CN208107650U - A kind of pipe-line system in water pumping aerator installation process - Google Patents

A kind of pipe-line system in water pumping aerator installation process Download PDF

Info

Publication number
CN208107650U
CN208107650U CN201820211810.5U CN201820211810U CN208107650U CN 208107650 U CN208107650 U CN 208107650U CN 201820211810 U CN201820211810 U CN 201820211810U CN 208107650 U CN208107650 U CN 208107650U
Authority
CN
China
Prior art keywords
water
pipe
tracheae
water pumping
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820211810.5U
Other languages
Chinese (zh)
Inventor
黄廷林
胡瑞柱
史保华
李恺弘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Weiyuan Environmental Protection Technology Co ltd
Xian University of Architecture and Technology
Original Assignee
Xi'an Weiyuan Environmental Protection Technology Co ltd
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Weiyuan Environmental Protection Technology Co ltd, Xian University of Architecture and Technology filed Critical Xi'an Weiyuan Environmental Protection Technology Co ltd
Priority to CN201820211810.5U priority Critical patent/CN208107650U/en
Application granted granted Critical
Publication of CN208107650U publication Critical patent/CN208107650U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Aeration Devices For Treatment Of Activated Polluted Sludge (AREA)

Abstract

The pipe-line system that the utility model provides in a kind of water pumping aerator installation process is fixed with float tube by multiple two-tube fixing cards on the tracheae side by side, is connected with pendant block in each two-tube fixing card including the tracheae that one end is connected with water pumping aerator;The other end of the tracheae with land air compressor machine by being connected the first communicating pipe;Float tube is equipped with check valve on one end of water pumping aerator, and the other end of the float tube far from water pumping aerator is connected by the second communicating pipe with land air compressor machine.This method is completed to construct with preparation stage, immersed tube stage and water filling by calculating with the pressure release stage.The method of the utility model solve due to during flood depth reservoir construction pipeline by pendant block pulling force it is larger caused by pipe deforming, pipeline leakiness gas under high hydraulic pressure influences the problem of water pumping aerator is run, and pipeline is longer, the depth of water is bigger, this method efficiency is higher, and advantage is more obvious.Solve the problems, such as water pumping aerator and pipe-line system maintenance, replacement difficulty simultaneously, convenient construction is time saving and energy saving.

Description

A kind of pipe-line system in water pumping aerator installation process
Technical field
The utility model belongs to pipeline construction field, is related to water pumping aerator installation, and in particular to a kind of water pumping aerator Pipe-line system in installation process.
Background technique
General reservoir and water body in lake capacity are big, and mobility is small, and many nutriments such as Organic carbon and nitrogen, phosphorus are heavy in bottom Accumulation collection provides sufficient nutrition throughout the year for planktonic organisms such as hydrobiontic algas, while algae can stablize stop and receive light in water According to and mass propagation, cause the eutrophication of water body and influence water quality.Deep water type water source reservoir and lake, more due to water body layering Add stabilization, lower water column is caused to be in anaerobism or anaerobic condition for a long time, the deterioration of the ecological environment, pollutant is big in basic sediment Amount release, causes the secondary pollution of water body.For these problems, it is domestic at present frequently with solution be to be filled to water body Oxygen.Domestic existing oxygenation hybrid technology can refer to Chinese patent " deep water type water source reservoir, which pumps up water, is aerated water correction device " (102603087 A of publication No. CN), the patent are to cause upper and lower level water body to exchange using the gas bullet formed, reach mixing up and down The purpose of water layer, while being oxygenated to water body, improve water hypoxia state.
The traditional laying method of water pumping aerator gas ducting be as the sinking tracheae of aerator starts to sink, while from One end close to aerator starts pendant block one by one.This method is time-consuming and laborious, and when reservoir is deeper, pipeline is be easy to cause to exist Stress is larger in vertical direction, and pipeline stretcher strain is serious, and pipeline service life is led to problems such as to shorten or gas leakage.
Summary of the invention
For the deficiencies in the prior art, the object of the present invention is to provide a kind of water pumping aerator installation processes In pipe-line system and laying and construction method, solve during existing pipeline construction due to pipeline during flood depth reservoir construction By pendant block pulling force it is larger caused by pipe deforming, easy gas leakage under high hydraulic pressure, the problem of influencing water pumping aerator operation.It pumps up water exposure Gas device and pipeline maintenance are more convenient, time saving and energy saving.
In order to solve the above-mentioned technical problem, the application, which adopts the following technical scheme that, is achieved:
Pipe-line system in a kind of water pumping aerator installation process, including the tracheae that one end is connected with water pumping aerator, institute It is fixed with float tube side by side by multiple two-tube fixing cards on the tracheae stated, is connected with pendant block in each two-tube fixing card;
The other end of the tracheae with land air compressor machine by being connected the first communicating pipe;Float tube is close to water pumping aerator Check valve is installed, the other end of the float tube far from water pumping aerator is connected by the second communicating pipe with land air compressor machine on one end;
Tracheae intake valve, exhaust valve and tracheae are sequentially installed with from land air compressor machine to tracheae on first communicating pipe Pressure gauge;Float tube intake valve, water injection valve and float tube pressure gauge are sequentially installed on second communicating pipe from land air compressor machine to float tube.
Compared with prior art, beneficial has the technical effect that the utility model:
The pipe-line system of the utility model gives tracheae an additional float tube, installs pipeline and pendant block whole group on the water surface Finish, with the sinking watching of aerator, it is only necessary to by air compressor machine air adjust guarantee pipeline buoyancy i.e. can guarantee pipeline with Aerator sinks together, finally can remove pipeline buoyancy by water filling, complete laying.Structure is simple, and be easy to construct popularization.
Detailed description of the invention
Fig. 1 is schematic piping diagram.
Fig. 2 is pipeline connection sectional view.
The meaning of each label is in figure:1- water pumping aerator, 2- tracheae, 3- float tube, the two-tube fixing card of 4-, 5- fall block, The land air compressor machine of 6-, the first communicating pipe of 7-, 8- check valve, the second communicating pipe of 9-, 10- tracheae intake valve, 11- exhaust valve, 12- gas Hook gauge, 13- float tube intake valve, 14- water injection valve, 15- float tube pressure gauge, 16- air bag.
Explanation is further explained in detail below in conjunction with particular content of the drawings and examples to the utility model.
Specific embodiment
Specific embodiment of the utility model is given below, it should be noted that the utility model is not limited to following tool Body embodiment, all equivalent transformations made on the basis of the technical solutions of the present application each fall within the protection scope of the utility model.
Embodiment 1:
The present embodiment provides the pipe-line system in a kind of water pumping aerator installation process, as depicted in figs. 1 and 2, including one It holds the tracheae 2 that is connected with water pumping aerator 1, is fixed with float tube 3 side by side by multiple two-tube fixing cards 4 on the tracheae 2, often Pendant block 5 is connected in a two-tube fixing card 4;
The other end of the tracheae 2 with land air compressor machine 6 by being connected the first communicating pipe 7;Float tube 3 is close to exposure of pumping up water Check valve 8 is installed on one end of gas device 1, the other end of the float tube 3 far from water pumping aerator 1 by the second communicating pipe 9 with it is land Air compressor machine 6 is connected;
Tracheae intake valve 10, exhaust valve are sequentially installed with from land air compressor machine 6 to tracheae 2 on first communicating pipe 7 11 gentle hook gauges 12;Float tube intake valve 13, note are sequentially installed on second communicating pipe 9 from land air compressor machine 6 to float tube 3 Water valve 14 and float tube pressure gauge 15.
Tracheae 2 and float tube 3 are all made of density less than water and rigid tubing is made, and can float in water, and in certain water Deformation occurs under the conditions of pressure and influences buoyancy and pipeline ventilation capacity.
Two-tube fixing card 4 is process by 304 different stainless steel band steels of two cross sections, and upper lower section is according to tracheae 2 It is determined with the size of float tube 3, between upper and lower two parts and lower part pipe clamp is below by being bolted, for adjusting two pipe clamps Diameter.
Pendant block 5 is reinforced concrete precast member, and pendant block weight is calculated according to design and determined.
Land air compressor machine 6 pressure and tolerance according to needed for aerator determines its model.
Laying and Construction Methods of Pipeline in the water pumping aerator installation process of the present embodiment, pipeline system described in this method System is specifically comprised the following steps using the pipe-line system in water pumping aerator installation process as described in Example 1, this method:
Step 1: calculating and preparation stage:
All parts are assembled according to the assembly relation of pipe-line system, after being completed, calculate the weight of float tube 3 The weight m of G1, the weight G2 of tracheae 2 and pendant block 5, when generated buoyancy F1 and tracheae 2 are full of air when float tube 3 is full of air Generated buoyancy F2, designs the structure size of pipe-line system, so that G1+G2+m=F1+F2;
The air bag 16 of water pumping aerator 1 is inflated, so that the buoyancy that air bag 16 generates is slightly less than water pumping aerator 1 and exists Water pumping aerator 1 is placed in water by the gravity in water, so that water pumping aerator 1 is in state to be sunk;
Original state closes all valves in pipe-line system, then opens tracheae intake valve 10 and float tube intake valve 13, By land air compressor machine 6 into float tube 3 and tracheae 2 gassy, be then shut off tracheae intake valve 10 and float tube intake valve 13, will Pipe-line system is laid in the water surface, so that entire pipe-line system is in suspended state in water;
The weight of float tube is:
In formula:G1- float tube weight, kg
ρ1- float tube density, kg/m3
L1- float tube length, m;
d1'-float tube interior diameter, m;
d1- float tube overall diameter, m
Generated buoyancy F when float tube gassy1For:
In formula:F1- float tube generated buoyancy, N when inflating;
ρWaterThe density of-water, takes 1000kg/m3
Float tube self residual buoyancy FIt is floating
Similarly, tracheae self residual buoyancy:
Fall block weight in water:
In formula:F2- tracheae generated buoyancy, N when inflating;
G2- tracheae weight, kg;
ρ2- tracheae density, kg/m3
L2- air tubing length, m;
d'2- tracheae interior diameter, m;
d2- tracheae overall diameter, m;
M-the weight of pendant block in water, kg;
ρPendant- pendant block density;kg/m3
mFrom- pendant block own wt, kg;
Pipe-line system balanced type:FGas+FIt is floating=m × n+M
In formula:Weight in the water such as M-pipe clamp, bolt, plug, check valve, kg;
N-pendant block number.
Step 2: the immersed tube stage:
The air bag 16 of water pumping aerator 1 starts to carry out bleed air operation, and water pumping aerator 1 starts to sink, and pulls float tube 3 gentle Pipe 2 sinks, and the offer buoyancy closed at both ends of float tube 3, one end that tracheae 2 is connected with water pumping aerator 1 starts to intake, in tracheae 2 Gas is reduced, and the buoyancy of pipe-line system is less than gravity, and float tube 3 and tracheae 2 start to sink automatically;
It is too fast to prevent float tube and tracheae from sinking automatically in step 2, in float tube 3 and the automatic sinking watching of tracheae 2, land Upper air compressor machine 6 compensates pressurization inflation into tracheae 2.
Step 3:Water filling and pressure release stage:
After water pumping aerator 1 is sink to the bottom completely, land air compressor machine 6 stops working, pipe-line system from land air compressor machine 6 to Heeling condition is presented in water pumping aerator 1, does not sink under water completely, starts to fill the water into float tube 3 by water injection valve 14 at this time, Gas in float tube 3 is discharged by check valve 8, gradually decreases the buoyancy of float tube 3;Exhaust valve 11 is fully opened simultaneously, by tracheae 2 In gas discharge complete pipeline laying construction so that entire pipe-line system sinks under water completely.
Normal pressure water filling or high pressure water injection can be used in the injecting process.The pipeline that normal pressure water filling is suitable for laying is straight, no bending State can be injected water into slowly at this time, gas in evacuated tube.High pressure water injection is suitable for pipe bending, manages when the injecting process is very fast It is easy in the case of pneumatosis in road, high pressure can be used and open the check valve 8 of float tube 3, water is rapidly injected.
Pipe-line system is such as needed to change or is repaired, and can be inflated into the air bag 16 of water pumping aerator 1, be made water pumping aerator 1 It floats, while pipe-line system being driven to start to float;It is inflated, pipeline and is raised into float tube 3 and tracheae 2 with land air compressor machine 6 simultaneously Water aerator 1 is all automatic to float, and maintenance or replacement pipeline are more convenient.
The Pipe-lining methods that the utility model uses are that the improved laying of a kind of pair of conventional pipelines laying and construction method is applied Work method, after connecting together tracheae with aerator in conventional method, with the sinking of aerator, the end of tracheae is also sunk to In water, starting constantly increase pendant number of blocks at this time makes its quick submerged to complete the laying of pipeline.It is this directly under Under heavy laying and construction method is longer in feed channel and the biggish situation of the depth of water, it will cause the bending deformation of pipeline, be easy because of shape Become and gas leakage.The laying and construction method of the utility model is then that by pipeline and pendant block, all assembling is finished on the water surface, with exposure The sinking watching of gas device, it is only necessary to be adjusted by air compressor machine air and guarantee the i.e. certifiable pipeline of pipeline buoyancy with aerator together Sink, finally pipeline buoyancy is removed in water filling, completes laying.
The method of the utility model is solved since pipeline is larger and lead by pendant block pulling force during flood depth reservoir construction The pipe deforming leakage problem of cause.And pipeline is longer, the depth of water is bigger, and this method efficiency is higher, and advantage is more obvious.
The laying and construction method of the utility model not only has greater advantage during constructing roughing-in, ties up in pipeline It repairs or piping foundation aspect is even more with the obvious advantage.Since this method principle uses buoyancy and gravitational equilibrium, in pipeline maintenance or It only needs to be inflated aerator and pipeline in person's replacement process, so that buoyancy and gravity are equal again, it can be by pipeline system System all floats, very convenient for pipeline maintenance or replacement.
The novel pipeline laying and construction method of the utility model is that the components such as whole pipelines and pendant block are primary on the water surface Property be completed, do not need to carry out any operation during pipeline commissioning, over long distances, the big depth of water pipeline construction during it is simple It is convenient, it is time saving and energy saving.
Concrete application example:
Specifically, this example provides a kind of water pumping aerator novel pipeline Project case.Lee family's River Reservoir is pumped up water water aeration Matter betterment works comes into effect in November, 2017, and pipeline laying side described in the utility model is used during pipeline laying Formula, work progress mainly include calculating and preparation stage, sinking stage, water filling and pressure release stage.It is used during pipeline laying Connection type as shown shown in Figure 1 and Figure 2.
A wherein duct length L=1400m in the present embodiment, reservoir depth H=70m.It was calculated in early period Following parameter is mainly determined in journey:Float tube and tracheae are all made of and PE pipeline similar in water density, outer diameter tube 75mm, wall thickness Respectively 7mm and 9mm, two-tube outpost weight 0.2kg, the weight 15kg such as plug and check-valves, falls the single self weight m=25kg of block, The distance between adjacent pendant block is 3.0m, falls quantity n=465 of block.
It is available by calculating:Float tube surplus buoyancy 4089kg/m, tracheae surplus buoyancy 3570kg/m, pendant block is in water Buoyant weight 6975kg, outpost and plug etc. are additional to be weighed about as 84kg, pipe-line system buoyancy affluence about 600kg, i.e. pipe-line system affluence Buoyancy 0.43kg/m.
Pipe-line system is finished in water surface assembling, pipe-line system is in state to be sunk.The sinking of aerator therewith, distance expose The pipeline that one section of gas device starts to sink, while air compressor machine starts to operate intermittently.The every sinking 10m of aerator, air compressor machine start operation Air pressure in pipeline is improved into an atmospheric pressure, guarantees intratracheal not water-filling, it is ensured that buoyancy maintains to stablize.Equal aerators are sunk to Behind reservoir bottom, the pressure release by 0.7MPa of pipe pressure then carries out normal pressure water filling to float tube.
Work progress is simple and convenient, only controls pipeline buoyancy by air compressor machine, avoids pipeline in aerator sinking watching In due to pipeline is longer and the depth of water it is larger caused by pipe deforming problem, while all components are finished in water surface combination, are quickly applied Work.

Claims (1)

1. the pipe-line system in a kind of water pumping aerator installation process, the tracheae being connected including one end with water pumping aerator (1) (2), which is characterized in that it is fixed with side by side float tube (3) on the tracheae (2) by multiple two-tube fixing cards (4), it is each two-tube Pendant block (5) is connected in fixing card (4);
The other end of the tracheae (2) is connected by the first communicating pipe (7) with land air compressor machine (6);Float tube (3) is close to pump up water It is equipped on one end of aerator (1) check valve (8), the other end of the float tube (3) far from water pumping aerator (1) passes through the second connection Pipe (9) is connected with land air compressor machine (6);
Tracheae intake valve (10), row are sequentially installed on first communicating pipe (7) from land air compressor machine (6) to tracheae (2) Air valve (11) gentle hook gauge (12);It is sequentially installed on second communicating pipe (9) from land air compressor machine (6) to float tube (3) floating Pipe intake valve (13), water injection valve (14) and float tube pressure gauge (15).
CN201820211810.5U 2018-02-06 2018-02-06 A kind of pipe-line system in water pumping aerator installation process Active CN208107650U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820211810.5U CN208107650U (en) 2018-02-06 2018-02-06 A kind of pipe-line system in water pumping aerator installation process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820211810.5U CN208107650U (en) 2018-02-06 2018-02-06 A kind of pipe-line system in water pumping aerator installation process

Publications (1)

Publication Number Publication Date
CN208107650U true CN208107650U (en) 2018-11-16

Family

ID=64123675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820211810.5U Active CN208107650U (en) 2018-02-06 2018-02-06 A kind of pipe-line system in water pumping aerator installation process

Country Status (1)

Country Link
CN (1) CN208107650U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108413250A (en) * 2018-02-06 2018-08-17 西安建筑科技大学 A kind of pipe-line system in water pumping aerator installation process and laying and construction method
CN108413250B (en) * 2018-02-06 2024-09-27 西安建筑科技大学 Pipeline system in installation process of water lifting aerator and laying construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108413250A (en) * 2018-02-06 2018-08-17 西安建筑科技大学 A kind of pipe-line system in water pumping aerator installation process and laying and construction method
CN108413250B (en) * 2018-02-06 2024-09-27 西安建筑科技大学 Pipeline system in installation process of water lifting aerator and laying construction method

Similar Documents

Publication Publication Date Title
WO2021008368A1 (en) Method applied to treatment of black and odorous water body and bio-ecological micro-power floating island device
CN101293703B (en) Apparatus for treating reinforced concrete structure deep well aeration waste water and prepraring method thereof
CN1323040C (en) Multifunction water pumping aerator
US20100065508A1 (en) Method and apparatus of submersible intake equipment
CN102531290A (en) Method and device for sludge digestive fluid two-level biological denitrification
CN206956921U (en) A kind of prefabricated pumping plant of step anti-floating
US7431623B1 (en) Modular vertical floating pipe
CN106830381B (en) Seabed oxygenation device
CN208107650U (en) A kind of pipe-line system in water pumping aerator installation process
CN102001744B (en) Integral Orbal oxidation ditch combination type aeration system
CN102337752A (en) Equal-diameter quasi-surge shaft for water pipe
CN107777793A (en) A kind of mixing oxygenation water correction device based on solar energy
CN101168462B (en) Aeration flow guiding water circulation treatment device
CN108413250B (en) Pipeline system in installation process of water lifting aerator and laying construction method
CN108413250A (en) A kind of pipe-line system in water pumping aerator installation process and laying and construction method
CN202441640U (en) Pump station air inlet/outlet valve type self-sealing water tank filling equipment
CN201176403Y (en) Aeration waste water treatment plant for deep well of reinforced concrete structure
CN201250233Y (en) Tunnel biogas pool with water return on the top
CN202164862U (en) Tower barrel type structure suitable for ocean engineering
KR20030000395A (en) A floating hydro-electric power plant
CN203668937U (en) Gas lift reverse circulation device
CN112031070A (en) Movable water inlet with head positioned by upright post and float bowl
CN107739100B (en) Mixed oxygenation-artificial floating island integrated water quality restoration device
CN207877387U (en) The film aerating system biological prosthetic suitable for shallow-layer river
CN113264637B (en) Low-disturbance oxygen supply repair equipment and method for lake and reservoir bottom

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Shaanxi Civil Engineering Construction Group Co.,Ltd.

Assignor: XIAN University OF ARCHITECTURE AND TECHNOLOG

Contract record no.: X2021980002385

Denomination of utility model: A kind of pipe system in the installation process of lifting aerator

Granted publication date: 20181116

License type: Exclusive License

Record date: 20210401

EE01 Entry into force of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: Shaanxi Civil Engineering Construction Group Co.,Ltd.

Assignor: XIAN University OF ARCHITECTURE AND TECHNOLOG

Contract record no.: X2021980002385

Date of cancellation: 20230113

EC01 Cancellation of recordation of patent licensing contract