CN208167502U - Modularization precast pier is laterally assembled to be constructed - Google Patents

Modularization precast pier is laterally assembled to be constructed Download PDF

Info

Publication number
CN208167502U
CN208167502U CN201820294377.6U CN201820294377U CN208167502U CN 208167502 U CN208167502 U CN 208167502U CN 201820294377 U CN201820294377 U CN 201820294377U CN 208167502 U CN208167502 U CN 208167502U
Authority
CN
China
Prior art keywords
assembly section
steel
assembly
assembled
lateral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201820294377.6U
Other languages
Chinese (zh)
Inventor
朱安静
庞伟
刘彬
李洋
马骏
蒲北辰
魏其忠
彭志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
North China Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Municipal Engineering Design and Research Institute Co Ltd filed Critical North China Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201820294377.6U priority Critical patent/CN208167502U/en
Application granted granted Critical
Publication of CN208167502U publication Critical patent/CN208167502U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of lateral assembled construction of modularization precast pier;It includes two sections of lateral middle assembly sections being arranged above and below, and two sections of lateral middle assembly save the end assembly section that left and right both ends are correspondingly connected with symmetrical structure;Lateral middle assembly section is connect with end assembly section by lateral anchor bolt pretightning force device.The utility model realizes bridge pier laterally assembly, can conveniently realize that bridge pier transverse segment is assembled and be reliably connected, and can adapt to bridge pier prefabrication and assembly construction under complex environment and builds, solves the construction assembly problem of modularization precast pier.The utility model is particularly suitable for the design-build of the prefabricated high pier of complex environment lower moduleization, greatly improves construction efficiency, shortens construction period.Realize that the construction of bridge pier prefabrication and assembly construction provides an effective way for bridge under complex environment.

Description

Modularization precast pier is laterally assembled to be constructed
Technical field
The utility model belongs to technical field of bridge engineering, and in particular to a kind of lateral assembled structure of modularization precast pier It makes, has the science of bridge building for quickly building demand suitable for various.
Background technique
Now with the industrialized propulsion of Chinese architecture, science of bridge building also starts to advocate industrialization construction, that is, uses factory The precast assembly component of change carries out bridge construction.Prefabricated assembled bridge can reduce to greatest extent the interference to existing traffic, Increase working security, reduce environmental pollution, improves construction quality, accelerate speed of application and reduction the life operation phase at This.The precast assembly technology of domestic bridge superstructure has tended to be mature, and bridge substructure especially bridge pier is prefabricated Assembling technique is only adopted in Donghai Bridge, Hangzhou Gulf Great Bridge, port Zhuhai and Macao bridge and some urban viaducts using less With.
Used the science of bridge building of precast assembly bridge pier, construction operation place is usually openr, and bridge pier be mostly in, Low pier, vertically assembled segment is less for bridge pier, and site condition is easy to use the biggish transport of tonnage, lifting construction mechanical.And multiple Bridge under heterocycle border, bridge pier is usually higher, and the biggish transport of tonnage, lifting construction machinery hardly enter construction site, bridge pier The component of small tonnage must be divided by realizing precast assembly just, i.e., bridge pier vertically will not only carry out multi-segmental division, horizontal To also need carry out segment division.The vertical connecting structure relative maturity of precast assembly bridge pier, therefore, a kind of adaptation modularization are prefabricated The lateral connection of bridge pier constructs and its construction method is the key that realize bridge pier prefabrication and assembly construction design-build under complex environment.
Summary of the invention
The purpose of this utility model is to provide a kind of prefabricated bridges of modularization for realizing that bridge pier is laterally assembled, construction efficiency is high Pier is laterally assembled to be constructed.The utility model can conveniently realize being reliably connected for bridge pier transverse segment assembly, energy It enough adapts to bridge pier prefabrication and assembly construction under complex environment to build, to solve the construction assembly problem of modularization precast pier.
To achieve the above object, the utility model provides the following technical solutions:A kind of modularization precast pier is laterally assembled Construction;It is characterized in that:Including two sections of lateral middle assembly sections being arranged above and below, two sections of left and right both ends of lateral middle assembly section It is correspondingly connected with the end assembly section of symmetrical structure;Lateral middle assembly section and end assembly section pass through lateral anchor bolt pretightning force and fill Set connection.
Lateral middle assembly section and end assembly section are high-strength thin-walled concrete prefabricated element.
Lateral middle assembly section left and right side is embedded with built-in steel-case, the left and right both ends of lateral middle assembly section be equipped with it is built-in The connection duct of steel case connection;Built-in steel-case is equipped with filter box mouth and vertical box mouth, and built-in steel-case outer surface is laid with socket cap Peg is acted on enhancing steel box outer wall and concrete binding.
The outer end of end assembly section(One end far from lateral middle assembly section)Equipped with end preformed groove is pre-tightened, it is reserved to pre-tighten end Slot is corresponding with the horizontal position of built-in steel-case, and assembly section in end is equipped with the end connecting with preload end preformed groove and connects duct;End Portion connection duct connects with duct is connect;It pre-tightens and is equipped with vertical slot on the inside of the preformed groove of end, outer end is equipped with end face notch.
It is pre-buried fining twisted steel bellows that end, which connects duct with duct is connect,.
Lateral anchor bolt pretightning force device includes anchor pole, pre-tightens end anchorage, fixing end anchorage, pre-tightens end backing plate and fixing end pad Plate;Anchor pole passes through end connection duct and installs fixing end anchorage and fixing end backing plate, fixing end anchor with duct, anchor pole inner end is connect Tool is located at built-in steel-case with fixing end backing plate and fixing end backing plate is installed on built-in steel-case vertical box mouth position, anchor pole outer end peace Dress pre-tightens end anchorage and preload end backing plate and preload end backing plate is installed on and pre-tightens end preformed groove vertical slot position.
Assembled seam crossing between lateral middle assembly section and left and right assembled section is coated with 2mm thickness epoxy adhesive.It is laterally pre- After the completion of clamp force applies, casting concrete in end preformed groove and built-in steel-case need to pre-tightened.The lateral assembled segment of the utility model It is reliably connected between end assembly section by lateral anchor bolt pretightning force device completion.
The utility model realizes bridge pier laterally assembly, and the utility model can conveniently realize bridge pier transverse direction Section assembling is reliably connected, and be can adapt to bridge pier prefabrication and assembly construction under complex environment and is built, solves modularization precast pier Construction assembly problem.The utility model construction efficiency is high, cross that is convenient, fast, reliably realizing modularization precast pier To assembly.
The utility model is by applying lateral pretightning force in lateral middle assembly section and end assembly section, easily and efficiently Realize being reliably connected for the two.Meanwhile 2mm thickness epoxy adhesive is applied between assembled seam and is further enhanced between assembled interface Friction, cementation.Therefore the utility model is particularly suitable for the design-build of the prefabricated high pier of complex environment lower moduleization, mentions significantly High construction efficiency shortens construction period.Realize that the construction of bridge pier prefabrication and assembly construction provides an effectively way for bridge under complex environment Diameter can promote bridge product quality, and it is horizontal to improve bridge prefabrication chemical industryization.
Detailed description of the invention
Fig. 1 is the general structure schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of lateral middle assembly section;
Fig. 3 is the structural schematic diagram of end assembly section;
Fig. 4 is lateral middle assembly section and end assembly section connection relationship diagram;
Fig. 5 is A-A sectional view of Fig. 4;
Fig. 6 is B-B sectional view of Fig. 5.
In figure:1-lateral middle assembly section, 2-built-in steel-cases, 201-filter box mouths, 202-socket cap pegs, 3- Assembled seam, 4-preload end preformed grooves, 401-end face notches, 5-anchor poles, 6-preload end anchorages, 7-fixing end anchorages, 8-pre-tighten end backing plate, and 9-fixing end backing plates, 10-connection ducts, 11-ends connect duct, 12-end assembly sections.
Specific embodiment
As shown in Figure 1:A kind of modularization precast pier is laterally assembled to be constructed;Including two sections of lateral middles being arranged above and below Assembly section 1, two sections of left and right both ends of lateral middle assembly section 1 are correspondingly connected with the end assembly section 12 of symmetrical structure;In transverse direction Portion's assembly section 1 is connect with end assembly section 12 by lateral anchor bolt pretightning force device.Lateral middle assembly section 1 and end assembly section 12 be high-strength thin-walled concrete prefabricated element.Assembly between lateral middle assembly section 1 and left and right end assembly section 12 connects It stitches and is coated with 2mm thickness epoxy adhesive at 3.
Referring to fig. 2:1 arranged on left and right sides of lateral middle assembly section is embedded with built-in steel-case 2, and lateral middle assembly section 1 is left and right Both ends are equipped with the connection duct 10 connecting with built-in steel-case 2;Built-in steel-case 2 is equipped with filter box mouth 201 and vertical box mouth, built-in steel 2 outer surface of case is laid with socket cap peg 202, is acted on enhancing steel box outer wall and concrete binding.
Referring to Fig. 3:The outer end of end assembly section 12, which is equipped with, pre-tightens end preformed groove 4, pre-tightens end preformed groove 4 and built-in steel-case 2 Horizontal position it is corresponding, end assembly section 12 is equipped with and the end connection duct 11 that pre-tightens end preformed groove 4 and connect;End connecting hole Road 11 connects with duct 10 is connect;It pre-tightens and is equipped with vertical slot on the inside of end preformed groove 4, outer end is equipped with end face notch 401.End Connection duct 11 is pre-buried fining twisted steel bellows with duct 10 is connect.
Referring to fig. 4 to Fig. 6:Lateral anchor bolt pretightning force device includes anchor pole 5, pre-tightens end anchorage 6, fixing end anchorage 7, pre-tightens Hold backing plate 8 and fixing end backing plate 9;Anchor pole 5 passes through end connection duct 11 and installs fixing end with duct 10,5 inner end of anchor pole is connect Anchorage 7 and fixing end backing plate 9, fixing end anchorage 7 is located at built-in steel-case 2 with fixing end backing plate 9 and fixing end backing plate 9 is installed on The vertical box mouth position of built-in steel-case 2, the installation of 5 outer end of anchor pole, which pre-tightens end anchorage 6 and pre-tightens end backing plate 8 and pre-tighten end backing plate 8, to block Mounted in the vertical slot position for pre-tightening end preformed groove 4.Anchor pole 5 is made by fining twisted steel, and finish rolling deformed bar is straight in this example Diameter is 25mm.
Bridge pier lateral middle assembly section 1 and end assembly section 12 are high-strength thin-walled concrete prefabricated element, tank wall thickness For 45cm, concrete grade C60.
Under self weight, secondary dead load, carload etc. vertically effect, lateral anchor bolt pretightning force device can ensure that bridge pier is entire Section forms whole coaction.
The construction method of the utility model approximately as:
(1)In pre-fabricated factory precast pier lateral middle assembly section 1 and end assembly section 12:It will be as connection duct 10 Fining twisted steel bellows, built-in steel-case 2 and 9 pre-plugged of fixing end backing plate are to bridge pier lateral middle assembly section 1, and built-in Lay multiple socket cap pegs 201 in 2 outer surface of steel case;It will be as the fining twisted steel bellows in end connection duct 11, preload It holds preformed groove 4 and pre-tightens 8 pre-plugged of end backing plate to bridge pier end assembly section 12.Reserved conduct connection duct is connect with end The fining twisted steel bellows in duct, so that the fining twisted steel as anchor pole passes through;Pre-buried built-in steel-case is finish rolling screw thread Steel carries out anchoring operation offer construction space after passing through reserving hole channel.The socket cap peg that built-in steel-case outer surface is laid, to increase The cementation of strong built-in steel-case outer wall and concrete.
(2)Pre-splicing lateral middle assembly section and bridge pier end assembly section at bridge location:In lateral middle assembly section 1 and bridge pier 2mm thickness epoxy adhesive is applied between the assembled seam 3 of end assembly section 12.
(3)Anchorage is installed:Anchor pole 5 is successively penetrated and pre-tightens end backing plate 8, end connection duct 11, connection duct 10 and consolidates Fixed end backing plate 9, the inner end of anchor pole 5 are placed in built-in steel-case 2 and install fixing end anchorage 7, and it is reserved that the outer end of anchor pole 5 is placed in preload end Slot 4 simultaneously installs preload end anchorage 6.
(4)Pretightning force is applied to bridge pier transverse direction prefabricated subsection:The pretightning force behaviour of lateral anchor bolt pretightning force device is carried out by root Make.
(5)Hole path pressure grouting:Hole path pressure grouting operation is carried out to fining twisted steel bellows.
(6)Sealing off and covering anchorage:Sealing off and covering anchorage is given to 2 casting concrete of built-in steel-case from filter box mouth 201;From end face notch 401 Sealing off and covering anchorage is given to 4 casting concrete of end preformed groove is pre-tightened.

Claims (8)

  1. It is constructed 1. a kind of modularization precast pier is laterally assembled, it is characterised in that:Two sections of lateral middles including being arranged above and below are spelled Dress section(1), two sections of lateral middle assembly sections(1)Left and right both ends are correspondingly connected with the end assembly section of symmetrical structure(12);Laterally Middle part assembly section(1)With end assembly section(12)It is connected by lateral anchor bolt pretightning force device.
  2. It is constructed 2. a kind of modularization precast pier as described in claim 1 is laterally assembled, it is characterised in that:Lateral middle is assembled Section(1)Arranged on left and right sides is embedded with built-in steel-case(2), lateral middle assembly section(1)Left and right both ends are equipped with and built-in steel-case(2)Even The connection duct connect(10);Built-in steel-case(2)Equipped with filter box mouth 201 and vertical box mouth.
  3. It is constructed 3. a kind of modularization precast pier as claimed in claim 2 is laterally assembled, it is characterised in that:Built-in steel-case(2) Outer surface is laid with socket cap peg(202).
  4. It is constructed 4. a kind of modularization precast pier as claimed in claim 3 is laterally assembled, it is characterised in that:End assembly section (12)Outer end be equipped with pre-tighten end preformed groove(4), pre-tighten end preformed groove(4)With built-in steel-case(2)Horizontal position it is corresponding, end Assembly section(12)Equipped with pre-tighten end preformed groove(4)The end of connection connects duct(11);End connects duct(11)With connection Duct(10)It connects;Pre-tighten end preformed groove(4)Inside is equipped with vertical slot, outer end is equipped with end face notch(401).
  5. It is constructed 5. a kind of modularization precast pier as claimed in claim 4 is laterally assembled, it is characterised in that:Lateral anchor bolt pre-tightens Power device includes anchor pole(5), pre-tighten end anchorage(6), fixing end anchorage(7), pre-tighten end backing plate(8)With fixing end backing plate(9);Anchor Bar(5)Duct is connected across end(11)With connect duct(10), anchor pole(5)Inner end is installed by fixing end anchorage(7)With fixing end Backing plate(9), fixing end anchorage(7)With fixing end backing plate(9)Positioned at built-in steel-case(2)And fixing end backing plate(9)It is installed on built-in Steel case(2)Vertical box mouth position, anchor pole(5)Outer end installation pre-tightens end anchorage(6)With preload end backing plate(8)And pre-tighten end pad Plate(8)It is installed on and pre-tightens end preformed groove(4)Vertical slot position.
  6. It is constructed 6. a kind of modularization precast pier as claimed in claim 5 is laterally assembled, it is characterised in that:End connects duct (11)With connect duct(10)For pre-buried fining twisted steel bellows;Anchor pole(5)It is made by fining twisted steel.
  7. 7. laterally assembly constructs a kind of modularization precast pier as described in claim 1 to 6 any one, it is characterised in that: Lateral middle assembly section(1)With end assembly section(12)Between assembled seam(3)Place is coated with 2mm thickness epoxy adhesive.
  8. It is constructed 8. a kind of modularization precast pier as claimed in claim 7 is laterally assembled, it is characterised in that:Lateral middle is assembled Section(1)With end assembly section(12)It is high-strength thin-walled concrete prefabricated element.
CN201820294377.6U 2018-03-02 2018-03-02 Modularization precast pier is laterally assembled to be constructed Withdrawn - After Issue CN208167502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820294377.6U CN208167502U (en) 2018-03-02 2018-03-02 Modularization precast pier is laterally assembled to be constructed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820294377.6U CN208167502U (en) 2018-03-02 2018-03-02 Modularization precast pier is laterally assembled to be constructed

Publications (1)

Publication Number Publication Date
CN208167502U true CN208167502U (en) 2018-11-30

Family

ID=64385480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820294377.6U Withdrawn - After Issue CN208167502U (en) 2018-03-02 2018-03-02 Modularization precast pier is laterally assembled to be constructed

Country Status (1)

Country Link
CN (1) CN208167502U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411770A (en) * 2018-03-02 2018-08-17 中国市政工程西北设计研究院有限公司 The lateral anchor bolts of modularization precast pier construct and its construction method
CN109853365A (en) * 2019-03-18 2019-06-07 北京工业大学 A kind of high pier construction of modularization prefabrication and assembly construction based on high-strength bolt connection and production method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411770A (en) * 2018-03-02 2018-08-17 中国市政工程西北设计研究院有限公司 The lateral anchor bolts of modularization precast pier construct and its construction method
CN108411770B (en) * 2018-03-02 2023-12-08 中国市政工程西北设计研究院有限公司 Transverse anchor bolt connection structure of modularized precast pier and construction method thereof
CN109853365A (en) * 2019-03-18 2019-06-07 北京工业大学 A kind of high pier construction of modularization prefabrication and assembly construction based on high-strength bolt connection and production method

Similar Documents

Publication Publication Date Title
CN203668815U (en) Concrete prefabricated section assembled pier
CN203213282U (en) Fabricated reinforced concrete frame structure system
CN2878478Y (en) Fabricated grooved beam for rear extending pre-stress segment pre-formation
CN110258789A (en) A kind of beam-column connection and its construction method that energy consumption rod iron is replaceable
CN104264584B (en) Combined cable-girder anchoring structure of pre-stressed concrete cable-stayed bridge top
CN208167502U (en) Modularization precast pier is laterally assembled to be constructed
CN113373797B (en) Prefabricated assembled concrete anti-seismic pier structure and repairing method
CN110792025A (en) Connection structure of assembled precast concrete decking and girder steel
CN101806220A (en) Structure extending open tunnel for existing rapid transit railway tunnel
CN1944796A (en) Prestress steel-concrete combined structure frame member
CN203768810U (en) Prefabricated bridge deck space steel pipe concrete truss combined beam
CN113107088A (en) Prestressed full-dry type connection assembly type concrete frame beam column joint
CN201650302U (en) Eiking clear hole structure of existing high speed railway tunnel
CN109457568A (en) A kind of beam prefabricated post-stressed assembly construction Craft of bilateral overlapping
CN210887565U (en) Assembled bolted connection roof beam-post node
CN112593644A (en) Prefabricated assembly type shear wall vertical joint connecting structure and construction method thereof
CN210262715U (en) Bridge engineering is with prefabricated assembled anticollision barrier
CN108411770A (en) The lateral anchor bolts of modularization precast pier construct and its construction method
CN203559329U (en) Steel-RPC (reactive powder concrete) combined bridge
CN113529944A (en) Beam-column energy-consumption connecting piece and construction method thereof
CN214401370U (en) Prefabricated viaduct structure of assembling of municipal administration
CN103556563B (en) Steel-RPC combined bridge
CN111719693A (en) Prestress assembly type steel-concrete sleeved beam-column joint
CN210561541U (en) Prefabricated assembled municipal concrete pavement
CN112942945A (en) Assembled tenon fourth of twelve earthly branches bracket type beam column node connecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20181130

Effective date of abandoning: 20231208

AV01 Patent right actively abandoned

Granted publication date: 20181130

Effective date of abandoning: 20231208