CN208083832U - A kind of installing mechanism of locked spacer - Google Patents

A kind of installing mechanism of locked spacer Download PDF

Info

Publication number
CN208083832U
CN208083832U CN201820114910.6U CN201820114910U CN208083832U CN 208083832 U CN208083832 U CN 208083832U CN 201820114910 U CN201820114910 U CN 201820114910U CN 208083832 U CN208083832 U CN 208083832U
Authority
CN
China
Prior art keywords
mounting base
bolt
column
overhead
bolt presses
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820114910.6U
Other languages
Chinese (zh)
Inventor
李攀桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ESSENWAY TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
SHANGHAI ESSENWAY TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ESSENWAY TECHNOLOGY DEVELOPMENT Co Ltd filed Critical SHANGHAI ESSENWAY TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201820114910.6U priority Critical patent/CN208083832U/en
Application granted granted Critical
Publication of CN208083832U publication Critical patent/CN208083832U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Automatic Assembly (AREA)

Abstract

The utility model provides a kind of installing mechanism of locked spacer, it includes Working gantry, shell, locked spacer installation group, product orientation clamping group, bolt presses operation group, the locked spacer installation group is made of positioning plate and mounting base profiling jig, product orientation clamping group is made of lifting cylinder and position housing piece, and bolt presses operation group is made of overhead cylinder, bolt presses block.The utility model may be implemented to roof-rack mounting base accurately and fast install the purpose of locked spacer, time saving, save people, laborsaving and then be Reducing Cost in Enterprises, and the utility model can design different shape and size according to actual conditions.

Description

A kind of installing mechanism of locked spacer
Technical field
The utility model belongs to automobile technical field, is related to the accessory installation of roof-rack more particularly to a kind of stop The installing mechanism of gasket.
Background technology
Many SUV in automobile market at present(Refer to " Sport Utility Vehicle ")Vehicle be all equipped with shape it is brief, It is generous, suspension type luggage carrier of good performance.Most of vehicles for being equipped with suspension type luggage carrier are all that roof rear and front end is held successfully Bolt hole directly assembles bolt on luggage carrier, and when vehicle assembles, luggage carrier can be directly installed in roof, pass through screw bolt and nut It is fixedly connected, it is easy to operate and quick.But precondition be bolts assemblies fortunately in luggage carrier mounting base when will not be upward It alters, otherwise can be extremely difficult when bolt wants attaching nut to be locked at roof, influence entrucking efficiency.
Given this importance is put, for bolts assemblies when on luggage carrier, each bolt will assemble a locked spacer, prevent spiral shell Play above and below silk.But manual assembly locked spacer was not only time-consuming and laborious at present, but also efficiency is low, production capacity is low, develops in this context The automatic mechanism that locked spacer is installed for roof-rack mounting base, with this achievees the effect that luggage carrier being capable of rapid wagon loading.
Invention content
The purpose of this utility model is to provide a kind of installing mechanisms of locked spacer, mainly solve above-mentioned prior art institute , i.e., on each bolt of roof-rack mounting base, manual assembly locked spacer was not only time-consuming and laborious, but also Efficiency is low, and the low problem of production capacity, the utility model provides a kind of installing mechanism of locked spacer, effectively increases locked spacer Installation effectiveness improves production capacity, reduces cost of labor, is reached for the effect of roof-rack mounting base Fast Installation locked spacer.
To achieve the goals above, technical solution used by the utility model is:A kind of installing mechanism of locked spacer, Include mainly Working gantry, shell, locked spacer installation group, product orientation clamping group, bolt presses operation group, feature exists In:
The locked spacer installation group is by the first positioning plate, the second positioning plate and the first mounting base profiling jig, second Mounting base profiling jig forms, and product orientation clamping group is made of lifting cylinder, position housing piece, and bolt presses operation group is by pushing up Set cylinder, bolt presses block composition;
Fix the shell of a front and back two sides perforation on the table top of the Working gantry, sheath top plate and Working gantry Shell bottom plate is fixed between table top, shell bottom plate is parallel with the table top of Working gantry, shell bottom plate and sheath top plate, shell side The first space is constituted between riser, the table top of shell bottom plate, shell cant board and Working gantry constitutes second space;
The Working gantry is equipped with the pressure regulator valve of the air pressure size for adjusting overhead cylinder and lifting cylinder, work The table top of rack is equipped with first manual air pressure valve, second-hand and takes offence pressure valve, lifting cylinder, and three is in second space, Wherein the top of lifting cylinder enters the first space after shell bottom plate, and the top of lifting cylinder is connect with position housing piece, Lifting cylinder drives position housing piece to synchronize and moves up and down;The first manual air pressure valve control overhead cylinder on move down Dynamic, second-hand's pressure valve of taking offence controls moving up and down for lifting cylinder;
There are two positioning plate, i.e., the first positioning towards parallelly setting before and after the side of second space for the shell bottom plate Plate and the second positioning plate are set wherein the first positioning plate is equipped with the first mounting base profiling jig on the first mounting base profiling jig There are two groove, i.e. the first groove and the second groove, which is equipped with indent hole post chamber, i.e. the first indent hole post Chamber and the second indent hole post chamber;Second positioning plate is equipped with the second mounting base profiling jig, is set on the second mounting base profiling jig There are two groove, i.e. third groove and the 4th groove, which is equipped with indent hole post chamber, i.e. third indent hole post Chamber and the 4th indent hole post chamber;Four grooves can bolt corresponding with roof-rack mounting base installation position form embedded knot The top of structure, four indent hole post chambers can place locked spacer and bolt hole corresponding with roof-rack mounting base aperture pair It answers, embedded four grooves are corresponding after bolt passes through the bolt hole of the bolt installation position of roof-rack mounting base, locked spacer Four indent hole post intracavitary;The diameter of the indent hole post chamber is greater than or equal to the diameter of bolt, is less than the outer of locked spacer Diameter;
The both ends of the position housing piece are located at the second peace of the first mounting base profiling jig sum of shell bottom plate The surface of seat profiling jig is filled, position housing piece front end is equipped with first protruded towards the first mounting base profiling jig direction and fixes Portion, position housing piece rear end are equipped with the second fixed part protruded towards the second mounting base profiling jig direction, and two fixed parts are used In roof-rack mounting base is fixed on the first mounting base profiling jig and the second mounting base profiling jig;
The overhead cylinder is located at the first space above, is fixed on the outside of sheath top plate, and the lower end of overhead cylinder is passed through It wears sheath top plate and is connected with bolt presses block middle part, the both ends of bolt presses block are located at the first installation of shell bottom plate The surface of seat profiling jig and the second mounting base profiling jig, and positioned at the surface at the both ends of position housing piece;Bolt pressure Tight block, which is located on one end right over the first mounting base profiling jig, sets that there are two towards the first mounting base profiling jig direction protrusion Bolt presses column, i.e. the first bolt presses column and the second bolt presses column, bolt presses block is located at the second mounting base profiling folder The bolt presses column protruded towards the second mounting base profiling jig direction there are two being set on one end right over having, i.e. third bolt pressure Tight column and the 4th bolt presses column;
First bolt presses column of the bolt presses block, the first groove of the first mounting base profiling jig first in Shrinkage pool column chamber is on a vertical line of vertical direction, the second bolt presses column of bolt presses block, the first mounting base profiling Second indent hole post chamber of the second groove of fixture is on a vertical line of vertical direction, the third bolt of bolt presses block Hold-down column, the second mounting base profiling jig the third indent hole post chamber of third groove be in a vertical line of vertical direction On, the 4th bolt presses column of bolt presses block, the second mounting base profiling jig the 4th indent hole post chamber of the 4th groove be in On one vertical line of vertical direction.
Further, the both ends of the position housing piece are respectively provided with a positioning guide column, i.e. the first positioning guide column and second Positioning guide column, through shell bottom plate and with lifting cylinder in vertical direction keeping parallelism, the first positioning guide column is located at positioning guide column Position housing piece corresponds to one end of the first mounting base profiling jig, and the second positioning guide column is located at position housing piece and corresponds to the second installation One end of seat profiling jig, position housing piece drive the first positioning guide column and the second positioning guide column to move up and down simultaneously;
The bolt presses block both ends are respectively provided with an overhead guide post, i.e. the first overhead guide post and the second overhead guide post, For overhead guide post through sheath top plate and with overhead cylinder in vertical direction keeping parallelism, the first overhead guide post is located at bolt presses block One end of corresponding first mounting base profiling jig, the second overhead guide post are located at bolt presses block and correspond to the second mounting base profiling jig One end, bolt presses block drives the first overhead guide post and the second overhead guide post to move up and down simultaneously;
The first overhead guide post on the bolt presses block and the second overhead guide post, each overhead guide post and sheath top plate The interconnecting piece on top is equipped with guide sleeve, as the first overhead guide post guide sleeve and the second overhead guide post guide sleeve, the positioning compression The first positioning guide column and the second positioning guide column of block, each positioning guide column and the interconnecting piece on shell bottom plate top are equipped with guide sleeve, The as guide sleeve of the guide sleeve of the first positioning guide column and the second positioning guide column.
Further, the bottom of the first fixed part of the position housing piece is equipped with the first fixing end in concave shape, The bottom of second fixed part is equipped with the second fixing end in concave shape, concave shape and the roof-rack mounting base of fixing end The outer shape and size for being fixed position are agreed with.
Further, the first manual air pressure valve and second-hand take offence before pressure valve is disposed side by side on Working gantry table top The 4th manual pneumatic valve and the 5th manual pneumatic valve, first manual air pressure valve is arranged side by side at the rear portion of Working gantry table top in portion It is identical as the effect of the 4th manual pneumatic valve, moving up and down for overhead cylinder can be individually controlled, second-hand takes offence pressure valve It is identical as the effect of the 5th manual pneumatic valve, moving up and down for lifting cylinder can be individually controlled.
Further, the first indent hole post chamber, the second indent hole post chamber, third indent hole post chamber and the 4th concave hole The top of the column chamber position that is connected with corresponding recesses is respectively provided with a locked spacer profiling chamber;The shell cant board is equipped with Hole;The table top of the Working gantry has four feets, and every feet bottom is equipped with castor.
Further, the locked spacer installation group, product orientation clamping group, bolt presses operation group are as a minimum Unit and third manual pneumatic valve, the 6th manual pneumatic valve are together in the table top of Working gantry, shell bottom plate and sheath top plate Accordingly increase a minimum unit, third manual pneumatic valve and the 6th manual pneumatic valve can be individually controlled newly-increased unit Lifting cylinder moves up and down, and the position housing piece for increasing unit newly is driven to move up and down, and increases the overhead cylinder of unit newly by original single The first manual air pressure valve or the 4th manual pneumatic valve of member individually control, and are moved up and down together with original overhead cylinder, drive The bolt presses block of bolt presses block and newly-increased unit moves up and down together.
A kind of installing mechanism of locked spacer, it is characterised in that:It include the Working gantry for playing support fixed function With shell, for by locked spacer be mounted on roof-rack mounting base bolt on locked spacer installation group, in stop pad For pacifying by the product orientation clamping group of the clamping of roof-rack mounting base and fixed position, in locked spacer in piece installation process Bolt presses operation group during dress for bolt to be embedded in locked spacer, Working gantry are connected with shell, locked spacer Installation group and product orientation clamping group are fixed on Working gantry, and bolt presses operation group is fixed on the shell.
Technical solution provided by the utility model can design different sizes, to meet different model according to actual conditions Roof-rack mounting base to the installation requirements of locked spacer.
Description of the drawings
Fig. 1 is the shaft side figure of the utility model.
Fig. 2 is the rearview of the utility model.
Fig. 3 is the vertical view A of the product orientation clamping group of the utility model.
Fig. 4 is the vertical view B of the product orientation clamping group of the utility model.
Fig. 5 is the shaft side figure of the product orientation clamping group of the utility model.
Fig. 6 is the axonometric drawing of the bolt presses operation group of the utility model.
Fig. 7 is the installation diagram of the product orientation clamping group and roof-rack mounting base of the utility model.
Fig. 8 is the front view of roof-rack mounting base.
Fig. 9 is the upward view of roof-rack mounting base.
In figure:
1, Working gantry;The table top of 1-1, Working gantry;The feet of 1-2, Working gantry;The castor of 1-3, Working gantry; 2, shell;The top plate of 2-1, shell;The bottom plate of 2-2, shell;2-3, shell cant board;The hole of 2-4, shell cant board;3, it pushes up Set cylinder;4-1, the first overhead guide post;The guide sleeve of 4-1-1, the first overhead guide post;4-2, the second overhead guide post;4-2-2, second The guide sleeve of overhead guide post;5, bolt presses block;The first bolt presses column of 5-1, bolt presses block;The of 5-2, bolt presses block Two bolt presses columns;The third bolt presses column of 5-3, bolt presses block;The 4th bolt presses column of 5-4, bolt presses block;6, Position housing piece;6-1-1, position housing piece lower end protrusion the first fixed part;6-1-1-1, position housing piece lower end it is convex The fixing end of the first fixed part gone out;6-1-2, position housing piece lower end protrusion the second fixed part;6-1-2-2, positioning pressure The fixing end of second fixed part of the protrusion of tight block lower end;6-2-1, position housing piece lower end the first positioning guide column;6-2-1- 1, the guide sleeve of the first positioning guide column of position housing piece lower end;6-2-2, position housing piece lower end the second positioning guide column;6-2- 2-2, position housing piece lower end the second positioning guide column guide sleeve;7, the first positioning plate;7-1, the first mounting base profiling jig;7- The first groove of 1-1, the first mounting base profiling jig;The second groove of 7-1-2, the first mounting base profiling jig;8, second is fixed Position plate;8-2, the second mounting base profiling jig;The third groove of 8-2-3, the second mounting base profiling jig;8-2-4, the second installation 4th groove of seat profiling jig;9, lifting cylinder;10-1, first manual air pressure valve;10-2, the 4th manual pneumatic valve;11-1, Second-hand takes offence pressure valve;11-2, the 5th manual pneumatic valve;12, pressure regulator valve;13-1, the first space;13-2, second space;14, Locked spacer;15, bolt;16, roof-rack mounting base;The bolt installation position of 16-1, roof-rack mounting base;16- 2, the bolt hole of the bolt installation position of roof-rack mounting base;
The third manual pneumatic valve of 21-1, newly-increased unit;The 6th manual pneumatic valve of 21-2, newly-increased unit;23, it increases newly single The overhead cylinder of member;The third overhead guide post of 24-3, newly-increased unit;24-3-3, newly-increased unit third overhead guide post guide sleeve; The 4th overhead guide post of 24-4, newly-increased unit;24-4-4, newly-increased unit the 4th overhead guide post guide sleeve;25, unit is increased newly Bolt presses block;25-5, newly-increased unit bolt presses block the 5th bolt presses column;The bolt presses of 25-6, newly-increased unit 6th bolt presses column of block;25-7, newly-increased unit bolt presses block the 7th bolt presses column;25-8, unit is increased newly 8th bolt presses column of bolt presses block;26, the position housing piece of unit is increased newly;The positioning compression of 26-1-3, newly-increased unit The third fixed part of the protrusion of block lower end;The third fixed part of the protrusion of the position housing piece lower end of 26-1-3-3, newly-increased unit Fixing end;4th fixed part of the protrusion of the position housing piece lower end of 26-1-4, newly-increased unit;26-1-4-4, newly-increased unit Position housing piece lower end protrusion the 4th fixed part fixing end;The position housing piece lower end of 26-2-3, newly-increased unit Third positioning guide column;The guide sleeve of the third positioning guide column of the position housing piece lower end of 26-2-3-3, newly-increased unit;It is 26-2-4, new Increase the 4th positioning guide column of the position housing piece lower end of unit;The 4th of the position housing piece lower end of 26-2-4-4, increasing unit is fixed The guide sleeve of position guide post;27, the third positioning plate of unit is increased newly;The third mounting base profiling jig of 27-3, newly-increased unit;27-3- 5, the 5th groove of the third mounting base profiling jig of unit is increased newly;The third mounting base profiling jig of 27-3-6, newly-increased unit The 6th groove;28, the 4th positioning plate of unit is increased newly;The 4th mounting base profiling jig of 28-4, newly-increased unit;28-4-7, 7th groove of the 4th mounting base profiling jig of newly-increased unit;The 4th mounting base profiling jig of 28-4-8, newly-increased unit 8th groove;29, the lifting cylinder of unit is increased newly.
Specific implementation mode
The following further describes the utility model with specific embodiments.It should be understood that these embodiments are merely to illustrate The utility model rather than limitation the scope of the utility model.In addition, it should also be understood that, having read in the utility model instruction After appearance, those skilled in the art can make various changes or modifications the utility model, and such equivalent forms equally fall within this Apply for the appended claims limited range.
Referring to Fig. 1 to Fig. 9, specific embodiment 1, a kind of installing mechanism of locked spacer provided by the utility model, mainly Including Working gantry 1, shell 2, locked spacer installation group, product orientation clamping group, bolt presses operation group, it is characterised in that:
The locked spacer installation group by the first positioning plate 7, the second positioning plate 8 and the first mounting base profiling jig 7-1, Second mounting base profiling jig 8-2 compositions, product orientation clamping group are made of lifting cylinder 9, position housing piece 6, bolt presses Operation group is made of overhead cylinder 3, bolt presses block 5;
The shell 2 of a front and back two sides perforation, sheath top plate 2-1 and work are fixed on the table top 1-1 of the Working gantry Make to be fixed with shell bottom plate 2-2 between the table top 1-1 of rack, shell bottom plate 2-2 is parallel with the table top 1-1 of Working gantry, shell The first space 13-1, shell bottom plate 2-2, shell cant board are constituted between bottom plate 2-2 and sheath top plate 2-1, shell cant board 2-3 The table top 1-1 of 2-3 and Working gantry constitutes second space 13-2;It is the Working gantry and shell of the utility model, sheath top plate, outer Shell bottom plate, shell cant board together constitute the first space and second space, to the fitting machine of the locked spacer of the utility model Structure provides the space and basis of each component installation.The front and back perforation of shell convenient for front and back placement, removes roof-rack installation Seat, or replace each different size and/or the mounting base profiling jig of model.
The Working gantry 1 is equipped with the pressure regulator valve of the air pressure size for adjusting overhead cylinder 3 and lifting cylinder 9 12, the table top 1-1 of Working gantry is equipped with first manual air pressure valve 10-1, second-hand and takes offence pressure valve 11-1, lifting cylinder 9, and three Person is in 13-2 in second space, and the wherein top of lifting cylinder 9 enters the first space 13-1 after shell bottom plate 2-2, The top of lifting cylinder 9 is connect with position housing piece 6, and lifting cylinder 9 drives position housing piece 6 to synchronize and moves up and down;Described First manual air pressure valve 10-1 controls moving up and down for overhead cylinder 3, and the second-hand pressure valve 11-1 that takes offence controls lifting cylinder 9 Move up and down;
There are two positioning plates towards parallelly setting before and after the side of second space 13-2 by the shell bottom plate 2-2, i.e., First positioning plate 7 and the second positioning plate 8, wherein the first positioning plate 7 is equipped with the first mounting base profiling jig 7-1, the first installation It is set on seat profiling jig 7-1 there are two groove, i.e. the first groove 7-1-1 and the second groove 7-1-2, which is all provided with There are indent hole post chamber, i.e. the first indent hole post chamber and the second indent hole post chamber;Second positioning plate 8 is equipped with the second mounting base profiling It is set on fixture 8-2, the second mounting base profiling jig 8-2 there are two groove, i.e. third groove 8-2-3 and the 4th groove 8-2-4, it should Two bottom portion of groove are equipped with indent hole post chamber, i.e. third indent hole post chamber and the 4th indent hole post chamber;Four grooves can be with The corresponding bolt installation position 16-1 of roof-rack mounting base forms embedded structure, and the top of four indent hole post chambers can place The locked spacer 14 and apertures bolt hole 16-2 corresponding with roof-rack mounting base are corresponding, bolt 15 are pacified across roof-rack Fill the corresponding four indents hole post chamber of embedded four grooves after the bolt hole of bolt installation position 16-1 of seat, locked spacer 14 It is interior;The diameter of the indent hole post chamber is greater than or equal to 15 diameter of bolt, is less than the outer diameter of locked spacer 14;The technology is special Sign, it is ensured that after the installation position of roof-rack mounting base is embedded in the groove on mounting base profiling jig, the concave hole of groove Column chamber can be corresponded with the bolt hole aperture of corresponding roof-rack mounting base, on the indent hole post chamber top of each groove After locked spacer is placed in portion, it can finally ensure that bolt passes through the bolt hole and stop pad of roof-rack mounting base installation position The indent hole post intracavitary of embedded corresponding groove, completes the installation of locked spacer after piece;The indent hole post of each groove Intracavitary diameter is greater than or equal to bolt outer diameter, and the indent hole post intracavitary of groove can be embedded in convenient for bolt.First mounting base profiling is pressed from both sides Tool is fixed on the first positioning plate, the second mounting base profiling jig is fixed on the second positioning plate, is preferable over and is bolted.
The both ends of the position housing piece 6 are located at the first mounting base profiling jig 7-1 sums of shell bottom plate 2-2 The surface of second mounting base profiling jig 8-2,6 front end of position housing piece are equipped with towards the first directions mounting base profiling jig 7-1 First fixed part 6-1-1 of protrusion, 6 rear end of position housing piece are equipped with the protruded towards the second directions mounting base profiling jig 8-2 Two fixed part 6-1-2, two fixed parts are used to roof-rack mounting base 16 being fixed on the first mounting base profiling jig 7-1 On the second mounting base profiling jig 8-2;The technical characteristic, convenient for position housing piece to the roof row on mounting base profiling jig Lee's frame mounting base carries out positioning compression, avoids the roof-rack mounting base in locked spacer installation process that position movement occurs, Influence installation effect.
The overhead cylinder 3 is located above the first space 13-1, is fixed on the outside of sheath top plate 2-1, overhead cylinder 3 Lower end be connected through sheath top plate 2-1 and with the middle part of bolt presses block 5, the both ends of bolt presses block 5 are located at shell The surface of the first mounting base profiling jig 7-1 of bottom plate 2-2 and the second mounting base profiling jig 8-2, and it is located at positioning compression The surface at the both ends of block 6;There are two bolt presses block 5 is located on one end right over the first mounting base profiling jig 7-1 and sets The bolt presses column protruded towards the first directions mounting base profiling jig 7-1, i.e. the first bolt presses column 5-1 and the second bolt presses Column 5-2, bolt presses block 5, which is located on one end right over the second mounting base profiling jig 8-2, sets that there are two towards the second mounting base The bolt presses column of the directions profiling jig 8-2 protrusion, i.e. third bolt presses column 5-3 and the 4th bolt presses column 5-4;The technology Overhead cylinder may be used in featureTaiwan Ya De visitorBrand, model SIJ-80X125-30 twin shaft double action stroke adjustables, spiral shell The first bolt presses column and the second bolt presses column, third bolt presses column and the 4th bolt presses column of bolt compact heap, four As bolt presses block moves up and down together, finally by four bolt presses columns to being pressed down after bolt active force so that bolt After bolt hole, locked spacer on mounting base profiling jig, then it is embedded into the indent of mounting base profiling jig corresponding recesses Hole post intracavitary.
First bolt presses column 5-1 of the bolt presses block 5, the first groove 7-1- of the first mounting base profiling jig 1 the first indent hole post chamber is on a vertical line of vertical direction, the second bolt presses column 5-2 of bolt presses block 5, The second indent hole post chamber of second groove 7-1-2 of one mounting base profiling jig is on a vertical line of vertical direction, spiral shell The third indent hole post of the third bolt presses column 5-3 of bolt compact heap 5, the third groove 8-2-3 of the second mounting base profiling jig Chamber is on a vertical line of vertical direction, bolt presses block the 4th bolt presses column 5-4, the second mounting base profiling jig The 4th indent hole post chamber of 4th groove 8-2-4 is on one article of vertical line of vertical direction.The technical characteristic, it is ensured that bolt is worn Cross the indent hole post chamber of embedded mounting base profiling jig corresponding recesses after the bolt hole of roof-rack mounting base, locked spacer It is interior, work that is disposable, quickly, accurately completing roof-rack installation assembly locked spacer.
The both ends of the position housing piece 6 are respectively provided with a positioning guide column, i.e. the first positioning guide column 6-2-1 and second is fixed Position guide post 6-2-2, positioning guide column through shell bottom plate 2-2 and with lifting cylinder 9 in vertical direction keeping parallelism, lead by the first positioning Column 6-2-1 is located at one end that position housing piece 6 corresponds to the first mounting base profiling jig 7-1, and the second positioning guide column 6-2-2 is located at fixed Position compact heap 6 corresponds to one end of the second mounting base profiling jig 8-2, and position housing piece 6 drives the first positioning guide column 6-2-1 and the Two positioning guide column 6-2-2 are moved up and down simultaneously;
5 both ends of bolt presses block are respectively provided with an overhead guide post, i.e. the first overhead guide post 4-1 and the second overhead is led Column 4-2, overhead guide post is through sheath top plate 2-1 and with overhead cylinder 3 in vertical direction keeping parallelism, the first overhead guide post 4-1 One end of the first mounting base profiling jig 7-1 is corresponded to positioned at bolt presses block 5, the second overhead guide post 4-2 is located at bolt presses block 5 One end of corresponding second mounting base profiling jig 8-2, bolt presses block 5 drive the first overhead guide post 4-1 and the second overhead guide post 4-2 is moved up and down simultaneously;
The first overhead guide post 4-1 on the bolt presses block 5 and the second overhead guide post 4-2, each overhead guide post with The interconnecting piece on the tops sheath top plate 2-1 is equipped with guide sleeve, as the first overhead guide post guide sleeve 4-1-1 and the second overhead guide post guide sleeve 4-2-2, the first positioning guide column 6-2-1 of the position housing piece 6 and the second positioning guide column 6-2-2, each positioning guide column with The interconnecting piece on the tops shell bottom plate 2-2 is equipped with guide sleeve, the guide sleeve 6-2-1-1 and the second positioning guide column of as the first positioning guide column Guide sleeve 6-2-2-2.The first overhead guide post on the bolt presses block of the utility model and the second overhead guide post, in overhead cylinder When driving bolt presses block to move up and down, convenient for the distance that observation bolt presses block moves up and down, in time by first-hand Pressure valve of taking offence or the 4th manual pneumatic valve adjust moving up and down for overhead cylinder, and then adjustment bolt compact heap moves up and down feelings Condition.First overhead guide post guide sleeve and the second overhead guide post guide sleeve, can either protect the first overhead guide post and the second overhead guide post, It can faster obtain the amplitude situation that the first overhead guide post and the second overhead guide post move up and down.First overhead guide post and second Use may be used in overhead guide postDongguan City Yu Kai precision dies Co., LtdBrand, model GP12-50, the first overhead guide post Guide sleeve and the second overhead guide post guide sleeve, can be usedDongguan City Yu Kai precision dies Co., LtdBrand, model LMFUU25.It is fixed The first positioning guide column and the second positioning guide column of position compact heap, can be usedDongguan City Yu Kai precision dies Co., LtdBrand, type Number be GP12-50, the interconnecting piece on each positioning guide column and bottom plate top is equipped with guide sleeve, as the guide sleeve of the first positioning guide column and The guide sleeve of second positioning guide column, can be usedDongguan City Yu Kai precision dies Co., LtdBrand, model GP12-20.Convenient for seeing The distance that position housing piece moves up and down is examined, overhead cylinder is adjusted by take offence pressure valve or the 5th manual pneumatic valve of second-hand in time Move up and down, and then adjust position housing piece move up and down situation.The guide sleeve of first positioning guide column and the second positioning guide column are led Set, can either protect the first positioning guide column and the second positioning guide column, also can faster show that the first positioning guide column and second is determined The amplitude situation that position guide post moves up and down.
The bottom of first fixed part 6-1-1 of the position housing piece is equipped with the first fixing end 6-1- in concave shape The bottom of 1-1, the second fixed part 6-1-2 be equipped in concave shape the second fixing end 6-1-2-2, the concave shape of fixing end with Roof-rack mounting base 16 is fixed the outer shape of position and size is agreed with.
The first manual air pressure valve 10-1 and second-hand the pressure valve 11-1 that takes offence are disposed side by side on Working gantry table top 1-1 Front, the rear portion of Working gantry table top 1-1 be arranged side by side the 4th manual pneumatic valve 10-2 and the 5th manual pneumatic valve 11-2, First manual air pressure valve 10-1 is identical as the effect of the 4th manual pneumatic valve 10-2, can be individually controlled the upper of overhead cylinder Lower movement, the second-hand pressure valve 11-1 that takes offence is identical as the effect of the 5th manual pneumatic valve 11-2, can be individually controlled lifting Cylinder moves up and down.The technical characteristic, convenient for either side can be to the fitting machine of locked spacer before and after Working gantry Structure carries out substantial length of operation, and corresponding manual pneumatic valve is operated without not stopping to walk up and down before and after Working gantry.This practicality is new The Working gantry of type is equipped with the pressure regulator valve of the air pressure size for adjusting overhead cylinder and lifting cylinder, may be usedTaiwan is sub- Moral visitorBrand, model AFR2000;First manual air pressure valve, second-hand take offence pressure valve, the 4th manual pneumatic valve and the 5th manually Air pressure valve is fixed on the table top of Working gantry, and first manual air pressure valve, second-hand, which are taken offence, pressure valve and comes Working gantry table top Front, the 4th manual pneumatic valve and the 5th manual pneumatic valve be fixed on Working gantry table top rear portion, four manual pneumatic valves can To useTaiwan Ya De visitorBrand, model 4H310-08(Five mouthfuls two)1/4 inch interface;
The first indent hole post chamber, the second indent hole post chamber, third indent hole post chamber and the 4th indent hole post chamber The top position that is connected with corresponding recesses is respectively provided with a locked spacer profiling chamber;The shell cant board 2-3 is equipped with hole Hole 2-4;The table top 1-1 of the Working gantry has four feet 1-2, and every feet bottom is equipped with castor 1-3.The skill Locked spacer profiling chamber in art feature avoids locked spacer from occurring during the installation process for placing locked spacer to be installed Position is moved, and the working efficiency for improving the utility model is conducive to.The cant board of shell is equipped with hole, is convenient for from a left side for shell The operational circumstances in installing mechanism are observed in right both sides, to adjust the operational motion of locked spacer installing mechanism in time.
Specific installation method one, a kind of installation method of locked spacer, it uses the fitting machine of above-mentioned locked spacer Structure carries out the installation of bolt and locked spacer, comprises the concrete steps that:
First manual air pressure valve 10-1 or the 4th manual pneumatic valve 10-2 are opened, are controlled by overhead cylinder 3 by the first step For bolt presses block 5 to moving up, overhead cylinder 3 drives the first overhead guide post 4-1 and the second overhead guide post 4-2 to moving up while band The first bolt presses column 5-1, the second bolt presses column 5-2, third bolt presses column 5-3 and the 4th spiral shell of dynamic bolt presses block 5 Bolt hold-down column 5-4 is moved up, until bolt presses block 5 close to sheath top plate 2-1 when, close first manual air pressure valve 10-1 or 4th manual pneumatic valve 10-2, overhead cylinder 3, the first overhead guide post 4-1, the second overhead guide post 4-2, bolt presses block 5 and spiral shell The first bolt presses column 5-1, the second bolt presses column 5-2, third bolt presses column 5-3 and the 4th bolt pressure of bolt compact heap 5 Tight column 5-4 stops movement;
The second-hand pressure valve 11-1 or the 5th manual pneumatic valve 11-2 that takes offence is opened, is controlled on lifting cylinder 9 by second step It moves, drives position housing piece 6 to moving up, the first positioning guide column 6-2-1, the second positioning guide column 6-2-2 are with positioning compression at this time Block 6, which is done, accordingly to be moved up, when the fixing end 6-1-1-1 of the first fixed part of position housing piece 6 leaves the first mounting base profiling jig After at the top of 7-1 and the fixing end 6-1-2-2 of the second fixed part of position housing piece 6 leaves the second tops mounting base profiling jig 8-2 Behind portion, closes second-hand and take offence pressure valve 11-1 or the 5th manual pneumatic valve 11-2, lifting cylinder 9, position housing piece 6, first are fixed The fixing end 6- of position guide post 6-2-1, the second positioning guide column 6-2-2, the fixing end 6-1-1-1 of the first fixed part and the second fixed part 1-2-2 stops movement;
Third walks, and four locked spacers 14 are individually placed to the first mounting base profiling jig 7-1 and the second mounting base profiling The locked spacer profiling intracavitary of the corresponding four indents hole post top of chamber of four grooves of fixture 8-2, four locked spacers 14 Two indent hole post chambers of the first groove 7-1-1 and the second groove 7-1-2 of centre bore and the first mounting base profiling jig 7-1 Center, the second mounting base profiling jig 8-2 third groove 8-2-3 and the 4th groove 8-2-4 two indent hole post chambers in The heart corresponds respectively;
4th step, two 16 corresponding bolt installation position 16-1 of roof-rack mounting base are embedding by profiling position difference Enter the first groove 7-1-1 and the second groove 7-1-2 of the first mounting base profiling jig 7-1, the second mounting base profiling jig 8-2 In third groove 8-2-3 and the 4th groove 8-2-4,16 corresponding bolt installation position 16-1 of roof-rack mounting base with it is corresponding Locked spacer 14, while four bolt hole 16-2 of two roof-rack mounting bases 16 have been placed between indent hole post top of chamber Center and the centre bore of four locked spacers 14, the first groove 7-1-1 and the second groove 7- of the first mounting base profiling jig 7-1 The center of two indent hole post chambers of 1-2, the second mounting base profiling jig 8-2 third groove 8-2-3 and the 4th groove 8-2-4 Two indent hole post chambers center, correspond respectively;
Four bolts 15 are each passed through two 16 respective bolt installation position 16-1 of roof-rack mounting base by the 5th step Four bolt hole 16-2 and four corresponding locked spacers 14 centre bore after, then embedded first mounting base profiling jig 7-1 Two indent hole post intracavitary, the third of the second mounting base profiling jig 8-2 of first groove 7-1-1 and the second groove 7-1-2 is recessed Two indent hole post intracavitary of slot 8-2-3 and the 4th groove 8-2-4;
The second-hand pressure valve 11-1 or the 5th manual pneumatic valve 11-2 that takes offence is opened, is controlled under lifting cylinder 9 by the 6th step Pressure, drives position housing piece 6 to decline, and position housing piece 6 drives the first positioning guide column 6-2-1, the second positioning guide column 6-2-2 to do It accordingly moves down, until the fixing end 6-1-1-1 of the first fixed part of position housing piece, which is pushed down, is placed on the first mounting base profiling folder Has the roof-rack mounting base 16 on 7-1, while the fixing end 6-1-2-2 of the second fixed part of position housing piece pushes down placement Roof-rack mounting base 16 on the second mounting base profiling jig 8-2 closes second-hand and takes offence pressure valve 11-1 or the at this time Five manual pneumatic valve 11-2 stop the movement of lifting cylinder 9;
First manual air pressure valve 10-1 or the 4th manual pneumatic valve 10-2 are opened, are controlled by overhead cylinder 3 by the 7th step Bolt presses block 5 is pressed downward, and overhead cylinder 3 drives the first overhead guide post 4-1 and the second overhead guide post 4-2 to moving down while band The first bolt presses column 5-1, the second bolt presses column 5-2, third bolt presses column 5-3 and the 4th spiral shell of dynamic bolt presses block 5 Bolt hold-down column 5-4 compresses downwards corresponding bolt 15 so that bolt 15 is pacified across 16 respective bolt of roof-rack mounting base After filling the bolt hole 16-2 of position 16-1 and the centre bore of locked spacer 14, it is imitative to be further embedded into corresponding first mounting base Two indent hole post intracavitary of the first groove 7-1-1 and the second groove 7-1-2 of clamp 7-1, the second mounting base profiling jig Two indent hole post intracavitary of the third groove 8-2-3 and the 4th groove 8-2-4 of 8-2, at this point, four bolts 15 and four stop Gasket 14 assembles in place;
8th step controls overhead cylinder 3 to moving up by first manual air pressure valve 10-1 or the 4th manual pneumatic valve 10-2, Overhead cylinder 3 drives the first overhead guide post 4-1 and the second overhead guide post 4-2 to moving up, while bolt presses block 5 being driven to move up, The first bolt presses column 5-1, the second bolt presses column 5-2, third bolt presses column 5-3 and the 4th bolt of bolt presses block 5 Hold-down column 5-4 to moving up, is detached with roof-rack mounting base 16, and it is manual to turn off first manual air pressure valve 10-1 or the 4th Air pressure valve 10-2, at this time overhead cylinder 3, the first overhead guide post 4-1 and the second overhead guide post 4-2, bolt presses block 5, the first spiral shell Bolt hold-down column 5-1, the second bolt presses column 5-2, third bolt presses column 5-3 and the 4th bolt presses column 5-4 stop moving;
9th step is taken offence pressure valve 11-1 or the 5th manual pneumatic valve 11-2 by second-hand, and control lifting cylinder 9 moves up, Position housing piece 6 is driven to move up, position housing piece 6 drives the first positioning guide column 6-2-1, the second positioning guide column 6-2-2 to do accordingly Move up, the fixing end 6-1-1-1 of the first fixed part of position housing piece 6 and the fixing end 6-1-2-2 of the second fixed part simultaneously from After opening two roof-rack mounting bases 16, turns off second-hand and take offence pressure valve 11-1 or the 5th manual pneumatic valve 11-2, lifting Cylinder 9, position housing piece 6, the first positioning guide column 6-2-1, the second positioning guide column 6-2-2 stop movement;Two roof rows at this time Lee's frame mounting base 16 and locked spacer 14, bolt 15 it is mating installation is complete, pacify from the first mounting base profiling jig 7-1 and second The roof-rack mounting base 16 for having installed locked spacer 14 is removed on dress seat profiling jig 8-2.The installation of the utility model Method, easy to operate, production efficiency is higher, can reach accurate, be quickly roof-rack mounting base assembly locked spacer Purpose, substitution manually assemble the working method of mounting base locked spacer, reduce cost of labor, avoid production safety wind Danger.In specific installation method, the corresponding bolt installation position of two roof-rack mounting bases is respectively embedded by profiling position First mounting base profiling jig, the second mounting base profiling jig four grooves in, the corresponding bolt of roof-rack mounting base The form and dimension of installation position, respectively with the first mounting base profiling jig, four grooves of the second mounting base profiling jig Mutually agree with, while the first mounting base profiling jig, the second mounting base profiling jig can be according to the shapes of roof-rack mounting base Shape and of different sizes is replaced in time, replaces the form and dimension phase become with the bolt installation position of roof-rack mounting base Matched the first new mounting base profiling jig, the second mounting base profiling jig.
Specific embodiment 2, the locked spacer installation group, product orientation clamping group, bolt presses operation group are as one A minimum unit and third manual pneumatic valve 21-1, the 6th manual pneumatic valve 21-2 are together in the table top 1-1 of Working gantry, outer Accordingly increase a minimum unit, third manual pneumatic valve 21-1 and the 6th manual gas on shell bottom plate 2-2 and sheath top plate 2-1 The lifting cylinder 29 that pressure valve 21-2 can be individually controlled newly-increased unit moves up and down, and drives the position housing piece 26 for increasing unit newly It moves up and down, increases the overhead cylinder 23 of unit newly by the first manual air pressure valve 10-1 or the 4th manual pneumatic valve of original unit 10-2 is individually controlled, and is moved up and down together with original overhead cylinder 3, and the bolt pressure of bolt presses block 5 and newly-increased unit is driven Tight block 25 moves up and down together.
Specific installation method two, a kind of installation method of locked spacer, it uses the fitting machine of above-mentioned locked spacer Structure carries out the installation of bolt and locked spacer, comprises the concrete steps that:
First manual air pressure valve 10-1 or the 4th manual pneumatic valve 10-2 are opened, are controlled by overhead cylinder 3 by the first step Bolt presses block 5 to moving up, synchronously by increase newly unit customization cylinder 23 control increase newly unit bolt presses block 25 to It moves up;Overhead cylinder 3 drives the first overhead guide post 4-1 and the second overhead guide post 4-2 to moving up while driving bolt presses block 5 The first bolt presses column 5-1, the second bolt presses column 5-2, third bolt presses column 5-3 and the 4th bolt presses column 5-4 to It moves up;Synchronously, the overhead cylinder 23 for increasing unit newly drives the third overhead guide post 24-3 and the 4th overhead guide post for increasing unit newly 24-4 drives the 5th bolt presses column 25-5, the 6th bolt presses column for the bolt presses block 25 for increasing unit newly to moving up 25-6, the 7th bolt presses column 25-7 and the 8th bolt presses column 25-8 are to moving up, until bolt presses block 5 and newly-increased unit When bolt presses block 25 is close to sheath top plate 2-1, first manual air pressure valve 10-1 or the 4th manual pneumatic valve 10-2, overhead are closed First bolt presses of cylinder 3, the first overhead guide post 4-1, the second overhead guide post 4-2, bolt presses block 5 and bolt presses block 5 The overhead gas of column 5-1, the second bolt presses column 5-2, third bolt presses column 5-3 and the 4th bolt presses column 5-4, newly-increased unit Cylinder 23, the third overhead guide post 24-3 of newly-increased unit, the 4th overhead guide post 24-4, the bolt presses block 25 of newly-increased unit and newly-increased The 5th bolt presses column 25-5, the 6th bolt presses column 25-6, the 7th bolt presses column 25-7 of the bolt presses block 25 of unit Stop moving with the 8th bolt presses column 25-8;
The second-hand pressure valve 11-1 or the 5th manual pneumatic valve 11-2 that takes offence is opened, is controlled on lifting cylinder 9 by second step It moves, drives position housing piece 6 to moving up, the first positioning guide column 6-2-1, the second positioning guide column 6-2-2 are with positioning compression at this time Block 6, which is done, accordingly to be moved up, when the fixing end 6-1-1-1 of the first fixed part of position housing piece 6 leaves the first mounting base profiling jig After at the top of 7-1 and the fixing end 6-1-2-2 of the second fixed part of position housing piece 6 leaves the second tops mounting base profiling jig 8-2 Behind portion, closes second-hand and take offence pressure valve 11-1 or the 5th manual pneumatic valve 10-2, lifting cylinder 9, position housing piece 6, first are fixed The fixing end 6- of position guide post 6-2-1, the second positioning guide column 6-2-2, the fixing end 6-1-1-1 of the first fixed part and the second fixed part 1-2-2 stops movement;
Synchronously, the third manual pneumatic valve 21-1 of newly-increased unit or the 6th manual pneumatic valve 21-2 are opened, control is new The lifting cylinder 29 for increasing unit moves up, and drives the position housing piece 26 for increasing unit newly to moving up, and increases the positioning pressure of unit newly at this time Third positioning guide column 26-2-3, the 4th positioning guide column 26-2-4 of tight block 26 are done accordingly with the position housing piece 26 of newly-increased unit It moves up, when the fixing end 26-1-3-3 of the third fixed part of the position housing piece 26 of newly-increased unit leaves the third peace of newly-increased unit After filling at the top of seat profiling jig 27-3 and the fixing end 26-1-4-4 of the 4th fixed part of the position housing piece 26 of newly-increased unit from After opening at the top of the 4th mounting base profiling jig 28-4 of newly-increased unit, the third manual pneumatic valve 21-1 for increasing unit newly or the is closed Six manual pneumatic valve 21-2 increase the lifting cylinder 29 of unit, position housing piece 26, third positioning guide column 26-2-3, the 4th fixed newly The fixing end 26-1-4-4 stopping movements of position guide post 26-2-4, the fixing end 26-1-3-3 of third fixed part, the 4th fixed part;
Third walks, and eight locked spacers 14 are individually placed to the first mounting base profiling jig 7-1 and the second mounting base profiling Fixture 8-2, newly-increased unit third mounting base profiling jig 27-3 and the 4th mounting base profiling jig 28-4 eight grooves pair The locked spacer profiling intracavitary for the eight indent hole post top of chamber answered, the centre bore of eight locked spacers 14 and the first mounting base are imitative The center of two indent hole post chambers of the first groove 7-1-1 and the second groove 7-1-2 of clamp 7-1, the second mounting base profiling The center of two indent hole post chambers of the third groove 8-2-3 and the 4th groove 8-2-4 of fixture 8-2, the third peace for increasing unit newly Fill center, the 4th peace of two indent hole post chambers of the 5th groove 27-3-5 and the 6th groove 27-3-6 of seat profiling jig 27-3 Fill the center of two indent hole post chambers of the 7th groove 28-4-7 and the 8th groove 28-4-8 of seat profiling jig 28-4, difference one One corresponds to;
4th step, four 16 corresponding bolt installation position 16-1 of roof-rack mounting base are embedding by profiling position difference Enter the first groove 7-1-1 and the second groove 7-1-2 of the first mounting base profiling jig 7-1, the second mounting base profiling jig 8-2 Third groove 8-2-3 and the 4th groove 8-2-4, newly-increased unit third mounting base profiling jig 27-3 the 5th groove 27-3-5 With the 6th groove 27-3-6, the 4th mounting base profiling jig 28-4 the 7th groove 28-4-7 and the 8th groove 28-4-8 in, vehicle Locked spacer has been placed between 16 corresponding bolt installation position 16-1 of top luggage carrier mounting base and corresponding indent hole post top of chamber 14, while the centre bore of eight centers bolt hole 16-2 of four roof-rack mounting bases 16 and eight locked spacers 14, the The center of two indent hole post chambers of the first groove 7-1-1 and the second groove 7-1-2 of one mounting base profiling jig 7-1, second The center of two indent hole post chambers of the third groove 8-2-3 and the 4th groove 8-2-4 of mounting base profiling jig 8-2, newly-increased list Two indent hole post chambers of the 5th groove 27-3-5 and the 6th groove 27-3-6 of the third mounting base profiling jig 27-3 of member Center, the 4th mounting base profiling jig 28-4 the 7th groove 28-4-7 and the 8th groove 28-4-8 two indent hole post chambers Center corresponds respectively;
Eight bolts 15 are each passed through four 16 respective bolt installation position 16-1 of roof-rack mounting base by the 5th step Eight bolt hole 16-2 and eight corresponding locked spacers 14 centre bore after, then embedded first mounting base profiling jig 7-1 The third groove 8- of the indent hole post intracavitary of first groove 7-1-1 and the second groove 7-1-2, the second mounting base profiling jig 8-2 The indent hole post intracavitary of 2-3 and the 4th groove 8-2-4, newly-increased unit third mounting base profiling jig 27-3 the 5th groove The indent hole post intracavitary of 27-3-5 and the 6th groove 27-3-6, the 7th groove 28-4-7 of the 4th mounting base profiling jig 28-4 and The indent hole post intracavitary of 8th groove 28-4-8;
The second-hand pressure valve 11-1 or the 5th manual pneumatic valve 11-2 that takes offence is opened, is controlled under lifting cylinder 9 by the 6th step Pressure, drives position housing piece 6 to decline, and position housing piece 6 drives the first positioning guide column 6-2-1, the second positioning guide column 6-2-2 to do It accordingly moves down, until the fixing end 6-1-1-1 of the first fixed part of position housing piece, which is pushed down, is placed on the first mounting base profiling folder Has the roof-rack mounting base 16 on 7-1, while the fixing end 6-1-2-2 of the second fixed part of position housing piece pushes down placement Roof-rack mounting base 16 on the second mounting base profiling jig 8-2 closes second-hand and takes offence pressure valve 11-1 or the at this time Five manual pneumatic valve 11-2 stop the movement of lifting cylinder 9;
Synchronously, the third manual pneumatic valve 21-1 of newly-increased unit or the 6th manual pneumatic valve 21-2 are opened, control is new The lifting cylinder 29 for increasing unit pushes, and drives the position housing piece 26 for increasing unit newly to decline, increases the position housing piece of unit newly 26 drive third positioning guide column 26-2-3, the 4th positioning guide column 26-2-4 do and accordingly move down, until the positioning compression of newly-increased unit The fixing end 26-1-3-3 of the third fixed part of block 26, which is pushed down, to be placed on the third mounting base profiling jig 27-3 of newly-increased unit Roof-rack mounting base 16, while fixing end 26-1-4-4 pressures of the 4th fixed part of the position housing piece 26 of newly-increased unit The roof-rack mounting base 16 being firmly placed on the 4th mounting base profiling jig 28-4 of newly-increased unit is closed newly-increased single at this time The third manual pneumatic valve 21-1 or the 6th manual pneumatic valve 21-2 of member stop the movement for increasing the lifting cylinder 29 of unit newly;
First manual air pressure valve 10-1 or the 4th manual pneumatic valve 10-2 are opened, are controlled by overhead cylinder 3 by the 7th step Bolt presses block 5 is pressed downward, synchronously by increase newly unit customization cylinder 23 control increase newly unit bolt presses block 25 to It pushes;Overhead cylinder 3 drives the first overhead guide post 4-1 and the second overhead guide post 4-2 to moving down while driving bolt presses block 5 The first bolt presses column 5-1, the second bolt presses column 5-2, third bolt presses column 5-3 and the 4th bolt presses column 5-4 will Corresponding bolt 15 compresses downwards so that bolt 15 passes through the spiral shell of 16 respective bolt installation position 16-1 of roof-rack mounting base After the centre bore of keyhole 16-2 and locked spacer 14, further it is embedded into the of corresponding first mounting base profiling jig 7-1 Two indent hole post intracavitary of one groove 7-1-1 and the second groove 7-1-2, the third groove of the second mounting base profiling jig 8-2 Two indent hole post intracavitary of 8-2-3 and the 4th groove 8-2-4;Synchronously, the overhead cylinder 23 for increasing unit newly drives newly-increased list The third overhead guide post 24-3 and the 4th overhead guide post 24-4 of member increases the bolt presses block 25 of unit newly to moving down while driving 5th bolt presses column 25-5, the 6th bolt presses column 25-6, the 7th bolt presses column 25-7 and the 8th bolt presses column 25-8 Corresponding bolt 15 is compressed downwards so that bolt 15 is across 16 respective bolt installation position 16-1's of roof-rack mounting base After the centre bore of bolt hole 16-2 and locked spacer 14, further it is embedded into the third mounting base profiling of corresponding newly-increased unit Two indent hole post intracavitary, the 4th mounting base profiling jigs of the 5th groove 27-3-5 and the 6th groove 27-3-6 of fixture 27-3 Two indent hole post intracavitary of the 7th groove 28-4-7 and the 8th groove 28-4-8 of 28-4, at this point, eight bolts 15 and eight Locked spacer 14 assembles in place;
8th step controls overhead cylinder 3 by first manual air pressure valve 10-1 or the 4th manual pneumatic valve 10-2 and increases newly The overhead cylinder 23 of unit is synchronized to moving up, and overhead cylinder 3 drives the first overhead guide post 4-1 and the second overhead guide post 4-2 upward It moves, while driving bolt presses block 5, the first bolt presses column 5-1 of bolt presses block 5, the second bolt presses column 5-2, third Bolt presses column 5-3 and the 4th bolt presses column 5-4 is detached to moving up with roof-rack mounting base 16;Synchronously, it increases newly The overhead cylinder 23 of unit, which drives, increases the third overhead guide post 24-3 and the 4th overhead guide post 24-4 of unit newly to moving up, while band The 5th bolt presses column 25-5, the 6th bolt of the bolt presses block 25 of dynamic newly-increased unit, the bolt presses block 25 of newly-increased unit Hold-down column 25-6, the 7th bolt presses column 25-7 and the 8th bolt presses column 25-8 are moved up, and are installed with roof-rack Seat 16 detaches;First manual air pressure valve 10-1 or the 4th manual pneumatic valve 10-2 is turned off, at this time overhead cylinder 3, newly-increased unit Overhead cylinder 23, bolt presses block 5, the first bolt presses column 5-1 of bolt presses block 5, the second bolt presses column 5-2, The bolt presses of three bolt presses column 5-3 and the 4th bolt presses column 5-4, the bolt presses block 25 of newly-increased unit, newly-increased unit The 5th bolt presses column 25-5, the 6th bolt presses column 25-6, the 7th bolt presses column 25-7 and the 8th bolt presses of block 25 Column 25-8, the first overhead guide post 4-1, the second overhead guide post 4-2, the third overhead guide post 24-3 of newly-increased unit and the 4th overhead are led Column 24-4 stops moving;
9th step is taken offence pressure valve 11-1 or the 5th manual pneumatic valve 11-2 by second-hand, and control lifting cylinder 9 moves up, Position housing piece 6 is driven to move up, position housing piece 6 drives the first positioning guide column 6-2-1, the second positioning guide column 6-2-2 to do accordingly Move up, the fixing end 6-1-1-1 of the first fixed part of position housing piece 6 and the fixing end 6-1-2-2 of the second fixed part simultaneously from After opening two roof-rack mounting bases 16, turns off second-hand and take offence pressure valve 11-1 or the 5th manual pneumatic valve 11-2, lifting Cylinder 9, position housing piece 6, the first positioning guide column 6-2-1, the second positioning guide column 6-2-2 stop movement;
Synchronously, by increasing the third manual pneumatic valve 21-1 or the 6th manual pneumatic valve 21-2 of unit newly, control is newly-increased The lifting cylinder 29 of unit moves up, and the position housing piece 26 for increasing unit newly is driven to move up, and increases 26 band of position housing piece of unit newly The third positioning guide column 26-2-3 and the 4th positioning guide column 26-2-4 of dynamic newly-increased unit do and accordingly move up, and increase the positioning pressure of unit newly The fixing end 26-1-3-3 of the third fixed part of tight block 26 and the fixing end 26-1-4-4 of the 4th fixed part leave two vehicles simultaneously After pushing up luggage carrier mounting base 16, the third manual pneumatic valve 21-1 or the 6th manual pneumatic valve 21-2 of newly-increased unit are turned off, newly Lifting cylinder 29, position housing piece 26, third positioning guide column 26-2-3, the 4th positioning guide column 26-2-4 for increasing unit stop moving It is dynamic;
At this time four roof-rack mounting bases 16 and locked spacer 14, bolt 15 it is mating installation is complete, from the first peace Fill the third mounting base profiling jig 27-3 and the 4th of seat profiling jig 7-1, the second mounting base profiling jig 8-2, newly-increased unit The roof-rack mounting base 16 for having installed locked spacer 14 is removed on mounting base profiling jig 28-4.The utility model is with only Mobile gasket installation group, product orientation clamping group, bolt presses operation group, can be in the platforms of Working gantry as a minimum unit Two minimum units of placement side by side, repeatedly are controlled in face, shell bottom plate and sheath top plate, can also be placed according to actual demand Multiple minimum units improve working efficiency.By taking two minimum units as an example, the overhead cylinder of unit is increased newly by original first Manual pneumatic valve or the 4th manual pneumatic valve individually control, and third manual pneumatic valve and the 6th manual pneumatic valve for increasing unit newly are equal The lifting cylinder that newly-increased unit can be individually controlled moves up and down, and the position housing piece for increasing unit newly is driven to move up and down, two The overhead cylinder of minimum unit, which synchronizes, to be moved up and down, and lifting cylinder, which synchronizes, to be moved up and down.
There are two the installing mechanisms of the locked spacer of minimum unit for above-mentioned tool in operation, can be disposably to four roofs Luggage carrier mounting base carries out the installation of locked spacer, largely improves production efficiency.
The above is only the preferred embodiment of the present invention, and it does not limit the scope of the patent of the present invention, Equivalent structure or equivalent flow shift made by using the description of the utility model and the drawings, is directly or indirectly transported Used in other related technical areas, it is equally included in the patent within the scope of the utility model.

Claims (7)

1. a kind of installing mechanism of locked spacer includes mainly Working gantry(1), shell(2), locked spacer installation group, product Position clamping group, bolt presses operation group, it is characterised in that:
The locked spacer installation group is by the first positioning plate(7), the second positioning plate(8)With the first mounting base profiling jig(7- 1), the second mounting base profiling jig(8-2)Composition, product orientation clamping group is by lifting cylinder(9), position housing piece(6)Composition, Bolt presses operation group is by overhead cylinder(3), bolt presses block(5)Composition;
The table top of the Working gantry(1-1)On fix the shell of a front and back two sides perforation(2), sheath top plate(2-1)With The table top of Working gantry(1-1)Between be fixed with shell bottom plate(2-2), shell bottom plate(2-2)With the table top of Working gantry(1-1) It is parallel, shell bottom plate(2-2)With sheath top plate(2-1), shell cant board(2-3)Between constitute the first space(13-1), shell Bottom plate(2-2), shell cant board(2-3)With the table top of Working gantry(1-1)Constitute second space(13-2);
The Working gantry(1)It is equipped with for adjusting overhead cylinder(3)And lifting cylinder(9)Air pressure size pressure regulator valve (12), Working gantry table top(1-1)It is equipped with first manual air pressure valve(10-1), second-hand takes offence pressure valve(11-1), lifting Cylinder(9), three is in second space(13-2), wherein lifting cylinder(9)Top run through shell bottom plate(2-2)It is laggard Enter the first space(13-1), lifting cylinder(9)Top and position housing piece(6)Connection, lifting cylinder(9)Drive positioning compression Block(6)It synchronizes and moves up and down;The first manual air pressure valve(10-1)Control overhead cylinder(3)Move up and down, second Manual pneumatic valve(11-1)Control lifting cylinder(9)Move up and down;
The shell bottom plate(2-2)Towards second space(13-2)The front and back of side parallelly set there are two positioning plate, i.e., First positioning plate(7)With the second positioning plate(8), wherein the first positioning plate(7)It is equipped with the first mounting base profiling jig(7-1), First mounting base profiling jig(7-1)On set there are two groove, i.e. the first groove(7-1-1)With the second groove(7-1-2), this two A bottom portion of groove is equipped with indent hole post chamber, i.e. the first indent hole post chamber and the second indent hole post chamber;Second positioning plate(8)On set There is the second mounting base profiling jig(8-2), the second mounting base profiling jig(8-2)On set there are two groove, i.e. third groove(8- 2-3)With the 4th groove(8-2-4), which is equipped with indent hole post chamber, i.e., in third indent hole post chamber and the 4th Shrinkage pool column chamber;Four grooves can bolt corresponding with roof-rack mounting base installation position(16-1)Embedded structure is formed, The top of four indent hole post chambers can place locked spacer(14)And bolt hole corresponding with roof-rack mounting base(16-2) Aperture corresponds to, bolt(15)Across the bolt installation position of roof-rack mounting base(16-1)Bolt hole(16-2), stop Gasket(14)It is embedded in the corresponding four indents hole post intracavitary of four grooves afterwards;The diameter of the indent hole post chamber is greater than or equal to Bolt(15)Diameter is less than locked spacer(14)Outer diameter;
The position housing piece(6)Both ends be located at shell bottom plate(2-2)The first mounting base profiling jig(7-1)With The second mounting base profiling jig(8-2)Surface, position housing piece(6)Front end is equipped with towards the first mounting base profiling jig (7-1)First fixed part of direction protrusion(6-1-1), position housing piece(6)Rear end is equipped with towards the second mounting base profiling jig(8- 2)Second fixed part of direction protrusion(6-1-2), two fixed parts are used to roof-rack mounting base(16)It is fixed on One mounting base profiling jig(7-1)With the second mounting base profiling jig(8-2)On;
The overhead cylinder(3)Positioned at the first space(13-1)Sheath top plate is fixed in top(2-1)Outside, overhead gas Cylinder(3)Lower end run through sheath top plate(2-1)And with bolt presses block(5)Middle part is connected, bolt presses block(5)Both ends point It Wei Yu not shell bottom plate(2-2)The first mounting base profiling jig(7-1)With the second mounting base profiling jig(8-2)Just on Side, and it is located at position housing piece(6)Both ends surface;Bolt presses block(5)Positioned at the first mounting base profiling jig(7-1) Towards the first mounting base profiling jig there are two being set on one end of surface(7-1)The bolt presses column of direction protrusion, i.e. the first spiral shell Bolt hold-down column(5-1)With the second bolt presses column(5-2), bolt presses block(5)Positioned at the second mounting base profiling jig(8-2)Just Towards the second mounting base profiling jig there are two being set on one end of top(8-2)The bolt presses column of direction protrusion, i.e. third bolt Hold-down column(5-3)With the 4th bolt presses column(5-4);
The bolt presses block(5)The first bolt presses column(5-1), the first mounting base profiling jig the first groove(7- 1-1)The first indent hole post chamber be on a vertical line of vertical direction, bolt presses block(5)The second bolt presses column (5-2), the first mounting base profiling jig the second groove(7-1-2)The second indent hole post chamber be in one of vertical direction and hang down On straight line, bolt presses block(5)Third bolt presses column(5-3), the second mounting base profiling jig third groove(8-2-3) Third indent hole post chamber be on a vertical line of vertical direction, the 4th bolt presses column of bolt presses block(5-4), second 4th groove of mounting base profiling jig(8-2-4)The 4th indent hole post chamber be on one article of vertical line of vertical direction.
2. a kind of installing mechanism of locked spacer according to claim 1, it is characterised in that:The position housing piece (6)Both ends be respectively provided with a positioning guide column, i.e. the first positioning guide column(6-2-1)With the second positioning guide column(6-2-2), positioning leads Column runs through shell bottom plate(2-2)And and lifting cylinder(9)In vertical direction keeping parallelism, the first positioning guide column(6-2-1)It is located at Position housing piece(6)Corresponding first mounting base profiling jig(7-1)One end, the second positioning guide column(6-2-2)It is pressed positioned at positioning Tight block(6)Corresponding second mounting base profiling jig(8-2)One end, position housing piece(6)Drive the first positioning guide column(6-2-1) With the second positioning guide column(6-2-2)It moves up and down simultaneously;
The bolt presses block(5)Both ends are respectively provided with an overhead guide post, i.e. the first overhead guide post(4-1)It is led with the second overhead Column(4-2), overhead guide post is through sheath top plate(2-1)And with overhead cylinder(3)In vertical direction keeping parallelism, the first overhead is led Column(4-1)Positioned at bolt presses block(5)Corresponding first mounting base profiling jig(7-1)One end, the second overhead guide post(4-2)Position In bolt presses block(5)Corresponding second mounting base profiling jig(8-2)One end, bolt presses block(5)The first overhead is driven to lead Column(4-1)With the second overhead guide post(4-2)It moves up and down simultaneously;
The bolt presses block(5)On the first overhead guide post(4-1)With the second overhead guide post(4-2), each overhead guide post With sheath top plate(2-1)The interconnecting piece on top is equipped with guide sleeve, as the first overhead guide post guide sleeve(4-1-1)It is led with the second overhead Column guide sleeve(4-2-2), the position housing piece(6)The first positioning guide column(6-2-1)With the second positioning guide column(6-2-2), Each positioning guide column and shell bottom plate(2-2)The interconnecting piece on top is equipped with guide sleeve, the as guide sleeve of the first positioning guide column(6-2- 1-1)With the guide sleeve of the second positioning guide column(6-2-2-2).
3. a kind of installing mechanism of locked spacer according to claim 1, it is characterised in that:The position housing piece First fixed part(6-1-1)Bottom be equipped in concave shape the first fixing end(6-1-1-1), the second fixed part(6-1-2) Bottom be equipped in concave shape the second fixing end(6-1-2-2), concave shape and the roof-rack mounting base of fixing end (16)The outer shape and size for being fixed position are agreed with.
4. a kind of installing mechanism of locked spacer according to claim 1, it is characterised in that:The first manual air pressure Valve(10-1)It takes offence pressure valve with second-hand(11-1)It is disposed side by side on Working gantry table top(1-1)Front, in workbench pallet Face(1-1)Rear portion be arranged side by side the 4th manual pneumatic valve(10-2)With the 5th manual pneumatic valve(11-2), first manual air pressure Valve(10-1)With the 4th manual pneumatic valve(10-2)Effect it is identical, moving up and down for overhead cylinder can be individually controlled, Second-hand takes offence pressure valve(11-1)With the 5th manual pneumatic valve(11-2)Effect it is identical, lifting cylinder can be individually controlled Move up and down.
5. a kind of installing mechanism of locked spacer according to claim 1, it is characterised in that:The first indent hole post Chamber, the second indent hole post chamber, the top position that is connected with corresponding recesses of third indent hole post chamber and the 4th indent hole post chamber are each If there are one locked spacer profiling chambers;The shell cant board(2-3)It is equipped with hole(2-4);The Working gantry Table top(1-1)Have four feets(1-2), every feet bottom is equipped with castor(1-3).
6. a kind of installing mechanism of locked spacer according to any one of claims 1 to 5, it is characterised in that:Described stops Mobile gasket installation group, product orientation clamping group, bolt presses operation group are as a minimum unit and third manual pneumatic valve (21-1), the 6th manual pneumatic valve(21-2)Together in the table top of Working gantry(1-1), shell bottom plate(2-2)And sheath top plate (2-1)On accordingly increase a minimum unit, third manual pneumatic valve(21-1)With the 6th manual pneumatic valve(21-2)Equal energy It is individually controlled the lifting cylinder of newly-increased unit(29)It moves up and down, drives the position housing piece for increasing unit newly(26)On move down It is dynamic, increase the overhead cylinder of unit newly(23)By the first manual air pressure valve of original unit(10-1)Or the 4th manual pneumatic valve(10- 2)Individually control, with original overhead cylinder(3)It moves up and down together, drives bolt presses block(5)With the bolt of newly-increased unit Compact heap(25)It moves up and down together.
7. a kind of installing mechanism of locked spacer, it is characterised in that:It include the Working gantry for playing support fixed function(1) And shell(2), for by locked spacer(14)Mounted on roof-rack mounting base(16)Bolt on locked spacer installation Group is used in locked spacer installation process by roof-rack mounting base(16)It clamps and the product orientation of fixed position clamps Group is used in locked spacer installation process by bolt(15)Embedded locked spacer(14)Bolt presses operation group, workbench Frame(1)And shell(2)It is connected, locked spacer installation group and product orientation clamping group are fixed on Working gantry(1)On, bolt pressure Tight operation group is fixed on shell(2)On.
CN201820114910.6U 2018-01-24 2018-01-24 A kind of installing mechanism of locked spacer Active CN208083832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820114910.6U CN208083832U (en) 2018-01-24 2018-01-24 A kind of installing mechanism of locked spacer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820114910.6U CN208083832U (en) 2018-01-24 2018-01-24 A kind of installing mechanism of locked spacer

Publications (1)

Publication Number Publication Date
CN208083832U true CN208083832U (en) 2018-11-13

Family

ID=64066340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820114910.6U Active CN208083832U (en) 2018-01-24 2018-01-24 A kind of installing mechanism of locked spacer

Country Status (1)

Country Link
CN (1) CN208083832U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108176976A (en) * 2018-01-24 2018-06-19 上海英汇科技发展有限公司 The installing mechanism and its installation method of a kind of locked spacer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108176976A (en) * 2018-01-24 2018-06-19 上海英汇科技发展有限公司 The installing mechanism and its installation method of a kind of locked spacer
CN108176976B (en) * 2018-01-24 2024-04-30 上海英汇科技发展有限公司 Mounting mechanism and mounting method for stop washer

Similar Documents

Publication Publication Date Title
CN208165355U (en) A kind of vacuum abutted stage apparatus
CN205058609U (en) Handrail covering equipment of borduring
CN208083832U (en) A kind of installing mechanism of locked spacer
CN206029190U (en) Sign feed mechanism of solenoid valve equipment
CN105935870B (en) The newest assembly of tightening machine
CN108176976A (en) The installing mechanism and its installation method of a kind of locked spacer
CN207273067U (en) A kind of battery clamp device
CN202278365U (en) Overturning device for front face installation decoration block of wheel
CN209395065U (en) A kind of fixture for column type processing of stone
CN205834622U (en) The rotating disk mechanism of electronic drain valve core kludge
CN218655287U (en) Automatic gluing device for workpieces
CN202668126U (en) Fixture for machining positioning hole of motor cylinder cover
CN202591918U (en) Pressing and fixing device of car lamp shade and lamp shell
CN208614315U (en) A kind of used in new energy vehicles air compressor machine frame processing tooling
CN114193773A (en) Automobile upright post leather-sticking device and working method thereof
CN211439126U (en) Automobile air conditioner compressor support clamp
CN209970179U (en) Cold and hot water valve body anchor clamps
CN208826125U (en) A kind of hydraulically operated fixture of compatible multi items knuckle processing
CN208527752U (en) A kind of altitude azimuth form summer beam calibrating instrument
CN220446256U (en) Positioning structure for processing tire mold
CN208210454U (en) A kind of clamping means for circuit board in plating line
CN216399426U (en) Multi-station machining clamp for automobile support
CN207578629U (en) Press beam device on a kind of edge banding machine
CN216541036U (en) Engine support positioning tool
CN221087807U (en) Automatic welding fixture

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant