CN208152734U - A kind of building site stable type guardrail - Google Patents

A kind of building site stable type guardrail Download PDF

Info

Publication number
CN208152734U
CN208152734U CN201820571343.7U CN201820571343U CN208152734U CN 208152734 U CN208152734 U CN 208152734U CN 201820571343 U CN201820571343 U CN 201820571343U CN 208152734 U CN208152734 U CN 208152734U
Authority
CN
China
Prior art keywords
lower rail
dock leveler
upper railing
link slot
building site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820571343.7U
Other languages
Chinese (zh)
Inventor
严宇航
严峰杰
孙青艳
管金月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yangguang Xinge Fence Technology Co Ltd
Original Assignee
Jiangsu Yangguang Xinge Fence Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yangguang Xinge Fence Technology Co Ltd filed Critical Jiangsu Yangguang Xinge Fence Technology Co Ltd
Priority to CN201820571343.7U priority Critical patent/CN208152734U/en
Application granted granted Critical
Publication of CN208152734U publication Critical patent/CN208152734U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of building site stable type guardrails, including upper railing and lower rail, intermediate rail is provided between the upper railing and lower rail, one end of the intermediate rail is bolted in upper railing, the other end is bolted on lower rail, it is provided with link slot inside the left end of the upper railing and lower rail, the right end of the upper railing and lower rail is provided with connecting column, and the link slot and connecting column are worked in coordination;By devising the DOCK LEVELER being mounted on lower rail surface and fixed plate, when installing fixed, it is only necessary to unscrew the bolt on lower rail, after regulating height, it is fixed in fixed plate by installing bolt, guardrail can be installed and be fixed, when needing mobile, when DOCK LEVELER being transferred to the top again after installation bolt is screwed off, railing can be moved by idler wheel, movement is set to get up more convenient, more laborsaving and saving labour installs more stable.

Description

A kind of building site stable type guardrail
Technical field
The utility model belongs to guard bar technique field, and in particular to a kind of building site stable type guardrail.
Background technique
Guardrail is said herein to refer to industrial " protective fence ".Guardrail is mainly used for house, highway, shopping centre, public place Etc. protection and protection in occasions to personal safety and installations and facilities.Guardrail is visible everywhere in we live.Guardrail is according to height The difference of degree, the price of every meter of length also can be different.
The guardrail in existing building site is all to fix stabilizer blade by installing bolt on the ground mostly, so that guardrail is moving More people are needed to carry guardrail during dynamic or transport, to carry both inconvenient and relatively elaborate, increasing Add labour, due to the out-of-flatness of building site ground, guardrail installation after can be uneven, in interconnection, will cause connecting column and The problem of link slot can not engaged on a horizontal, thus it is proposed that a kind of building site stable type guardrail.
Utility model content
The purpose of this utility model is to provide a kind of building site stable type guardrails, to solve to propose in above-mentioned background technique Existing building site guardrail be all mostly stabilizer blade is fixed on the ground by installing bolt so that guardrail mobile or More people are needed to carry guardrail during transport, to carry both inconvenient and relatively elaborate, increase labour Power can be uneven after guardrail installation due to the out-of-flatness of building site ground, in interconnection, will cause connecting column and link slot The problem of can not engaged on a horizontal.
To achieve the above object, the utility model provides the following technical solutions:A kind of building site stable type guardrail, including it is upper Railing and lower rail, are provided with intermediate rail between the upper railing and lower rail, one end of the intermediate rail passes through bolt It is fixed in upper railing, the other end is bolted on lower rail, is all provided with inside the left end of the upper railing and lower rail It is equipped with link slot, the right end of the upper railing and lower rail is provided with connecting column, and the link slot and connecting column are worked in coordination, And the link slot and connecting column are bolted to connection, the bottom end of the lower rail is provided with idler wheel, the idler wheel it is upper End is provided with whorl brace rod, and one end of the idler wheel is fixed by welding in idler wheel, and the other end is connected to by screwing mode On lower rail, the front and rear surfaces of the lower rail are provided with DOCK LEVELER, and the surface of the DOCK LEVELER is provided with cunning Slot, the bottom end of the DOCK LEVELER is provided with fixed plate, and the fixed plate and DOCK LEVELER are fixed by welding Connection, the surface of the fixed plate are provided with mounting hole, and the DOCK LEVELER is bolted to connection on lower rail.
Preferably, reflective strip is provided on the upper railing, lower rail and intermediate rail surface.
Preferably, the link slot is consistent with the size and location of connecting column.
Preferably, it is all provided on the link slot and connecting column fluted.
Preferably, the DOCK LEVELER is L structure.
Compared with prior art, the utility model has the beneficial effects that:It is mounted on lower rail surface by devising DOCK LEVELER and fixed plate, when installing fixed, it is only necessary to unscrew the bolt on lower rail, after regulating height, pass through Installation bolt is fixed in fixed plate, so that it may be fixed guardrail installation, when needing mobile, after installation bolt is screwed off again When DOCK LEVELER is transferred to the top, so that it may be moved to railing by idler wheel, so that movement is got up more convenient, more Laborsaving and saving labour, installs more stable;By the whorl brace rod being mounted on idler wheel, can be rolled by rotation Wheel, so that whorl brace rod is outwardly or inwardly adjusted, so as to adjust the length of idler wheel, thus keep the height of guardrail consistent, So that can be attached between guardrail, keep guardrail practicability higher.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is that the guardrail of the utility model is connected with each other structural schematic diagram;
Fig. 3 is the DOCK LEVELER side structure schematic view of the utility model;
Fig. 4 is the structure of mounting hole schematic diagram of the utility model;
In figure:1- upper railing, 2- link slot, 3- intermediate rail, 4- idler wheel, 5- whorl brace rod, 6- sliding slot, 7- are fixed Plate, 8- DOCK LEVELER, 9- lower rail, 10- connecting column, 11- mounting hole.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1 to FIG. 4,:A kind of building site stable type guardrail, including it is upper Railing 1 and lower rail 9, are provided with intermediate rail 3 between upper railing 1 and lower rail 9, one end of intermediate rail 3 is solid by bolt It is scheduled in upper railing 1, the other end is bolted on lower rail 9, is respectively provided with inside the left end of upper railing 1 and lower rail 9 There is a link slot 2, the right end of upper railing 1 and lower rail 9 is provided with connecting column 10, and link slot 2 and connecting column 10 are worked in coordination, and Link slot 2 and connecting column 10 are bolted to connection, and the bottom end of lower rail 9 is provided with idler wheel 4, and the upper end of idler wheel 4 is provided with Whorl brace rod 5, one end of idler wheel 4 are fixed by welding in idler wheel 4, and the other end is connected on lower rail 9 by screwing mode, The front and rear surfaces of lower rail 9 are provided with DOCK LEVELER 8, and the surface of DOCK LEVELER 8 is provided with sliding slot 6, DOCK LEVELER 8 Bottom end be provided with fixed plate 7, and fixed plate 7 and DOCK LEVELER 8 are fixedly connected by welding, the surface of fixed plate 7 It is provided with mounting hole 11, DOCK LEVELER 8 is bolted to connection on lower rail 9.
In order to remind the vehicle of dealing, prevent accident, in the present embodiment, it is preferred that upper railing 1, lower rail 9 and in Between be provided with reflective strip on 3 surface of railing.
In order to engage link slot 2 and connecting column 10, in the present embodiment, it is preferred that link slot 2 and connecting column 10 Size and location is consistent.
In order to which link slot 2 and connecting column 10 to be fixed by bolt, in the present embodiment, it is preferred that link slot 2 and company Connect be all provided on column 10 it is fluted.
In order to keep guardrail stable type higher, in the present embodiment, it is preferred that DOCK LEVELER 8 is L structure.
The working principle and process for using of the utility model:After device installation, guardrail is first placed on required installation Position after, by unscrewing the bolt on lower rail 9, by DOCK LEVELER 8 to downward, so that fixed plate 7 is with ground face contact Can, then bolt is screwed, then installation bolt is passed through into mounting hole 11, fixed plate 7 is fixed on the ground, others are by the above step It is rapid all set after, then the guardrail of next guardrail and front is attached, by the link slot 2 of next guardrail and the shield of front After column connecting column 10 engages, it is fixed by bolt, due to the ground out-of-flatness in building site, it is too low to encounter next guardrail, under , can be by swing roller 4 after the link slot 2 of a guardrail can not be engaged with the guardrail connecting column 10 of front, it will be with idler wheel 4 The whorl brace rod 5 of connection is extended after unscrewing, so that the height of entire guardrail is improved, to be attached, subsequent shield Column connection is identical as above step, and circulation is gone down always, installs until by guardrail, upper railing 1, the intermediate rail 3 of guardrail It is both provided with reflective strip in 9 front and rear surfaces of lower rail, the vehicle to remind dealing is used for, prevents accident.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of building site stable type guardrail, including upper railing(1)And lower rail(9), it is characterised in that:The upper railing(1) And lower rail(9)Between be provided with intermediate rail(3), the intermediate rail(3)One end be bolted on upper railing(1) On, the other end is bolted on lower rail(9)On, the upper railing(1)And lower rail(9)Left end inside be provided with Link slot(2), the upper railing(1)And lower rail(9)Right end be provided with connecting column(10), the link slot(2)And even Connect column(10)It works in coordination, and the link slot(2)And connecting column(10)It is bolted to connection, the lower rail(9)'s Bottom end is provided with idler wheel(4), the idler wheel(4)Upper end be provided with whorl brace rod(5), the idler wheel(4)One end pass through It is weldingly fixed on idler wheel(4), the other end is connected to lower rail by screwing mode(9)On, the lower rail(9)Front and rear surfaces It is provided with DOCK LEVELER(8), the DOCK LEVELER(8)Surface be provided with sliding slot(6), the DOCK LEVELER(8) Bottom end be provided with fixed plate(7), and the fixed plate(7)And DOCK LEVELER(8)It is fixedly connected by welding, it is described Fixed plate(7)Surface be provided with mounting hole(11), the DOCK LEVELER(8)It is bolted to connection in lower rail(9) On.
2. a kind of building site stable type guardrail according to claim 1, it is characterised in that:The upper railing(1), lower rail (9)And intermediate rail(3)Reflective strip is provided on surface.
3. a kind of building site stable type guardrail according to claim 1, it is characterised in that:The link slot(2)And connection Column(10)Size and location it is consistent.
4. a kind of building site stable type guardrail according to claim 3, it is characterised in that:The link slot(2)And connection Column(10)On be all provided with it is fluted.
5. a kind of building site stable type guardrail according to claim 1, it is characterised in that:The DOCK LEVELER(8)For L Structure.
CN201820571343.7U 2018-04-20 2018-04-20 A kind of building site stable type guardrail Expired - Fee Related CN208152734U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820571343.7U CN208152734U (en) 2018-04-20 2018-04-20 A kind of building site stable type guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820571343.7U CN208152734U (en) 2018-04-20 2018-04-20 A kind of building site stable type guardrail

Publications (1)

Publication Number Publication Date
CN208152734U true CN208152734U (en) 2018-11-27

Family

ID=64378742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820571343.7U Expired - Fee Related CN208152734U (en) 2018-04-20 2018-04-20 A kind of building site stable type guardrail

Country Status (1)

Country Link
CN (1) CN208152734U (en)

Similar Documents

Publication Publication Date Title
CN110904895A (en) Highway bridge railing cleaning equipment based on vehicle
CN202831589U (en) Movable type security operating platform
CN208152734U (en) A kind of building site stable type guardrail
CN204435922U (en) Protection device of elevator shaft
CN106869472A (en) A kind of building scaffold easy to use
CN208267260U (en) A kind of architectural engineering adjustable protective fence
CN206110846U (en) Building site safety protective guard
CN208792890U (en) A kind of adjustable assembling guardrail
CN206971788U (en) A kind of construction high-altitude guard rail
CN212641203U (en) Novel road and bridge engineering is with protection frame
CN111409656A (en) Adjustable mine inclined shaft maintenance operation platform
CN206308652U (en) A kind of highway guard rail
CN205663303U (en) Building construction safety intelligence rail guard
CN213772931U (en) Stretching-in type viaduct side construction crawling ladder
CN213626587U (en) Hanging flower basket for construction
CN214807990U (en) Accessible life rope system device of preventing falling that passes through
CN219637773U (en) Road side guardrail with adjustable height
CN213927808U (en) Rail guard is used in municipal garden construction
CN204960193U (en) Guardrail bar is prevented to movable stair of dismantling
CN219411928U (en) Telescopic edge protection device for building construction
CN208219504U (en) A kind of combination-type guardrail
CN213418439U (en) Safety inclination protection device for attached scaffold
CN217894815U (en) Exempt from to climb ware mounting structure
CN216428972U (en) Scaffold for building electromechanical installation engineering
CN213509550U (en) Scaffold inboard free position drag props protector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181127

Termination date: 20190420