CN208137847U CN201820602432.3U CN201820602432U CN208137847U CN 208137847 U CN208137847 U CN 208137847U CN 201820602432 U CN201820602432 U CN 201820602432U CN 208137847 U CN208137847 U CN 208137847U
Authority
CN
China
Prior art keywords
arm
drilling
balladeur train
drilling machine
retention bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820602432.3U
Other languages
Chinese (zh)
Inventor
佀永峰
彭子刚
陈远志
刘皓
于先美
文国林
杨红卫
燕永强
马兴浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201820602432.3U priority Critical patent/CN208137847U/en
Application granted granted Critical
Publication of CN208137847U publication Critical patent/CN208137847U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a kind of multi-arm drill control inclination armature boring construction system, by the way that simple inclinometer is arranged on the balladeur train of multi-arm drilling machine, when drilling, when the balladeur train of multi-arm drilling machine turns to bore inclining angle, movable pointer is overlapped with the label of marking pen, to realize the accurate control of bore inclining angle.Retention bar is horizontally disposed with by the drilling orientation on scar, the position of drilling in the horizontal plane is provided with label on retention bar, freely sagging vertical line is set on the balladeur train of multi-arm drilling machine, when drilling, the label on vertical line and retention bar on balladeur train aligns, to realize the accurate control of drilling horizontal position.Drilling construction is carried out by construction personnel's experience relative to traditional, the accurate control of bore inclining angle and horizontal position can be realized using simple inclinometer, retention bar and vertical line by the application, and whole system structure is simple, and manufacturing cost is low, is worthy of popularization.

Description

A kind of multi-arm drill control inclination armature boring construction system
Technical field
The utility model relates to armature boring technical field of construction, tilt in particular to a kind of multi-arm drill control Armature boring construction system.
Background technique
When the huge underground cavities such as underground power house, mine working are constructed in hydraulic engineering, the positions such as furred ceiling pedestal beam, concrete ledge are deposited In inclination bolthole, when multi-arm drilling machine carries out drilling construction, there are certain difficulty of construction for the accurate control of bore angle, how to protect The accuracy of the gradient and horizontal position of demonstrate,proving drilling becomes a problem in work progress.
Summary of the invention
The main purpose of the utility model is to provide a kind of multi-arm drill controls to tilt armature boring construction system, with solution Inclination armature boring construction certainly in the prior art is accurately positioned difficult problem.
To achieve the goals above, the utility model provides a kind of multi-arm drill control inclination armature boring construction system System, including multi-arm drilling machine and simple inclinometer, inclinometer include semicircle protractor and movable pointer, one end of movable pointer with The center rotating of the plane side of protractor connects, and the plane side of protractor is fixedly connected on the balladeur train of multi-arm drilling machine, sliding When frame is horizontally arranged, movable pointer 90 ° of lines in a vertical state and with protractor are overlapped;It is marked on protractor by marking pen Bore inclining angle out, when the balladeur train of multi-arm drilling machine turns to bore inclining angle, movable pointer is overlapped with the label of marking pen.
Further, multi-arm drill control inclination armature boring construction system further includes retention bar, and retention bar is along rock Drilling orientation on face is horizontally disposed, and the position of drilling in the horizontal plane is provided with label, multi-arm on retention bar Freely sagging vertical line is set on the balladeur train of drilling machine, and when drilling, vertical line aligns with the label on retention bar.
Further, distance of the vertical line apart from scar is greater than 1m.
Further, retention bar is arranged in below the lower inflection point of multi-arm drilling machine.
In addition, present invention also provides a kind of multi-arm drill controls to tilt armature boring construction method, including step S10 is extremely Step S70, wherein step S10:Setting-out is measured according to construction drawing, anchor pole absolute altitude, anchor pole spacing is determined, makes drilling hole Position, makes a mark;Step S20:In the lower inflection point lower position of multi-arm drilling machine, retention bar, multi-arm drilling machine and retention bar are set For the multi-arm drilling machine and retention bar in claim 4, made marks on retention bar by survey crew according to bore position;Step Rapid S30:Drilling construction is carried out by multi-arm drilling machine, the tilt angle of drilling is controlled by simple inclinometer, and simple inclinometer is Simple inclinometer in claim 4, when movable pointer and vertical line are overlapped with the label on protractor and retention bar respectively, Start to drill;Step S40:After the completion of drilling, measurement drilling hole depth;Step S50:With high pressure water or high-pressure blast by the product in drilling Water, rock powder are rinsed well;Step S60:The perfusion mortar in the drilling rinsed well;Step S70:When slip casting is excessive to mortar When, anchor pole is assigned in drilling.
Further, in step s 30, after drilling depth reaches projected depth, multi-arm favourable turn drill bit must retreat back and forth Repeatedly, outer with water discharge drilling convenient for rock ballast.
Further, in step s 40, the drilling hole hole depth error of elevation angle anchor pole is less than or equal to the 1% of rock-bolt length, bows The drilling hole depth of angle anchor pole is greater than design hole depth 100mm or more.
It further, further include the mixing of anchor pole mortar between step S50 and step S60, used in anchor pole mortar Sand is using 2.5mm sieve using preceding, guarantees that artificial sand particle is not more than 2.5mm, sand fineness modulus is being more than or equal to 2.4 are less than or equal to 2.5.
Using the technical solution of the utility model, by the way that simple inclinometer, protractor are arranged on the balladeur train of multi-arm drilling machine Upper to mark bore inclining angle by marking pen, when drilling, when the balladeur train of multi-arm drilling machine turns to bore inclining angle, activity refers to Needle is overlapped with the label of marking pen, to realize the accurate control of bore inclining angle.Pass through the drilling arrangement side on scar To horizontally disposed retention bar, the position of drilling in the horizontal plane is provided with label, the cunning of multi-arm drilling machine on retention bar Freely sagging vertical line is set on frame, and when drilling, the label on vertical line and retention bar on balladeur train aligns, to realize brill The accurate control of hole horizontal position.Bore inclining angles and positions are carried out really by construction personnel's experience relative to traditional Recognize, the accurate control of bore inclining angle and horizontal position can be realized using simple inclinometer, retention bar and vertical line by the application System, whole system structure is simple, it is easy and easy to operate to realize, manufacturing cost is low, is worthy of popularization.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide a further understanding of the present invention, this is practical Novel illustrative embodiments and their description are not constituteed improper limits to the present invention for explaining the utility model. In the accompanying drawings:
Fig. 1 shows the structural representation of multi-arm drill control inclination armature boring construction system according to the present utility model Figure;
Fig. 2 shows the structural schematic diagrams of retention bar in Fig. 1.
Wherein, above-mentioned attached drawing includes the following drawings label:
10, multi-arm drilling machine;11, balladeur train;12, vertical line;20, simple inclinometer;21, protractor;22, movable pointer;30, fixed Position cross bar;40, scar.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
In the present invention, in the absence of explanation to the contrary, the noun of locality used such as " upper and lower, top, bottom " is usually It is for direction shown in the drawings, or for component itself is on vertical, vertical or gravity direction;Together Sample, it for ease of understanding and describes, " inside and outside " refers to the inside and outside of the profile relative to each component itself, but the above-mentioned noun of locality is simultaneously It is not used in limitation the utility model.
To solve the problems, such as that it is difficult that inclination armature boring construction in the prior art is accurately positioned, the utility model is provided A kind of multi-arm drill control inclination armature boring construction system.
As shown in Figure 1, multi-arm drill control inclination armature boring construction system includes multi-arm drilling machine 10 and simple inclinometer 20, inclinometer includes semicircle protractor 21 and movable pointer 22, one end of movable pointer 22 and the plane side of protractor 21 Center rotating connection, the plane side of protractor 21 is fixedly connected on the balladeur train 11 of multi-arm drilling machine 10, and 11 level of balladeur train is put When setting, the 90 ° of lines in a vertical state and with protractor 21 of movable pointer 22 are overlapped;It is marked on protractor 21 by marking pen Bore inclining angle, when the balladeur train 11 of multi-arm drilling machine 10 turns to bore inclining angle, the label weight of movable pointer 22 and marking pen It closes.
By the way that simple inclinometer 20 is arranged on the balladeur train 11 of multi-arm drilling machine 10, marked on protractor 21 by marking pen Bore inclining angle, when drilling, when the balladeur train 11 of multi-arm drilling machine 10 turns to bore inclining angle, movable pointer 22 and marking pen Label is overlapped, to realize the accurate control of bore inclining angle.
As depicted in figs. 1 and 2, multi-arm drill control inclination armature boring construction system further includes retention bar 30, positioning Drilling orientation of the cross bar 30 on scar 40 is horizontally disposed, sets on retention bar 30 according to the position of drilling in the horizontal plane It is equipped with label, the free sagging vertical line 12 of setting on the balladeur train 11 of multi-arm drilling machine 10, when drilling, on vertical line 12 and retention bar 30 Label align.
Retention bar is horizontally disposed with by drilling orientation on scar, according to drilling in horizontal plane on retention bar On position be provided with label, the free sagging vertical line of setting on the balladeur train of multi-arm drilling machine, when drilling, vertical line on balladeur train and fixed Label on the cross bar of position aligns, to realize the accurate control of drilling horizontal position.
Preferably, distance of the vertical line 12 apart from scar 40 is greater than 1m, to ensure to control precision, avoids vertical line 12 and scar 40 It interferes.
Preferably, retention bar 30 is arranged in below the lower inflection point of multi-arm drilling machine 10, convenient for being observed when drilling, specifically Position can also be determined according to field condition.
Armature boring construction system is tilted corresponding to above-mentioned multi-arm drill control, present invention also provides a kind of multi-arm drilling machines Control inclination armature boring construction method, specifically includes step S10 to step S70, wherein step S10:According to construction drawing into Row surveying and locating determines anchor pole absolute altitude, anchor pole spacing, makes drilling hole location, make a mark;Step S20:In multi-arm drilling machine 10 Retention bar 30 is arranged in lower inflection point lower position, and multi-arm drilling machine 10 and retention bar 30 are the multi-arm drilling machine 10 in claim 4 With retention bar 30, made marks on retention bar 30 by survey crew according to bore position;Step S30:Pass through multi-arm drilling machine 10 carry out drilling construction, and the tilt angle of drilling is controlled by simple inclinometer 20, and simple inclinometer 20 is in claim 4 Simple inclinometer 20 is opened when movable pointer 22 and vertical line 12 are overlapped with the label on protractor 21 and retention bar 30 respectively Begin to drill;Step S40:After the completion of drilling, measurement drilling hole depth;Step S50:With high pressure water or high-pressure blast by the product in drilling Water, rock powder are rinsed well, to guarantee the adhesion strength of mortar and hole wall;Step S60:Sand is perfused in the drilling rinsed well Slurry;Step S70:When slip casting is excessive to mortar, anchor pole is assigned in drilling.
Preferably, in step s 30, after drilling depth reaches projected depth, multi-arm favourable turn drill bit must retreat more back and forth It is secondary, it is outer with water discharge drilling convenient for rock ballast.
Preferably, in step s 40, the drilling hole hole depth error of elevation angle anchor pole is less than or equal to the 1% of rock-bolt length, the angle of depression The drilling hole depth of anchor pole is greater than design hole depth 100mm or more.
It preferably, further include the mixing of anchor pole mortar, sand used in anchor pole mortar between step S50 and step S60 2.5mm sieve is being used using preceding, is guaranteeing that artificial sand particle is not more than 2.5mm, sand fineness modulus is being more than or equal to 2.4 Less than or equal to 2.5.
It can be seen from the above description that the above embodiments of the present invention achieve the following technical effects:
Relative to traditional confirmation for carrying out bore inclining angles and positions by construction personnel's experience, the application utilizes letter The accurate control of bore inclining angle and horizontal position can be realized in easy inclinometer 20, retention bar 30 and vertical line 12, entire to be Structure of uniting is simple, it is easy and easy to operate to realize, manufacturing cost is low, is worthy of popularization.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, work, device, component and/or their combination.
It should be noted that term " includes " and " tool in the description and claims of this application and above-mentioned attached drawing Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing a series of steps or units Process, method, system, product or equipment those of are not necessarily limited to be clearly listed step or unit, but may include without clear Other step or units listing to Chu or intrinsic for these process, methods, product or equipment.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (4)

1. a kind of multi-arm drill control tilts armature boring construction system, which is characterized in that including:Multi-arm drilling machine(10);Simply Inclinometer(20), the inclinometer includes semicircle protractor(21)And movable pointer(22), the movable pointer(22)One End and the protractor(21)Plane side center rotating connection, the protractor(21)Plane side be fixedly connected on The multi-arm drilling machine(10)Balladeur train(11)On, the balladeur train(11)When horizontal positioned, the movable pointer(22)In vertical State and with the protractor(21)90 ° of lines be overlapped;The protractor(21)It is upper that bore inclining angle is marked by marking pen Degree, the multi-arm drilling machine(10)Balladeur train(11)When turning to bore inclining angle, the movable pointer(22)With the marking pen Label be overlapped.
2. multi-arm drill control according to claim 1 tilts armature boring construction system, which is characterized in that the multi-arm It further includes retention bar that drill control, which tilts armature boring construction system,(30), the retention bar(30)Along scar(40)On The orientation that drills is horizontally disposed, the retention bar(30)On drilling position in the horizontal plane is provided with label, institute State multi-arm drilling machine(10)Balladeur train(11)The upper free sagging vertical line of setting(12), when drilling, the vertical line(12)With it is described fixed Position cross bar(30)On label align.
3. multi-arm drill control according to claim 2 tilts armature boring construction system, which is characterized in that the vertical line (12)Apart from the scar(40)Distance be greater than 1m.
4. multi-arm drill control according to claim 3 tilts armature boring construction system, which is characterized in that the positioning Cross bar(30)It is arranged in the multi-arm drilling machine(10)Lower inflection point below.
CN201820602432.3U 2018-04-26 2018-04-26 A kind of multi-arm drill control inclination armature boring construction system Active CN208137847U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820602432.3U CN208137847U (en) 2018-04-26 2018-04-26 A kind of multi-arm drill control inclination armature boring construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820602432.3U CN208137847U (en) 2018-04-26 2018-04-26 A kind of multi-arm drill control inclination armature boring construction system

Publications (1)

Publication Number Publication Date
CN208137847U true CN208137847U (en) 2018-11-23

Family

ID=64310265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820602432.3U Active CN208137847U (en) 2018-04-26 2018-04-26 A kind of multi-arm drill control inclination armature boring construction system

Country Status (1)

Country Link
CN (1) CN208137847U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487861A (en) * 2018-04-26 2018-09-04 中国水利水电第四工程局有限公司 A kind of multi-arm drill control tilts armature boring construction system and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487861A (en) * 2018-04-26 2018-09-04 中国水利水电第四工程局有限公司 A kind of multi-arm drill control tilts armature boring construction system and construction method

Similar Documents

Publication Publication Date Title
CN104482815B (en) Tunnel smooth blasting method
CN206740090U (en) One kind is applied to linear pattern canal axes positioning measuring device
CN109915019A (en) A kind of drilling rod drilling orienting device and orientation method
CN107843244A (en) A kind of borehole punching positioner and localization method
CN107167112A (en) A kind of device and method suitable for linear pattern canal axes positioning measurement
CN202900251U (en) Drill hole angle-locating device for channeling hole
CN105625943A (en) Method for accurately controlling overbreak and underbreak by adopting peripheral hole formation through fine-adjustment drill rod of rock drilling jumbo
CN109440838A (en) Drilled pile hole quality detection method
CN208137847U (en) A kind of multi-arm drill control inclination armature boring construction system
CN108487861A (en) A kind of multi-arm drill control tilts armature boring construction system and construction method
CN107907019A (en) A kind of vertical snubber angle positioning device and localization method
CN111794679A (en) Horizontal light blasting hole direction control device and use method thereof
CN209724226U (en) A kind of drilling rod drilling orienting device
CN106908047A (en) To the accurate laying out apparatus of fan shape cloth hole and its application method in one kind
CN106968686A (en) A kind of pipe shed construction method
CN106595614A (en) Slot raise cuthole precise lofting device and application method thereof
CN203337144U (en) Omni-directional drilling position finder
CN208396689U (en) A kind of speedy lofting mould bases suitable for tunnel perimeter eye
CN108386208B (en) A kind of method for rapidly positioning of tunnel hole location
CN106403996A (en) Production method of forced centering observation mark stake for precision engineering measurement
CN109854265A (en) Three arm rock drilling jumbos stablize construction method and stablize rack
CN206378128U (en) A kind of inclination measuring device constructed for tunnel drilling and blasting
CN206467656U (en) Simple soil nailing manual pore-forming's angle controller
CN202255403U (en) Upper centering bracket for gyroscopic total station
CN102636101A (en) Roadway surface convergence measuring method and roadway surface convergence sight scale

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant