CN208075357U - A kind of solar bracket structure adapting to foundation settlement - Google Patents
A kind of solar bracket structure adapting to foundation settlement Download PDFInfo
- Publication number
- CN208075357U CN208075357U CN201721846982.1U CN201721846982U CN208075357U CN 208075357 U CN208075357 U CN 208075357U CN 201721846982 U CN201721846982 U CN 201721846982U CN 208075357 U CN208075357 U CN 208075357U
- Authority
- CN
- China
- Prior art keywords
- cant beam
- foundation settlement
- solar bracket
- bracket structure
- hinged end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/40—Solar thermal energy, e.g. solar towers
- Y02E10/47—Mountings or tracking
Landscapes
- Foundations (AREA)
Abstract
The utility model provides a kind of solar bracket structure adapting to foundation settlement, it adapts to the displacement of stanchion vertical direction caused by pile foundation settlement, the displacement of horizontal direction and the transmeridional inclination of stanchion, it is stuck that it so that tracking does not occur, it is ensured that the normal use of cant beam.It includes several continuously arranged simple spans, each simple span includes at least two stanchions, an independent cant beam, each stanchion upper end is provided with corresponding bearing, combination forms the simple span after cant beam length direction both ends extend through corresponding bearing and evagination, is connected by universal joint assembly between the cant beam corresponding to the adjacent simple span.
Description
Technical field
The utility model is related to the technical field of solar bracket, specially a kind of solar bracket adapting to foundation settlement
Structure.
Background technology
Photovoltaic solar power generation is the strategic production that our times major country such as China, the U.S., Germany support energetically
Industry developing direction.The photovoltaic generation main difficult technical to be solved at present is how quickly to reduce cost of electricity-generating, is reduced and routine
The cost of electricity-generating gap of the energy.
Tracking photovoltaic plant has the characteristics that generated energy is higher than the generated energy of conventional fixed-type power station 10-25%, can reduce
Power station cost of electricity-generating 5-10% or more, therefore obtain market extensive concern and application.A large amount of photovoltaic plant, which is arranged in, at present adopts
Coal Subsidence Area, objective circumstances require tracking holder itself allow for adapting to a certain range of foundation uneven settlement, avoid with
After track holder is due to foundation settlement, stuck, tracking failure occurs, or even cover.
The existing main body rack structure for being used for anchoring steam-electric power plant is continuous beam, truss structure or combination
Structure, there are multiple supporting-points, can rotate or fix in supporting-point position;Main body rack for solar tracking device
Bearing housing is carried at the top of the supporting-point of structure such as column, has bearing, cant beam to sequentially pass through multiple bearings and column in bearing housing
The line of centres of connection, multiple bearings must point-blank, and be overlapped with the axis of cant beam, when basic part sedimentation
Afterwards, the lines of centres of multiple bearings is necessarily caused point-blank, not cause cant beam stuck, tracking failure.
Invention content
In view of the above-mentioned problems, the utility model provides a kind of solar bracket structure adapting to foundation settlement, can fit
The displacement of stanchion vertical direction caused by pile foundation settlement, the displacement of horizontal direction and the transmeridional inclination of stanchion are answered, is made
Tracking does not occur stuck, it is ensured that the normal use of cant beam.
A kind of solar bracket structure adapting to foundation settlement, it is characterised in that:It includes several continuously arranged letters
Branch is across each simple span includes at least two stanchions, an independent cant beam, and each stanchion upper end is provided with corresponding
Bearing, cant beam length direction both ends extend through combination after corresponding bearing and evagination and form the simple span, adjacent
The simple span corresponding to cant beam between connected by universal joint assembly.
It is further characterized by:The universal joint assembly includes transmission cant beam, a pair of of universal joint, the transmission
The both ends of cant beam are separately connected the cant beam of the simple span corresponding to both ends by the corresponding universal joint
Corresponding end;
Corresponding component palette is fixed on the cant beam, the bearing is installed in the upper of corresponding stanchion by bearing block
End face;
It is fixed with corresponding component palette on the transmission cant beam;
When the universal joint assembly is a universal joint, lead between the cant beam corresponding to the adjacent simple span
Cross the universal joint connection;
The universal joint includes the first hinged end, the second hinged end, and first rotating shaft is provided in first hinged end,
The second shaft, the first rotating shaft, the orthogonal arrangement of the second shaft are provided in second hinged end;
The first rotating shaft, the second shaft do not arrange in the same plane, first hinged end, the second hinged end pair
It should hold and be interconnected to form overall structure, at this time affixed first hinged end of the first rotating shaft and wherein cant beam
The corresponding end of corresponding end, second shaft affixed second hinged end and another cant beam;
The first rotating shaft, the second shaft arrange that the first rotating shaft, the second shaft combine to form ten in the same plane
Word structure, first hinged end, the second hinged end connect to form overall structure by cross structure, wherein cant beam
Corresponding end is inserted into and is installed in the first installation positioning chamber of first hinged end, and the corresponding end of another cant beam is inserted into simultaneously
It is installed in the second installation positioning chamber of second hinged end;
The stanchion is specially piling bar, the absolute construction of concrete-pile or composite structure;
Swing arm is also associated on a wherein cant beam for the cant beam that each row is connected with each other, the swing arm is for driving
The tracking of component palette.
After the utility model, due to passing through universal joint group between the cant beam corresponding to the adjacent simple span
Part connects, and universal joint assembly so that vertical, horizontal direction position movement, pile foundation thing can occur between adjacent cant beam
To inclination so that tracking process stuck phenomenon will not occur, it is ensured that the normal use of cant beam.
Description of the drawings
Fig. 1 is the main view schematic diagram of specific embodiment of the utility model;
Fig. 2 is the main view schematic diagram of the specific embodiment after the sedimentation of the utility model vertical direction;
Fig. 3 is the stereogram knot of the specific embodiment after the inclination of the movement and pile foundation in the utility model horizontal direction
Structure schematic diagram;
Fig. 4 is the specific embodiment one of the universal joint of the utility model;
Fig. 5 is the specific embodiment two of the universal joint of the utility model;
Title in figure corresponding to serial number is as follows:
Stanchion 1, cant beam 2, bearing 3, transmission cant beam 4, universal joint 5, the first hinged end 51, the second hinged end 52,
Component palette 6, bearing block 7, swing arm 8, first rotating shaft 9, the second shaft 10, cross structure 11, first are installed positioning chamber 12, second and are pacified
Fill positioning chamber 13.
Specific implementation mode
It is a kind of adapt to foundation settlement solar bracket structure, see Fig. 1-Fig. 3:It includes several continuously arranged freely-supporteds
Across each simple span includes at least two stanchions, 1, independent cant beam 2, and 1 upper end of each stanchion is provided with corresponding axis
Hold 3, after 2 length direction both ends of cant beam extend through corresponding bearing 3 and evagination combination form simple span, adjacent freely-supported
It is connected by universal joint assembly between corresponding cant beam 2
Corresponding component palette 6 is fixed on cant beam 2, bearing 3 is installed in the upper end of corresponding stanchion 1 by bearing block 7
Face;Stanchion 1 is specially piling bar, the absolute construction of concrete-pile or composite structure;The cant beam 2 that each row is connected with each other is wherein
Swing arm 8 is also associated on a piece cant beam 2, swing arm 8 is used for the tracking of drive component plate 6.
Preferred embodiment is shown in Fig. 1-Fig. 3:Universal joint assembly preferably includes transmission cant beam 4, a pair of of Universal connector
First 5, the both ends of transmission cant beam 4 are separately connected the cant beam 2 of the simple span corresponding to both ends by corresponding universal joint 5
Corresponding end;It is fixed with corresponding component palette 6 on transmission cant beam 4.
Specific embodiment, universal joint assembly can be an individual universal joint 5, and simple span adjacent at this time institute is right
It is connected by universal joint 5 between the cant beam 2 answered.
In above-described embodiment, universal joint 5 includes the first hinged end 51, the second hinged end 52, and the first hinged end 51 passes through
First rotating shaft 9 connects the corresponding end of wherein one adjacent cant beam 2, and the second hinged end 52 connects phase by the second shaft 10
The corresponding end of wherein another adjacent cant beam 2, first rotating shaft 9,10 orthogonal arrangement of the second shaft;
The specific embodiment one of universal joint 5 is shown in Fig. 4:First rotating shaft 9, the second shaft 10 do not arrange in the same plane,
First hinged end 51, the second hinged end 52 corresponding end be interconnected to form overall structure, at this time first rotating shaft 9 affixed first cut with scissors
Connect the corresponding end at end 51 and wherein one cant beam 2, pair of the second shaft 10 affixed second hinged end 52 and another cant beam 2
Ying Duan;
The specific embodiment two of universal joint 5 is shown in Fig. 5:First rotating shaft 9, the second shaft 10 arrange in the same plane,
One shaft 9, the combination of the second shaft 10 form cross structure 11, and the first hinged end 51, the second hinged end 52 pass through cross structure 11
Connection forms overall structure, determines wherein the corresponding end of a cant beam 2 is inserted into and is installed in the first of the first hinged end 51 and installs
In the chamber 12 of position, the corresponding end of another cant beam 2 is inserted into and is installed in the second installation positioning chamber 13 of the second hinged end 52.
Its operation principle is as follows:Cant beam is changed to several bars, increases a kind of the universal of universal connection between bar and bar
Adapter assembly connects, and after realizing pile foundation displacement, in the case of the displacement for causing bearing, the rotation of cant beam smoothness, tracker is still
It can so track, not occur stuck.
Specific embodiment of the utility model is described in detail above, but content is only what the utility model was created
Preferred embodiment should not be construed as limiting the practical range of the utility model creation.All created according to the utility model is applied
All the changes and improvements made by range etc. should all still belong within this patent covering scope.
Claims (10)
1. a kind of solar bracket structure adapting to foundation settlement, it is characterised in that:It includes several continuously arranged freely-supporteds
Across each simple span includes at least two stanchions, an independent cant beam, and each stanchion upper end is provided with corresponding axis
It holds, cant beam length direction both ends extend through combination after corresponding bearing and evagination and form the simple span, adjacent
It is connected by universal joint assembly between cant beam corresponding to the simple span.
2. a kind of solar bracket structure adapting to foundation settlement as described in claim 1, it is characterised in that:The Universal connector
Head assembly includes transmission cant beam, a pair of of universal joint, and the both ends of the transmission cant beam pass through the corresponding universal joint
It is separately connected the corresponding end of the cant beam of the simple span corresponding to both ends.
3. a kind of solar bracket structure adapting to foundation settlement as described in claim 1, it is characterised in that:The Universal connector
When head assembly is a universal joint, connected by the universal joint between the cant beam corresponding to the adjacent simple span
It connects.
4. a kind of solar bracket structure adapting to foundation settlement as described in claim 1, it is characterised in that:The cant beam
On be fixed with corresponding component palette, the bearing is installed in the upper surface of corresponding stanchion by bearing block.
5. a kind of solar bracket structure adapting to foundation settlement as claimed in claim 2, it is characterised in that:The transmission turns
It is fixed with corresponding component palette on dynamic beam.
6. a kind of solar bracket structure adapting to foundation settlement as claimed in claim 2 or claim 3, it is characterised in that:Described ten thousand
Include the first hinged end, the second hinged end to connector, first rotating shaft, second hinged end are provided in first hinged end
Inside it is provided with the second shaft, the first rotating shaft, the orthogonal arrangement of the second shaft.
7. a kind of solar bracket structure adapting to foundation settlement as claimed in claim 6, it is characterised in that:Described first turn
Axis, the second shaft do not arrange in the same plane, first hinged end, the second hinged end corresponding end be interconnected to form it is whole
Body structure, the at this time corresponding end of affixed first hinged end of the first rotating shaft and wherein one cant beam, second turn described
The corresponding end of axis affixed second hinged end and another cant beam.
8. a kind of solar bracket structure adapting to foundation settlement as claimed in claim 6, it is characterised in that:Described first turn
Axis, the second shaft arrange that the first rotating shaft, the second shaft combine to form cross structure in the same plane, first hinge
It connects end, the second hinged end to connect to form overall structure by cross structure, wherein the corresponding end of a cant beam is inserted into and is fixedly mounted with
In in the first installation positioning chamber of first hinged end, the corresponding end of another cant beam is inserted into and is installed in second hinge
It connects in the second installation positioning chamber at end.
9. a kind of solar bracket structure adapting to foundation settlement as described in claim 1, it is characterised in that:The stanchion tool
Body is piling bar, the absolute construction of concrete-pile or composite structure.
10. a kind of solar bracket structure adapting to foundation settlement as described in claim 1, it is characterised in that:Each row's phase
Swing arm is also associated on a wherein cant beam for the cant beam to connect, the swing arm is used for the tracking of drive component plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721846982.1U CN208075357U (en) | 2017-12-26 | 2017-12-26 | A kind of solar bracket structure adapting to foundation settlement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721846982.1U CN208075357U (en) | 2017-12-26 | 2017-12-26 | A kind of solar bracket structure adapting to foundation settlement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208075357U true CN208075357U (en) | 2018-11-09 |
Family
ID=64033521
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721846982.1U Active CN208075357U (en) | 2017-12-26 | 2017-12-26 | A kind of solar bracket structure adapting to foundation settlement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208075357U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107965930A (en) * | 2017-12-26 | 2018-04-27 | 苏州金山太阳能科技有限公司 | A kind of solar bracket structure for adapting to foundation settlement |
-
2017
- 2017-12-26 CN CN201721846982.1U patent/CN208075357U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107965930A (en) * | 2017-12-26 | 2018-04-27 | 苏州金山太阳能科技有限公司 | A kind of solar bracket structure for adapting to foundation settlement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1741928B1 (en) | System and method for installing a wind turbine at an offshore location | |
CN204475334U (en) | Large diameter steel pipe sunk pile pile holding device | |
AU2011201775A1 (en) | Tilt adjustment system | |
CN105471377A (en) | Horizontal single axis sun-tracking support apparatus | |
CN202220324U (en) | Multidirectional displacement modulus type bridge telescopic device | |
WO2008146557A1 (en) | Pitch driver of wind turbine generator and wind turbine generator | |
CN208075357U (en) | A kind of solar bracket structure adapting to foundation settlement | |
CN103760910A (en) | Rotary solar single-shaft tracking system | |
CN203788228U (en) | Spindle connection structure of solar uniaxial tracker | |
CN115263662A (en) | Multi-rotor vertical shaft fan with rotatable support frame | |
CN107965930A (en) | A kind of solar bracket structure for adapting to foundation settlement | |
CN205105150U (en) | Two rotary transmission structure's biax tracker and photovoltaic system | |
CN203627064U (en) | Renewable energy hydroelectric power generation device applied to low water head | |
CN105003381A (en) | Underwater perpendicular shaft stable type electricity generator | |
CN201424033Y (en) | Clamping rail device | |
CN203630625U (en) | Linked azimuth angle tracking photovoltaic power station | |
CN203085582U (en) | Photovoltaic module adjusting mechanism and photovoltaic bracket system | |
KR101297569B1 (en) | Runner Apparatus for Power Generation | |
CN106970658A (en) | A kind of 3-freedom parallel mechanism for motion compensation | |
CN210469182U (en) | Photovoltaic tracker transmission bearing structure | |
CN205240610U (en) | Running gear of maglev train bogie | |
CN204684736U (en) | A kind of harrow frame is guide locating device provided | |
CN105141238A (en) | Adaptive-terrain solar flat single-axis connecting shaft tracking system | |
CN208351338U (en) | A kind of double Curved beam solar-tracking system actuators | |
CN204967722U (en) | Solar tracking system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230105 Address after: 200120 38th floor, No. 150 YaoYuan road and No. 149 Youcheng Road, Pudong New Area, Shanghai (the actual building floor is 33 floors) Patentee after: Shanghai Nengyao New Energy Technology Co.,Ltd. Address before: No.68, Dongnan Avenue, Changshu Southeast Economic Development Zone, Suzhou, Jiangsu Province, 215500 Patentee before: SUZHOU JINSHAN SOLAR ENERGY TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right |