CN204325931U - Hierarchical loading device of high pier top support of bridge - Google Patents

Hierarchical loading device of high pier top support of bridge Download PDF

Info

Publication number
CN204325931U
CN204325931U CN201420733793.3U CN201420733793U CN204325931U CN 204325931 U CN204325931 U CN 204325931U CN 201420733793 U CN201420733793 U CN 201420733793U CN 204325931 U CN204325931 U CN 204325931U
Authority
CN
China
Prior art keywords
pier
embedded
flexible cable
bridge
bridge high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420733793.3U
Other languages
Chinese (zh)
Inventor
李国梁
丁永铭
刘秀昌
郭�东
胡磊
刘果
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN201420733793.3U priority Critical patent/CN204325931U/en
Application granted granted Critical
Publication of CN204325931U publication Critical patent/CN204325931U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a hierarchical loading device of high pier top support of bridge has solved the many and load tonnage of the material that expends that exist when prior art carries out the pre-compaction to the high pier bracket of bridge and is difficult to the problem of accurate control. The bridge pier body bearing platform comprises a bridge high pier body bearing platform (1), wherein a steel bar net piece (4) is pre-embedded in the bridge pier body bearing platform, an upper pre-embedded steel plate and a lower pre-embedded steel plate are pre-embedded on the upper end surface and the lower end surface of the steel bar net piece (4), a steel strand anchorage device is pre-embedded on the upper pre-embedded steel plate and the lower pre-embedded steel plate, the lower end of a lower flexible cable (9) is riveted in an upper anchorage device (6) of the steel strand and a lower anchorage device (8) of the steel strand, the upper end of the lower flexible cable (9) is connected with the lower end of an upper flexible cable (12) through a flexible cable connector (11), a jack anchorage device (13) is arranged on a top support (3). The utility model discloses be particularly suitable for the job site and use.

Description

Bridge High-pier platform top end holder hierarchical loading device
Technical field
The utility model relates to a kind of precompressed charger, particularly a kind of precompressed charger of high pier top end support.
Background technology
Carry out precompressed to the bracket on Bridge High-pier platform, present stage adopts traditional piling prepressing mode to carry out.The sand pocket that piling prepressing is used or concrete precast block or water tank are transported on Bridge High-pier platform support by lifting.During with sand pocket or concrete block precompressed, need the project organization considering hanging box and suspension ring, also must consider during stacking to put slope, also want formwork erection if desired and establish pull bar, to ensure the safety of loading procedure.It is many to there is consume material in this mode of carrying out precompressed to Bridge High-pier platform bracket, and the load time is long, loads the defect that tonnage is difficult to accurately control.In addition, when Bridge High-pier platform support top width relative narrower, in work high above the ground environment, also there is huge potential safety hazard in a large amount of weight of preloading.
Summary of the invention
The utility model provides a kind of Bridge High-pier platform top end holder hierarchical loading device, and solve the consume material of existence when prior art carries out precompressed to Bridge High-pier platform bracket many, the load time is long, loads the technical problem that tonnage is difficult to accurately control.
The utility model solves above technical problem by the following technical programs:
A kind of Bridge High-pier platform top end holder hierarchical loading device, comprise Bridge High-pier pier shaft cushion cap 1, Bridge High-pier pier shaft cushion cap 1 is provided with Bridge High-pier pier shaft 2, Bridge High-pier pier shaft 2 is provided with top end holder 3, reinforced mesh 4 is embedded with in Bridge High-pier pier shaft cushion cap 1, the upper surface of reinforced mesh 4 is embedded with upper end pre-embedded steel slab 5, upper end pre-embedded steel slab 5 is embedded with ground tackle 6 on steel strand, the lower surface of reinforced mesh 4 is embedded with lower end pre-embedded steel slab 7, lower end pre-embedded steel slab 7 is embedded with ground tackle 8 under steel strand, the lower end of lower flexible cable 9 to be riveted on steel strand under ground tackle 6 and steel strand in ground tackle 8, high performance concrete 10 has been built in Bridge High-pier pier shaft cushion cap 1, the upper end of lower flexible cable 9 and the lower end of upper flexible cable 12 are linked together by flexible cable connector 11, top end holder 3 is provided with jack anchor set 13, the upper end of upper flexible cable 12 is connected in jack anchor set 13, top end holder 3 is provided with top end holder deformation test dial gauge 14.
4 cover hierarchical loading flexible cable devices are evenly equipped with between Bridge High-pier pier shaft cushion cap 1 and top end holder 3.
The utility model saves squeeze time, has saved experimentation cost, can the various situations of accurate simulation concrete uniform load and uneven load, is particularly suitable for job site and uses.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model on side-looking direction.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail:
A kind of Bridge High-pier platform top end holder hierarchical loading device, comprise Bridge High-pier pier shaft cushion cap 1, Bridge High-pier pier shaft cushion cap 1 is provided with Bridge High-pier pier shaft 2, Bridge High-pier pier shaft 2 is provided with top end holder 3, reinforced mesh 4 is embedded with in Bridge High-pier pier shaft cushion cap 1, the upper surface of reinforced mesh 4 is embedded with upper end pre-embedded steel slab 5, upper end pre-embedded steel slab 5 is embedded with ground tackle 6 on steel strand, the lower surface of reinforced mesh 4 is embedded with lower end pre-embedded steel slab 7, lower end pre-embedded steel slab 7 is embedded with ground tackle 8 under steel strand, the lower end of lower flexible cable 9 to be riveted on steel strand under ground tackle 6 and steel strand in ground tackle 8, high performance concrete 10 has been built in Bridge High-pier pier shaft cushion cap 1, the upper end of lower flexible cable 9 and the lower end of upper flexible cable 12 are linked together by flexible cable connector 11, top end holder 3 is provided with jack anchor set 13, the upper end of upper flexible cable 12 is connected in jack anchor set 13, top end holder 3 is provided with top end holder deformation test dial gauge 14.
4 cover hierarchical loading flexible cable devices are evenly equipped with between Bridge High-pier pier shaft cushion cap 1 and top end holder 3.The flexible cable jack hierarchical loading prepressing device that the utility model uses is on the basis of traditional piling prepressing device, in conjunction with a kind of innovation newly of steel strand tension principle.In order to make precompressed loading procedure and practice of construction process stress match, area load being modeled to the multiple spot point load of equivalence, reaching the inspection stability of bracket and the object of safety by measuring the distortion observing Nodes of respectively exerting pressure.

Claims (2)

1. a Bridge High-pier platform top end holder hierarchical loading device, comprise Bridge High-pier pier shaft cushion cap (1), Bridge High-pier pier shaft cushion cap (1) is provided with Bridge High-pier pier shaft (2), Bridge High-pier pier shaft (2) is provided with top end holder (3), it is characterized in that, reinforced mesh (4) is embedded with in Bridge High-pier pier shaft cushion cap (1), the upper surface of reinforced mesh (4) is embedded with upper end pre-embedded steel slab (5), upper end pre-embedded steel slab (5) is embedded with ground tackle on steel strand (6), the lower surface of reinforced mesh (4) is embedded with lower end pre-embedded steel slab (7), lower end pre-embedded steel slab (7) is embedded with ground tackle (8) under steel strand, the lower end of lower flexible cable (9) to be riveted under ground tackle on steel strand (6) and steel strand in ground tackle (8), high performance concrete (10) has been built in Bridge High-pier pier shaft cushion cap (1), the upper end of lower flexible cable (9) and the lower end of upper flexible cable (12) are linked together by flexible cable connector (11), top end holder (3) is provided with jack anchor set (13), the upper end of upper flexible cable (12) is connected in jack anchor set (13), top end holder (3) is provided with top end holder deformation test dial gauge (14).
2. a kind of Bridge High-pier platform top end holder hierarchical loading device according to claim 1, is characterized in that, be evenly equipped with 4 cover hierarchical loading flexible cable devices between Bridge High-pier pier shaft cushion cap (1) and top end holder (3).
CN201420733793.3U 2014-11-29 2014-11-29 Hierarchical loading device of high pier top support of bridge Active CN204325931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420733793.3U CN204325931U (en) 2014-11-29 2014-11-29 Hierarchical loading device of high pier top support of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420733793.3U CN204325931U (en) 2014-11-29 2014-11-29 Hierarchical loading device of high pier top support of bridge

Publications (1)

Publication Number Publication Date
CN204325931U true CN204325931U (en) 2015-05-13

Family

ID=53162307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420733793.3U Active CN204325931U (en) 2014-11-29 2014-11-29 Hierarchical loading device of high pier top support of bridge

Country Status (1)

Country Link
CN (1) CN204325931U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603860A (en) * 2016-02-19 2016-05-25 河南省交通规划设计研究院股份有限公司 Prefabricated T beam and construction method
CN108193605A (en) * 2018-02-24 2018-06-22 中交路桥建设有限公司 No. 0 block bracket prepressing structure of continuous beam bridge pier in water
CN114108488A (en) * 2021-12-19 2022-03-01 中铁四局集团路桥工程有限公司 Reverse-pulling construction method for thin-wall pier ultrahigh ultra-wide extra-heavy 0# block bracket

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603860A (en) * 2016-02-19 2016-05-25 河南省交通规划设计研究院股份有限公司 Prefabricated T beam and construction method
CN108193605A (en) * 2018-02-24 2018-06-22 中交路桥建设有限公司 No. 0 block bracket prepressing structure of continuous beam bridge pier in water
CN114108488A (en) * 2021-12-19 2022-03-01 中铁四局集团路桥工程有限公司 Reverse-pulling construction method for thin-wall pier ultrahigh ultra-wide extra-heavy 0# block bracket

Similar Documents

Publication Publication Date Title
CN103437291B (en) Monolithic water tank precompressed construction technology
CN102505636B (en) Construction method of No.0 block of continuous rigid frame bridge of double-thin-wall pier
CN204849607U (en) A continuous beam string basket pre -compaction device for bridge construction
CN102995669B (en) Large-tonnage foundation pile uplift-resistant static test connection device, loading counter-force system and method
CN204325931U (en) Hierarchical loading device of high pier top support of bridge
CN103628422B (en) A kind of anti-force type dragging suspension basket prepressing device and implementation method thereof
CN103090945A (en) Weighing method and independent weighing units of large ocean function module
CN103498425A (en) Full-dismounting combination type multifunctional bracket supporting structure and construction method thereof
CN205223871U (en) Suspension bridge bridge tower overarm brace pre -compaction device
CN111398073A (en) Test device and method for simulating CFRP (carbon fiber reinforced plastics) reinforced coal sample impact disturbance
CN104964840A (en) Secondary lining arch foot sedimentation experiment loading device and application method
CN204112240U (en) The overall prepressing device of Hanging Basket
CN102677710B (en) Reaction frame testing method for earth nail drawing tests
CN202041399U (en) Dead load testing device for stress of precast beam
CN102434007A (en) Construction process for installing vibration isolation support among floors
CN103523665B (en) A kind of transport device and method of high pedestal jib crane
CN201000412Y (en) Building project bearing beam load test device
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN205676784U (en) Bracket reverse drawing loads prepressing device
CN106480826A (en) The cast-in-place traversing construction engineering method of single line box beam pier top
CN203479511U (en) Railway T beam static load test pedestal
CN105651604A (en) Experimental device and experimental method for simulating anti-floating anchor-concrete plate composite structure
CN205035732U (en) Interim support of combined type bridge
CN201762738U (en) Open combined type load box
CN203684109U (en) Device for adjusting sling force and elevation of sling of suspension bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant