CN208164959U - One kind can have enough to meet the need mobile tank car flushing tank - Google Patents
One kind can have enough to meet the need mobile tank car flushing tank Download PDFInfo
- Publication number
- CN208164959U CN208164959U CN201820755567.3U CN201820755567U CN208164959U CN 208164959 U CN208164959 U CN 208164959U CN 201820755567 U CN201820755567 U CN 201820755567U CN 208164959 U CN208164959 U CN 208164959U
- Authority
- CN
- China
- Prior art keywords
- filtration case
- meet
- enough
- picking
- container
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000011010 flushing procedure Methods 0.000 title claims abstract description 27
- 238000001914 filtration Methods 0.000 claims abstract description 54
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 20
- 239000000463 material Substances 0.000 claims abstract description 18
- 238000007789 sealing Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 41
- 239000004576 sand Substances 0.000 abstract description 8
- 239000004575 stone Substances 0.000 abstract description 7
- 238000005266 casting Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 11
- 239000010959 steel Substances 0.000 description 11
- 238000004140 cleaning Methods 0.000 description 5
- 238000004064 recycling Methods 0.000 description 5
- 239000004568 cement Substances 0.000 description 4
- 239000002699 waste material Substances 0.000 description 4
- 230000001376 precipitating effect Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 2
- 238000009435 building construction Methods 0.000 description 2
- 229920001971 elastomer Polymers 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 230000008447 perception Effects 0.000 description 2
- 239000005060 rubber Substances 0.000 description 2
- 239000011701 zinc Substances 0.000 description 2
- 229910052725 zinc Inorganic materials 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model, which provides one kind, can have enough to meet the need mobile tank car flushing tank, including three cabinets being successively set on a bottom plate, picking-up container, by-pass filtration case and secondary filtration case;Between picking-up container and by-pass filtration case, it is respectively communicated between by-pass filtration case and secondary filtration case and is connected to position and be respectively arranged with primary filter and secondary filter;It is provided with discharge door on the side wall of three cabinets, is provided with idler wheel below bottom plate;It is provided with material receiving port at the top of picking-up container, secondary filtration case is provided with drainpipe, and drainpipe is connected with water pump.The beneficial effects of the utility model are:The utility model production is simple, can be moved according to casting concrete pump truck position, eliminates previous engineering construction scene and special concrete tank is specified to rinse region;It can be saved water using the utility model, stone, sand and moisture class are recycled, the investment of project construction cost is effectively reduced, conducive to the smooth implementation of engineering project green construction.
Description
Technical field
The utility model relates to technical field of building construction more particularly to one kind can have enough to meet the need mobile tank car flushing tank.
Background technique
Building engineering construction field green construction is more more and more universal, and manpower financial capacity needed for the greening of scene also gradually increases,
Current engineering construction scene is not provided with the concrete tank flushing device tank car driver that leaves and rinses everywhere, and serious pollution construction is existing
Field and urban health, the difficulty of the stealthy investment for increasing construction site labour and urban sanitary workers' work, engineering are applied
What work scene was specified, which has special concrete tank to rinse region, still can have contamination phenomenon, and be unfavorable for projects cost
The development of control and green construction.
With comprehensive covering of construction Dust Improvement, green construction gradually becomes the keypoint treatment of each project under construction
, gradually increase in line with the work that the theory of " four sections " environmental protection is carried out, every engineering support in Building Construction
In the case that measure is sound, major building constructor is making great efforts to improve engineering construction scene material profit margin, reduces engineering project
Construction cost.So engineering construction scene is not provided with the concrete tank flushing device tank car driver that leaves and rinses everywhere or work
Journey construction site specifies special concrete tank to rinse, and region etc. not can solve and there are pollution problems.
There are mainly two types of for current existing technical solution:Concrete tank travels out engineering construction site and voluntarily rinses
Cleaning, will lead to urban health and seriously pollutes, increase the work difficulty of sanitationman, waste of material is serious, and is unfavorable for city
Civilization construction;Engineering construction scene specifies special concrete tank to rinse region, occupies engineering construction scene temporary site
It is more, still there can be pollution problem when concrete tank rinses, it is bad to influence the whole perception of engineering construction and scene.
The concrete tank flushing tank that construction site is used, in early days using designated position brick masonry at the construction field (site) or
Person's concreting, then do the form of waterproof.Such method increases engineering site temporary site area, and the previous item of mesh
Mesh has several or even more than ten or more single building, and pump truck casting position is uncertain, from pump truck position after the completion of concreting
It sets and arrives the distance between flushing tank position again, often result in concrete and trickle down on road, impurely lower can use water and live ring
Border health is also unfavorable for opening for projects cost control and green construction while increasing construction site labour investment
Exhibition.
Summary of the invention
In order to solve the above technical problems, the utility model provides one kind and can be needed at the scene according to engineering construction scene
That puts and move on road and may be implemented repeatedly to have enough to meet the need has enough to meet the need mobile tank car flushing tank, effectively reduces engineering
The investment of cost of building projects, conducive to the smooth implementation of engineering project green construction.
The utility model is realized by following measure:One kind can have enough to meet the need mobile tank car flushing tank, including successively set
Set three cabinets on a bottom plate, picking-up container, by-pass filtration case and secondary filtration case;
Distinguish between the picking-up container and the by-pass filtration case, between the by-pass filtration case and the secondary filtration case
It is connected to and is connected to position and be respectively arranged with primary filter and secondary filter;
It is provided with discharge door on the side wall of three cabinets, is provided with idler wheel below the bottom plate;
Material receiving port is provided at the top of the picking-up container, the secondary filtration case is provided with drainpipe, the drainpipe connection
There is water pump.
The primary filter is 4 mesh screens, and the secondary filter is 8 mesh screens.
The discharge door inner sidewall is provided with sealing strip close to surrounding position.
The picking-up container is higher than the by-pass filtration case and the secondary filtration case, and the material receiving port surrounding is provided with oblique
Upper outside flange.
The by-pass filtration case and the secondary filtration box top are provided with observation door.
Three cabinets are that the size of square box and length and width is that 600mm × 900mm, wall thickness are
3mm, the height of the picking-up container are 1500mm, and the height of the by-pass filtration case and the secondary filtration case is 900mm.
It is provided by the utility model to have enough to meet the need the mobile long 1800mm of tank car flushing tank, wide 900mm, high 1500mm, it uses
Angle steel is welded as frame by the steel plate of 30 × 30 × 5 Zinc-coated angle steels and the 3mm of correspondingly-sized thickness, 4 150mm rubber
Idler wheel is welded on bottom plate.
In use, having enough to meet the need mobile tank car flushing tank by described and being moved to tank car tail portion, the material receiving port is directed at tank car
Feed opening;Then water flowing is cleaned above tank car, and the water with concrete after cleaning is from the feed opening of tank car through institute
Mobile tank car flushing tank can be had enough to meet the need described in material receiving port inflow by stating;The sand of stone in concrete and greater particle size after filtering
Son is stored in the lesser sand of partial size in the picking-up container inner concrete and is stored in the by-pass filtration case;Remaining water
In if can be recycled containing cement is less, returned in tank car and cleaned by the water pump;It is beaten after the completion of cleaning
The discharge door is opened, stone and sand are cleaned up into recycling, the water containing cement is by filtering precipitating recycling.
It is provided by the utility model to have enough to meet the need mobile tank car flushing tank, it is all according to unified standard batch production production
Component, workshop after processing is completed, assembly and connection can be carried out immediately by being transported to building-site, form the mobile tank car punching of integral type
Wash pool can apply in concreting engineering after processing is completed.It is provided by the utility model to have enough to meet the need mobile tank car
Flushing tank can be moved according to engineering construction scene, realized that construction site faces and built land used reduction, save the area, and
The stone generated after filtering can rinse tank car with recycling and reusing in levelling of the land, the hardening of engineering construction scene temporary road etc.
With water after filtering precipitating, it can be avoided polluted underground water, be conducive to environmental protection, be green construction technology measure, solve
The problem of concrete tank is driven out to engineering construction scene and is not rinsed unrestrained concrete, pollutes construction site and urban health
Cause the whole perception in engineering construction scene poor with specifying region to rinse at engineering construction scene, waste of material, cost input increases
The problems such as adding, is conducive to the step for the green construction that engineering project follow-up country advocates.
Provided by the utility model to have enough to meet the need mobile tank car flushing tank easy to make, can quickly be used in turn, and institute
The materials such as the steel plate, the angle steel that use are extremely wide in each building engineering construction field application, can according to the actual situation all or
Part is conducive to the materials such as the waste and old steel plate in engineering construction scene, iron sheet, steel fabric sheet, angle steel, can make by specification cutting,
The waste for greatly reducing material is conducive to projects cost control.
The beneficial effects of the utility model are:The utility model production is simple, can be according to casting concrete pump truck position
It is moved, eliminates previous engineering construction scene and special concrete tank is specified to rinse region, solved occupancy engineering and apply
The more problem of work scene temporary site;Mobile tank car flushing tank is had enough to meet the need using provided by the utility model, can be saved
With water, stone, sand and moisture class are recycled, the investment of project construction cost is effectively reduced, is conducive to work
The smooth implementation of journey project green construction.
Detailed description of the invention
Fig. 1 is the overall schematic of the utility model embodiment.
Fig. 2 is the schematic diagram for the discharge door that the utility model embodiment removes by-pass filtration case and secondary filtration case.
Wherein, appended drawing reference is:1, bottom plate;2, picking-up container;3, by-pass filtration case;4, secondary filtration case;5, by-pass filtration
Net;6, secondary filter;7, discharge door;8, idler wheel;9, material receiving port;10, drainpipe;11, water pump;12, flange;13, door is observed.
Specific embodiment
In order to clarify the technical characteristics of the invention, being illustrated below by specific embodiment to this programme.
Referring to Fig. 1-2, the utility model is that one kind can have enough to meet the need mobile tank car flushing tank, including be successively set on a bottom plate
Three cabinets on 1, picking-up container 2, by-pass filtration case 3 and secondary filtration case 4;
It is respectively communicated with and is connected between picking-up container 2 and by-pass filtration case 3, between by-pass filtration case 3 and secondary filtration case 4
Position is respectively arranged with primary filter 5 and secondary filter 6;
It is provided with discharge door 7 on the side wall of three cabinets, idler wheel 8 is provided with below bottom plate 1;
Material receiving port 9 is provided at the top of picking-up container 2, secondary filtration case 4 is provided with drainpipe 10, and drainpipe 10 is connected with water pump
11。
Primary filter 5 is 4 mesh screens, and secondary filter 6 is 8 mesh screens.
7 inner sidewall of discharge door is provided with sealing strip close to surrounding position.
Picking-up container 2 is higher than by-pass filtration case 3 and secondary filtration case 4, and 9 surrounding of material receiving port is provided with flange outside obliquely
12。
Observation door 13 is provided at the top of by-pass filtration case 3 and secondary filtration case 4.
Three cabinets are that the size of square box and length and width is 600mm × 900mm, wall thickness 3mm, are connect
The height of hopper 2 is 1500mm, and the height of by-pass filtration case 3 and secondary filtration case 4 is 900mm.
Provided by the utility model to have enough to meet the need mobile tank car flushing tank overall length 1800mm, wide 900mm, high 1500mm make
It uses angle steel as frame, is welded by the steel plate of 30 × 30 × 5 Zinc-coated angle steels and the 3mm of correspondingly-sized thickness, 4 150mm rubbers
Rubber-surfaced roll wheel 8 is welded on bottom plate 1.
In use, can have enough to meet the need mobile tank car flushing tank is moved to tank car tail portion, material receiving port 9 is directed at the blanking of tank car
Mouthful;Then water flowing is cleaned above tank car, and the water with concrete after cleaning is flowed from the feed opening of tank car through material receiving port 9
Enter to have enough to meet the need mobile tank car flushing tank;The sand of the stone in concrete and greater particle size is stored in splicing after filtering
The lesser sand of partial size is stored in by-pass filtration case 3 in 2 inner concrete of case;In remaining water if containing cement is less can
To be recycled, is returned in tank car and cleaned by water pump 11;Discharge door 7 is opened after the completion of cleaning, by stone and sand
Recycling is cleaned up, the water containing cement is by filtering precipitating recycling.
Technical characteristic of the utility model without description can realize that details are not described herein by or using the prior art,
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above, this technology neck
The variations, modifications, additions or substitutions that the those of ordinary skill in domain is made in the essential scope of the utility model, also should belong to
The protection scope of the utility model.
Claims (6)
1. one kind can have enough to meet the need mobile tank car flushing tank, which is characterized in that including three cabinets being successively set on a bottom plate,
Picking-up container, by-pass filtration case and secondary filtration case;
It is respectively communicated between the picking-up container and the by-pass filtration case, between the by-pass filtration case and the secondary filtration case
And it is connected to position and is respectively arranged with primary filter and secondary filter;
It is provided with discharge door on the side wall of three cabinets, is provided with idler wheel below the bottom plate;
It is provided with material receiving port at the top of the picking-up container, the secondary filtration case is provided with drainpipe, and the drainpipe is connected with water
Pump.
2. according to claim 1 have enough to meet the need mobile tank car flushing tank, which is characterized in that the primary filter is 4
Mesh screen, the secondary filter are 8 mesh screens.
3. according to claim 1 have enough to meet the need mobile tank car flushing tank, which is characterized in that the discharge door inner sidewall leans on
Nearly surrounding position is provided with sealing strip.
4. according to claim 1-3 have enough to meet the need mobile tank car flushing tank, which is characterized in that the picking-up container
Higher than the by-pass filtration case and the secondary filtration case, the material receiving port surrounding is provided with flange outside obliquely.
5. according to claim 1-3 have enough to meet the need mobile tank car flushing tank, which is characterized in that the level-one mistake
Filter box and the secondary filtration box top are provided with observation door.
6. according to claim 1-3 have enough to meet the need mobile tank car flushing tank, which is characterized in that three casees
Body is that the size of square box and length and width is 600mm × 900mm, wall thickness 3mm, the height of the picking-up container
For 1500mm, the height of the by-pass filtration case and the secondary filtration case is 900mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820755567.3U CN208164959U (en) | 2018-05-21 | 2018-05-21 | One kind can have enough to meet the need mobile tank car flushing tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820755567.3U CN208164959U (en) | 2018-05-21 | 2018-05-21 | One kind can have enough to meet the need mobile tank car flushing tank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208164959U true CN208164959U (en) | 2018-11-30 |
Family
ID=64364548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820755567.3U Expired - Fee Related CN208164959U (en) | 2018-05-21 | 2018-05-21 | One kind can have enough to meet the need mobile tank car flushing tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208164959U (en) |
-
2018
- 2018-05-21 CN CN201820755567.3U patent/CN208164959U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203494265U (en) | Solid and liquid separation device of construction waste collecting system | |
CN212237647U (en) | Construction waste treatment system | |
CN204523497U (en) | Slag coarse aggregate washing screening device | |
CN208164959U (en) | One kind can have enough to meet the need mobile tank car flushing tank | |
CN109235911A (en) | A kind of water-saving depositing dust construction method of construction site | |
CN107869101A (en) | A kind of prefabricated assembled Intercepting Drain Used in Highway and its manufacture method | |
CN208072571U (en) | A kind of villages within the city's separate system | |
CN208212697U (en) | A kind of separation and recovery reutilization system of discarded concrete and waste water and dregs | |
CN206597378U (en) | Sedimentation basin is recycled suitable for probing water | |
CN109469093A (en) | A kind of construction method on engineering truck cleaning equipment in-site installation basis | |
CN206810747U (en) | Concrete washing equipment | |
CN213038444U (en) | Temporary device for screening sludge in river channel culvert | |
CN205224780U (en) | Can have enough to meet need reinforcing bar waste material pond | |
CN208853442U (en) | A kind of aluminium electroloysis waste lining leaching pond | |
CN210194691U (en) | Protective structure for post-cast strip of settlement of basic raft | |
CN204163177U (en) | A kind of for the blowdown apparatus in factory building | |
CN205461381U (en) | Wash concrete conveying pipe's wastewater collection system system | |
CN207712022U (en) | Vehicle rinsing stage apparatus | |
CN210238633U (en) | Rainwater recycling system | |
CN207805215U (en) | A kind of mixing plant band square sedimentation basin | |
CN206867795U (en) | A kind of filter plate for filter tank | |
CN214884255U (en) | Tool for preventing floor drain from being blocked | |
CN206233254U (en) | A kind of underground captation | |
CN218517356U (en) | Concrete pump pipe flushing and draining system | |
CN203247687U (en) | Water collection recycling system in field area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201211 Address after: No.3099 national highway bridge section no.3099, Tianqiao District, Jinan City, Shandong Province Patentee after: Shandong China Construction Eighth bureau investment and Construction Co.,Ltd. Address before: No. 89, Gongye South Road, Lixia District, Jinan City, Shandong Province Patentee before: THE FIRST COMPANY OF CHINA EIGHTH ENGINEERING BUREAU Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |