CN208124998U - A kind of cable guide pipe center line positioning measurement supplementary base - Google Patents
A kind of cable guide pipe center line positioning measurement supplementary base Download PDFInfo
- Publication number
- CN208124998U CN208124998U CN201820370211.8U CN201820370211U CN208124998U CN 208124998 U CN208124998 U CN 208124998U CN 201820370211 U CN201820370211 U CN 201820370211U CN 208124998 U CN208124998 U CN 208124998U
- Authority
- CN
- China
- Prior art keywords
- guide pipe
- cable guide
- positioning
- plate
- graduation mark
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- A Measuring Device Byusing Mechanical Method (AREA)
Abstract
The utility model discloses a kind of cable guide pipe center line positioning measurement supplementary base, is related to supplemental measurement tool field;Including positioning rule, positioning support plate, fixed vertical plate, longitudinal center's graduation mark, ruler plate transverse direction graduation mark, ruler plate transverse and longitudinal graduation mark punctuate are marked in positioning rule, utilize label positioning cable guide pipe center line in positioning support plate and positioning rule, overcome during conventional cable guide pipe accurate measurement can not direct accurate measurement cable guide pipe position of center line defect, avoid the installation deviation as brought by cable guide pipe machining accuracy or point position error, cable guide pipe location and installation precision is improved, is worth promoting in engineering practice.
Description
Technical field
The utility model discloses a kind of supplementary base, is related to supplemental measurement tool field, specifically a kind of cable guide pipe
Center line positioning measurement supplementary base.
Background technique
Cable-stayed bridge is mainly exactly by Cable stress, and Cable stress acts at the both ends anchoring of cable guide pipe.Oblique pull
The line style of rope is one of the key point of CONSTRUCTION OF CABLE-STAYED BRIDGE success or failure, and suspension cable is to form according to cable guide pipe position, therefore construct again
It is particularly important that cable guide pipe installation positioning is carried out in the process fast and accurately.Cable guide pipe installation positioning is broadly divided into two steps:Preliminary survey:?
Setting-out goes out the relative position of cable guide pipe on stiff skeleton, and cable guide pipe is lifted to stiff skeleton, by cable guide pipe setting-out on skeleton
Mark point, line on position and cable guide pipe align, and guarantee angle, line style that cable guide pipe is tentatively installed.Cable guide pipe is existed with guide chain
Vertical, horizontal position is temporarily fixed on skeleton.Accurate measurement:Point position is marked in cable guide pipe upper and lower opening in advance, utilizes measuring point and rope
Catheter center's line relative positional relationship, extrapolates measuring point design coordinate, and precise measurement measuring point actual coordinate is sat by the way that measuring point is practical
Mark and design coordinate pair ratio, finely tune cable guide pipe, until cable guide pipe reaches design position.
Existing accurate measurement process has certain limitation, can not direct accurate measurement cable guide pipe position of center line, once cable guide pipe
Machining accuracy is poor or error occurs in label point position, the installation positioning of cable guide pipe with and just will appear deviation.This is practical new
Type provides a kind of cable guide pipe center line positioning measurement supplementary base, including positioning rule, positioning support plate, fixed vertical plate, positioning rule
Upper mark longitudinal center graduation mark, ruler plate transverse direction graduation mark, ruler plate transverse and longitudinal graduation mark punctuate, utilize positioning support plate and positioning rule
Upper label positions cable guide pipe center line, and overcoming conventional cable guide pipe accurate measurement in the process can not direct accurate measurement cable guide pipe position of center line
Defect, avoid the installation deviation as brought by cable guide pipe machining accuracy or point position error, it is fixed to improve cable guide pipe
Position installation accuracy is worth promoting in engineering practice.
Utility model content
The utility model is directed to the demand and shortcoming of current technology development, provides a kind of cable guide pipe center line positioning survey
Supplementary base is measured, fabrication and installation are very simple and convenient, improve cable guide pipe location and installation precision, are worth pushing away in engineering practice
Extensively.
A kind of cable guide pipe center line positioning measurement supplementary base, including positioning rule, positioning support plate, fixed vertical plate,
Wherein arc plate, arc boom plate, camber board group are at semicircle positioning support plate, arc boom plate top margin and cable guide pipe internal diameter phase
Together, through-hole is opened up among camber plate, fixed vertical plate passes through through-hole, and front and back vertically connects two blocks of positioning support plates, two pieces of positioning branch
The arc boom plate midpoint of fagging opens up groove, the horizontal positioned positioning rule of accommodating in groove, and positioning rule top surface label is longitudinal
Center graduation mark, lateral graduation mark and transverse and longitudinal graduation mark punctuate, for positioning cable guide pipe center line.
The length of positioning rule is greater than the distance between two blocks of positioning support plates in the supplementary base.Easily facilitate survey
Amount.
Anti-slip layer is attached in the supplementary base on the outside of arc plate.Prevent supplementary base from skidding in cable guide pipe.
Longitudinal center's graduation mark of positioning rule top surface label different colours, lateral graduation mark and cross in the supplementary base
Vertical graduation mark punctuate.
The utility model has an advantageous effect in that compared with prior art:
Including positioning rule, positioning support plate, fixed vertical plate, longitudinal center's graduation mark is marked in positioning rule, ruler plate is laterally carved
Line, ruler plate transverse and longitudinal graduation mark punctuate are spent, using label positioning cable guide pipe center line in positioning support plate and positioning rule, is overcome often
Advise during cable guide pipe accurate measurement can not direct accurate measurement cable guide pipe position of center line defect, avoid due to cable guide pipe machining accuracy
Or installation deviation brought by point position error, cable guide pipe location and installation precision is improved, is worth promoting in engineering practice.
Detailed description of the invention
The positive angle schematic diagram of Fig. 1 the utility model;
Fig. 2 the utility model left view angle schematic diagram;
Fig. 3 the utility model overhead view;
Fig. 4 the utility model application site schematic diagram.
Appended drawing reference:1 positioning rule, 2 arc plates, 3 fixed vertical plates, 4 camber plates, 5 arc boom plates.
Specific embodiment
It is right below in conjunction with specific embodiment for the purpose of this utility model, technical solution and advantage is more clearly understood
The utility model is further described.
Embodiment 1:
A kind of cable guide pipe center line positioning measurement supplementary base, including positioning rule 1, positioning support plate, fixed vertical plate 3,
Wherein arc plate 2, arc boom plate 5, camber plate 4 form semicircle positioning support plate, and it is anti-to attach rubber on the outside of arc plate
Slip layer, 5 top margin of arc boom plate is identical as cable guide pipe internal diameter, and through-hole is opened up among camber plate 4, and fixed vertical plate 3 passes through through-hole, and front and back is hung down
Directly two blocks of positioning support plates of welding, 5 midpoint of arc boom plate of two blocks of positioning support plates open up groove, and accommodating is horizontal in groove
The positioning rule 1 of placement, the length of positioning rule 1 are greater than the distance between two blocks of positioning support plates, and 1 top surface of positioning rule marks black vertical
To center graduation mark, red lateral graduation mark and yellow transverse and longitudinal graduation mark punctuate, for positioning cable guide pipe center line.
Embodiment 2:
A kind of cable guide pipe center line positioning measurement supplementary base, including positioning rule 1, positioning support plate, fixed vertical plate 3,
Wherein arc plate 2, arc boom plate 5, camber plate 4 form semicircle positioning support plate, attach frosted rubber on the outside of arc plate
Glue anti-slip layer, 5 top margin of arc boom plate is identical as cable guide pipe internal diameter, through-hole is opened up among camber plate 4, fixed vertical plate 3 passes through through-hole, preceding
Two blocks of positioning support plates of vertical welding afterwards, 5 midpoint of arc boom plate of two blocks of positioning support plates open up groove, accommodating in groove
Horizontal positioned positioning rule 1, the length of positioning rule 1 are greater than the distance between two blocks of positioning support plates, and 1 top surface of positioning rule label is black
Longitudinal center's graduation mark of color, lateral graduation mark and transverse and longitudinal graduation mark punctuate, for positioning cable guide pipe center line.
When the utility model is used, cable guide pipe has been lifted in Sarasota and being fixed temporarily, and after pedestal completes, will be assisted
Pedestal stretches to side suitable for reading in cable guide pipe, and the position marked, as labeling position in known cable guide pipe, then will assist base
The whole cable guide pipe that is put into of seat is suitable for reading interior, and two blocks of positioning support plates 2 are held out against with cable guide pipe inner wall simultaneously, can by relative positional relationship
Know, longitudinal center's graduation mark in positioning rule 1 is overlapped with cable guide pipe center line and center line extended line, by known cable guide pipe
Labeling position extrapolates the design coordinate of the transverse and longitudinal graduation mark punctuate of longitudinal center's graduation mark and lateral graduation mark intersection, will survey
Gauge rod is placed on transverse and longitudinal graduation mark punctuate, is measured transverse and longitudinal graduation mark punctuate actual coordinate, is passed through the reality of transverse and longitudinal graduation mark punctuate
Coordinate and design coordinate pair ratio, are finely adjusted cable guide pipe and fixation;Then under another supplementary base being stretched in cable guide pipe
Mouth side, and the position marked, same principle hold out against positioning support plate 2 and cable guide pipe inner wall, extrapolate ruler plate transverse and longitudinal scale
The design coordinate of line punctuate, measuring scale plate transverse and longitudinal graduation mark punctuate actual coordinate and adjustment consolidate cable guide pipe after reaching design position
It is fixed.
Claims (4)
1. a kind of cable guide pipe center line positioning measurement supplementary base, it is characterised in that including positioning rule, positioning support plate, fix and erect
Plate,
Wherein at semicircle positioning support plate, arc boom plate top margin is identical as cable guide pipe internal diameter for arc plate, arc boom plate, camber board group,
Through-hole is opened up among camber plate, fixed vertical plate passes through through-hole, and front and back vertically connects two blocks of positioning support plates, two blocks of positioning support plates
Arc boom plate midpoint open up groove, the horizontal positioned positioning rule of accommodating in groove, positioning rule top surface marks longitudinal center
Graduation mark, lateral graduation mark and transverse and longitudinal graduation mark punctuate, for positioning cable guide pipe center line.
2. supplementary base according to claim 1, it is characterised in that the length of positioning rule be greater than two blocks of positioning support plates it
Between distance.
3. supplementary base according to claim 1 or 2, it is characterised in that attach anti-slip layer on the outside of arc plate.
4. supplementary base according to claim 3, it is characterised in that the longitudinal center of positioning rule top surface label different colours
Graduation mark, lateral graduation mark and transverse and longitudinal graduation mark punctuate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820370211.8U CN208124998U (en) | 2018-03-19 | 2018-03-19 | A kind of cable guide pipe center line positioning measurement supplementary base |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820370211.8U CN208124998U (en) | 2018-03-19 | 2018-03-19 | A kind of cable guide pipe center line positioning measurement supplementary base |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208124998U true CN208124998U (en) | 2018-11-20 |
Family
ID=64199311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820370211.8U Active CN208124998U (en) | 2018-03-19 | 2018-03-19 | A kind of cable guide pipe center line positioning measurement supplementary base |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208124998U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110579168A (en) * | 2019-06-29 | 2019-12-17 | 上海二十冶建设有限公司 | method for quickly and accurately positioning central point of large-diameter circular pipeline |
CN111060034A (en) * | 2019-12-31 | 2020-04-24 | 中国水利水电第八工程局有限公司 | Cable guide central axis positioning device and cable guide central axis deviation measuring method |
CN111521169A (en) * | 2020-03-26 | 2020-08-11 | 国网浙江余姚市供电有限公司 | Multifunctional electric pole auxiliary measurement positioning tool |
CN114108473A (en) * | 2021-11-23 | 2022-03-01 | 中铁大桥局集团有限公司 | Precision positioning device and positioning method for cable-stayed bridge cable duct center |
-
2018
- 2018-03-19 CN CN201820370211.8U patent/CN208124998U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110579168A (en) * | 2019-06-29 | 2019-12-17 | 上海二十冶建设有限公司 | method for quickly and accurately positioning central point of large-diameter circular pipeline |
CN111060034A (en) * | 2019-12-31 | 2020-04-24 | 中国水利水电第八工程局有限公司 | Cable guide central axis positioning device and cable guide central axis deviation measuring method |
CN111060034B (en) * | 2019-12-31 | 2021-12-24 | 中国水利水电第八工程局有限公司 | Cable guide central axis positioning device and cable guide central axis deviation measuring method |
CN111521169A (en) * | 2020-03-26 | 2020-08-11 | 国网浙江余姚市供电有限公司 | Multifunctional electric pole auxiliary measurement positioning tool |
CN114108473A (en) * | 2021-11-23 | 2022-03-01 | 中铁大桥局集团有限公司 | Precision positioning device and positioning method for cable-stayed bridge cable duct center |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208124998U (en) | A kind of cable guide pipe center line positioning measurement supplementary base | |
CN104260643B (en) | A kind of wind-proof overall steel bracket installation method | |
CN105507155A (en) | Construction process for installation of small-segment steel box girder | |
CN107726965A (en) | A kind of servicing unit and its application method for being used to detect ship plank linearity | |
CN206440206U (en) | A kind of pre-buried copper tip of railway roadbed highly controls chi | |
CN206772307U (en) | A kind of measurement apparatus for coordinating total powerstation to check the positioning of concrete steel trolley formwork | |
CN110333082A (en) | It is a kind of for judging that straight line travels the calculation method of registration back and forth | |
CN114030394A (en) | Subway contact net full-parameter trackless measurement construction method | |
CN110966970B (en) | Steel plate spring arc height measuring tool | |
CN216523877U (en) | A sinkage measuring device for bridge design | |
CN205742129U (en) | A kind of vertical ship lift balance weight track Fast Installation adjusting apparatus | |
CN112444230B (en) | Rigid contact net tunnel suspension post bottom plate angle trackless measuring method | |
CN106949886B (en) | Rapid positioning device and positioning method for subway tunnel engineering line measuring point positions | |
CN105804039B (en) | A kind of vertical ship lift balance weight track Fast Installation adjusting apparatus and its application process | |
CN110044230B (en) | Novel spare part assembly error detects device | |
CN109405723B (en) | Pipe straightness accuracy measurement detection device | |
CN204043593U (en) | Railway transponder dip stick | |
CN205373711U (en) | Laser positioning device | |
CN209623755U (en) | The device of section waterside, vertical line start point distance is determined suitable for discharge measurement of paddling | |
CN206974320U (en) | Triangle mark plate shape dimension measurement slide calliper rule | |
CN111023943A (en) | Multi-functional scale of measurationing of ballastless track | |
CN204954673U (en) | Positioner of pre -buried probe usefulness in concrete sample | |
CN114045999B (en) | Metal roof T-code positioning and mounting device and application method thereof | |
CN208921040U (en) | It is a kind of for checking the measuring device of curved surfaces flatness | |
CN207991439U (en) | A kind of crane I-steel upper flange horizontal location copying apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |