CN208105020U - Bridge construction stage Temporary Piers support reaction monitoring device - Google Patents

Bridge construction stage Temporary Piers support reaction monitoring device Download PDF

Info

Publication number
CN208105020U
CN208105020U CN201721741972.1U CN201721741972U CN208105020U CN 208105020 U CN208105020 U CN 208105020U CN 201721741972 U CN201721741972 U CN 201721741972U CN 208105020 U CN208105020 U CN 208105020U
Authority
CN
China
Prior art keywords
temporary piers
displacement meter
meter
support reaction
transverse distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721741972.1U
Other languages
Chinese (zh)
Inventor
宋于祺
梁新礼
李永
陈坚柔
吴海勃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201721741972.1U priority Critical patent/CN208105020U/en
Application granted granted Critical
Publication of CN208105020U publication Critical patent/CN208105020U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of bridge construction stage Temporary Piers support reaction monitoring device, is provided with transverse distribution beam between the top of adjacent steel pipe Temporary Piers;One group of surface strain meter is laid from center to upper and lower two sides at the span centre of transverse distribution beam side;In transverse distribution soffit from laying one group of displacement meter to both ends at span centre;Displacement meter is fixed by displacement meter bracket, and displacement meter bracket both ends are separately fixed on two adjacent steel pipe Temporary Piers;Displacement meter, surface strain meter are connect by signal wire with strain acquirement instrument, strain acquirement instrument is transferred to data processing system after converting the signal that displacement meter, surface strain meter acquire, and data processing system goes out the support reaction of steel pipe Temporary Piers by the Deformation calculation of collected transverse distribution beam.For the utility model when steel pipe Temporary Piers top carries out main girder construction, girder load makes transverse distribution beam deformed, by test transverse distribution deflection of beam stress, amount of deflection can inverse pier top support reaction at this, and manufacturing cost is cheap, data are accurate in real time.

Description

Bridge construction stage Temporary Piers support reaction monitoring device
Technical field:
The utility model relates to Temporary Piers counter-force the field of test technology, in particular to a kind of bridge construction stage Temporary Piers branch Counter-force monitoring device.
Background technique:
In bridge construction, the interim bridge pier set up for structure stress and safely is seen everywhere.Temporary Piers are as lower part The important component of support construction, its effect, importance and main pier have par during pushing tow.In girder steel pushing tow In the process, not only support reaction changes greatly Temporary Piers, and pressure pattern is changeable.No. 3 Temporary Piers of such as flat victory bridge are in girder Support reaction reaches maximum when pushing tow is to 165 operating condition, and value is 12000kN or so, in the 200th~the 285th operating condition of girder pushing tow When support reaction be zero;For the L2 Temporary Piers of two or seven Yangtze Bridge when girder is total to pushing tow 140m operating condition, girder is to L2 Temporary Piers slideway Pressure be uniformly abound with slideway length, but when girder is total to pushing tow 180m operating condition (not crossing pier), girder is to L2 Temporary Piers slideway Pressure is two-fold line load and load length only has 80cm or so.
On the other hand, although having carried out intensity and stability meter to interim pier structure in main beam supporting or before pouring Calculate, but engineering in practice, often due to exploration is insufficient, so that how much the parameter and theoretical value of the soil body will appear deviation.For For the sake of safety, the bridge construction being placed on for a long time on Temporary Piers especially for girder very must to the monitoring of Temporary Piers counter-force It wants.The construction technology in China realized rapid development in recent years, but to still no at present specific of the monitoring of Temporary Piers counter-force Method.
Summary of the invention:
The purpose of this programme is to provide a kind of bridge construction stage Temporary Piers support reaction monitoring device, to solve due to calculating Error and the excessive bring damage of support reaction caused by the different construction stages.
A kind of bridge construction stage Temporary Piers support reaction monitoring device, including:Displacement meter, surface strain meter, strain acquirement Instrument, data processing system, displacement meter bracket, power supply unit;Wherein, transverse direction is provided between the top of adjacent steel pipe Temporary Piers Distribution beam;One group of surface strain meter, and transverse distribution are laid from center to upper and lower two sides at the span centre of transverse distribution beam side The center position of beam upper and lower side lays a surface strain meter;In transverse distribution soffit from laying one group of position to both ends at span centre Meter is moved, and a displacement meter is laid in transverse distribution soffit span centre position;Displacement meter is fixed by displacement meter bracket, displacement meter branch Frame both ends are separately fixed on two adjacent steel pipe Temporary Piers;Displacement meter, surface strain meter pass through signal wire and strain acquirement instrument Connection, strain acquirement instrument are transferred to data processing system, data processing after converting the signal that displacement meter, surface strain meter acquire System goes out the support reaction of steel pipe Temporary Piers by the Deformation calculation of collected transverse distribution beam;Power supply unit is used for as displacement Meter, surface strain meter, strain acquirement instrument provide electric power.
Preferably, data processing system is fixed on steel pipe Temporary Piers.
Preferably, bridge construction stage Temporary Piers support reaction monitoring device further includes wireless signal transceiver, and strain is adopted Collection instrument is transferred at the data of distal end after converting the signal that displacement meter, surface strain meter acquire by wireless signal transceiver Reason system;Wireless signal transceiver is powered by power supply unit.
Preferably, power supply unit includes rechargeable battery, charging circuit, photovoltaic mould group;Photovoltaic mould group electricity passes through charging Circuit is that rechargeable battery charges to solve the problems, such as building site breakpoint.
Preferably, displacement is calculated as 3, and the displacement meter for being located at two sides is separately positioned on 1/4 away from adjacent steel pipe Temporary Piers Place.
Preferably, surface strain is calculated as 3, and the surface strain meter for being located at two sides is separately positioned on the 1/4 of upper and lower two sides Place.
Preferably, data processing system is personal computer system or the PLC with display panel.Data processing system is logical It crosses force equation and calculates steel pipe Temporary Piers support reaction, and shown by display panel, issued when support reaction is more than preset value Alarm.
For the utility model when steel pipe Temporary Piers top carries out main girder construction, girder load becomes transverse distribution beam deflection Shape, by test transverse distribution deflection of beam stress, amount of deflection can inverse pier top support reaction at this, and manufacturing cost is cheap, data It is accurate in real time.
Detailed description of the invention:
Attached drawing 1 is the structural representation of the bridge construction stage Temporary Piers support reaction monitoring device of a width better embodiment Figure.
In figure:Displacement meter 1, surface strain meter 2, strain acquirement instrument 3, data processing system 4, displacement meter bracket 5, for Denso Set 6, steel pipe Temporary Piers 8, transverse distribution beam 9.
Specific embodiment:
As shown in Fig. 1, a kind of bridge construction stage Temporary Piers support reaction monitoring device, including:Displacement meter 1, surface are answered Become meter 2, strain acquirement instrument 3, data processing system 4, displacement meter bracket 5, power supply unit 6;Wherein, in adjacent steel pipe Temporary Piers 8 Top between be provided with transverse distribution beam 9;One group is laid from center to upper and lower two sides at the span centre of 9 side of transverse distribution beam Surface strain meter 2, and the center position of 9 upper and lower side of transverse distribution beam lays a surface strain meter 2;At 9 bottom of transverse distribution beam Face is from laying one group of displacement meter 1 to both ends at span centre, and a displacement meter 1 is laid in 9 bottom surface span centre position of transverse distribution beam;Displacement Meter 1 is fixed by displacement meter bracket 5, and 5 both ends of displacement meter bracket are separately fixed on two adjacent steel pipe Temporary Piers 8;Displacement meter 1, surface strain meter 2 is connect by signal wire (figure middle polyline) with strain acquirement instrument 3, and strain acquirement instrument 3 is by displacement meter 1, surface It is transferred to data processing system 4 after the signal conversion that strain gauge 2 acquires, data processing system 4 passes through collected transverse distribution The Deformation calculation of beam 9 goes out the support reaction of steel pipe Temporary Piers 8;Power supply unit 6 is 2 based on for displacement meter 1, surface strain, strain Acquisition Instrument 3 provides electric power.
In the present embodiment, data processing system 4 is fixed on steel pipe Temporary Piers 8;Power supply unit 6 includes charging electricity Pond, charging circuit, photovoltaic mould group;Photovoltaic mould group electricity is that rechargeable battery charges to solve building site breakpoint by charging circuit Problem.Displacement meter 1 is 3, and the displacement meter 1 for being located at two sides is separately positioned at 1/4 away from adjacent steel pipe Temporary Piers 8.Surface Strain gauge 2 is 3, and the surface strain meter 2 for being located at two sides is separately positioned at the 1/4 of upper and lower two sides.Data processing system 4 is Personal computer system or PLC with display panel.
In another embodiment, bridge construction stage Temporary Piers support reaction monitoring device further includes wireless signal transmitting-receiving Device, the signal that strain acquirement instrument 3 acquires displacement meter 1, surface strain meter 2 are transmitted after converting by wireless signal transceiver To the data processing system of distal end;Wireless signal transceiver is powered by power supply unit 6.

Claims (7)

1. a kind of bridge construction stage Temporary Piers support reaction monitoring device, which is characterized in that including:Displacement meter, surface strain meter, Strain acquirement instrument, data processing system, displacement meter bracket, power supply unit;Wherein, in the structure of an essay at the top of adjacent steel pipe Temporary Piers Equipped with transverse distribution beam;One group of surface strain meter is laid from center to upper and lower two sides at the span centre of transverse distribution beam side, and The center position of transverse distribution beam upper and lower side lays a surface strain meter;Transverse distribution soffit from span centre to both ends cloth If one group of displacement meter, and a displacement meter is laid in transverse distribution soffit span centre position;Displacement meter is fixed by displacement meter bracket, Displacement meter bracket both ends are separately fixed on two adjacent steel pipe Temporary Piers;Displacement meter, surface strain meter pass through signal wire and answer Becoming Acquisition Instrument connection, strain acquirement instrument is transferred to data processing system after converting the signal that displacement meter, surface strain meter acquire, Data processing system goes out the support reaction of steel pipe Temporary Piers by the Deformation calculation of collected transverse distribution beam;Power supply unit is used In providing electric power for displacement meter, surface strain meter, strain acquirement instrument.
2. bridge construction stage Temporary Piers support reaction monitoring device as described in claim 1, which is characterized in that data processing system System is fixed on steel pipe Temporary Piers.
3. bridge construction stage Temporary Piers support reaction monitoring device as described in claim 1, which is characterized in that bridge construction rank Section Temporary Piers support reaction monitoring device further includes wireless signal transceiver, and strain acquirement instrument adopts displacement meter, surface strain meter The data processing system of distal end is transferred to after the signal conversion of collection by wireless signal transceiver;Wireless signal transceiver by Power supply unit power supply.
4. bridge construction stage Temporary Piers support reaction monitoring device as claimed in claim 2 or claim 3, which is characterized in that for Denso It sets including rechargeable battery, charging circuit, photovoltaic mould group;Photovoltaic mould group electricity is rechargeable battery charging by charging circuit.
5. the bridge construction stage Temporary Piers support reaction monitoring device as described in claims 1 to 3 any one, feature exist In displacement is calculated as 3, and the displacement meter for being located at two sides is separately positioned at 1/4 away from adjacent steel pipe Temporary Piers.
6. the bridge construction stage Temporary Piers support reaction monitoring device as described in claims 1 to 3 any one, feature exist In surface strain is calculated as 3, and the surface strain meter for being located at two sides is separately positioned at the 1/4 of upper and lower two sides.
7. bridge construction stage Temporary Piers support reaction monitoring device as claimed in claim 2 or claim 3, which is characterized in that at data Reason system is personal computer system or the PLC with display panel.
CN201721741972.1U 2017-12-14 2017-12-14 Bridge construction stage Temporary Piers support reaction monitoring device Expired - Fee Related CN208105020U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721741972.1U CN208105020U (en) 2017-12-14 2017-12-14 Bridge construction stage Temporary Piers support reaction monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721741972.1U CN208105020U (en) 2017-12-14 2017-12-14 Bridge construction stage Temporary Piers support reaction monitoring device

Publications (1)

Publication Number Publication Date
CN208105020U true CN208105020U (en) 2018-11-16

Family

ID=64130824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721741972.1U Expired - Fee Related CN208105020U (en) 2017-12-14 2017-12-14 Bridge construction stage Temporary Piers support reaction monitoring device

Country Status (1)

Country Link
CN (1) CN208105020U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112362007A (en) * 2020-09-19 2021-02-12 郑州大学 Pipeline bracket safety real-time monitoring and early warning system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112362007A (en) * 2020-09-19 2021-02-12 郑州大学 Pipeline bracket safety real-time monitoring and early warning system

Similar Documents

Publication Publication Date Title
CN102322071B (en) Universal base structure of main transformer of 220kV substation
CN105040985B (en) The detecting system and method for stretching force under a kind of vertical finish rolling deformed bar anchor
CN108505458A (en) A kind of suspension bridge removes the monitoring method of overall process
CN204101361U (en) A kind of PCslab girder large deflection failure test device
CN208105020U (en) Bridge construction stage Temporary Piers support reaction monitoring device
CN104406777A (en) Three-dimensional space variable angle loading device
CN214747897U (en) Building construction monitoring system
CN202974148U (en) Tool for detecting burial depth of chuck of chassis of power transmission pole
CN102431918B (en) Method for judging damage position on steel structure of tower body of tower crane
CN201223881Y (en) Apparatus for measuring tensioning force of fine rolling screw-thread steel
CN105784243A (en) Method for calculating prestress loss caused by anchorage retraction
CN103147402B (en) For bracing or strutting arrangement and the height regulation method of continuous box girder bridge construction
CN208899333U (en) A kind of space curved surface suspension cable beam-ends cable guide pipe positioning device
CN102706391A (en) Troubled cable and supporting seat translation progressive-type identification method for combined monitoring during variation of temperature
CN206540539U (en) A kind of subgrade settlement monitoring system
CN203498758U (en) Lever-type prepressing bracket device
CN203982667U (en) Ribbing geomembrane composite pad system model test unit
CN204124150U (en) The equipment of hoisting force measurement mechanism and measurement continuously welded rail track actual lock rail temperature
CN204849855U (en) Clump of piles field test's model device
CN210886964U (en) Real-time monitoring system for concrete performance change in steel pipe
CN113447067A (en) Monitoring method of construction monitoring system of reinforced concrete combined section
CN209875182U (en) Tunnel corrugated steel plate supporting structure and real-time monitoring system thereof
CN113514000A (en) Method for monitoring deformation of steel plate vertical shaft wall
CN104695717A (en) Upwarp degree precontrol adjusting equipment of revolving platform
CN209117226U (en) A kind of aqueduct carbon fiber patch reinforcement monitoring analysis system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181116

Termination date: 20191214

CF01 Termination of patent right due to non-payment of annual fee