CN208094595U - A kind of lims Design of Laboratory Management System device talk controller - Google Patents
A kind of lims Design of Laboratory Management System device talk controller Download PDFInfo
- Publication number
- CN208094595U CN208094595U CN201820626766.4U CN201820626766U CN208094595U CN 208094595 U CN208094595 U CN 208094595U CN 201820626766 U CN201820626766 U CN 201820626766U CN 208094595 U CN208094595 U CN 208094595U
- Authority
- CN
- China
- Prior art keywords
- communication module
- unit
- design
- management system
- lims
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Selective Calling Equipment (AREA)
Abstract
The utility model discloses a kind of lims Design of Laboratory Management System device talk controllers, including communication controller ontology and the first communication module and the second communication module that are arranged on communication controller ontology, the first communication module and the second communication module are connect with the 4th communication module by signal being arranged on the third communication module and user terminal being arranged on Design of Laboratory Management System respectively;The utility model passes through the secure identification system and data storage system that are arranged on communication controller ontology, when experimenter carries out remote monitoring and operation, it can not only identify the identity of operator, password authentification is carried out to operator, improve safety and the tightness of experiment, operating process and feedback result etc. information can also all be stored by data storage system when operator operates, the progress of work is analyzed and inquired into convenient for later experiments, also there is supervisory function bit simultaneously, when there is bad result in experiment, individual can be tracked, everyone has responsibility.
Description
Technical field
The utility model is related to laboratory safety protection technology field, espespecially a kind of lims Design of Laboratory Management System equipment is logical
Interrogate controller.
Background technology
Laboratory is the place tested, and laboratory is the cradle of science, is the base of scientific research, development in science and technology
Source plays very important effect to development in science and technology.The famous laboratory to enjoy high reputation in the world is more called scientific research neck
The Meccah in domain is the place that scientific worker longs for and follows, these laboratories often represent world's leading basic research
Top, the science and technology that the large quantities of Nobel laureates and possessing of being born draw period meaning are started something different achievement, be carry out it is high-grade
The secondary academic important events exchanged, so country and research institute are to the equipment and Experiment Result, experimental technique inside laboratory
Great attention is all remain with experiment process etc., tightness and safety suffer from very high requirement, still, because different
It tests it to take and require all not to the utmost, time-consuming but does not need experimenter keeps test at one's side always for some experiments
Equipment and material adjustment, it is only necessary to which at this moment irregularly observation and local directed complete set arrange several experimenters to keep watch this again
Experiment, will result in the waste of human resources, also can be to the sleep of having a meal in experimenter's daily life, or even goes to toilet and all make
At inconvenience, at this time if there are one setting for remote control is capable of remote reviewing control can be carried out to the experiment, it will be able to solve
Laboratory technician is put, but existing remote control equipment does not all have the function of security protection in the prior art, can not avoid removing
People except experimenter accidentally touches or touches intentionally the case where user terminal causes the failure of an experiment and occurs, and there are certain uneasinesses
Total factor, while be responsible for same experiment of more people, existing controller can not distinguish certain for being who operates in the experiment
One flow, can not system reflect the operating process and operating personnel.
Invention content
The technical problems to be solved in the utility model is to provide a kind of lims laboratory room managings the shortcomings that overcoming the prior art
System equipment communication controller.
In order to solve the above-mentioned technical problem, the utility model provides the following technical solution:
The utility model provides a kind of lims Design of Laboratory Management System device talk controller, including communication controller ontology
With the first communication module and the second communication module being arranged on communication controller ontology, the first communication module and the second communication mould
Block respectively with the 4th communication module by signal that is arranged on the third communication module and user terminal that are arranged on Design of Laboratory Management System
Connection;Secure identification system and data storage system are provided on communication controller ontology, secure identification system includes that identity is tested
Card unit and password authentication unit, identity authenticating unit distinguish telecommunications with password authentication unit and connect the body being arranged on user terminal
Part input unit and Password Input unit, the first communication module, the second communication module, third communication module and the 4th communication module
On be both provided with information transmitting unit and information receiving unit, information transmitting unit and information receiving unit and data storage system
It is connected.
As a kind of optimal technical scheme of the utility model, Password Input unit include finger-print cipher input, data it is close
Code input and face Password Input, password authentication unit be corresponding to it respectively include fingerprint recognition verification, data identification verification and
Recognition of face is verified.
As a kind of optimal technical scheme of the utility model, secure identification system passes through the second communication module and four-way
The identity input unit and Password Input unit being arranged on news module by signal connection user terminal.
As a kind of optimal technical scheme of the utility model, it is provided with operation note unit in data storage system, grasps
The input terminal electric connection information transmitting unit of unit of noting down and information receiving unit, output end are connected with print system.
As a kind of optimal technical scheme of the utility model, the information transmitting unit and letter that are arranged on the first communication module
Breath receiving unit is electrically connected with the information receiving unit and information transmitting unit being arranged on third communication module respectively.
As a kind of optimal technical scheme of the utility model, the information transmitting unit and letter that are arranged on the second communication module
Breath receiving unit is electrically connected with the information receiving unit and information transmitting unit being arranged on the 4th communication module respectively.
As a kind of optimal technical scheme of the utility model, pass through letter between the first communication module and the second communication module
Number repeater is electrically connected.
The advantageous effect that the utility model is reached is:The utility model passes through the peace that is arranged on communication controller ontology
Full identifying system and data storage system can not only identify operation when experimenter carries out remote monitoring and operation
The identity of person carries out password authentification to operator, improves safety and the tightness of experiment, additionally it is possible to when operator operates
Time all stores operating process and feedback result etc. information by data storage system, analyzes and visits convenient for later experiments
The progress of work is begged for, while also there is supervisory function bit, when bad result occurs in experiment, individual can be tracked, responsibility arrives
The phenomenon that people avoids mutually shifting responsibility onto others between more people, and the popular feeling does not conform to can also reinforce the sense of responsibility of staff and rigorous
Property.
Description of the drawings
Attached drawing is used to provide a further understanding of the present invention, and a part for constitution instruction, with this practicality
Novel embodiment for explaining the utility model, does not constitute limitations of the present invention together.
In the accompanying drawings:
Fig. 1 is the utility model structure diagram;
Figure label:1, communication controller ontology;11, the first communication module;12, the second communication module;13, safety identification
System;14, data storage system;15, identity authenticating unit;16, password authentication unit;17, operation note unit;18, signal
Repeater;2, Design of Laboratory Management System;21, third communication module;3, user terminal;31, the 4th communication module;32, identity is defeated
Enter unit;33, Password Input unit;4, information transmitting unit;5, information receiving unit;6, print system.
Specific implementation mode
The preferred embodiment of the utility model is illustrated below in conjunction with attached drawing, it should be understood that described herein excellent
It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
In the description of the present invention, it should be noted that the instructions such as term "vertical", "upper", "lower", "horizontal"
Orientation or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model and simplification
Description, does not indicate or imply the indicated device or element must have a particular orientation, with specific azimuth configuration and behaviour
Make, therefore should not be understood as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set
Set ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection,
Or it is integrally connected;It can be mechanical connection, can also be electrical connection;It can be directly connected, intermediary can also be passed through
It is indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be according to specific feelings
Condition understands the concrete meaning of above-mentioned term in the present invention.
Embodiment:As shown in Figure 1, the utility model provides a kind of lims Design of Laboratory Management System device talk controller,
Including communication controller ontology 1 and the first communication module 11 and the second communication module 12 that are arranged on communication controller ontology 1,
First communication module 11 and the second communication module 12 respectively with the third communication module 21 being arranged on Design of Laboratory Management System 2 and use
31 signal of the 4th communication module connection being arranged in family terminal 3, can lead to the information on Design of Laboratory Management System 2 by first
News module 11 is transferred to communication controller ontology 1, and user's end is passed to by the second communication module 12 by communication controller ontology 1
End 3, realizes the effect of real time monitoring, meanwhile, operational order can be also sent to by user terminal 3 by the second communication module 12
Communication controller ontology 1, then Design of Laboratory Management System 2 is sent to by the first communication module 11 by communication controller ontology 1, it is real
Reality tests the work of adjustment;Secure identification system 13 and data storage system 14 are provided on communication controller ontology 1, safety is known
Other system 13 includes identity authenticating unit 15 and password authentication unit 16, and identity authenticating unit 15 and password authentication unit 16 are distinguished
The identity input unit 32 and Password Input unit 33, the first communication module 11, second being arranged on telecommunications connection user terminal 3 are logical
It is both provided with information transmitting unit 4 and information receiving unit on news module 12, third communication module 21 and the 4th communication module 31
5, information transmitting unit 4 and information receiving unit 5 are connected with data storage system 14, and user is in use user terminal 3 to experiment
Room management system 2 is monitored and before operation element, needs to input the identity of oneself by identity input unit 32, by identity
Authentication unit 15 verifies whether as the qualified experimenter for operating the experiment in the laboratory, after being proved to be successful, Yong Huzai
The password stored in advance is inputted by Password Input unit 33, is verified by password authentication unit 16, is proved to be successful and then passes through
4th communication module 31 is monitored and adjusts work, while being verified, being monitored and adjusted work, data storage system
14 store these information by operation note unit 17, then by experimenter be selectively connected to and print system
In system 6, the print job for choosing material is carried out.
Password Input unit 33 includes finger-print cipher input, data cryptogram input and face Password Input, password authentification list
Member 16, which is corresponding to it, respectively includes fingerprint recognition verification, data identification verification and recognition of face verification.
Secure identification system 13 is connected with 31 signal of the 4th communication module by the second communication module 12 and is set on user terminal 3
The identity input unit 32 and Password Input unit 33 set.
Operation note unit 17 is provided in data storage system 14, the input terminal of operation note unit 17 is electrically connected letter
Breath transmission unit 4 and information receiving unit 5, output end are connected with print system 6 so that operator can manually select needs
The content connection print system 6 of printing is printed.
The information transmitting unit 4 and information receiving unit 5 being arranged on first communication module 11 respectively with third communication module
The information receiving unit 5 and information transmitting unit 4 being arranged on 21 are electrically connected.
The information transmitting unit 4 and information receiving unit 5 being arranged on second communication module 12 respectively with the 4th communication module
The information receiving unit 5 and information transmitting unit 4 being arranged on 31 are electrically connected.
It is electrically connected by signal repeater 18 between first communication module 11 and the second communication module 12.
Operation principle:
First, user Design of Laboratory Management System 2 is monitored using user terminal 3 and operation element before, need
The identity of oneself is inputted by identity input unit 32, is verified whether as qualified behaviour in the laboratory by identity authenticating unit 15
Make the experimenter of the experiment;Secondly, after authentication success, user inputs advance storage by Password Input unit 33 again
Password, verified by password authentication unit 16;Then, password authentification is successful and then is supervised by the 4th communication module 31
Control and adjustment work, communication controller ontology is transferred to by the information on Design of Laboratory Management System 2 by the first communication module 11
1, user terminal 3 is passed to by the second communication module 12 by communication controller ontology 1, realizes the effect of real time monitoring, meanwhile,
Operational order also can be sent to communication controller ontology 1 by user terminal 3 by the second communication module 12, then by Communication Control
Device ontology 1 is sent to Design of Laboratory Management System 2 by the first communication module 11, realizes the work of experiment adjustment;Finally, it is carrying out
While verification, monitoring and adjustment work, data storage system 14 stores these information by operation note unit 17,
By experimenter be selectively connected in print system 6 again, carries out the print job for choosing material.
Finally it should be noted that:The preferred embodiment that these are only the utility model, is not limited to this practicality
It is novel, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art,
It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc.
With replacement.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all include
It is within the protection scope of the utility model.
Claims (7)
1. a kind of lims Design of Laboratory Management System device talk controller, which is characterized in that including communication controller ontology(1)With
It is arranged in communication controller ontology(1)On the first communication module(11)With the second communication module(12), the first communication module
(11)With the second communication module(12)Respectively with Design of Laboratory Management System(2)The third communication module of upper setting(21)With user's end
End(3)4th communication module of upper setting(31)Signal connects;Communication controller ontology(1)On be provided with secure identification system
(13)And data storage system(14), secure identification system(13)Including identity authenticating unit(15)And password authentication unit
(16), identity authenticating unit(15)And password authentication unit(16)Telecommunications connects user terminal respectively(3)The identity of upper setting is defeated
Enter unit(32)With Password Input unit(33), the first communication module(11), the second communication module(12), third communication module
(21)With the 4th communication module(31)On be both provided with information transmitting unit(4)And information receiving unit(5), information transmitting unit
(4)And information receiving unit(5)With data storage system(14)It is connected.
2. a kind of lims Design of Laboratory Management System device talk controller according to claim 1, which is characterized in that password
Input unit(33)Including finger-print cipher input, data cryptogram input and face Password Input, password authentication unit(16)Therewith
It is corresponding to respectively include fingerprint recognition verification, data identification verification and recognition of face verification.
3. a kind of lims Design of Laboratory Management System device talk controller according to claim 1, which is characterized in that safety
Identifying system(13)Pass through the second communication module(12)With the 4th communication module(31)Signal connects user terminal(3)Upper setting
Identity input unit(32)With Password Input unit(33).
4. a kind of lims Design of Laboratory Management System device talk controller according to claim 1, which is characterized in that data
Stocking system(14)On be provided with operation note unit(17), operation note unit(17)Input terminal be electrically connected information send
Unit(4)And information receiving unit(5), output end and print system(6)It is connected.
5. a kind of lims Design of Laboratory Management System device talk controller according to claim 1, which is characterized in that first
Communication module(11)The information transmitting unit of upper setting(4)And information receiving unit(5)Respectively with third communication module(21)On
The information receiving unit of setting(5)And information transmitting unit(4)It is electrically connected.
6. a kind of lims Design of Laboratory Management System device talk controller according to claim 1, which is characterized in that second
Communication module(12)The information transmitting unit of upper setting(4)And information receiving unit(5)Respectively with the 4th communication module(31)On
The information receiving unit of setting(5)And information transmitting unit(4)It is electrically connected.
7. a kind of lims Design of Laboratory Management System device talk controller according to claim 1, which is characterized in that first
Communication module(11)With the second communication module(12)Between pass through signal repeater(18)It is electrically connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820626766.4U CN208094595U (en) | 2018-04-28 | 2018-04-28 | A kind of lims Design of Laboratory Management System device talk controller |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820626766.4U CN208094595U (en) | 2018-04-28 | 2018-04-28 | A kind of lims Design of Laboratory Management System device talk controller |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208094595U true CN208094595U (en) | 2018-11-13 |
Family
ID=64052622
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820626766.4U Expired - Fee Related CN208094595U (en) | 2018-04-28 | 2018-04-28 | A kind of lims Design of Laboratory Management System device talk controller |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208094595U (en) |
-
2018
- 2018-04-28 CN CN201820626766.4U patent/CN208094595U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103578169B (en) | Intelligent information passive electronic lockset | |
CN206162749U (en) | Wireless access control system | |
Sarker et al. | Design and implementation of smart attendance management system using multiple step authentication | |
CN106710043A (en) | Time-limited entrance guard management system with visitor authentication and method thereof | |
CN205486372U (en) | Intelligent building access control system based on two -dimensional code discernment | |
CN109934975B (en) | Open laboratory wisdom guide system based on cloud platform and zigBee | |
CN103116919A (en) | On-off control system and access control system | |
CN105868549B (en) | Medical equipment based on Internet internet of things and communication device and method thereof | |
CN105391680A (en) | Identification, authentication and authorization method in a laboratory system | |
CN207046617U (en) | A kind of gate inhibition's Elevator Intelligent Control System | |
CN108288319A (en) | A kind of intelligent access control system and access control method | |
CN110070660A (en) | A kind of gate inhibition and the integrated control method of terraced control and system | |
CN107104946A (en) | A kind of management system of computer laboratory | |
CN102479397A (en) | Entrance guard system controlling method, entrance guard controlling apparatus and mobile terminal | |
CN106327077A (en) | Electrical maloperation-preventing control device based on entrance guard and control method thereof | |
CN212211051U (en) | Intelligent laboratory management system | |
CN102546571A (en) | Identity authentication system and method | |
CN110895599B (en) | Access right determination device and access right determination method | |
CN208094595U (en) | A kind of lims Design of Laboratory Management System device talk controller | |
CN105933503A (en) | Information processing method and electronic equipment | |
CN105678547B (en) | A kind of terminal and its working method checking holder's identity | |
CN104392321B (en) | A kind of biological authentification system of power scheduling graphic operation ticket, power scheduling operation ticket system | |
CN107610014A (en) | A kind of newborn check-in system and method suitable for school | |
CN201498026U (en) | Hierarchical access card recognition system | |
CN107064775A (en) | A kind of system that distributed reliability test is carried out to printed circuit board (PCB) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181113 Termination date: 20200428 |
|
CF01 | Termination of patent right due to non-payment of annual fee |