CN203668815U - Concrete prefabricated section assembled pier - Google Patents

Concrete prefabricated section assembled pier Download PDF

Info

Publication number
CN203668815U
CN203668815U CN201320758471.XU CN201320758471U CN203668815U CN 203668815 U CN203668815 U CN 203668815U CN 201320758471 U CN201320758471 U CN 201320758471U CN 203668815 U CN203668815 U CN 203668815U
Authority
CN
China
Prior art keywords
sections
concrete prefabricated
anchor block
prefabricated section
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320758471.XU
Other languages
Chinese (zh)
Inventor
张建东
刘朵
张帆
薛东焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Transportation Research Institute Co Ltd
Original Assignee
Jiangsu Transportation Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Transportation Research Institute Co Ltd filed Critical Jiangsu Transportation Research Institute Co Ltd
Priority to CN201320758471.XU priority Critical patent/CN203668815U/en
Application granted granted Critical
Publication of CN203668815U publication Critical patent/CN203668815U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a concrete prefabricated section assembled pier which comprises M first sections, N second sections, steel base plates, bolts, pre-stress ribs, anchoring blocks, a foundation and a top plate, wherein the M is larger than or equal to one, and the N is lager than or equal to one. One ends of the pre-stress ribs are anchored in the foundation, the other ends of the pre-stress ribs are anchored on the first section connected with the top plate, the M first sections and the N second sections are alternatively arranged between the foundation and the top plate, the anchoring blocks are arranged on the inner walls of the first sections, the pre-stress ribs are arranged along the inner walls of the first sections, penetrate through through holes pre-formed in the anchoring blocks on the inner walls of the first sections, and are fixed to the anchoring blocks through the bolts, and the steel base plates are arranged between the bolts and the anchoring blocks. According to the concrete prefabricated section assembled pier, the temporary supporting cost during pouring is reduced, and the construction period is shortened.

Description

A kind of concrete prefabricated section assembling bridge pier
Technical field
The utility model belongs to civil engineering bridge field, is specifically related to a kind of concrete prefabricated section assembling bridge pier.
Background technology
Precast assembly bridge pier, due to advantages such as its easy construction, duration are short, good endurance, is studied abroad and is applied, and is widely used in Oversea bridge engineering and offshore construction platform.The research of domestic section assembling construction technology is relative less with application, mainly concentrate in bridge superstructure, the nearly more than ten years just start for lower bridge pier structure, and the larger bottom precast construction recently completing is the constructure scheme of section assembling bridge pier as employings such as Donghai Bridge, Hangzhou Gulf Great Bridge, Changjiang River Bridge Shanghais.
From construction angle, bridge pier can be divided into integral cast-in-situ and prefabricated installation.Wherein, integral cast-in-situ bridge pier has good resistance to overturning, but its support cost is very high, the duration is relatively long.Precast Concrete Segmental Bridges bridge pier is by bridge pier vertically, be divided into some parts by certain modulus, builds then on-site consolidation at precasting yard on the ground.In China's Practical Project, section assembling bridge pier at present adopts wet seam to connect, adopt the mode of posttension prestressing with bond that sections is connected into entirety, but, between sections joint face, often can cause rod iron or steel hinge line corrosion owing to contacting leakiness, in addition, also need in preserved pipeline, be in the milk, working procedure complexity.
China is in extensive transport development period, the suitable application area of substructure section assembling construction technology just such as overhead road of city and bridge pier over strait.Therefore, study the assembled bridge pier of a kind of assembled precast concrete segment easy, durable practicality and just seem particularly urgent.
Summary of the invention
The purpose of this utility model is to provide a kind of concrete prefabricated section assembling bridge pier, while solving in prior art monobloc cast concrete pier, temporary supporting cost is high, the construction period long and while adopting wet seam splicing between sections contact closely, easily do not grind one's teeth and the problem such as rod iron easy-to-rust.
The technical solution that realizes the utility model object is: a kind of concrete prefabricated section assembling bridge pier, comprises M the first sections, N the second sections, billet, bolt, presstressed reinforcing steel, anchor block, basis, top board, wherein M >=1, N >=1; One end of presstressed reinforcing steel is anchored in basis, the other end is anchored on the first sections being connected with top board, between basis and top board, be arranged alternately M the first sections and N the second sections, on the first sections inwall, anchor block is set, presstressed reinforcing steel is along the inwall setting of the first sections, and through the through hole of offering in advance in the anchor block on the first sections inwall, be bolted on anchor block, between bolt and anchor block, be provided with billet.
The utility model compared with prior art, its remarkable advantage: mutual socket joint between (1) sections, can form the machine-processed horizontal loads of resisting of effective shearing resistance; (2) by external stretch-draw prestressing force rod iron or steel hinge line, can guarantee to connect closely between sections contact surface, there is good impermeable and durability performance, in reducing rod iron easy-to-rust risk, also facilitate operating personnel's construction and detected; (3) adopt and carry out preservative treatment on presstressed reinforcing steel surface, avoided this working procedure of duct grouting, the phase, assembled speed was fast, effectively the reduction of erection time; (4) meet with after earthquake, the convenient effective prestress size that checks, can mend if desired tension prestress or change rod iron.
Accompanying drawing explanation
Fig. 1 is the intersegmental connection diagram of concrete prefabricated section assembling bridge pier of the present utility model.
Fig. 2 is the A-A sectional drawing of concrete prefabricated sections 1 of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
In conjunction with Fig. 1 and Fig. 2, a kind of concrete prefabricated section assembling bridge pier, comprises M the first sections 1, N the second sections 2, billet 3, bolt 4, presstressed reinforcing steel 5, anchor block 7, basis 8, top board 9, wherein M >=1, N >=1; One end of presstressed reinforcing steel 5 is anchored in basis 8, the other end is anchored on the first sections 1 being connected with top board 9, between basis 8 and top board 9, be arranged alternately M the first sections 1 and N the second sections 2, on the first sections 1 inwall, anchor block 7 is set, presstressed reinforcing steel 5 is along the inwall setting of the first sections 1, and through the through hole 10 of offering in advance in the anchor block 7 on the first sections 1 inwall, be fixed on anchor block 7 by bolt 4, between bolt 4 and anchor block 7, be provided with billet 3.
Also comprise connector 6, between adjacent presstressed reinforcing steel 5, connect by connector 6.
Connector 6 is not arranged in anchor block 7, must be complete through the presstressed reinforcing steel 5 of through hole 10 in anchor block 7.
On the joint face between the first sections 1, the second sections 2, basis 8 and top board 9, apply epoxy resin.
Presstressed reinforcing steel 5 is prestressed steel bar or prestress wire.
So that being set between basis 8 and top board 9,1 and 3 the second sections 2 of 2 the first sections briefly explain as example, first, should complete at the scene that basic 8 templates are set up, assembling reinforcement and reservedly wear muscle through hole, penetrate afterwards prestress wire 5, water underpin 8 concrete and fixing prestress wire 5, then with lifting machine, second sections 2 is vertically placed on basis 8, on the second sections 2, put again first sections 1, by brushwork epoxy resin to sections with basis, joint face between sections and sections carries out joint treatment, subsequently will be through antiseptic prestress wire 5(external surface brushwork epoxy resin or zinc-plated) aim at through the reserved through hole 10 in anchor block 7, employing jack pair prestress wire 5 carries out stretch-draw and is fixed in the top of anchor block 7, lift by crane successively more afterwards another two second sections 2 and another first sections 1, until each sections lay in place after, interspersed prestress wire 5, adjacent prestress wire 5 connects by connector 6, joint is positioned at the second sections 2, the same jack that adopts is anchored at the presstressed reinforcing steel of upper end 5 in the first sections 1 being connected with top board 9, finally, place a block concrete top board 9 at prefabricated subsection 1 top and carry out encapsulation process, so just each prefabricated subsection closely can be assembled into a common stressed bridge abutment integral.Can guarantee closely to connect between prefabricated subsection by this connected mode, can effectively improve sealing and the durability performance of bridge pier.

Claims (5)

1. a concrete prefabricated section assembling bridge pier, it is characterized in that: comprise M the first sections (1), N the second sections (2), billet (3), bolt (4), presstressed reinforcing steel (5), anchor block (7), basis (8), top board (9), wherein M >=1, N >=1, one end of presstressed reinforcing steel (5) is anchored in basis (8), the other end is anchored on the first sections (1) being connected with top board (9), between basis (8) and top board (9), be arranged alternately M the first sections (1) and N the second sections (2), on the first sections (1) inwall, anchor block (7) is set, presstressed reinforcing steel (5) is along the inwall setting of the first sections (1), and through the through hole (10) of offering in advance in the anchor block (7) on the first sections (1) inwall, be fixed on anchor block (7) by bolt (4), between bolt (4) and anchor block (7), be provided with billet (3).
2. concrete prefabricated section assembling bridge pier according to claim 1, is characterized in that: also comprise connector (6), between adjacent presstressed reinforcing steel (5), connect by connector (6).
3. concrete prefabricated section assembling bridge pier according to claim 2, is characterized in that: connector (6) is not arranged in anchor block (7), must be complete through the presstressed reinforcing steel (5) of through hole (10) in anchor block (7).
4. concrete prefabricated section assembling bridge pier according to claim 1, is characterized in that: on the joint face between the first sections (1), the second sections (2), basis (8) and top board (9), apply epoxy resin.
5. concrete prefabricated section assembling bridge pier according to claim 1, is characterized in that: presstressed reinforcing steel (5) is prestressed steel bar or prestress wire.
CN201320758471.XU 2013-11-27 2013-11-27 Concrete prefabricated section assembled pier Expired - Lifetime CN203668815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320758471.XU CN203668815U (en) 2013-11-27 2013-11-27 Concrete prefabricated section assembled pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320758471.XU CN203668815U (en) 2013-11-27 2013-11-27 Concrete prefabricated section assembled pier

Publications (1)

Publication Number Publication Date
CN203668815U true CN203668815U (en) 2014-06-25

Family

ID=50965131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320758471.XU Expired - Lifetime CN203668815U (en) 2013-11-27 2013-11-27 Concrete prefabricated section assembled pier

Country Status (1)

Country Link
CN (1) CN203668815U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612038A (en) * 2015-01-22 2015-05-13 宁波大学 Flange-connecting concrete-filled double-wall steel pipe prefabricated assembly piers with additional dampers
CN105369739A (en) * 2015-12-07 2016-03-02 中铁大桥局上海工程有限公司 Bridge prefabricated structure assembly connection method and bridge
CN105386405A (en) * 2015-12-09 2016-03-09 北京工业大学 Precast segment assembled concrete filled steel tube bridge pier based on bolted connection
CN105714673A (en) * 2016-02-18 2016-06-29 东南大学 Self-restoration FRP-steel-concrete composite structure pier stud and construction method
US9777499B2 (en) * 2015-03-13 2017-10-03 National Applied Research Laboratories Precast segment, stacking structure and energy dissipation column thereof
CN108179696A (en) * 2018-01-31 2018-06-19 中交第二航务工程勘察设计院有限公司 A kind of post-tensioned prestressing precast hollow formula bridge pier rod structure and construction method
CN108411770A (en) * 2018-03-02 2018-08-17 中国市政工程西北设计研究院有限公司 The lateral anchor bolts of modularization precast pier construct and its construction method
CN110820545A (en) * 2019-11-08 2020-02-21 冯涛 Assembled concrete pier
CN110847018A (en) * 2019-11-12 2020-02-28 山东交通学院 Assembled concrete pier and construction method thereof
CN110886230A (en) * 2019-12-13 2020-03-17 安徽文天信息科技有限公司 A high strength rapid Assembly type bridge strutting arrangement for construction
CN114517440A (en) * 2022-01-28 2022-05-20 中铁二十局集团第四工程有限公司 Large-section arch rib and construction method thereof

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612038A (en) * 2015-01-22 2015-05-13 宁波大学 Flange-connecting concrete-filled double-wall steel pipe prefabricated assembly piers with additional dampers
US9777499B2 (en) * 2015-03-13 2017-10-03 National Applied Research Laboratories Precast segment, stacking structure and energy dissipation column thereof
CN105369739A (en) * 2015-12-07 2016-03-02 中铁大桥局上海工程有限公司 Bridge prefabricated structure assembly connection method and bridge
CN105369739B (en) * 2015-12-07 2018-01-12 中铁大桥局上海工程有限公司 The method and bridge of the assembled connection of bridge prefabrication structure
CN105386405A (en) * 2015-12-09 2016-03-09 北京工业大学 Precast segment assembled concrete filled steel tube bridge pier based on bolted connection
CN105714673A (en) * 2016-02-18 2016-06-29 东南大学 Self-restoration FRP-steel-concrete composite structure pier stud and construction method
CN105714673B (en) * 2016-02-18 2017-05-10 东南大学 Self-restoration FRP-steel-concrete composite structure pier stud and construction method
CN108179696A (en) * 2018-01-31 2018-06-19 中交第二航务工程勘察设计院有限公司 A kind of post-tensioned prestressing precast hollow formula bridge pier rod structure and construction method
CN108411770A (en) * 2018-03-02 2018-08-17 中国市政工程西北设计研究院有限公司 The lateral anchor bolts of modularization precast pier construct and its construction method
CN108411770B (en) * 2018-03-02 2023-12-08 中国市政工程西北设计研究院有限公司 Transverse anchor bolt connection structure of modularized precast pier and construction method thereof
CN110820545A (en) * 2019-11-08 2020-02-21 冯涛 Assembled concrete pier
CN110847018A (en) * 2019-11-12 2020-02-28 山东交通学院 Assembled concrete pier and construction method thereof
CN110886230A (en) * 2019-12-13 2020-03-17 安徽文天信息科技有限公司 A high strength rapid Assembly type bridge strutting arrangement for construction
CN110886230B (en) * 2019-12-13 2021-05-07 江苏省交通工程集团有限公司 A high strength rapid Assembly type bridge strutting arrangement for construction
CN114517440A (en) * 2022-01-28 2022-05-20 中铁二十局集团第四工程有限公司 Large-section arch rib and construction method thereof
CN114517440B (en) * 2022-01-28 2023-12-12 中铁二十局集团第四工程有限公司 Large-section arch rib and construction method thereof

Similar Documents

Publication Publication Date Title
CN203668815U (en) Concrete prefabricated section assembled pier
CN104929034B (en) A kind of modularization steel reinforced concrete rapid construction small box girder bridge and its construction method
CN110512647B (en) Partial assembly type subway station structure design and construction method
CN107165272A (en) Prestressing force assembly concrete frame joint attachment structure and its construction method
CN207194146U (en) Prestressing force assembly concrete frame joint attachment structure
CN108342982B (en) Self-anchoring structure at bearing cable beam end of cable crane of cable stayed bridge of mixed composite beam
CN103266574A (en) Simply-supported box girder bridge strengthening method with oblique cables
CN108867310A (en) The short rib T beam bridge of pretensioning prestressed concrete and its construction method
CN103938546A (en) Simple-supported continuous construction method and structure thereof
CN104153287A (en) Segmental assembled concrete frame pier system with self-reset function and method
CN109610315A (en) The dry joint connecting structure of prefabrication and assembly construction floorings and implementation method
CN110258789A (en) A kind of beam-column connection and its construction method that energy consumption rod iron is replaceable
CN103924680A (en) Precast concrete beam and square-rectangular concrete-filled steel tube column combining joint employing unbonded prestressed and ordinary reinforcement for connection
CN203768810U (en) Prefabricated bridge deck space steel pipe concrete truss combined beam
CN108411769A (en) A kind of assembled device of prefabricated pier shaft and prefabricated bent cap
CN204753604U (en) A excavation supporting system for expanding soil district
CN205046464U (en) Prefabricated assembled concrete bridge mound
CN103614974A (en) Prestress sectional steel reinforcing system of reinforced concrete arch shell bridge body
CN107100322B (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN204059179U (en) A kind of T-shaped plate girder precast segment unit based on steel truss and combined bridge deck
CN206887745U (en) A kind of section assembling FRP using SMA strengthens concrete pier of steel tube
CN103924679B (en) Prestressed concrete beam and circular steel pipe concrete column combined joint connected with regular rebars
CN107246094B (en) Superposed reinforced concrete slab structure capable of bearing heavy load and manufacturing method
CN103510458B (en) Pile type continuous rigid frame bridge and construction method thereof
CN203475289U (en) Pile type continuous rigid frame bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140625

CX01 Expiry of patent term