CN208073534U - A kind of artificial digging pile underground automatic air - Google Patents

A kind of artificial digging pile underground automatic air Download PDF

Info

Publication number
CN208073534U
CN208073534U CN201820308611.6U CN201820308611U CN208073534U CN 208073534 U CN208073534 U CN 208073534U CN 201820308611 U CN201820308611 U CN 201820308611U CN 208073534 U CN208073534 U CN 208073534U
Authority
CN
China
Prior art keywords
air
blowing device
supply duct
digging pile
artificial digging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820308611.6U
Other languages
Chinese (zh)
Inventor
程利民
王磊
胡德帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201820308611.6U priority Critical patent/CN208073534U/en
Application granted granted Critical
Publication of CN208073534U publication Critical patent/CN208073534U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of artificial digging pile underground automatic airs, its main feature is that, it includes blowing device, fixing bracket, air supply duct, gas detecting instrument and controller;The blowing device and fixing bracket respectively fix on the ground;The air supply duct is fixed on support bracket fastened top, and the upper end is connected with the air outlet of blowing device, and bottom end is placed in the position close to shaft bottom;The gas detecting instrument is fixed at the side of air supply duct bottom end;The blowing device and gas detecting instrument respectively access the controller by circuit.The utility model is reasonable for structure, easy to operate, assembling is quick, in application, the utility model can carry out air-supply or out-of-blast according to the actual conditions of toxic and harmful gas in the well detected, the safety of operating personnel in well is effectively ensured, highly practical.

Description

A kind of artificial digging pile underground automatic air
Technical field
The utility model belongs to construction engineering technical field, and in particular to a kind of artificial digging pile underground automatic ventilating fills It sets.
Background technology
During manual digging pile construction, it is possible to generate " toxic gas " in well, according to《Ambient air quality mark It is accurate》Record in GB3095-96, toxic gas are mainly the system for the gas for having baneful influence to underground operators living environment Claim, such as oxygen-enriched oxygen debt " air " or methane gas.Underground biogas has Muddy Bottoms, peat, coal mine, rubbish to fill out around being common in The regions such as field are buried, it is mainly that the toxic gases such as methane are oozed out in stratum, is unfavorable for underground operators, so must be in pore-forming Toxic gas is measured in real time in the process, it, just can be with underground work, if there is danger in the case of as a result condition license In the case of, it is necessary to it is passed through fresh air by force, after the time is no less than 30 minutes, can just be continued into hole operation.Traditional skill Forced air supply is generally used to artificial digging pile underground in art, is reached after a certain period of time, engineering staff again under to making in well Industry can not in real time blow or out-of-blast according to the actual conditions of air in well, and use cost can not reduce, and engineering staff exists There is also certain security risks for underground.
Utility model content
Problem to be solved in the utility model is to provide a kind of artificial digging pile underground automatic air, using this reality With it is novel can be carried out according to the actual conditions of toxic and harmful gas in the well detected air-supply or it is out-of-blast, well is effectively ensured The safety of interior operating personnel.
The technical solution that the utility model solves technical problem is as follows:
A kind of artificial digging pile underground automatic air of the utility model, it includes blowing device, fixing bracket, air-supply Pipeline, gas detecting instrument and controller;The blowing device and fixing bracket respectively fix on the ground;The air supply duct It is fixed on support bracket fastened top, the upper end is connected with the air outlet of blowing device, and bottom end is placed in the position close to shaft bottom;Institute State the side that gas detecting instrument is fixed at air supply duct bottom end;The blowing device and gas detecting instrument respectively pass through line The controller is accessed on road.
Further, it is fixedly installed steel wire at the bottom end pipeline opening of the air supply duct.
Further, the support bracket fastened top is buckle-type.
Further, the air supply duct is formed by several fastener for connection, the end being connected per adjacent two steel pipes It is respectively set as screw thread shape and is fixedly connected by compatible sleeve.
Further, the blowing device is air blower or compressor.
Further, it is additionally provided with frequency converter between the blowing device and controller.
Further, the controller is PLC or central control computer.
When using the utility model, the connection of air supply duct is first carried out, then by steel wire banding fixed in air supply duct Bottom, gas detecting instrument is fixed on to the side of air supply duct bottom, the depth dug according still further to underground is by air supply duct cloth It sets to shaft bottom, the top of air supply duct is fixed with fixing bracket, then by the outlet air of the upper end of air supply duct and blowing device Mouth is connected, finally by blowing device and gas detecting instrument respectively by circuit access controller, in use, first passing through gas detection Instrument detects temperature, humidity value in shaft bottom pernicious gas value and air, then sends testing result to controller, passes through controller Judge in the air of shaft bottom that whether temperature, humidity value exceed a certain range in pernicious gas value or shaft bottom air, then pass through control Device carries out blowing device to start or stop operation.
The utility model has the beneficial effects that:(1) simple and reasonable for structure, novel, it is safe and reliable, can effectively it subtract The security risk of few underground work;(2) numerical value that gas detecting instrument is received by controller carries out judging whether underground needs to send Wind, then blowing device is operated by controller and is started or stoped, change original forced air supply according to automatic ventilating is needed, to save About resource avoids unnecessary waste;(3) the utility model assembling is simple, can be built and be come into operation quickly, used Material is also common materials, and use cost is low, highly practical.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and detailed description:
Fig. 1 is the structural schematic diagram of the utility model;
In figure:1, blowing device;2, fixing bracket;3, sleeve;4, air supply duct;5, gas detecting instrument;6, steel wire;7, Controller;8, artificial digging pile hoistway.
Specific implementation mode
As shown in Figure 1, a kind of artificial digging pile underground automatic air, it includes blowing device 1, fixing bracket 2, send Wind pipeline 4, gas detecting instrument 5 and controller 7;The blowing device 1 and fixing bracket 2 respectively fix on the ground, described Blowing device 1 can be air blower or compressor, and 2 bottom of the fixing bracket fixes with ground, and top is fastened air-supply The top of pipeline 4, the fixing bracket 2 may be set to be buckle-type, facilitate fixed air supply duct 4;The air supply duct 4 is fixed At the top of fixing bracket 2, the upper end is connected with the air outlet of blowing device 1, and bottom end is placed in close to artificial digging pile hoistway 8 Shaft bottom position, which can be formed by several fastener for connection, and the end being connected per adjacent two steel pipes is equal Be respectively set to screw thread shape and be fixedly connected by compatible sleeve 3, the internal diameter of sleeve 3 according to outer diameter of steel pipes screw thread and It is fixed, facilitate installation and dismounting, the specification of the steel pipe that can use Φ 50*3.6mm;The gas detecting instrument 5, which is fixed at, to be sent The side of 4 bottom end of wind pipeline, the gas detecting instrument 5 are finished product detection instrument, contain the functions such as testing temperature, humidity and air content; The blowing device 1 and gas detecting instrument 5 respectively access the controller 7 by circuit, in application, gas detecting instrument 5 is real When the data transmission of downhole gas that detects control air-supply further according to the gas data situation received to controller 7, controller 7 The unlatching and stopping of equipment;Controller 7 described in the present embodiment can be PLC or central control computer, to facilitate according to reality Situation carries out automatically controlling the entire air-supply arrangement.
It results in blockage in order to avoid shaft bottom sundries enters air supply duct 4, is fixed at the bottom end pipeline opening of the air supply duct 4 It is provided with steel wire 6, the diameter of the steel wire can be 1mm, and sundries can be prevented to enter air supply duct, can also be effectively ensured and send Wind effect.
In order to energy saving, frequency converter is additionally provided between the blowing device 1 and controller 7, the benefit being arranged in this way It is can be according to gas content, temperature and the humidity value that gas detecting instrument 5 detects the case where, passes through controller 7 and rationally adjust The frequency of blowing device 1 avoids the waste of resource to change the size of air output.
The utility model has obtained good application in Jiujiang in the construction of ship the second stage of the project, the engineering manually digging hole Stake holes diameter is 900mm and 1000mm, hole depth 10m~17m, and totally 41, original underground forced air supply is changed to self-action air-supply, As long as shaft bottom air quality reaches requirement, construction personnel can descend to construct to shaft bottom, without going into the well according to original construction personnel The preceding air-supply that certain time must be carried out to shaft bottom, when construction, first by steel wire banding fixed in the bottom of air supply duct, by gas Body detector is fixed on the side of air supply duct bottom, and air supply duct is then arranged into shaft bottom according to the depth that underground has been dug, The top of air supply duct is fixed with fixing bracket, then the upper end of air supply duct is connected with the air outlet of blowing device, most Afterwards by blowing device and gas detecting instrument respectively by circuit access controller, in use, first passing through gas detecting instrument detection well Temperature, humidity value in bottom pernicious gas value and air, then send testing result to controller, judge shaft bottom by controller Whether temperature, humidity value exceed a certain range in pernicious gas value or shaft bottom air in air, then by controller to air-supply Equipment carries out starting or stoping operation, so as to according to the actual conditions in well carry out air-supply or it is out-of-blast.The utility model can It to effectively reduce the security risk of underground work, can also be widely used, be worth in ultra-deep manually digging hole operation It promotes.
It these are only the preferred embodiment of the utility model, but protection scope of the utility model is not limited thereto, appoints What those familiar with the art within the technical scope disclosed by the utility model, the variation that can readily occur in or replaces It changes, should be covered within the scope of the utility model.Therefore, the scope of protection of the utility model should be with claim Subject to the protection domain defined.
Place is not described in detail for the utility model, is the known technology of those skilled in the art of the present technique.

Claims (8)

1. a kind of artificial digging pile underground automatic air, characterized in that it include blowing device (1), fixing bracket (2), Air supply duct (4), gas detecting instrument (5) and controller (7);The blowing device (1) and fixing bracket (2) are respectively fixed on On ground;The air supply duct (4) is fixed on the top of fixing bracket (2), the air outlet phase of the upper end and blowing device (1) Even, bottom end is placed in the position close to shaft bottom;The gas detecting instrument (5) is fixed at the side of air supply duct (4) bottom end; The blowing device (1) and gas detecting instrument (5) respectively access the controller (7) by circuit.
2. a kind of artificial digging pile underground automatic air according to claim 1, characterized in that the air supply duct (4) steel wire (6) is fixedly installed at bottom end pipeline opening.
3. a kind of artificial digging pile underground automatic air according to claim 1 or 2, characterized in that the fixation The top of holder (2) is buckle-type.
4. a kind of artificial digging pile underground automatic air according to claim 1 or 2, characterized in that the air-supply Pipeline (4) is formed by several fastener for connection, and the end being connected per adjacent two steel pipes is respectively set as screw thread shape simultaneously It is fixedly connected by compatible sleeve (3).
5. a kind of artificial digging pile underground automatic air according to claim 3, characterized in that the air supply duct (4) it is formed by several fastener for connection, the end being connected per adjacent two steel pipes is respectively set as screw thread shape and passes through Compatible sleeve (3) is fixedly connected.
6. a kind of artificial digging pile underground automatic air according to claim 1, characterized in that the blowing device (1) it is air blower or compressor.
7. a kind of artificial digging pile underground automatic air according to claim 1 or 6, characterized in that the air-supply It is additionally provided with frequency converter between equipment (1) and controller (7).
8. a kind of artificial digging pile underground automatic air according to claim 1 or 6, characterized in that the control Device (7) is PLC or central control computer.
CN201820308611.6U 2018-03-06 2018-03-06 A kind of artificial digging pile underground automatic air Active CN208073534U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820308611.6U CN208073534U (en) 2018-03-06 2018-03-06 A kind of artificial digging pile underground automatic air

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820308611.6U CN208073534U (en) 2018-03-06 2018-03-06 A kind of artificial digging pile underground automatic air

Publications (1)

Publication Number Publication Date
CN208073534U true CN208073534U (en) 2018-11-09

Family

ID=64039692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820308611.6U Active CN208073534U (en) 2018-03-06 2018-03-06 A kind of artificial digging pile underground automatic air

Country Status (1)

Country Link
CN (1) CN208073534U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056386A (en) * 2019-03-29 2019-07-26 重庆大学 A kind of automatic air for artificial digging pile well

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056386A (en) * 2019-03-29 2019-07-26 重庆大学 A kind of automatic air for artificial digging pile well
CN110056386B (en) * 2019-03-29 2021-03-12 重庆大学 Automatic air supply device for manual hole digging pile well

Similar Documents

Publication Publication Date Title
US4890672A (en) Method of controlling the flow of landfill gas from sanitary landfills and apparatus for performing the method
CN101520365B (en) Simulation experimental system for controlling mine tunnel dust environment
CN103712755B (en) A kind of simulate the assay device that natural gas leaks in soil
CN208073534U (en) A kind of artificial digging pile underground automatic air
CN107091096A (en) Replacing options in the main driving seal failure hole of balancing earth-pressure shielding machine under a kind of normal pressure
CN207065102U (en) A kind of liquid leakage automatic detection device
CN112177657B (en) Sectional type ventilation system for long-distance tunnel and implementation method thereof
CN107035403A (en) A kind of non-explosion-proof flexible transport method in high methane and Gas Outburst tunnel
CN108061623A (en) A kind of air pipeline leak testing process
CN201932715U (en) Blanking tube and material batching system equipped therewith
CN204591331U (en) The mine development end dash system of adjoint high-concentration hydrogen sulfide and gas
CN205349414U (en) Quick escape device in tunnel construction accident
CN204989134U (en) Air foam flooding oil output online detection device
CN114542154A (en) Intelligent control ventilation system for tunnel construction
CN107676632B (en) A kind of city integrated piping lane natural gas line monitor control system and method
CN106382114A (en) Modular equipment system for underground gasification process of coals
CN213711240U (en) Automatic internal gas discharge unit of single-pile foundation of offshore wind turbine generator system
KR100237162B1 (en) Gas leak detector of buried conduit
CN108343466A (en) It is a kind of can automatic shunt high-concentration and low-concentration methane gas device and its shunt method
CN105650480B (en) Low-pressure fuel gas underground pipe draining pressure testing device and draining and pressure-measuring method
CN217618581U (en) Closed floating bin with emergency function
CN210981673U (en) Automatic pollution discharge monitoring device
EP0363508B1 (en) A method of controlling the flow of landfill gas from sanitary landfills and apparatus for performing the method
CN208475344U (en) A kind of torch assembly with lime set detection unit
CN206352135U (en) Sludge gas collection well closing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant