries test, and relay timing time disconnects after arriving, and coil one disconnects from Switching Power Supply, one power loss of coil, and switch KM1 is disconnected
It opens, switch KM2 closure, coil two must be electric, forms access by KM3 between backup power source and load, and powering load is complete at this time
At the detection of entire backup power source and interlock circuit, chopper switch K, automatic switching to utility grid powering load are closed.This
Sample can test the load capacity of backup power source at any time, and backup power source is avoided not have to that backup power source load capacity is caused to be degenerated for a long time
And backup power source is run with load during the test, can test the true band of backup power source in use and carry energy
Power extends the service life of backup power source.
When utility grid has a power failure, Switching Power Supply stops working, one power loss of coil, and switch KM2 is closed, and coil two is from spare
Obtained at power supply it is electric so that switch KM3 obtain it is electric, load by closure KM3 and backup power source between form access, utilize standby electricity
Source power supply is until city power recovery powers.
The relay is the time relay of model JS-11A/11, and the Switching Power Supply is model S-100-24 switch
Power supply.
Claims (3)
1. based on the high power intelligent electricity generation system of same period load control, including test device, which is characterized in that the test dress
It is placed between utility grid and backup power source, load, the load and the utility grid is electrically connected in the utility grid
Between be equipped with chopper switch K, the test device is separately connected the utility grid and backup power source;
The test device includes Switching Power Supply, relay, coil one and coil two, and the input terminal of the Switching Power Supply is connected to
In utility grid, the input terminal of the output end connection relay of the Switching Power Supply, the output end of the relay connects coil
One, the coil two is connect with the backup power source;
It is equipped with switch KM2 between the coil two and the backup power source, switch KM1 is equipped between the backup power source and load
With switch KM3, the one control switch KM1 of coil and switch KM2, the two control switch KM3 of coil.
2. the high power intelligent electricity generation system according to claim 1 based on same period load control, which is characterized in that described
It is separately connected between backup power source and the load by independent cable one and cable two, the cable one is equipped with switch
KM3, the cable two are equipped with switch KM1.
3. the high power intelligent electricity generation system according to claim 1 or 2 based on same period load control, which is characterized in that
The relay is the time relay of model JS-11A/11, and the Switching Power Supply is model S-100-24 Switching Power Supply.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820462925.1U CN208174267U (en) | 2018-04-03 | 2018-04-03 | High power intelligent electricity generation system based on same period load control |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820462925.1U CN208174267U (en) | 2018-04-03 | 2018-04-03 | High power intelligent electricity generation system based on same period load control |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208174267U true CN208174267U (en) | 2018-11-30 |
Family
ID=64371448
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820462925.1U Expired - Fee Related CN208174267U (en) | 2018-04-03 | 2018-04-03 | High power intelligent electricity generation system based on same period load control |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208174267U (en) |
-
2018
- 2018-04-03 CN CN201820462925.1U patent/CN208174267U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106655478B (en) | Low-voltage emergency safety power supply system of household garbage power plant and control method thereof | |
CN203071637U (en) | DC power supply connection control apparatus | |
CN204376520U (en) | A kind of multiple feed selection circuit | |
CN104079065A (en) | Method for making mobile power generation system be connected into power grid for operation in synchronous grid connection mode | |
CN112072741B (en) | Method and device for realizing one-key starting of household energy storage system | |
CN205666679U (en) | UPS of bypass automatic switch -over type | |
CN210536349U (en) | Full-automatic uninterrupted power supply dual-power supply system | |
CN208174267U (en) | High power intelligent electricity generation system based on same period load control | |
CN204316175U (en) | Uninterruption power source | |
CN102545370A (en) | Power supply device for control system of wind driven generator | |
CN106602598B (en) | A kind of intelligent power supply system of the accessory power supply of grid-connection device | |
CN203339768U (en) | Backup energy storage power supply for photovoltaic and mains supply complementary input | |
CN204967410U (en) | Zero -power direct current UPS switched systems | |
CN210273512U (en) | Micro-grid control system | |
CN114629154A (en) | Micro-grid-based energy storage system maintenance device and control method | |
CN211377605U (en) | Uninterrupted parallel operation grid-connected system of medium-voltage power supply vehicle | |
CN208127982U (en) | intelligent load management device | |
CN205921447U (en) | Gas turbine test platform power supply system | |
CN105207343A (en) | Control circuit for conversion of two power sources | |
CN110518815A (en) | A kind of distribution terminal electric power controller and method | |
CN205509924U (en) | Photovoltaic power generation control system of autonomic formula | |
CN204794348U (en) | Uninterrupted power source on -line maintenance device for distributed control system | |
CN204557177U (en) | For the automatic continuous controller for electric consumption of numerically-controlled machine | |
CN204008725U (en) | Vacuum circuit breaker debugging termination | |
CN213027535U (en) | UPS maintenance bypass topology circuit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |