CN208140401U - A kind of geologic prospect engineering is with taking soil device - Google Patents
A kind of geologic prospect engineering is with taking soil device Download PDFInfo
- Publication number
- CN208140401U CN208140401U CN201820544832.3U CN201820544832U CN208140401U CN 208140401 U CN208140401 U CN 208140401U CN 201820544832 U CN201820544832 U CN 201820544832U CN 208140401 U CN208140401 U CN 208140401U
- Authority
- CN
- China
- Prior art keywords
- telescopic rod
- electric telescopic
- sliding block
- output end
- sampler barrel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Sampling And Sample Adjustment (AREA)
Abstract
The utility model discloses a kind of geologic prospect engineerings with taking soil device, including electric drill, pedestal and rotating electric machine, two sides above the pedestal are all welded with support column, motorized precision translation stage is installed above the support column, the inside of the motorized precision translation stage is equipped with screw rod by bearing, the surface screw thread of the screw rod is equipped with the first sliding block, the first electric telescopic rod is installed on first sliding block, the output end of first electric telescopic rod is equipped with electric drill, the screw thread of first sliding block side is equipped with the second sliding block, the second electric telescopic rod is installed on second sliding block, the output end of second electric telescopic rod is equipped with rotating electric machine by mounting base, the output end of the rotating electric machine is equipped with sampler barrel by bearing.The utility model makes the present apparatus have many advantages, such as that easy to use, sampling effect is good and sampling efficiency is high during taking soil by being provided with a series of structure.
Description
Technical field
The utility model relates to geologic prospect design library part editor and reuse technical field, specially a kind of geologic prospect engineering is with taking soil
Device.
Background technique
Geologic prospect is made from broadly can be regarded as geology T, is according to economic construction, national defense construction and scientific technological advance
Needs, surveyed with mapping, geophysical exploration, geochemical exploration, probing, probing, sampling test, the geology such as geolovic remote sensing
Checking method, the investigation work that the geological conditions such as rock, stratigraphic structure, mineral products, underground water, landforms in a given area are carried out
Make, the acquisition of pedotheque is the basis of soil science research, geological mapping field, is mentioned for the measurement of pedotheque physicochemical property
Material base is supplied, the sampling of soil there are many methods, generally samples using drilling pipe, after drilling pipe pierces underground, soil is being bored
An earth pillar is formd in pipe, earth pillar is taken out and is analyzed, and conventional soil sampler is equipped with a cutting ring, passes through hand
Dynamic or automatic mode rotates cutting ring, is sampled, but a cutting ring, in rotation sampling process, progress is slow, encounters hard
Cutting ring is easy to happen Caton phenomenon when soil layer, makes motor viscous motion, and sampling is time-consuming and laborious, and soil is inconvenient to take after sampling
It takes out by force out and is easily destroyed soil globality influence inspection result.
Utility model content
The purpose of this utility model is to provide a kind of geologic prospect engineerings with soil device is taken, to solve above-mentioned background skill
The problem of being proposed in art.
To achieve the above object, the utility model provides the following technical solutions:A kind of geologic prospect engineering is with taking soil to fill
It sets, including electric drill, pedestal and rotating electric machine, the two sides above the pedestal are all welded with support column, the top of the support column
Motorized precision translation stage is installed, the inside of the motorized precision translation stage is equipped with screw rod, the surface screw thread peace of the screw rod by bearing
Equipped with the first sliding block, the first electric telescopic rod, the output end peace of first electric telescopic rod are installed on first sliding block
Equipped with electric drill, the screw thread of first sliding block side is equipped with the second sliding block, and is equipped on second sliding block
The output end of two electric telescopic rods, second electric telescopic rod is equipped with rotating electric machine, the rotating electric machine by mounting base
Output end sampler barrel is equipped with by bearing, the inner wall of the sampler barrel is provided with internal screw thread, taking between the internal screw thread
Third electric telescopic rod is installed, the output end of the third electric telescopic rod is equipped with baffle, the sampler barrel inside sample cylinder
Port annular blade is installed, the input terminal of the screw rod is equipped with stepper motor, the surface installation of the support column side
There is power supply box, the output end of the power supply box passes through conducting wire and rotating electric machine, stepper motor, the first electric telescopic rod, the second electricity
Dynamic telescopic rod and the input terminal of third electric telescopic rod are electrically connected.
Preferably, the support column surface below the stepper motor is provided with control button.
Preferably, the two sides of the pedestal are all welded with fixing seat, and spud pile is movably installed in fixing seat.
Preferably, the surface of the sampler barrel is provided with observation window, and the surface of observation window is provided with graduated scale.
Preferably, the inside of the pedestal is hollow form.
Compared with prior art, the utility model has the beneficial effects that:The geologic prospect engineering is passed through with taking soil device
Fixing seat and spud pile are installed, can facilitate and device is integrally fixed during tube sample boring, prevent tube sample boring
The vibration generated in the process, which causes device to shift, influences tube sample boring effect, harder when encountering by being equipped with electric drill
It can be drilled first by electric drill when geological stratification and smash hard layer, facilitating later period sampler barrel to be sampled prevents sampler barrel card
It firmly or damages, by being equipped with rotating electric machine, sampler barrel and annular blade, rotating electric machine can be passed through and drive sampler barrel and endless knife
Piece carries out rotating to be deep into soil being sampled, and more convenient saving physical strength improves efficiency, by being provided with observation window
And graduated scale, it can facilitate and need the soil level deep to sampler barrel to observe according to the sampling of different soils layer, thus
Carrying out control keeps the accuracy of sampling higher, can by being equipped with motorized precision translation stage, screw rod, stepper motor and electric telescopic rod
It is convenient that the horizontal position of electric drill and sampler barrel and height are adjusted, can precise positioning, by being provided with internal screw thread,
The soil fixing of sampling can be made to be attached in sampler barrel by increasing the frictional force of soil and sampler barrel inner wall, prevent sampling process
Middle soil, which skids off, to be fallen, and by being equipped with third electric telescopic rod and baffle, can be facilitated soil after sampling from sampler barrel
Interior release, while so that soil is able to maintain integrality and avoiding influencing inspection result.
Detailed description of the invention
Fig. 1 is the schematic diagram of internal structure of the utility model;
Fig. 2 is the main view of the utility model;
Fig. 3 is the side view of the utility model;
Fig. 4 is the sampler barrel external structure schematic diagram of the utility model;
Fig. 5 is the base part structural schematic diagram of the utility model;
Fig. 6 is the sampler barrel schematic diagram of internal structure of the utility model.
In figure:1, screw rod;2, support column;3, electric drill;4, pedestal;5, fixing seat;6, spud pile;7, sampler barrel;8, it rotates
Motor;9, mounting base;10, the second electric telescopic rod;11, stepper motor;12, the second sliding block;13, motorized precision translation stage;14, it controls
Button;15, bearing;16, observation window;17, graduated scale;18, annular blade;19, third electric telescopic rod;20, baffle;21, interior
Screw thread;22, the first electric telescopic rod;23, the first sliding block;24, power supply box.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-6, a kind of embodiment provided by the utility model:A kind of geologic prospect engineering with taking soil device,
Including electric drill 3, pedestal 4 and rotating electric machine 8, the inside of pedestal 4 is hollow form, and the two sides of pedestal 4 are all welded with fixing seat 5, and
It is movably installed with spud pile 6 in fixing seat 5, can facilitate and device is integrally fixed during tube sample boring, prevents from taking
The vibration generated in sample boring procedure, which causes device to shift, influences tube sample boring effect, and the two sides of 4 top of pedestal are all welded
There is support column 2, the top of support column 2 is equipped with motorized precision translation stage 13, and the inside of motorized precision translation stage 13 is equipped with by bearing 15
Screw rod 1, the surface screw thread of screw rod 1 are equipped with the first sliding block 23, are equipped with the first electric telescopic rod 22 on the first sliding block 23, and first
The output end of electric telescopic rod 22 is equipped with electric drill 3, and can carry out drilling by electric drill 3 first when encountering harder geological stratification will
Hard layer smashes, and facilitating later period sampler barrel 7 to be sampled prevents sampler barrel 7 from blocking or damaging, the screw rod 1 of 23 side of the first sliding block
Surface screw thread is equipped with the second sliding block 12, and the second electric telescopic rod 10 is equipped on the second sliding block 12, can facilitate to electric drill 3 and take
The horizontal position of sample cylinder 7 and height are adjusted, can precise positioning, the output end of the second electric telescopic rod 10 passes through peace
Dress seat 9 is equipped with rotating electric machine 8, this 8 model of rotating electric machine can be Y90S-2 motor, and the output end of rotating electric machine 8 passes through bearing
15 are equipped with sampler barrel 7, and the surface of sampler barrel 7 is provided with observation window 16, and the surface of observation window 16 is provided with graduated scale 17, can
Facilitate and need the soil level deep to sampler barrel 7 to observe according to the sampling of different soils layer, so that carrying out control makes
The accuracy of sampling is higher, and the inner wall of sampler barrel 7 is provided with internal screw thread 21, can be by increasing rubbing for soil and 7 inner wall of sampler barrel
Wiping power is attached to the soil fixing of sampling in sampler barrel 7, prevents in sampling process soil to skid off and falls, between internal screw thread 21
Third electric telescopic rod 19 is installed, the output end of third electric telescopic rod 19 is equipped with baffle 20, can facilitate inside sampler barrel 7
Soil is released out of sampler barrel 7 after sampling, while so that soil is able to maintain integrality and avoiding influencing inspection result, sampling
The port of cylinder 7 is equipped with annular blade 18, sampler barrel 7 and annular blade 18 can be driven rotate deeply by rotating electric machine 8
It being sampled into soil, more convenient saving physical strength improves efficiency, and the input terminal of screw rod 1 is equipped with stepper motor 11,
This 11 model of stepper motor can be S90D130A-MACR6 motor, and 2 surface of support column of 11 lower section of stepper motor is provided with control
Button 14, the surface of 2 side of support column are equipped with power supply box 24, and the output end of power supply box 24 passes through conducting wire and rotating electric machine 8, step
Input terminal into motor 11, the first electric telescopic rod 22, the second electric telescopic rod 10 and third electric telescopic rod 19 is electrically connected.
Working principle:Using needing to check the present apparatus before the present apparatus, whether check device all parts are intact
Inspection finishes rear and can be used, first by device by being manually moved at specified sampling, by being manually driven into spud pile 6
Device is integrally fixed below earth's surface, power supply is then passed to by control button 14 and starts electric drill 3, the geological stratification at sampling
When harder inconvenience is directly sampled, stepper motor 11 can be started by control button 14 and screw rod 1 is driven to drive the first sliding block
23 are moved to electric drill 3 at sampling, then electric drill is dropped to by the first electric telescopic rod 22 contacted with earth's surface at sampling into
Row drilling can drive screw rod 1 to drive the second sliding block 12 that sampler barrel 7 is moved to drilling after drilling by stepper motor 11
Sampler barrel 7 is dropped to drill hole by the second electric telescopic rod 10 by place, and starting rotating electric machine 8 drives sampler barrel 7 and annular
Blade 18 carries out rotating to be deep into soil being sampled, and can pass through control button 14 after the completion of sampling and control third electric expansion
Bar 19 drives baffle 20 integrally to release the soil inside sampler barrel 7 in holding vessel and collects.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and
And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in
All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting
Related claim.
Claims (5)
1. a kind of geologic prospect engineering is with soil device, including electric drill (3), pedestal (4) and rotating electric machine (8) is taken, feature exists
In:Two sides above the pedestal (4) are all welded with support column (2), are equipped with motorized precision translation stage above the support column (2)
(13), the inside of the motorized precision translation stage (13) is equipped with screw rod (1) by bearing (15), the surface screw thread of the screw rod (1)
It is equipped with the first sliding block (23), is equipped with the first electric telescopic rod (22) on first sliding block (23), described first electronic stretches
The output end of contracting bar (22) is equipped with electric drill (3), and screw rod (1) surface screw thread of the first sliding block (23) side is equipped with second
Sliding block (12) is equipped with the second electric telescopic rod (10) on second sliding block (12), second electric telescopic rod (10)
Output end is equipped with rotating electric machine (8) by mounting base (9), and the output end of the rotating electric machine (8) is installed by bearing (15)
Have sampler barrel (7), the inner wall of the sampler barrel (7) is provided with internal screw thread (21), the sampler barrel (7) between the internal screw thread (21)
Inside is equipped with third electric telescopic rod (19), and the output end of the third electric telescopic rod (19) is equipped with baffle (20), institute
The port for stating sampler barrel (7) is equipped with annular blade (18), and the input terminal of the screw rod (1) is equipped with stepper motor (11), institute
The surface for stating support column (2) side is equipped with power supply box (24), and the output end of the power supply box (24) passes through conducting wire and electric rotating
Machine (8), stepper motor (11), the first electric telescopic rod (22), the second electric telescopic rod (10) and third electric telescopic rod (19)
Input terminal be electrically connected.
2. a kind of geologic prospect engineering according to claim 1 is with taking soil device, it is characterised in that:The stepper motor
(11) support column (2) surface below is provided with control button (14).
3. a kind of geologic prospect engineering according to claim 1 is with taking soil device, it is characterised in that:The pedestal (4)
Two sides be all welded with fixing seat (5), and spud pile (6) are movably installed in fixing seat (5).
4. a kind of geologic prospect engineering according to claim 1 is with taking soil device, it is characterised in that:The sampler barrel
(7) surface is provided with observation window (16), and the surface of observation window (16) is provided with graduated scale (17).
5. a kind of geologic prospect engineering according to claim 1 is with taking soil device, it is characterised in that:The pedestal (4)
Inside be hollow form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820544832.3U CN208140401U (en) | 2018-04-17 | 2018-04-17 | A kind of geologic prospect engineering is with taking soil device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820544832.3U CN208140401U (en) | 2018-04-17 | 2018-04-17 | A kind of geologic prospect engineering is with taking soil device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208140401U true CN208140401U (en) | 2018-11-23 |
Family
ID=64293838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820544832.3U Active CN208140401U (en) | 2018-04-17 | 2018-04-17 | A kind of geologic prospect engineering is with taking soil device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208140401U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109520836A (en) * | 2018-12-11 | 2019-03-26 | 佛山科学技术学院 | A kind of consolidation test system and its operating method of the soil that multiple groups can compare |
CN109900520A (en) * | 2019-04-02 | 2019-06-18 | 中国石油大学(华东) | Crude oil storage tank basic sediment in-situ sampling device and method based on stiction |
CN111811870A (en) * | 2020-07-09 | 2020-10-23 | 广东诚浩工程项目管理有限公司 | Construction detection soil sampling system in engineering supervision |
CN113418736A (en) * | 2021-05-13 | 2021-09-21 | 湖北汉源环境科技有限公司 | Soil sampling device |
CN114459804A (en) * | 2022-02-16 | 2022-05-10 | 辽宁省德明环境检测有限公司 | Rapid sampling device for soil detection and using method thereof |
CN114878224A (en) * | 2022-06-09 | 2022-08-09 | 山东正元建设工程有限责任公司 | Hydraulic ring geological survey sampling device and using method |
-
2018
- 2018-04-17 CN CN201820544832.3U patent/CN208140401U/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109520836A (en) * | 2018-12-11 | 2019-03-26 | 佛山科学技术学院 | A kind of consolidation test system and its operating method of the soil that multiple groups can compare |
CN109900520A (en) * | 2019-04-02 | 2019-06-18 | 中国石油大学(华东) | Crude oil storage tank basic sediment in-situ sampling device and method based on stiction |
CN111811870A (en) * | 2020-07-09 | 2020-10-23 | 广东诚浩工程项目管理有限公司 | Construction detection soil sampling system in engineering supervision |
CN111811870B (en) * | 2020-07-09 | 2023-04-07 | 广东诚浩工程项目管理有限公司 | Construction detection soil sampling system in engineering supervision |
CN113418736A (en) * | 2021-05-13 | 2021-09-21 | 湖北汉源环境科技有限公司 | Soil sampling device |
CN114459804A (en) * | 2022-02-16 | 2022-05-10 | 辽宁省德明环境检测有限公司 | Rapid sampling device for soil detection and using method thereof |
CN114878224A (en) * | 2022-06-09 | 2022-08-09 | 山东正元建设工程有限责任公司 | Hydraulic ring geological survey sampling device and using method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208140401U (en) | A kind of geologic prospect engineering is with taking soil device | |
AU2017311614B2 (en) | Detection while drilling (DWD) apparatus and method for lithological composition of roadway roof | |
CN211927335U (en) | Geotechnical engineering reconnaissance sampling device | |
NO345446B1 (en) | Drill core direction methods | |
CN110108860A (en) | A kind of surveying device and investigation method based on geological exploration | |
CN103195425B (en) | A kind of coal mine roadway Surrounding Rock Strength situ Rapid Determination method | |
CN211042775U (en) | Sampler for geological environment monitoring | |
CN211600027U (en) | Hydraulic ring geological crack measuring device | |
CN212535535U (en) | Geological survey is with drilling rig convenient to accurate degree of depth | |
CN211122855U (en) | Mine geology measuring device | |
CN108827699A (en) | A kind of sampling method obtaining large scale cylinder undisturbed soil | |
CN210660062U (en) | Roadway roof lithologic component measurement-while-drilling device based on rock debris logging technology | |
CN214309619U (en) | Geological engineering sampler | |
CN215447715U (en) | Device for measuring geotechnical geological investigation depth | |
JPH11152982A (en) | Rotary type sampling method | |
CN214408147U (en) | Portable geological survey is with drilling sampling device | |
CN211717827U (en) | Drilling sampling device for geotechnical engineering exploration | |
CN213956840U (en) | Soil sampling device for geological exploration | |
CN213022391U (en) | Geological exploration sampler | |
CN207300624U (en) | A kind of Geological Engineering sampler | |
CN214616367U (en) | Worker's exploration air detector and quiet reamer | |
CN206113905U (en) | Measure device of not hard up circle thickness of coal petrography | |
CN216669328U (en) | Geological survey is with equipment of fetching earth | |
CN219434370U (en) | Colliery geological survey probing sampling device | |
CN213456182U (en) | Geological measuring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200509 Address after: 510000 Room 102, floor 1, building 5, Juhe Creative Park, 738 Helong 1st Road, Helong street, Baiyun District, Guangzhou City, Guangdong Province (self declaration) Patentee after: Guangdong Zhongmei Jiangnan engineering survey and Design Co., Ltd Address before: 510030 Unit 1002-1007, 140 Dongfeng West Road, Yuexiu District, Guangzhou City, Guangdong Province Patentee before: CHINA COAL JIANGNAN CONSTRUCTION DEVELOPMENT Co.,Ltd. |
|
TR01 | Transfer of patent right |