CN208131486U - A kind of PON fast plant test fixture - Google Patents

A kind of PON fast plant test fixture Download PDF

Info

Publication number
CN208131486U
CN208131486U CN201820253230.2U CN201820253230U CN208131486U CN 208131486 U CN208131486 U CN 208131486U CN 201820253230 U CN201820253230 U CN 201820253230U CN 208131486 U CN208131486 U CN 208131486U
Authority
CN
China
Prior art keywords
pon
placing groove
test fixture
pon equipment
equipment placing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820253230.2U
Other languages
Chinese (zh)
Inventor
陈渊杰
范张森
王寅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Communication Technology Co ltd
Zhongtian Broadband Technology Co Ltd
Original Assignee
Zhongtian Broadband Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Broadband Technology Co Ltd filed Critical Zhongtian Broadband Technology Co Ltd
Priority to CN201820253230.2U priority Critical patent/CN208131486U/en
Application granted granted Critical
Publication of CN208131486U publication Critical patent/CN208131486U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

What is involved is the fixtures for detecting PON equipment for a kind of PON fast plant test fixture of the utility model.A kind of PON fast plant test fixture has pedestal, and the side of base upper surface is provided with sliding rail, is equipped with test fixture in the upper surface of pedestal, test fixture includes mounting base, PON equipment placing groove, interface block and driving handle device;It is movably installed with mounting base on the slide rail, is fixedly installed with PON equipment placing groove in the upper surface of mounting base, the front end of PON equipment placing groove is provided with interface block, interface block is mounted on the base by screw;The PON equipment placing groove is cubic, and the top and front of PON equipment placing groove are provided with opening, wherein the opening of top is for being conveniently put into PON equipment to be tested, the opening in front is for facilitating PON equipment interconnection to interface block;It is additionally provided with connecting hole in the trailing flank of PON equipment placing groove, attachment screw passes through connecting hole and is connected on driving handle device.

Description

A kind of PON fast plant test fixture
Technical field
What is involved is the fixtures for detecting PON equipment for a kind of PON fast plant test fixture of the present invention.
Background technique
The current big operator of industry three and broadcasting and TV market are needed after the completion of production there are the PON equipment of vast number to setting It is standby to be detected;Many processing factories are tested using artificial connection equipment or using easy fixture now, cable and electricity Source line, tail optical fiber etc. need artificial connection, waste a large amount of working hours, and production efficiency is low, cannot in face of massive demand in the market Meet needs in time, it is therefore necessary to design the new detection of one kind to meet actual use demand with fixture.
Summary of the invention
The present invention is directed to the demand, provides a kind of PON fast plant test fixture;Fixture is customized by installation, Can quickly place PON equipment, accelerate equipment and start the time, the Connection Time, and can more test simultaneously, increase production efficiency, And fixture is modularized design, can flexibly be replaced as needed.
A kind of PON fast plant test fixture has pedestal, and the side of base upper surface is provided with sliding rail, in the upper of pedestal Surface is equipped with test fixture, and test fixture includes mounting base, PON equipment placing groove, interface block and driving handle device;In cunning It is movably installed with mounting base on rail, PON equipment placing groove is fixedly installed in the upper surface of mounting base, in PON equipment placing groove Front end be provided with interface block, interface block is mounted on the base by screw;The PON equipment placing groove is cubic, The top and front of PON equipment placing groove are provided with opening, wherein the opening of top is set for being conveniently put into PON to be tested Standby, the opening in front is for facilitating PON equipment interconnection to interface block;Connection is additionally provided in the trailing flank of PON equipment placing groove Hole, attachment screw pass through connecting hole and are connected on driving handle device.
Be additionally provided with cushion block between driving handle device and PON equipment placing groove, for adjust driving handle device and The distance between PON equipment placing groove, cushion block are fixedly attached on pedestal or PON equipment placing groove by screw.
The driving handle device includes that handle set, handle, connecting rod one, connecting rod two and pull rod, handle set pass through Screw is fixedly connected on pedestal, is connected with connecting rod one in the tail end of handle set, the other end of connecting rod one is fixed to be connected It is connected to handle, is connected with connecting rod two at the middle part of connecting rod one, the other end of connecting rod two is movably connected on pull rod, Pull rod is attached by screw and PON equipment placing groove.
It is additionally provided with drag link sleeve on handle set, pull rod is inserted in drag link sleeve, guarantees that pull rod is more steady during exercise.
It is also pasted with buffer unit in the inner wall of PON equipment placing groove, the buffer unit is sponge.
PON equipment placing groove is mounted on the upper surface of mounting base by screw.
The test fixture quantity is no less than 1, preferably 4.
Working principle
By on cable access interface seat, PON equipment to be tested is put into PON equipment placing groove, handle is pressed downward Dynamic, handle drives pull rod to travel forward, and pull rod pushes PON equipment placing groove and built-in PON equipment to travel forward together, in hand PON equipment is contacted with the contact on interface block when handle presses to minimum point, and then detects PON equipment, and qualified equipment retains, no Qualified equipment is rejected, and is lifted handle upwards after detection, is put into next PON equipment to be detected, so week and Back and forth.
Present inventive concept is ingenious, structure is simple and easy to use, can be using fixture is customized, and equipment is not loosened, rocked, Fixture inner wall increases sponge, prevents device housings from scratching, increases the service life of fixture, the wiring for equipment of being more convenient for, and is inserted into net Line etc.;It is time saving and energy saving using lever principle handspike, the fatigue of operator is reduced, efficiency and the same pedestal are increased, it can Multiple test fixtures share, and save space, while more tests, save the time, have good application and popularizations value.
Detailed description of the invention
Fig. 1 is a kind of decomposing state structural schematic diagram of PON fast plant test fixture of the present invention.
Fig. 2 is a kind of structural schematic diagram one of PON fast plant test fixture of the present invention.
Fig. 3 is a kind of structural schematic diagram two of PON fast plant test fixture of the present invention.
Specific embodiment
Referring to attached drawing 1-3, a kind of PON fast plant test fixture has pedestal 1, and the side of 1 upper surface of pedestal is provided with Sliding rail 2 is equipped with test fixture in the upper surface of pedestal 1, and test fixture includes mounting base 3, PON equipment placing groove 4, interface block 5 and driving handle device;It is movably installed with mounting base 3 on sliding rail 2, is fixedly installed with PON equipment in the upper surface of mounting base 3 Placing groove 6 is provided with interface block 5 in the front end of PON equipment placing groove 6, and interface block 5 is mounted on pedestal 1 by screw;It is described PON equipment placing groove 6 be cubic, the top and front of PON equipment placing groove 6 be provided with opening, wherein above open Mouth is for being conveniently put into PON equipment 7 to be tested, and the opening in front is for facilitating PON equipment 7 to be docked to interface block 5;In PON The trailing flank of equipment placing groove 6 is additionally provided with connecting hole, and attachment screw 8 passes through connecting hole and is connected on driving handle device.
It is additionally provided with cushion block 9 between driving handle device and PON equipment placing groove 6, for adjusting driving handle device The distance between PON equipment placing groove 6, cushion block 9 are fixedly attached to 6 on pedestal 1 or PON equipment placing groove by screw.
The driving handle device include handle set 10-1, handle 10-2, one 10-3 of connecting rod, two 10-4 of connecting rod and Pull rod 10-5, handle set 10-1 are fixedly connected on pedestal 1 by screw, are connected with connection in the tail end of handle set 10-1 The other end of one 10-3 of bar, one 10-3 of connecting rod are fixedly connected with handle 10-2, are flexibly connected at the middle part of one 10-3 of connecting rod There is two 10-4 of connecting rod, the other end of two 10-4 of connecting rod is movably connected on pull rod 10-5, and pull rod 10-5 passes through screw and PON Equipment placing groove 6 is attached.
It is additionally provided with drag link sleeve 10-6 on handle set 10-1, pull rod 10-5 is inserted in drag link sleeve 10-6, guarantees pull rod 10-5 is more steady during exercise.
It is also pasted with buffer unit 11 in the inner wall of PON equipment placing groove 6, the buffer unit 11 is sponge.
PON equipment placing groove 6 is mounted on the upper surface of mounting base 3 by screw.
The test fixture quantity is no less than 1, preferably 4.
Working principle
By on 6 access interface seat 5 of cable, PON equipment 7 to be tested is put into PON equipment placing groove 6, by handle 10- 2 pull down, and handle 10-2 drives pull rod 10-5 to travel forward, and pull rod 10-5 pushes PON equipment placing groove 6 and built-in PON Equipment 7 travels forward together, and when handle 10-2 presses to minimum point, PON equipment 7 is contacted with the contact on interface block 5, in turn PON equipment 7 is detected, qualified equipment retains, and underproof equipment is rejected, handle 10-2 is lifted upwards after detection, It is put into next PON equipment to be detected, it is so all and reciprocal.

Claims (7)

1. a kind of PON fast plant test fixture, it is characterised in that:With pedestal, the side of base upper surface is provided with sliding rail, Test fixture is installed in the upper surface of pedestal, test fixture includes mounting base, PON equipment placing groove, interface block and pushes hand Handle device;It is movably installed with mounting base on the slide rail, PON equipment placing groove is fixedly installed in the upper surface of mounting base, in PON The front end of equipment placing groove is provided with interface block, and interface block is mounted on the base by screw;The PON equipment placing groove is Cubic, the top and front of PON equipment placing groove are provided with opening, wherein the opening of top is to be tested for being conveniently put into PON equipment, the opening in front is for facilitating PON equipment interconnection to interface block;It is also set up in the trailing flank of PON equipment placing groove There is connecting hole, attachment screw passes through connecting hole and is connected on driving handle device.
2. a kind of PON fast plant test fixture according to claim 1, it is characterised in that:In driving handle device and It is additionally provided with cushion block between PON equipment placing groove, for adjusting the distance between driving handle device and PON equipment placing groove, Cushion block is fixedly attached on pedestal or PON equipment placing groove by screw.
3. a kind of PON fast plant test fixture according to claim 1, it is characterised in that:The driving handle dress It sets and is fixedly connected on pedestal including handle set, handle, connecting rod one, connecting rod two and pull rod, handle set by screw, in hand The tail end of handle seat is connected with connecting rod one, and the other end of connecting rod one is fixedly connected with handle, at the middle part of connecting rod one It is connected with connecting rod two, the other end of connecting rod two is movably connected on pull rod, and pull rod is placed by screw and PON equipment Slot is attached.
4. a kind of PON fast plant test fixture according to claim 3, it is characterised in that:It is also set up on handle set There is drag link sleeve, pull rod is inserted in drag link sleeve, guarantees that pull rod is more steady during exercise.
5. a kind of PON fast plant test fixture according to claim 1, it is characterised in that:In PON equipment placing groove Inner wall is also pasted with buffer unit, and the buffer unit is sponge.
6. a kind of PON fast plant test fixture according to claim 1, it is characterised in that:PON equipment placing groove passes through Screw is mounted on the upper surface of mounting base.
7. a kind of PON fast plant test fixture according to claim 1, it is characterised in that:The test fixture number Amount is 4.
CN201820253230.2U 2018-02-12 2018-02-12 A kind of PON fast plant test fixture Expired - Fee Related CN208131486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820253230.2U CN208131486U (en) 2018-02-12 2018-02-12 A kind of PON fast plant test fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820253230.2U CN208131486U (en) 2018-02-12 2018-02-12 A kind of PON fast plant test fixture

Publications (1)

Publication Number Publication Date
CN208131486U true CN208131486U (en) 2018-11-23

Family

ID=64286131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820253230.2U Expired - Fee Related CN208131486U (en) 2018-02-12 2018-02-12 A kind of PON fast plant test fixture

Country Status (1)

Country Link
CN (1) CN208131486U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108499892A (en) * 2018-02-12 2018-09-07 中天宽带技术有限公司 A kind of PON fast plant tests fixture

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108499892A (en) * 2018-02-12 2018-09-07 中天宽带技术有限公司 A kind of PON fast plant tests fixture

Similar Documents

Publication Publication Date Title
CN201887319U (en) Automatic tinning device for cables
CN106141280A (en) A kind of pipe fitting cutting location clamping frock
CN208131486U (en) A kind of PON fast plant test fixture
CN112351614A (en) Direct-current power supply device with circuit fault diagnosis function
CN107984707A (en) A kind of light guide plate cuts polishing all-in-one machine
CN106217010A (en) A kind of one goes out three type orthoscopic bottle cap pad inserting machines
CN204686155U (en) A kind of cutting of the pipe fitting with cam location clamping frock
CN211147730U (en) Monitoring device for outdoor environment protection
CN108499892A (en) A kind of PON fast plant tests fixture
CN209247839U (en) A kind of circuit board detection device for being convenient for adjusting
CN114082653B (en) Screw accessory production is with automatic material feeding unit that sorts
CN215894907U (en) Intelligent power distribution and utilization state detection device
CN204686154U (en) A kind of pipe fitting cutting location clamping frock
CN205324190U (en) Automatic testing arrangement of multistation
CN208818792U (en) Transformer voltage-withstand test mechanism
CN209517281U (en) A kind of auxiliary mobile phone test multi-purpose stand
CN105372543A (en) Automatic cable testing device
CN207650115U (en) Overlap detection machine
CN205177877U (en) Discharging device
CN210099573U (en) Based on CNC makes and uses sweeps cleaning device
CN214666915U (en) Building engineering detects fixing device
CN218036721U (en) Carbon dioxide emission monitoring facilities
CN208547581U (en) A kind of machine vision product surface microdefect detection device easy to use
CN211627762U (en) Automatic motor performance detection device
CN209356555U (en) A kind of fixture of quick test Intellectual computer protection location

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191114

Address after: 226463 Zhongtian Industrial Zone, Hekou Town, Rudong County, Jiangsu, Nantong

Co-patentee after: Zhongtian Communication Technology Co.,Ltd.

Patentee after: ZHONGTIAN BROADBAND TECHNOLOGY Co.,Ltd.

Address before: 226463 Zhongtian Industrial Zone, Hekou Town, Rudong County, Jiangsu, Nantong

Patentee before: ZHONGTIAN BROADBAND TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181123