CN208139951U - A kind of detonator cluster articulation protection binding device - Google Patents
A kind of detonator cluster articulation protection binding device Download PDFInfo
- Publication number
- CN208139951U CN208139951U CN201721882046.6U CN201721882046U CN208139951U CN 208139951 U CN208139951 U CN 208139951U CN 201721882046 U CN201721882046 U CN 201721882046U CN 208139951 U CN208139951 U CN 208139951U
- Authority
- CN
- China
- Prior art keywords
- binding
- detonator
- blanket
- protection
- binding device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Package Frames And Binding Bands (AREA)
Abstract
The utility model belongs to blasting technique field, discloses a kind of detonator cluster articulation protection binding device, including:Protect blanket, adhesive layer and binding nylon tape;The cladding face of the protection blanket is arranged in the adhesive layer;The binding nylon tape is fixed on the protection blanket side.The utility model provides a kind of detonator cluster articulation protection binding device, structure is simple, binds that secured speed is fast, can effectively prevent the destruction of metal jet, film flying to blasting circuit, reduce detonator blasting noise, increase detonator and be detonated area, improves the accuracy and propagation of explosion precision of blasting circuit, ensure that the reliability and safety of ignition, the needs ignited suitable for various multiple spot explosion earth's surface networks, it is convenient to construct, at low cost, is easier to realize and promote.
Description
Technical field
The utility model relates to blasting technique field, in particular to a kind of detonator cluster articulation protects binding device.
Background technique
In blasting engineering, it is often used common plastics Nonel detonator blasting circuit, takes cluster connection connection type connection quick-fried
It scores a goal road, in practice of construction, earth's surface modeling that metal jet and the fragment cutting generated due to detonator front end sockets for collecting energy is not detonated
Expect Nonel tube network, causes blasting circuit to be miss-fired, explosion failure.
The method for solving this problem at present is to commonly use tied silk, electrical adhesive tape, sandy soil, rubber material during the connection process
Binding covering is carried out etc. a series of tools, dosage is big, and at high cost, binding speed is slow, completes a cluster syncranium binding and needs 2~3
Minute, it is time-consuming and laborious.Binding protection quality influenced by human factor and environment, often occur binding loosely, detonator overlapping show
As influencing excitation, propagation of explosion effect.Traditional binding protection tool and binding protection method, had not only affected blast working process, but also
Hidden danger is brought to safety in production.
Utility model content
The utility model provides a kind of detonator cluster articulation protection binding device, and it is time-consuming to solve cluster syncranium binding in the prior art
Arduously, the technical issues of explosion unstable quality influences excitation and propagation of explosion effect.
In order to solve the above technical problems, the utility model provides a kind of detonator cluster articulation protection binding device, including:It is anti-
Protect blanket, adhesive layer and binding nylon tape;
The cladding face of the protection blanket is arranged in the adhesive layer;
The binding nylon tape is fixed on the protection blanket side;
The binding nylon tape includes:Tooth button and the band body being attached thereto;
The tooth button is fixed on the protection blanket side.
Further, the cladding Middle face of the protection blanket is arranged in the adhesive layer;
Further, adhesive coating on the adhesive layer.
Further, the protection blanket is prepared using PVC filament circle.
Further, the long 120mm, wide 100mm, thick 5mm of the protection blanket.
Further, the long 80mm of the adhesive layer, wide 60mm.
Further, the band body includes:Left bundle, middle band and right bundle;The tooth button includes matching
Left tooth button, middle tooth button and right tooth button;
Wherein, the left bundle setting is in the protection blanket left part, corresponding binding protection blanket left part;The middle band setting
In the middle part of the protection blanket, in the middle part of corresponding binding protection blanket;In the protection blanket right part, corresponding binding is anti-for the right bundle setting
Protect blanket right part.
Further, tooth cavity difference the width 15mm, 65mm, 15mm of the left tooth button, middle tooth button and right tooth button.
Further, the left bundle and the right bundle a length of 150mm~180mm, the middle a length of 180mm of band~
200mm。
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
The detonator cluster articulation protection binding device provided in the embodiment of the present application, by protecting blanket integral coating detonator cluster
Connection mainly keeps out impact, effectively the impact dynamics of limitation metal jet, film flying, so that it be avoided to have the destruction of blasting circuit
Effect ground increases detonator and is detonated area, to be suitable for the needs that various multiple spot explosion earth's surface networks are ignited, while reducing thunder
Pipe Property of Blasting Noise;Also, the protection binding device structure is simple, and it is fast to bind secured speed, and it is convenient to construct, at low cost, is easier to reality
Now with popularization.On the other hand, by setting adhesive layer by detonator be adhered to above, realize binding plastic detonating tube while just
Fixation in position improves the accuracy and propagation of explosion precision of blasting circuit, ensure that the reliability and safety of ignition;Also certain
The intensity of cladding binding is improved in degree.Cooperate binding nylon tape to bind outside protection blanket simultaneously, greatly improves binding
Efficiency reduces operation complexity and material consumption, adapts to all kinds of complex environments.
Further, be divided into three strands of left, center, right by the way that nylon tape will be bound, respectively correspond left and right side edge and middle part lead it is quick-fried
The different situation of the volume of tube bundle connection, effectively prevent detonating primer to slide, promotes the reliability of binding;Metal is avoided simultaneously to penetrate
The problem of stream, film flying are projected from edge, further limits damage capability.
Detailed description of the invention
Fig. 1 is that detonator cluster articulation provided by the utility model protects binding device structural schematic diagram;
The bottom view of Fig. 2 Fig. 1.
Specific embodiment
The embodiment of the present application solves cluster syncranium in the prior art and ties up by providing a kind of detonator cluster articulation protection binding device
Time and effort consuming is pricked, explosion unstable quality influences the technical issues of exciting with propagation of explosion effect.
In order to better understand the above technical scheme, in conjunction with appended figures and specific embodiments to upper
It states technical solution to be described in detail, it should be understood that the specific features in the utility model embodiment and embodiment are to this Shen
Please technical solution detailed description, rather than the restriction to technical scheme, in the absence of conflict, the application are real
The technical characteristic applied in example and embodiment can be combined with each other.
Referring to Fig. 1 and Fig. 2, a kind of detonator cluster articulation protects binding device, including:Protect blanket 1, adhesive layer 2 and binding
Nylon tape;Detonator cluster articulation is integrally bonded by adhesive layer 2, protection blanket 1 is then rolled and carrys out integral coating.It is vacant in the process
Adhesive layer can reinforce coat intensity.Then, the protection blanket 1 that will wind up by being fixed on the binding nylon tape of protection 1 edge of blanket
It compresses, to limit the impact dynamics of metal jet, film flying, to avoid its destruction to blasting circuit, effectively increases and lead
Booster is detonated area, to be suitable for the needs that various multiple spot explosion earth's surface networks are ignited, while can be effectively reduced detonator
Property of Blasting Noise;It is efficiently simple that operation is bound simultaneously, is suitable for various environment and is used.
In general, the cladding face of the protection blanket 1 is arranged in the adhesive layer 2, to detonator cluster articulation be stablized solid
In being scheduled on.
The binding nylon tape is fixed on 1 side of protection blanket, after protecting blanket 1 to roll, convenient force binding.
Certainly, the cladding Middle face of the protection blanket 1 can also be arranged in the adhesive layer 2, that is, part is arranged;From
And it is only bonded detonator cluster articulation main body, maintain fixed position;Remaining explosion destroys lesser pipeline and passes through protection 1 edge of blanket
?.
In general, on the adhesive layer 2 adhesive coating as cementing medium.
Optionally, the protection blanket 1 is prepared using regeneration PVC filament circle.
The long 120mm, wide 100mm, thick 5mm of the protection blanket.
The long 80mm of the adhesive layer, wide 60mm.
In general, the binding nylon tape includes:Tooth button and the band body 6 being attached thereto;
The tooth button is fixed on 1 side of protection blanket.
Further, the band body 6 includes:Left bundle, middle band and right bundle;The tooth button includes matching
Left tooth button 4, middle tooth button 3 and right tooth button 4;Wherein, the left bundle setting is in the protection blanket left part, corresponding binding protection
Blanket left part;The middle band is arranged in the middle part of the protection blanket, in the middle part of corresponding binding protection blanket;The right bundle is arranged described
Protect blanket right part, corresponding binding protection blanket right part.
That is, the left, center, right portion that three bands of setting respectively correspond protection blanket 1 carries out compartmentalization binding.Reply is led
Booster cluster connection main body is relatively large, and volume relatively small situation in both ends effectively prevent detonating primer to slide, to promote binding
Reliability, while avoid metal jet, film flying from edge project the problem of, further limit damage capability.
In general, the difference of tooth cavity 5 the width 15mm, 65mm, 15mm of the left tooth button, middle tooth button and right tooth button.
The left bundle and the right bundle a length of 150mm~180mm, the middle a length of 180mm~200mm of band.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
The detonator cluster articulation protection binding device provided in the embodiment of the present application, by protecting blanket integral coating detonator cluster
Connection mainly keeps out impact, effectively the impact dynamics of limitation metal jet, film flying, so that it be avoided to have the destruction of blasting circuit
Effect ground increases detonator and is detonated area, to be suitable for the needs that various multiple spot explosion earth's surface networks are ignited, while reducing thunder
Pipe Property of Blasting Noise;Also, the protection binding device structure is simple, and it is fast to bind secured speed, and it is convenient to construct, at low cost, is easier to reality
Now with popularization.On the other hand, by setting adhesive layer by detonator be adhered to above, realize binding plastic detonating tube while just
Fixation in position improves the accuracy and propagation of explosion precision of blasting circuit, ensure that the reliability and safety of ignition;Also certain
The intensity of cladding binding is improved in degree.Cooperate binding nylon tape to bind outside protection blanket simultaneously, greatly improves binding
Efficiency reduces operation complexity and material consumption, adapts to all kinds of complex environments.
Further, be divided into three strands of left, center, right by the way that nylon tape will be bound, respectively correspond left and right side edge and middle part lead it is quick-fried
The different situation of the volume of tube bundle connection, promotes the reliability of binding;Avoid metal jet simultaneously, film flying is asked from what edge projected
Topic, further limits damage capability.
It should be noted last that the above specific embodiment is only to illustrate the technical solution of the utility model rather than limits
System, although the utility model is described in detail referring to example, those skilled in the art should understand that, it can be right
The technical solution of the utility model is modified or replaced equivalently, without departing from the spirit and model of technical solutions of the utility model
It encloses, should all cover in the scope of the claims of the utility model.
Claims (9)
1. a kind of detonator cluster articulation protects binding device, which is characterized in that including:Protect blanket, adhesive layer and binding nylon tape;
The cladding face of the protection blanket is arranged in the adhesive layer;
The binding nylon tape is fixed on the protection blanket side;
The binding nylon tape includes:Tooth button and the band body being attached thereto;
The tooth button is fixed on the protection blanket side.
2. detonator cluster articulation as described in claim 1 protects binding device, which is characterized in that the adhesive layer is arranged described
Protect the cladding Middle face of blanket.
3. detonator cluster articulation as claimed in claim 2 protects binding device, it is characterised in that:Gluing is coated on the adhesive layer
Agent.
4. detonator cluster articulation as claimed in claim 3 protects binding device, which is characterized in that the protection blanket uses PVC filament
Circle is prepared.
5. detonator cluster articulation as claimed in claim 4 protects binding device, which is characterized in that the long 120mm of the protection blanket,
Wide 100mm, thick 5mm.
6. detonator cluster articulation as claimed in claim 5 protects binding device, which is characterized in that the long 80mm of the adhesive layer,
Wide 60mm.
7. detonator cluster articulation as described in any one of claims 1 to 6 protects binding device, which is characterized in that the band body
Including:Left bundle, middle band and right bundle;The tooth button includes the left tooth button, middle tooth button and right tooth button matched;
Wherein, the left bundle setting is in the protection blanket left part, corresponding binding protection blanket left part;The middle band is arranged in institute
It states in the middle part of protection blanket, in the middle part of corresponding binding protection blanket;The right bundle setting is in the protection blanket right part, corresponding binding protection blanket
Right part.
8. detonator cluster articulation as claimed in claim 7 protects binding device, which is characterized in that the left tooth button, middle tooth button with
And tooth cavity difference the width 15mm, 65mm, 15mm of right tooth button.
9. detonator cluster articulation as claimed in claim 8 protects binding device, which is characterized in that the left bundle and the right bundle
With a length of 150mm~180mm, the middle a length of 180mm~200mm of band.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721882046.6U CN208139951U (en) | 2017-12-28 | 2017-12-28 | A kind of detonator cluster articulation protection binding device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721882046.6U CN208139951U (en) | 2017-12-28 | 2017-12-28 | A kind of detonator cluster articulation protection binding device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208139951U true CN208139951U (en) | 2018-11-23 |
Family
ID=64283368
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721882046.6U Expired - Fee Related CN208139951U (en) | 2017-12-28 | 2017-12-28 | A kind of detonator cluster articulation protection binding device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208139951U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108253854A (en) * | 2017-12-28 | 2018-07-06 | 武汉科技大学 | A kind of detonator cluster articulation protects binding device |
-
2017
- 2017-12-28 CN CN201721882046.6U patent/CN208139951U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108253854A (en) * | 2017-12-28 | 2018-07-06 | 武汉科技大学 | A kind of detonator cluster articulation protects binding device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA1149229A (en) | Low-energy fuse consisting of a plastic tube the inner surface of which is coated with explosive in powder form | |
CN208139951U (en) | A kind of detonator cluster articulation protection binding device | |
MX2021011708A (en) | Intumescent coating composition. | |
CN108253854A (en) | A kind of detonator cluster articulation protects binding device | |
CN102503746A (en) | Bundling device for ignition and detonation tube bundle and using method thereof | |
CN207991384U (en) | A kind of tunnel safety blast working device | |
CN104833281B (en) | A kind of heatproof being applied in high temperature big gun hole inhales Thermal Protection Structural | |
CN208075693U (en) | A kind of device for protecting the normal propagation of explosion of Nonel detonator | |
CN206627033U (en) | Short-delay blasting device for immersed tube tunnel underwater reef explosion | |
CN110360908B (en) | Device and method for increasing gap distance and enhancing smooth blasting effect | |
CN203298662U (en) | Auxiliary device of blast hole non-coupling explosive loading | |
CN206803860U (en) | A kind of Nonel detonator networking connector | |
CN201653302U (en) | Regenerative double-detonating network | |
CN203170551U (en) | Wire belt | |
CN207231329U (en) | A kind of two-way propagation of explosion primacord presplit blasting network | |
CN207489542U (en) | A kind of improved flexible fireproof cable | |
CN203081473U (en) | Anchor net | |
CN202614115U (en) | Safe blasting bus | |
CN202668371U (en) | Enhanced type protective leather belt for shot blasting machine | |
CN107893660A (en) | A kind of tunnel branch leads cave blasting design method and intelligence system | |
CN105396751A (en) | Non-pitch-based waterproof roll gluing production line | |
CN206695701U (en) | A kind of explosive pack arrangement of underwater reef explosion construction | |
CN101261104A (en) | Crack rock laneway molding control method | |
CN102042785A (en) | Cumulative cutting method for wall-thickness variable metal component with bent cross section | |
CN202348247U (en) | Quadric-detonation composite perforating charge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181123 Termination date: 20191228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |