CN208105042U - A kind of bridge efficiently drained - Google Patents
A kind of bridge efficiently drained Download PDFInfo
- Publication number
- CN208105042U CN208105042U CN201820403877.9U CN201820403877U CN208105042U CN 208105042 U CN208105042 U CN 208105042U CN 201820403877 U CN201820403877 U CN 201820403877U CN 208105042 U CN208105042 U CN 208105042U
- Authority
- CN
- China
- Prior art keywords
- bridge
- fixed frame
- bituminous pavement
- permeable
- rock road
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a kind of bridge efficiently drained, including bridge fixed frame, bridge fixed frame is in " character cut in bas-relief " shape, the centre of bridge fixed frame is equipped with bituminous pavement, and bituminous pavement insertion is set in bridge fixed frame, the middle position of bituminous pavement is fixed with drainage rock road, and the insertion of drainage rock road is set in bituminous pavement, bottom inside bridge fixed frame is fixed with reinforcing bar fixed frame, and reinforcing bar fixed frame is welded and fixed with bridge fixed frame.Pass through setting drainage rock road in the device, when rainy, rainwater falls into bituminous pavement, lower from the drainage rock road being arranged between bituminous pavement to seep, and the top in drainage rock road is equipped with permeable stone, the appearance of permeable stone is equipped with many permeable holes, water will seep under permeable hole, and discharge is seeped under bridge bottom surface, achieve the effect that efficiently to drain, solves the problem of previous bridge is easy ponding, automobile is caused to be easy to happen sideslip.
Description
Technical field
The utility model relates to bridge technology field, specially a kind of draining bridge.
Background technique
Bridge(bridge)Refer to as road the building built across natural or cultural obstacle, it is erected at river
River and lake is marine, makes traffic etc. that can smoothly pass through.Bridge is generally made of superstructure, substructure and attached structure,
Superstructure refers mainly to bridge span structure and support system;Substructure includes abutment, bridge pier and basis;Attached structure then refers to bridge
Head attachment strap, truncated cone banking, shore protection, training works etc..Bridge is divided according to structural system, is had beam bridge, arch bridge, rigid frame bridge, is hanged
Suo Chengchong(Suspension bridge, cable-stayed bridge)Four kinds of primary structures, are divided by purpose, and can be divided into highway bridge, railway bridge, rail-road two
With bridge, city bridge.It can divide by supporting member stress condition:For beam bridge, slab bridge, arch bridge, steel structural bridge, suspension bridge, combined system birdge
(Cable-stayed bridge, suspension bridge).
Existing bridge drainage effect is poor, and setting is single, substantially adds asphalt surface to be made using concrete, and pitch uses
Highdensity laying processing, at rainy day, rainwater can not flow down, and need to disperse to flow into outside bridge to two sides, be easy to produce product
Water causes driving to break away.
Utility model content
The purpose of this utility model is intended to solve that bridge drainage effect is poor, and driving in the rainy day is easy to happen asking for sideslip
Topic provides a kind of bridge efficiently drained, passes through setting permeable stone and low-density bitumen layer, the setting of permeable stone interval in the device
In bituminous pavement, when rainy day, water can penetrate permeable stone, and it is lower seep to low-density bitumen layer, low-density bitumen layer is using close
Lower stone is spent to suppress, can be effective permeable, water is directly descended to infiltration bridge bottom, achievees the effect that efficiently to drain.
To achieve the above object, the utility model provides the following technical solutions:A kind of bridge efficiently drained, including bridge
Fixed frame, the bridge fixed frame are in " character cut in bas-relief " shape, and the centre of the bridge fixed frame is equipped with bituminous pavement, and asphalt pavement embedding
Enter to be set in bridge fixed frame, the middle position of the bituminous pavement is fixed with drainage rock road, and the insertion of drainage rock road is set
It is placed in bituminous pavement, the bottom inside the bridge fixed frame is fixed with reinforcing bar fixed frame, and reinforcing bar fixed frame and bridge
Fixed frame is welded and fixed.
Further, the top in the drainage rock road is equipped with permeable stone.
Further, the top of the reinforcing bar fixed frame is equipped with concrete layer, and concrete layer is disposed through reinforcing bar and fixes
Top of the trellis.
Further, the top of the permeable stone is equipped with permeable hole, and permeable hole insertion is set in permeable stone.
Further, the bottom of the permeable stone is fixed with low-density bitumen layer.
The purpose of this utility model is intended to solve the problem of that drainage effect is poor to be easy to produce ponding, provides one kind and is
A kind of bridge efficiently drained is provided, passes through setting drainage rock road in the device, when rainy, rainwater falls into bituminous pavement, from
Lower in the drainage rock road being arranged between bituminous pavement to seep, the top in drainage rock road is equipped with permeable stone, and the appearance of permeable stone is equipped with very
More permeable holes, water will seep under permeable hole, until low-density bitumen layer, low-density bitumen layer is laid with using the stone of low-density
Processing, water can seep under low-density bitumen layer, and drainage rock road runs through concrete layer, and insertion is set in concrete layer, then water
It is lower to seep to reinforcing bar fixed frame across concrete layer, until the bottom surface of bridge, discharge is seeped under bottom surface, reaches the effect efficiently drained
Fruit solves the problem of previous bridge is easy ponding, automobile is caused to be easy to happen sideslip.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the bridge fixed frame partial structure sectional view of the utility model;
Fig. 3 is the drainage rock road partial structural diagram of the utility model.
In figure:1, bridge fixed frame, 2, drainage rock road, 3, bituminous pavement, 4, permeable hole, 5, permeable stone, 6, low-density drip
Cyan layer, 7, concrete layer, 8, reinforcing bar fixed frame.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Bridge fixed frame 1, drainage rock road 2 used in the utility model, bituminous pavement 3, permeable stone 5, low-density pitch
Layer 6, concrete layer 7, reinforcing bar fixed frame 8 can be as obtained by being bought market or individual is customized.
Fig. 1 to 3 is please referred to, the utility model provides a kind of technical solution:A kind of bridge efficiently drained, including bridge are solid
Determine frame 1, drainage rock road 2, bituminous pavement 3, permeable hole 4, permeable stone 5, low-density bitumen layer 6, concrete layer 7, reinforcing bar fixed frame
8, bridge fixed frame 1 is in " character cut in bas-relief " shape, and the centre of bridge fixed frame 1 is equipped with bituminous pavement 3, and the insertion of bituminous pavement 3 is set to
In bridge fixed frame 1, the middle position of bituminous pavement 3 is fixed with drainage rock road 2, and the insertion of drainage rock road 2 is set to pitch
In road surface 3, the bottom inside bridge fixed frame 1 is fixed with reinforcing bar fixed frame 8, and reinforcing bar fixed frame 8 and bridge fixed frame 1 weld
Connect fixation, the top in drainage rock road 2 is equipped with permeable stone 5, and the density of permeable stone 5 is larger, the rainwater that can be accessed on penetrating bridge, water
Downstream to bottom, the top of reinforcing bar fixed frame 8 is equipped with concrete layer 7, and concrete layer 7 is disposed through the top of reinforcing bar fixed frame 8
Portion, the bridge are not constituted using permeable stone entirely, can increase the stability of bridge using concrete layer 7, the top of permeable stone 5 is equipped with
Permeable hole 4, and the insertion of permeable hole 4 is set in permeable stone 5, the water accessed on bridge will be penetrated from permeable hole 4, permeable stone 5
Bottom be fixed with low-density bitumen layer 6, low-density bitumen layer 6 will provide certain permeable effect, and low-density bitumen layer 6
Stability can also be provided.
In the bridge efficiently drained using the utility model one kind, consolidate firstly, the bridge fixed frame 1 is fixed to bridge
Positioning, when rainy, rainwater falls into bituminous pavement 3, lower from the drainage rock road 2 being arranged between bituminous pavement 3 to seep, drainage rock road
2 top is equipped with permeable stone 5, and the appearance of permeable stone 5 is equipped with many permeable holes 4, and water will be seeped from permeable hole 4 is lower, until low-density drips
Cyan layer 6, low-density bitumen layer 6 carry out laying processing using the stone of low-density, and water can be seeped from low-density bitumen layer 6 is lower, draining
Stone road 2 runs through concrete layer 7, and insertion is set in concrete layer 7, and then water passes through concrete layer 7, lower to seep to reinforcing bar fixed frame
8, until the bottom surface of bridge, discharge is seeped under bottom surface, achievees the effect that efficiently to drain, above is exactly the bridge efficiently drained
Working principle.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. the bridge that one kind efficiently drains, including bridge fixed frame(1), it is characterised in that:The bridge fixed frame(1)In " recessed
Word " shape, the bridge fixed frame(1)Centre be equipped with bituminous pavement(3), and bituminous pavement(3)Insertion is set to bridge and fixes
Frame(1)In, the bituminous pavement(3)Middle position be fixed with drainage rock road(2), and drainage rock road(2)Insertion is set to
Bituminous pavement(3)In, the bridge fixed frame(1)Internal bottom is fixed with reinforcing bar fixed frame(8), and reinforcing bar fixed frame
(8)With bridge fixed frame(1)It is welded and fixed.
2. the bridge that one kind according to claim 1 efficiently drains, it is characterised in that:The drainage rock road(2)Top
Equipped with permeable stone(5).
3. the bridge that one kind according to claim 1 efficiently drains, it is characterised in that:The reinforcing bar fixed frame(8)Top
Portion is equipped with concrete layer(7), and concrete layer(7)It is disposed through reinforcing bar fixed frame(8)Top.
4. the bridge that one kind according to claim 2 efficiently drains, it is characterised in that:The permeable stone(5)Top set
There is permeable hole(4), and permeable hole(4)Insertion is set to permeable stone(5)In.
5. the bridge that one kind according to claim 2 efficiently drains, it is characterised in that:The permeable stone(5)Bottom it is solid
Surely it is equipped with low-density bitumen layer(6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820403877.9U CN208105042U (en) | 2018-03-23 | 2018-03-23 | A kind of bridge efficiently drained |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820403877.9U CN208105042U (en) | 2018-03-23 | 2018-03-23 | A kind of bridge efficiently drained |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208105042U true CN208105042U (en) | 2018-11-16 |
Family
ID=64122665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820403877.9U Expired - Fee Related CN208105042U (en) | 2018-03-23 | 2018-03-23 | A kind of bridge efficiently drained |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208105042U (en) |
-
2018
- 2018-03-23 CN CN201820403877.9U patent/CN208105042U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110158389A (en) | A kind of light soil road structure and its construction method | |
CN205557351U (en) | Dun ding sets up structure that bridge was widened to steel bent cap | |
CN210216254U (en) | Concrete guardrail structure | |
CN212103654U (en) | Bridge expansion joint drainage device | |
CN208105042U (en) | A kind of bridge efficiently drained | |
CN207452609U (en) | A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section | |
CN108867664A (en) | A kind of road based on contrary sequence method changes bridge section foundation pit supporting construction and its construction method | |
CN111501459B (en) | Roadbed structure of mountain road and construction method thereof | |
CN209066280U (en) | A kind of bridge road structure | |
CN203411895U (en) | Drainage facility for highway bridge floor | |
CN110904756B (en) | Construction method of three-layer bridge | |
CN207295446U (en) | A kind of bridge pave-load layer water-proof drainage structure | |
CN208717919U (en) | A kind of road based on contrary sequence method changes bridge section foundation pit supporting construction | |
JP2764544B2 (en) | Street lid for permeable pavement | |
CN206308613U (en) | Beam-ends percolating water ejector at a kind of expansion joint | |
CN206233347U (en) | A kind of prefabricated assembled tunnel drainage gutter | |
KR101054310B1 (en) | Drainage bridge structure and construction method | |
CN208815404U (en) | A kind of bridge deck drainage structure and bridge | |
CN217026666U (en) | Drainage system for urban bridge central green belt | |
CN216972999U (en) | New and old road bed junction repair structure | |
CN210657963U (en) | Transverse multi-span frame pier for railway and rail traffic | |
CN213203761U (en) | River channel water passing trestle | |
CN210194454U (en) | Assembled culvert template system | |
CN110965565B (en) | Intelligent protection system for reconstructing and expanding highway slope | |
CN213114180U (en) | Anticorrosive wood platform drainage steel trough |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181116 Termination date: 20190323 |