CN205921447U - Gas turbine test platform power supply system - Google Patents

Gas turbine test platform power supply system Download PDF

Info

Publication number
CN205921447U
CN205921447U CN201620961268.6U CN201620961268U CN205921447U CN 205921447 U CN205921447 U CN 205921447U CN 201620961268 U CN201620961268 U CN 201620961268U CN 205921447 U CN205921447 U CN 205921447U
Authority
CN
China
Prior art keywords
power supply
power
city
double
switching device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620961268.6U
Other languages
Chinese (zh)
Inventor
刘金超
杨超
吴世勋
袁建克
孟丽
尚伟
谭春青
孙志刚
高庆
张永军
张龙
倪庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Engineering Thermophysics of CAS
CAS Hefei Micro Gas Turbine Research Institute Co Ltd
Original Assignee
CAS Hefei Micro Gas Turbine Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CAS Hefei Micro Gas Turbine Research Institute Co Ltd filed Critical CAS Hefei Micro Gas Turbine Research Institute Co Ltd
Priority to CN201620961268.6U priority Critical patent/CN205921447U/en
Application granted granted Critical
Publication of CN205921447U publication Critical patent/CN205921447U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

The utility model discloses a gas turbine test platform power supply system, including generator, two switching of power device, quick switching device, circuit breaker, test bench power consumption block terminal and UPS. Transmit for test bench power consumption block terminal through behind first pair of switching of power device and the quick switching power of quick switching device in power that the generator produced and urban power supply source, is provided with first circuit breaker between the urban power supply source and the first pair of switching of power device, is connected with intelligent circuit breaker between the generator and the first pair of switching of power device, there is signal connection between first circuit breaker and the generator, during the urban power supply outage, gives the generator with signal transmission, the control generator automatic start, outside the power output is opened automatically to intelligent circuit breaker simultaneously, when urban power supply resumes the power supply, generator received signal self -closing. But the gas turbine test platform power supply system of uninterrupted power supply has guaranteed the continuity and the reliability of test bench work.

Description

Test bench for gas turbine electric power system
Technical field
This utility model is related to gas turbine technology field, particularly to a kind of test bench for gas turbine electric power system.
Background technology
Gas turbine be a kind of gas using continuous flowing as working medium, heat energy is converted to the rotary power of mechanical energy Machinery.In recent years, its related R&D work has obtained the extensive attention of National Development and Reform Committee and the Department of Science and Technology, is put into China's science and technology Long-range developmental program give priority to field.On the basis of carrying out gas turbine design research and development, development experimental study is needed Carry out Numerical Validation and design optimization, this is accomplished by building test bench for gas turbine.
Electric power system provides test electricity consumption and general lighting electricity consumption for test bench for gas turbine, and conventional powering mode is more Single, generally only city powers a kind of mode.When occur city power power-off when, scientific research and testing have to stop.For combustion gas wheel The examination of machine endurance test or long period reliability test, city's power-off of powering can affect scientific research and testing progress, some tests due to Process interrupt even also wants accent to start, and additionally increases substantial amounts of test run expense and personal expenditures.
At present, in order to realize the standby of power supply, how the use of ups to be uninterrupted power source, be that (mostly plumbic acid exempts to tie up by accumulator Shield accumulator) it is connected with main frame, by modular circuits such as main frame inverters, unidirectional current is converted into the system equipment of civil power.Main It is used for providing to single computer, computer network system or other power electronic equipment such as electromagnetic valve, pressure transmitter etc. Stable, continual supply of electric power.When civil power input is normal, ups will be supplied to load to use after civil power voltage stabilizing, now Ups is exactly an electric main manostat, and it also charges to self-contained battery simultaneously;When commercial power interruption (forced outage), ups stands Will battery direct current energy, supply 220v alternating current is continued by the square normal load of inversion zero switch transition, so that load is tieed up Hold normal work and protect load soft and hardware without damage.Ups equipment generally can provide guarantor to overtension or brownout Shield.But powerful ups price comparison is expensive, power-on time is limited, and accumulator battery floor space is big, environmental-protecting performance is poor.
Also dual power supply can be adopted in some systems, but using conventional power transfer device, switch between power supply Time be generally higher than 300ms, slow up to 1 to 2s, within this time, again without realizing really continuously powering.And, Equipment is had to be shared in dual power supply, when shared device fails, test bench for gas turbine also can face the office of power-off Face.
Therefore, it is necessary to carry out perfect to test bench for gas turbine powering mode, improve test bench for gas turbine further Power supply continuity and reliability.
Content of the invention
In view of the shortcomings of the prior art, the technical problems to be solved in the utility model is to provide a kind of flammable gas-turbine Testing stand electric power system, is test bench for gas turbine continued power.
To achieve these goals, this utility model is to realize by the following technical solutions: a kind of gas turbine examination Test platform electric power system, the power supply producing including electromotor, the first double-power supply switching device, testing stand electricity consumption distribution box, electromotor It is transferred to testing stand electricity consumption distribution box, testing stand electricity consumption distribution box with city's power supply source after the first double-power supply switching device switches For testing bench control subsystem, circulation water subsystem, fuel oil subsystem and lubricating oil subsystem distribution.Wherein, city's power supply source and It is provided with the first chopper between one double-power supply switching device, between electromotor and the first double-power supply switching device, be connected with intelligence Chopper;Have signal to be connected between first chopper and electromotor, city power power-off when, transmit a signal to electromotor, control Electromotor automatic, simultaneously intelligent breaker automatically open up outside output electric energy;When city's service restoration is powered, electromotor receives Automatic shutting-down of signal, intelligent breaker disconnects automatically.
Further, the first double-power supply switching device is connected with apparatus for fast switching, for city's power supply source and electromotor Being switched fast of power supply.
Further, common electricity consumption distribution box, the second double-power supply switching device are also included, power supply and city that electromotor produces Power supply source is transferred to common electricity consumption distribution box after the second double-power supply switching device switches.City's power supply source is cut with the second dual power supply It is connected with the second chopper between changing device.Intelligent breaker is connected between electromotor and the second double-power supply switching device.
Further, system also includes ups, ups and testing bench control subsystem, circulation water subsystem, fuel oil subsystem, Lubricating oil subsystem is respectively connected with, for city power unexpected power-off when emergency service in short-term is provided, the capacity of ups is sent out according to diesel oil Motor starting time is selected.
The beneficial effects of the utility model:
1st, test bench for gas turbine electric power system of the present utility model, city's power supply as main power supply, for city is powered Be supplied to testing stand electricity consumption distribution box and common electricity consumption distribution box, electromotor as stand-by power supply, for city power power-off when will Generator powered is outwards transmitted;And, it is connected with apparatus for fast switching on the first double-power supply switching device, can quickly realize Being switched fast between city's power supply source and electrical power generators power supply, improves the power supply continuity of test bench for gas turbine.
2nd, test bench for gas turbine electric power system of the present utility model, is designed with ups, sends out for city's power supply source and electromotor During power-off that all break down in power supply two lines road or shared device breaks down, it is communication subsystem, recirculated water of testing stand System, fuel oil subsystem and lubricating oil subsystem provide emergency service it is ensured that the safety of whole experimental bench system and scientific research cycle Property test seriality, further increase power supply continuity and the reliability of test bench for gas turbine.
Brief description
In order to be illustrated more clearly that the specific embodiment of the invention or technical scheme of the prior art, below will be to concrete In embodiment or description of the prior art, the accompanying drawing of required use is briefly described.In all of the figs, similar element Or partly typically identified by similar reference.In accompanying drawing, each element or part might not be drawn according to actual ratio.
Fig. 1 is a kind of structural representation of this utility model test bench for gas turbine electric power system.
Specific embodiment
Below in conjunction with accompanying drawing, the embodiment of technical solution of the present invention is described in detail.Following examples are only used for Clearly technical scheme is described, is therefore only used as example, and the protection model of the present invention can not be limited with this Enclose.
It should be noted that unless otherwise stated, technical term used in this application or scientific terminology should be this The ordinary meaning that bright one of ordinary skill in the art are understood.
As described in Figure 1, a kind of technical scheme of this utility model offer:
A kind of test bench for gas turbine electric power system, uses including diesel-driven generator, the first double-power supply switching device, testing stand Electric distribution box, diesel-driven generator is connected with the first double-power supply switching device, city's power supply source and the first double-power supply switching device phase Connect, the first double-power supply switching device is connected with apparatus for fast switching, is capable of diesel-generator power sources and city's power supply source Between quick automatic switching, then by switching after electric energy be transferred to testing stand electricity consumption distribution box.Testing stand electricity consumption distribution box is Testing bench control subsystem, circulation water subsystem, fuel oil subsystem and lubricating oil subsystem distribution.
Wherein, it is provided with the first chopper, the first chopper and bavin between city's power supply source and the first double-power supply switching device There is signal to connect between oily hair motor, between diesel-driven generator and the first double-power supply switching device, be connected with intelligent breaker.When City power normal power supply when, mains supply line works, and to the first chopper, the first chopper is normally closed to city's power supply source output electric energy State, line conduction, electric energy transports to the first double-power supply switching device, and apparatus for fast switching acts on the first dual power supply switching dress Put, by quick power switching to city's power supply source power supply state, line conduction, power flow is to testing stand electricity consumption distribution box.Work as city During power supply power-off, the first circuit breaker trip simultaneously transmits a signal to diesel-driven generator, controls diesel-driven generator automatic, simultaneously Intelligent breaker automatically opens up, stand-by power supply line work, and diesel-driven generator generates electricity, output electric energy to intelligent breaker, due to Intelligent breaker automatically opens up, line conduction, and electric energy transports to the first double-power supply switching device, and apparatus for fast switching acts on , by quick power switching to diesel power generation power supply state, line conduction, power flow is to testing stand for one double-power supply switching device Electricity consumption distribution box.When service restoration is powered, electromotor receipt signal is automatically switched off, and intelligent breaker disconnects automatically.
Whole system also includes common electricity consumption, such as electric consumption on lighting.Power supply and city's power supply source and that diesel-driven generator produces Two double-power supply switching devices are connected, and realize diesel-generator power sources and the automatic switchover of city's power supply source, then by the electricity after switching Common electricity consumption distribution box can be transferred to.Wherein, it is provided with the second chopper between city's power supply source and the second double-power supply switching device, It is connected with intelligent breaker between diesel-driven generator and the second double-power supply switching device.When city powers normal power supply, main power supply Line work, to the second chopper, the second chopper is normally off to city's power supply source output electric energy, line conduction, and electric energy is transported to Second double-power supply switching device, the second double-power supply switching device switches to city's power supply source power supply state, line conduction, power flow To common electricity consumption distribution box.When city powers power-off, the first circuit breaker trip simultaneously transmits a signal to diesel-driven generator, controls bavin Oily hair motor automatic, simultaneously intelligent breaker automatically open up, stand-by power supply line work, diesel-driven generator generate electricity, output Electric energy to intelligent breaker, because intelligent breaker automatically opens up, line conduction, electric energy transport to second dual power supply switching dress Put, the second double-power supply switching device switches to diesel power generation power supply state, line conduction, and power flow is to common electricity consumption distribution Case.When city's service restoration is powered, electromotor receipt signal is automatically switched off, and intelligent breaker disconnects automatically.
The system is also devised with ups, and the capacity of ups is selected according to diesel-driven generator starting time.Testing stand electricity consumption Distribution box be connected with testing bench control subsystem, circulation water subsystem, fuel oil subsystem, lubricating oil subsystem, ups also respectively with survey Control subsystem, circulation water subsystem, fuel oil subsystem, lubricating oil subsystem are connected.When city's power supply source and electrical power generators source two When bar circuit all breaks down or certain shared device break down power-off when, ups for each system of testing stand provide short When emergency service it is ensured that the whole safety of experimental bench system and the seriality of scientific research periodic test, further increase combustion The seriality of gas-turbine testing stand and reliability.
Finally it is noted that various embodiments above, only in order to technical scheme to be described, is not intended to limit;To the greatest extent Pipe has been described in detail to the present invention with reference to foregoing embodiments, it will be understood by those within the art that: its according to So the technical scheme described in foregoing embodiments can be modified, or wherein some or all of technical characteristic is entered Row equivalent;And these modifications or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology The scope of scheme, it all should be covered in the middle of the claim of the present invention and the scope of description.

Claims (4)

1. a kind of test bench for gas turbine electric power system, including electromotor, the first double-power supply switching device, testing stand electricity consumption distribution Case, the power supply that described electromotor produces and city's power supply source are transferred to testing stand electricity consumption after the first double-power supply switching device switches Distribution box, described testing stand electricity consumption distribution box is testing bench control subsystem, circulation water subsystem, fuel oil subsystem and lubricating oil are sub System power;It is characterized in that: it is provided with the first chopper between described city power supply source and the first double-power supply switching device, described It is connected with intelligent breaker between electromotor and the first double-power supply switching device;There is letter between described first chopper and electromotor Number connect, city power power-off when, transmit a signal to electromotor, control electromotor automatic, intelligent breaker is automatic simultaneously Open outside output electric energy;When city's service restoration is powered, electromotor receipt signal is automatically switched off, and intelligent breaker disconnects automatically.
2. test bench for gas turbine electric power system according to claim 1 it is characterised in that: described first dual power supply switching Apparatus for fast switching is connected with device, for being switched fast of city's power supply source and generator powered power supply.
3. test bench for gas turbine electric power system according to claim 1 it is characterised in that: also include common electricity consumption distribution Case, the second double-power supply switching device, the power supply that described electromotor produces and city's power supply source are cut by the second double-power supply switching device It is transferred to common electricity consumption distribution box after changing;It is connected with the second open circuit between described city power supply source and the second double-power supply switching device Device;Described intelligent breaker is connected between electromotor and the second double-power supply switching device.
4. test bench for gas turbine electric power system according to claim 3 it is characterised in that: also include ups, ups and examination Test platform communication subsystem, circulation water subsystem, fuel oil subsystem, lubricating oil subsystem are respectively connected with.
CN201620961268.6U 2016-08-26 2016-08-26 Gas turbine test platform power supply system Expired - Fee Related CN205921447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620961268.6U CN205921447U (en) 2016-08-26 2016-08-26 Gas turbine test platform power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620961268.6U CN205921447U (en) 2016-08-26 2016-08-26 Gas turbine test platform power supply system

Publications (1)

Publication Number Publication Date
CN205921447U true CN205921447U (en) 2017-02-01

Family

ID=57869300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620961268.6U Expired - Fee Related CN205921447U (en) 2016-08-26 2016-08-26 Gas turbine test platform power supply system

Country Status (1)

Country Link
CN (1) CN205921447U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106230109A (en) * 2016-08-26 2016-12-14 中科合肥微小型燃气轮机研究院有限责任公司 Can the test bench for gas turbine electric power system of uninterrupted power supply

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106230109A (en) * 2016-08-26 2016-12-14 中科合肥微小型燃气轮机研究院有限责任公司 Can the test bench for gas turbine electric power system of uninterrupted power supply

Similar Documents

Publication Publication Date Title
Fu et al. Microgrids: architectures, controls, protection, and demonstration
TWI565175B (en) Electricity distribution system and electrical system
CN104092236B (en) hybrid renewable energy and energy storage system power supply system and control method thereof
CN103066684A (en) High voltage direct current power supply system
CN103457296B (en) A kind of independent operating micro-grid master control power-supply switching method
CN204304495U (en) A kind of photovoltaic intelligent electricity generation system possessing second function
CN105071527A (en) Small-power host modular fire-fighting emergency power supply
CN102891626A (en) Integrated portable solar power station
CN205921447U (en) Gas turbine test platform power supply system
CN103259327A (en) Electric power control system
CN104600751A (en) New-energy power generator grid-connection system
CN204316175U (en) Uninterruption power source
CN204465137U (en) The uninterruption power source device that a kind of civil power generating switches
CN212695892U (en) Double-switch power supply hot standby power supply unit
CN103840548A (en) Transformer substation system with microgrid system
CN205178860U (en) Uninterrupted power source supply ware of alternating current -direct current input
CN205017090U (en) Bank electric system
CN204633347U (en) A kind of intelligent micro-grid control system
CN203813510U (en) Transformer substation system with microgrid system
CN203722328U (en) Apparatus capable of automatically switch power frequency electric supply in case of UPS own faults
CN106230109A (en) Can the test bench for gas turbine electric power system of uninterrupted power supply
CN104218664A (en) Continuous power supply system for stadium at night
CN205017094U (en) Intelligence microgrid control system
CN204706942U (en) Direct current system is electric supply installation and DC suppling equipment again
CN204794330U (en) Static idle generating device main control unit supply circuit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180827

Address after: 238000 Huashan Industrial Park, Chaohu Economic Development Zone, Hefei, Anhui

Co-patentee after: Institute of Engineering Thermophysics, Chinese Academy of Sciences

Patentee after: CAS HEFEI MICRO GAS TURBINE RESEARCH INSTITUTE Co.,Ltd.

Address before: 238000 Huashan Industrial Park, Chaohu Economic Development Zone, Hefei, Anhui

Patentee before: CAS HEFEI MICRO GAS TURBINE RESEARCH INSTITUTE Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170201