CN208105078U - Bridge triangular hanging basket - Google Patents

Bridge triangular hanging basket Download PDF

Info

Publication number
CN208105078U
CN208105078U CN201820374046.3U CN201820374046U CN208105078U CN 208105078 U CN208105078 U CN 208105078U CN 201820374046 U CN201820374046 U CN 201820374046U CN 208105078 U CN208105078 U CN 208105078U
Authority
CN
China
Prior art keywords
pillar
hanging basket
bridge
fixedly connected
fixedly installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820374046.3U
Other languages
Chinese (zh)
Inventor
程朋来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820374046.3U priority Critical patent/CN208105078U/en
Application granted granted Critical
Publication of CN208105078U publication Critical patent/CN208105078U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses bridge triangular hanging baskets, including bridge column, bottom plate and Hanging Basket, the upper end of the bridge column is fixedly connected with bridge floor, the left and right ends of the bridge floor are fixedly installed with guide rail, the inner surface of the guide rail is connected with Guide rollers, the left and right ends of the bottom base plate are fixedly installed with wheel frame, left and right ends at the top of the bottom plate are fixedly connected to triangle hack lever, it is fixedly installed with the first pillar at the center of the left end triangle hack lever, is fixedly installed with the second pillar at the center of the right end triangle hack lever.The utility model is cooperated by bridge floor, guide rail, wheel frame, rope shaft, cross bar, motor, motor fixed block, bottom plate, Guide rollers, stock, pulley blocks, rope, Hanging Basket, the first pillar, tripod bar and the second pillar, solving existing triangle hanging basket may only generally be moved forward and backward, want to move up and down and just needs to reinstall Hanging Basket, problem very troublesome.

Description

Bridge triangular hanging basket
Technical field
The utility model relates to bridge construction technical fields, specially bridge triangular hanging basket.
Background technique
Hanging Basket cantilever pouring construction be also known as Di Weidake construction method, since nineteen sixties by preceding West Germany first It since use, has been developed so far, it has also become build a kind of extremely efficient construction means of big-and-middle across footpath bridge, Hanging Basket is filled as outstanding The capital equipment of method construction has developed into numerous kinds, as parallel truss Hanging Basket, triangle combination beam type Hanging Basket, bowstring type are hung Basket, stayed-cable hanging basket and triangular truss formula Hanging Basket etc., China has achieved huge since the eighties introduce the technique Achievement, wherein with triangle because its structure is simple and the advantages such as reasonable stress will be widely welcomed, but existing triangle hanging basket It may only generally be moved forward and backward, it is desirable to it moves up and down and just needs to reinstall Hanging Basket, it is very troublesome, for this purpose, it is proposed that bridge Triangle hanging basket.
Utility model content
The purpose of this utility model is to provide bridge triangular hanging baskets, have multi-direction mobile advantage, solve existing Triangle hanging basket may only be generally moved forward and backward, it is desirable to and it moves up and down and just needs to reinstall Hanging Basket, problem very troublesome.
To achieve the above object, the utility model provides the following technical solutions:Bridge triangular hanging basket, including bridge column, bottom plate And Hanging Basket, the upper end of the bridge column are fixedly connected with bridge floor, the left and right ends of the bridge floor are fixedly installed with guide rail, described to lead The inner surface of rail is connected with Guide rollers, and the left and right ends of the bottom base plate are fixedly installed with wheel frame, the bottom Left and right ends at the top of plate are fixedly connected to triangle hack lever, are fixedly installed with first at the center of triangle hack lever left end Column is fixedly installed with the second pillar at the center of the triangle hack lever right end, is fixedly installed with electricity on the left of first pillar Machine, is rotatably connected to shaft between first pillar and the second pillar, the output shaft of the motor and the left side of shaft are fixed The top of connection, first pillar and the second pillar is fixedly connected to cross bar, and the left and right ends of the cross bar front surface are equal It is fixedly connected with stock, the bottom of the stock front surface is movably installed with pulley blocks.
Preferably, the outer surface of the shaft is arranged with rope, and the material of rope is irony.
Preferably, the bottom of the motor is fixedly connected with motor fixed block, and the motor fixed block is fixedly connected on The left side of one pillar.
Preferably, the inner surface of the wheel frame is flexibly connected with Guide rollers, and pulley system is equipped on Guide rollers Dynamic structure.
Compared with prior art, the beneficial effects of the utility model are as follows:
1, the utility model is fixedly installed with guide rail in the left and right ends of bridge floor, and the inner surface of guide rail, which is connected with, leads Rail pulley, the left and right ends of bottom base plate are fixedly installed with wheel frame, and the inner surface of wheel frame is flexibly connected with Guide rollers, Hanging Basket can be allowed to be moved forward and backward, the left and right ends at the top of bottom plate are fixedly connected to triangle hack lever, in triangle hack lever left end It is fixedly installed with the first pillar at center, the second pillar, a left side for the first pillar are fixedly installed at the center of triangle hack lever right end Side is fixedly installed with motor, and shaft, the output shaft of motor and a left side for shaft are rotatably connected between the first pillar and the second pillar Side is fixedly connected, and the top of the first pillar and the second pillar is fixedly connected to cross bar, and the left and right ends of cross bar front surface are solid Surely it is connected with stock, the bottom of stock front surface is movably installed with pulley blocks, Hanging Basket can be made to move up and down, and solves existing Triangle hanging basket may only be generally moved forward and backward, it is desirable to and it moves up and down and just needs to reinstall Hanging Basket, problem very troublesome.
2, the utility model is fixedly connected with motor fixed block in the bottom of motor, and motor fixed block is fixedly connected on first The left side of pillar guarantees the stability of motor during the work time, pulley brake structure is equipped on Guide rollers, guarantees to lead Rail pulley can stop at any time.
Detailed description of the invention
Fig. 1 is the utility model schematic view of the front view;
Fig. 2 is the utility model right side structural representation.
In figure:Bridge 1 column, Bridge 2 face, 3 guide rails, 4 wheel frames, 5 rope shafts, 6 cross bars, 7 motors, 8 motor fixed blocks, 9 bottoms Plate, 10 Guide rollers, 11 stocks, 12 pulley blocks, 13 ropes, 14 Hanging Baskets, 15 first pillars, 16 tripod bars, 17 second pillars.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Bridge triangular hanging basket referring to FIG. 1-2, including bridge column 1, bottom plate 9 and Hanging Basket 14, the upper end of bridge column 1 are fixedly connected There is bridge floor 2, the left and right ends of bridge floor 2 are fixedly installed with guide rail 3, and the inner surface of guide rail 3 is connected with Guide rollers 10, bottom The left and right ends of 9 bottom of plate are fixedly installed with wheel frame 4, and the inner surface of wheel frame 4 is flexibly connected with Guide rollers 10, can be with It allows Hanging Basket to be moved forward and backward, and pulley brake structure is installed on Guide rollers 10, guarantee that Guide rollers 10 can stop at any time, bottom The left and right ends at 9 top of plate are fixedly connected to triangle hack lever 16, are fixedly installed with first at the center of 16 left end of triangle hack lever Pillar 15 is fixedly installed with the second pillar 17 at the center of 16 right end of triangle hack lever, and the left side of the first pillar 15 is fixedly installed with Motor 7, the bottom of motor 7 are fixedly connected with motor fixed block 8, and motor fixed block 8 is fixedly connected on the left side of the first pillar 15, Shaft 5 is rotatably connected between first pillar 15 and the second pillar 17, the outer surface of shaft 5 is arranged with rope 13, and rope 13 Material be irony, the output shaft of motor 7 is fixedly connected with the left side of shaft 5, the top of the first pillar 15 and the second pillar 17 It is fixedly connected to cross bar 6, the left and right ends of 6 front surface of cross bar are fixedly connected to stock 11, the bottom of 11 front surface of stock Pulley blocks 12 are movably installed with, Hanging Basket can be made to move up and down, solving existing triangle hanging basket may only generally be moved forward and backward, Want to move up and down and just needs to reinstall Hanging Basket, problem very troublesome.
In use, being fixedly installed with guide rail 3 in the left and right ends of bridge floor 2, the inner surface of guide rail 3 is connected with guide rail Pulley 10, the left and right ends of 9 bottom of bottom plate are fixedly installed with wheel frame 4,10 activity of inner surface and Guide rollers of wheel frame 4 Connection, can allow Hanging Basket to be moved forward and backward, and triangle hack lever 16 is fixedly connected in the left and right ends at 9 top of bottom plate, in tripod It is fixedly installed with the first pillar 15 at the center of 16 left end of bar, is fixedly installed with the second pillar at the center of 16 right end of triangle hack lever 17, the left side of the first pillar 15 is fixedly installed with motor 7, is fixedly connected with motor fixed block 8 in the bottom of motor 7, motor is solid Determine the left side that block 8 is fixedly connected on the first pillar 15, guarantees the stability of motor 7 during the work time, the first pillar 15 and the Shaft 5 is rotatably connected between two pillars 17, the output shaft of motor 7 is fixedly connected with the left side of shaft 5, the first pillar 15 and The top of two pillars 17 is fixedly connected to cross bar 6, and the left and right ends of 6 front surface of cross bar are fixedly connected to stock 11, stock The bottom of 11 front surfaces is movably installed with pulley blocks 12, Hanging Basket can be made to move up and down, and it is general to solve existing triangle hanging basket It may only be moved forward and backward, it is desirable to it moves up and down and just needs to reinstall Hanging Basket, problem very troublesome.
In summary:The bridge triangular hanging basket passes through bridge floor 2, guide rail 3, wheel frame 4, rope shaft 5, cross bar 6, motor 7, motor fixed block 8, bottom plate 9, Guide rollers 10, stock 11, pulley blocks 12, rope 13, Hanging Basket 14, the first pillar 15, three feet Hack lever 16 and the second pillar 17 cooperate, and solving existing triangle hanging basket may only generally be moved forward and backward, it is desirable to above move down It is dynamic just to need to reinstall Hanging Basket, problem very troublesome.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. bridge triangular hanging basket, including bridge column (1), bottom plate (9) and Hanging Basket (14), it is characterised in that:The upper end of the bridge column (1) It is fixedly connected with bridge floor (2), the left and right ends of the bridge floor (2) are fixedly installed with guide rail (3), the interior table of the guide rail (3) Face is connected with Guide rollers (10), and the left and right ends of bottom plate (9) bottom are fixedly installed with wheel frame (4), described Left and right ends at the top of bottom plate (9) are fixedly connected to triangle hack lever (16), are consolidated at the center of triangle hack lever (16) left end Dingan County is equipped with the first pillar (15), is fixedly installed with the second pillar (17) at the center of triangle hack lever (16) right end, described It is fixedly installed on the left of first pillar (15) motor (7), the company of rotation between first pillar (15) and the second pillar (17) It is connected to shaft (5), is fixedly connected on the left of the output shaft of the motor (7) and shaft (5), first pillar (15) and second The top of pillar (17) is fixedly connected to cross bar (6), and the left and right ends of cross bar (6) front surface are fixedly connected to stock (11), the bottom of stock (11) front surface is movably installed with pulley blocks (12).
2. bridge triangular hanging basket according to claim 1, it is characterised in that:The outer surface of the shaft (5) is arranged with rope Sub (13), and the material of rope (13) is irony.
3. bridge triangular hanging basket according to claim 1, it is characterised in that:The bottom of the motor (7) is fixedly connected with Motor fixed block (8), the motor fixed block (8) are fixedly connected on the left side of the first pillar (15).
4. bridge triangular hanging basket according to claim 1, it is characterised in that:The inner surface and guide rail of the wheel frame (4) Pulley (10) is flexibly connected, and is equipped with pulley brake structure on Guide rollers (10).
CN201820374046.3U 2018-03-20 2018-03-20 Bridge triangular hanging basket Expired - Fee Related CN208105078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820374046.3U CN208105078U (en) 2018-03-20 2018-03-20 Bridge triangular hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820374046.3U CN208105078U (en) 2018-03-20 2018-03-20 Bridge triangular hanging basket

Publications (1)

Publication Number Publication Date
CN208105078U true CN208105078U (en) 2018-11-16

Family

ID=64127628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820374046.3U Expired - Fee Related CN208105078U (en) 2018-03-20 2018-03-20 Bridge triangular hanging basket

Country Status (1)

Country Link
CN (1) CN208105078U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820584A (en) * 2019-11-22 2020-02-21 安徽信睦信息科技有限公司 Triangular hanging basket applied to building bridge construction and safe auxiliary positioning structure thereof
CN111042005A (en) * 2020-01-16 2020-04-21 中建七局安装工程有限公司 Construction method for cantilever casting of corrugated steel web diagonal box girder bridge by hanging basket method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820584A (en) * 2019-11-22 2020-02-21 安徽信睦信息科技有限公司 Triangular hanging basket applied to building bridge construction and safe auxiliary positioning structure thereof
CN110820584B (en) * 2019-11-22 2021-04-23 安徽启源建筑工程有限公司 Triangular hanging basket applied to building bridge construction and safe auxiliary positioning structure thereof
CN111042005A (en) * 2020-01-16 2020-04-21 中建七局安装工程有限公司 Construction method for cantilever casting of corrugated steel web diagonal box girder bridge by hanging basket method
CN111042005B (en) * 2020-01-16 2022-02-01 中建七局安装工程有限公司 Construction method for cantilever casting of corrugated steel web diagonal box girder bridge by hanging basket method

Similar Documents

Publication Publication Date Title
CN205346760U (en) Hoist overhauls uses elevating platform
CN208105078U (en) Bridge triangular hanging basket
CN109399432B (en) A kind of hoistway job platform that climbs certainly
CN205206304U (en) Novel creeping formwork support body
CN209156992U (en) A kind of construction bar cropper
CN205802845U (en) A kind of civil engineering is with hanging a liter machine
CN213445861U (en) Reinforced portal frame for construction of constructional engineering
CN204266651U (en) Novel two-layer lift-sliding formula parking apparatus
CN109967547A (en) A kind of crane end carriage automation pressurizing unit
CN105858488A (en) Indoor and outdoor moving hoisting frame for buildings
CN209367631U (en) A kind of elevator fixes device with Novel counterweight block
CN204402000U (en) Can lateral displacement building external application hanging basket
CN209416016U (en) A kind of dry kiln car automatic loader and unloader structure
CN203976331U (en) Can cross travel building external application hanging basket
CN202508782U (en) Novel automatic gantry crane mechanism
CN207063616U (en) A kind of fast simple lowering or hoisting gear
CN206997622U (en) A kind of new reinforcing steel bar apparatus for bending
CN217051474U (en) Height-adjustable's material hoist for building engineering
CN205151529U (en) A lift dolly for electric plate wire
CN206277280U (en) A kind of Novel double-station integral type electroplates sand-planting machine
CN213173367U (en) Box girder inner top plate die carrier for bridge
CN215798318U (en) Hang whole elevating gear of basket template
CN203701558U (en) Cantilever mechanism of electric hanging basket
CN214359804U (en) High-stability beam lifting machine
CN211028162U (en) Numerical control drilling production line for elevator upright posts, pillars, knockout plates and angle steels

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181116

Termination date: 20190320

CF01 Termination of patent right due to non-payment of annual fee