CN208153078U CN201820405718.2U CN201820405718U CN208153078U CN 208153078 U CN208153078 U CN 208153078U CN 201820405718 U CN201820405718 U CN 201820405718U CN 208153078 U CN208153078 U CN 208153078U
Authority
CN
China
Prior art keywords
steam
residual air
power
heat
turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820405718.2U
Other languages
Chinese (zh)
Inventor
李宝珠
王敬欣
商甲伟
魏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Energy Engineering Technology Co Ltd
Original Assignee
Hebei Construction Energy Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Energy Engineering Technology Co Ltd filed Critical Hebei Construction Energy Engineering Technology Co Ltd
Priority to CN201820405718.2U priority Critical patent/CN208153078U/en
Application granted granted Critical
Publication of CN208153078U publication Critical patent/CN208153078U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/14Combined heat and power generation [CHP]

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The utility model discloses a kind of systems for carrying out cogeneration of heat and power using residual air resource, are related to industrial residual air utilization of resources field.The utility model includes gas turbine, the waste heat boiler being connected by diffuser with the exhaust outlet of gas turbine, and the steam turbine being connect with the steam steam drain of waste heat boiler, the gas turbine and gas turbine powered generator are driven, the steam turbine and steam turbine generator are driven, the steam drain of the steam turbine is connect with steam pipe network, and the electric quantity output end of the gas turbine powered generator and steam turbine generator is connect with other electrical equipments or power grid.The utility model thermal efficiency is high, and exhaust gas discharge is less, has fewer environmental impacts.

Description

A kind of system carrying out cogeneration of heat and power using residual air resource
Technical field
It is especially a kind of to be using residual air resource cogeneration of heat and power the utility model relates to industrial residual air utilization of resources field System.
Background technique
Industrial generation coke-stove gas calorific value is higher, there is very big utility value.In the prior art to coke-stove gas Utilization in, the thermal efficiency is low, and exhaust gas discharge more causes serious pollution to the environment.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of system using residual air resource cogeneration of heat and power, this realities High with the novel thermal efficiency, exhaust gas discharge is less, has fewer environmental impacts.
In order to solve the above technical problems, technical solution adopted in the utility model is:It is a kind of to be carried out using residual air resource The system of cogeneration of heat and power, it is characterised in that:Including gas turbine, the waste heat being connected by diffuser with the exhaust outlet of gas turbine Boiler, and the steam turbine connecting with the steam steam drain of waste heat boiler, the gas turbine and gas turbine powered generator pass Dynamic, the steam turbine and steam turbine generator are driven, and the steam drain of the steam turbine is connect with steam pipe network, the combustion The electric quantity output end of gas-turbine generator and steam turbine generator is connect with other electrical equipments or power grid.
Be connected with a further technical solution lies in, the air inlet of the gas turbine for being pressurized to gas, The positive battery metering device of filtration treatment.
Further technical solution also resides in, and the positive battery metering device includes the emergency cut-off list connecting with appendix Member, and the coarse filtration unit, the separating and filtering that successively connect with the gas outlet of emergency cut-off unit condense storage unit, metering list The air inlet of member, pressurization and cooling unit and outlet port unit, the outlet port unit and gas turbine connects.
Further technical solution also resides in, and the positive battery metering device successively includes emergency cut-off unit, coarse filtration list Member, separating and filtering condensation storage unit, metering units, pressurization and cooling unit and outlet port unit.
Further technical solution also resides in, and the outlet port unit is connected with the release system for diffusing safely to residual air System.
Further technical solution also resides in, and the diffuser is connected with the air inlet of waste heat boiler by expansion joint.
Further technical solution also resides in, and the exhaust vent of the waste heat boiler is connect with chimney, the chimney Height is 40 meters, and is internally provided with silencer and rain-proof baffle.
Further technical solution also resides in, and the water filling port of the waste heat boiler is connected with frequency conversion feed pump.
Further technical solution also resides in, and is connected with deoxygenation between the frequency conversion feed pump and the water filling port of waste heat boiler Device.
Further technical solution also resides in, and the steam turbine is equipped with gland heater, the gland heater The connection of the entrance of water outlet and oxygen-eliminating device.
Generated beneficial effect is by adopting the above technical scheme:In the utility model, steam turbine and waste heat boiler Between diffuser expansion joint is installed, can be used for absorbing thermal expansion and obstruct vibration;The outlet installation of positive battery metering device is tight Anxious cutting unit, when fire occurs for gas turbine or main building, emergency cut-off unit (uses accident emergency pneumatic valve or spring Valve) it will turn off to prevent residual air from entering main building, for the safety relief for guaranteeing parsing feed channel, residual air pipeline is equipped with and puts The system of dissipating, is diffused in prescribed way.The utility model thermal efficiency is high, exhaust gas discharge is few, has fewer environmental impacts.
Detailed description of the invention
Utility model will be further described in detail below with reference to the attached drawings and specific embodiments.
Fig. 1 is the principles of the present invention figure;
Specific embodiment
Below with reference to the attached drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out clear Chu is fully described by, it is clear that and described embodiment is only a part of the embodiment of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Many details are explained in the following description in order to fully understand the utility model, but this is practical new Type can also be implemented using other than the one described here other way, and those skilled in the art can be without prejudice to this reality With doing similar popularization in the case where novel intension, therefore the utility model is not limited by the specific embodiments disclosed below.
In the present embodiment, appendix is for providing residual air (being known as resolution gas after Hydrogen Extraction From Coke Oven Gas).The outlet of appendix Mouth is connected with positive battery metering device.The exhaust outlet of positive battery metering device and the air inlet of gas turbine connect, gas turbine and combustion Gas-turbine generator drive gear drives gas turbine powered generator power generation.The exhaust outlet of gas turbine passes through diffuser and waste heat boiler Air inlet connection, and diffuser is equipped with expansion joint, for absorbing thermal expansion and obstructs vibration.The exhaust gas of waste heat boiler is arranged Port is connect with chimney, and the height of chimney is 40 meters, and silencer and rain-proof baffle are sequentially installed with inside chimney.Waste heat boiler Steam steam drain is connect with steam turbine, and steam turbine and steam turbine generator are driven, and drives steam turbine generator power generation, The steam drain of steam turbine is connect with steam pipe network, is recycled to high-temperature steam.Frequency conversion feed pump after oxygen-eliminating device with it is remaining The water filling port connection of heat boiler is for whole system moisturizing.Gland heater is installed, gland heater can on steam turbine To recycle gland packing leakage and using its heat come the device of heat-setting water, energy loss is reduced, the thermal effect of steam turbine is improved Rate.The outlet of gland heater and the entrance of oxygen-eliminating device connect, since steam turbine is back pressure machine, no condenser, unit moisturizing It need to mend to atmospheric type deaerator.Demineralized water enters oxygen-eliminating device deoxygenation after gland heater heats.Gas turbine powered generator and steaming Turbine generator provides electricity for the use of other electrical equipments, is can transport after extra electricity is boosted to neighbouring power grid.
In the present embodiment, gas turbine has 2, model SGT-400, and matching gas turbine powered generator is 15MW Generator also have 2;Positive battery metering device has 3 sets, wherein 1 set spare;Steam turbine is that back pressure type has 2, model B1.5-3.43/0.981, matching steam turbine generator are that the generator of 15MW also has 2;Oxygen-eliminating device is 2.5t/h , have 2 wherein 1 it is spare;The parameter of frequency conversion feed pump is Q=600m3/ h, H=30m, the parameter of necessary electromotor are N= 65kW, n=1450r/min, frequency conversion feed pump also have 2 wherein 1 it is spare.
In the present embodiment, pressure of the residual air in appendix is about 0.1-0.4MPa, into positive battery metering device, measure, Crude separation, essence filtering, heating, pressure is about 2.6MPa after pressurization, and quality and the term of delivery can satisfy the use of gas turbine Gas requirement.When fire occurs for gas turbine or main building, emergency cut-off unit (using accident emergency pneumatic valve or spring valve) will It is automatically closed to prevent residual air from entering main building, for the safety relief for guaranteeing residual air pipeline, residual air pipeline is equipped with diffusion system, It diffuses in prescribed way.Residual air by gas turbine inlet duct after filtering, introduce compressor compression boosting, subsequently into combustion Gas turbine combustion chamber, enters combustion chamber after preheating after residual air boosting, the high-temperature flue gas after burning enters gas turbine acting, band Dynamic gas turbine powered generator power generation.The flue gas of the discharge of gas turbine enters waste heat boiler, waste heat boiler and diffusion through diffuser Coupled between pipe with expansion joint, absorbing thermal expansion simultaneously obstructs vibration.The high-temperature flue gas that gas turbine excludes first enters in waste heat boiler Mouth loudspeaker section continues to spread, until being uniformly distributed before heating surface, superheater, each pressure evaporating then in turn through waste heat boiler Device, economizer, heating furnace water generates superheated steam around here, and is sent into steam turbine acting after being allowed to overheat.Last flue-gas temperature Be down to about 120 DEG C, into chimney, then pass sequentially through silencer, rain-proof baffle door to steel stack is discharged into atmosphere, every waste heat pot Furnace matches a chimney.Due to using clean energy resource, chimney height temporarily presses 40m consideration.The final determination of chimney height is examined by environmental impact assessment Opinion and actually determined boiler shape are looked into determine.The heating steam of steam turbine steam drain discharge, through attemperator desuperheat Parameter is 0.8MPa afterwards, 183 DEG C, is passed through steam pipe network and is recycled.Steam turbine generator and gas turbine powered generator hair Electricity output be 10kV can access plant area's power grid, after can boosting if any extra electricity access nearby power grid.

Claims (9)

1. a kind of system for carrying out cogeneration of heat and power using residual air resource, it is characterised in that:Including gas turbine, by diffuser with The connected waste heat boiler of the exhaust outlet of gas turbine, and the steam turbine being connect with the steam steam drain of waste heat boiler, it is described Gas turbine and gas turbine powered generator are driven, and the steam turbine and steam turbine generator are driven, the steam turbine Steam drain is connect with steam pipe network, electric quantity output end that the gas turbine powered generator and steam turbine generator issue and other Electrical equipment or power grid connection.
2. a kind of system for carrying out cogeneration of heat and power using residual air resource according to claim 1, it is characterised in that:The combustion The air inlet of gas-turbine is connected with for being pressurized to gas, the positive battery metering device of filtration treatment.
3. a kind of system for carrying out cogeneration of heat and power using residual air resource according to claim 2, it is characterised in that:The increasing Pressing metering device includes the emergency cut-off unit connecting with appendix, and successively connect with the gas outlet of emergency cut-off unit Coarse filtration unit, separating and filtering condensation storage unit, metering units, pressurization and cooling unit and outlet port unit, the outlet are single Member is connect with the air inlet of gas turbine.
4. a kind of system for carrying out cogeneration of heat and power using residual air resource according to claim 3, it is characterised in that:It is described go out Mouth unit is also connected with the diffusion system for diffusing safely to residual air.
5. a kind of system for carrying out cogeneration of heat and power using residual air resource according to claim 1, it is characterised in that:The expansion Separate tube is connected with the air inlet of waste heat boiler by expansion joint.
6. a kind of system for carrying out cogeneration of heat and power using residual air resource according to claim 1, it is characterised in that:It is described remaining The exhaust vent of heat boiler is connect with chimney, and the height of the chimney is 40 meters, and is internally provided with silencer and rain-proof Baffle.
7. a kind of system for carrying out cogeneration of heat and power using residual air resource according to claim 1, it is characterised in that:It is described remaining The water filling port of heat boiler is connected with frequency conversion feed pump.
8. a kind of system for carrying out cogeneration of heat and power using residual air resource according to claim 7, it is characterised in that:The change Oxygen-eliminating device is connected between frequency feed pump and the water filling port of waste heat boiler.
9. a kind of according to claim 1,8 any system for carrying out cogeneration of heat and power using residual air resource, it is characterised in that: The steam turbine is equipped with gland heater, and the water outlet of the gland heater and the entrance of oxygen-eliminating device connect.
CN201820405718.2U 2018-03-23 2018-03-23 A kind of system carrying out cogeneration of heat and power using residual air resource Expired - Fee Related CN208153078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820405718.2U CN208153078U (en) 2018-03-23 2018-03-23 A kind of system carrying out cogeneration of heat and power using residual air resource

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820405718.2U CN208153078U (en) 2018-03-23 2018-03-23 A kind of system carrying out cogeneration of heat and power using residual air resource

Publications (1)

Publication Number Publication Date
CN208153078U true CN208153078U (en) 2018-11-27

Family

ID=64392618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820405718.2U Expired - Fee Related CN208153078U (en) 2018-03-23 2018-03-23 A kind of system carrying out cogeneration of heat and power using residual air resource

Country Status (1)

Country Link
CN (1) CN208153078U (en)

Similar Documents

Publication Publication Date Title
CN202732012U (en) Ventilation air methane oxidization power generation system
CN107747503A (en) A kind of system and operation method of Thermal generation unit Ultra-low load operation
CN106321174B (en) A kind of electricity generation system using high-temperature flue gas waste heat
CN103353239A (en) Improved lime kiln exhaust gas waste heat power generation system and power generation method thereof
ZA949840B (en) Arrangement for improving efficiency of a power plant
CN102839999B (en) Small steam turbine exhaust steam cold source loss recovery system and method
CN105443244A (en) Fuel gas-steam combined cycle power generator set two-stage coal gas pressurization system
CN208153078U (en) A kind of system carrying out cogeneration of heat and power using residual air resource
CN209326387U (en) A kind of power generation system with residual heat of fume
CN109539216B (en) Combined power generation system integrating garbage incineration boiler and coal-fired boiler
CN203964690U (en) A kind of flue gas heat recovery device of bell type heating furnace
CZ120894A3 (en) Device with a combination of gas and steam turbine for generating electric power
RU118360U1 (en) INSTALLATION OF ELECTRIC-HEAT-WATER SUPPLY OF ENTERPRISES OF MINING, TRANSPORT AND PROCESSING OF HYDROCARBON RAW MATERIALS
RU2666271C1 (en) Gas turbine co-generation plant
RU2350758C2 (en) Start-up, operation and load-relief method of combined heat-and-power plant, and device for method's realisation
CN201589537U (en) Device utilizing deaerating feed to heat condensed water in cement kiln afterheat generation
CN110822399A (en) Gas boiler for waste heat in metallurgical industry and combustion control method thereof
WO2015187064A2 (en) Multi-mode combined cycle power plant
RU2272914C1 (en) Gas-steam thermoelectric plant
RU2261337C1 (en) Power and heating plant with open power and heat supply system
RU134993U1 (en) INSTALLATION OF ELECTRIC-HEAT-WATER SUPPLIES
RU164323U1 (en) INSTALLATION OF ELECTRIC-HEAT-WATER-COLD SUPPLIES
RU44171U1 (en) HEAT ELECTROCENTRAL WITH AN OPEN HEATING SYSTEM
CN218154255U (en) Self-balancing reheating system of waste incineration disposal power station
CN219976370U (en) Heating device for power station boiler after stopping

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181127

Termination date: 20210323

CF01 Termination of patent right due to non-payment of annual fee