CN208072620U - Pre-buried channel flow - Google Patents
Pre-buried channel flow Download PDFInfo
- Publication number
- CN208072620U CN208072620U CN201820151962.0U CN201820151962U CN208072620U CN 208072620 U CN208072620 U CN 208072620U CN 201820151962 U CN201820151962 U CN 201820151962U CN 208072620 U CN208072620 U CN 208072620U
- Authority
- CN
- China
- Prior art keywords
- groove body
- buried channel
- channel flow
- dowel
- fixed plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model is related to a kind of pre-buried channel flows, including:Groove body, groove body have groove;Multiple dowels are connect with one end of groove body, and are spaced apart along the length direction of groove body;And fixed plate, it is set on multiple dowels, and be arranged in a determining deviation with groove body, fixed plate can be moved by dowel relative to groove body, so that the adjustable interval between fixed plate and groove body.Groove body when mounted by being fitted in the side of stirrup frame by above-mentioned pre-buried channel flow, then it is moved with the spacing size between adjustment fixing plate and groove body relative to groove body by dowel adjustment fixing plate, so that fixed plate and the other side of stirrup frame offset, to realize that pre-buried channel flow grips installation with respect to stirrup frame, so, template need to only be bonded with pre-buried channel flow and can be fixed without trepanning, so that template can reuse, it economizes on resources, cost is reduced, while ensure that the installation accuracy of pre-buried channel flow.
Description
Technical field
The utility model is related to pre-buried tightening technology fields, more particularly to a kind of pre-buried channel flow.
Background technology
Pre-buried channel flow is the component being pre-installed in concealed work, is the structural fittings disposed when structure is poured into a mould, is used
In the anchor connection for building object structure by laying bricks or stones, so that the installation of field engineering Equipment Foundations is fixed.The installation of traditional pre-buried channel flow
It is to be fixed pre-buried channel flow and template by mechanical connection manner, which usually requires the trepanning in template, leads to mould
Plate breakage can not reuse, and cause the waste of resource;Pre-buried channel flow is fixed on template simultaneously, when fill concrete is easy to lead
It causes pre-buried channel flow to misplace, causes the low of the installation accuracy of pre-buried channel flow.
Utility model content
Based on this, it is necessary to provide a kind of install and be fixed without template trepanning, and the pre-buried channel flow that installation accuracy is high.
A kind of pre-buried channel flow, including:
Groove body, the groove body have groove;
Multiple dowels are connect with one end of the groove body, and are spaced apart along the length direction of the groove body;And
Fixed plate is set on multiple dowels, and is arranged in a determining deviation with the groove body, and the fixed plate can
It is moved relative to the groove body by the dowel, so that the adjustable interval between the fixed plate and the groove body.
The fixed plate is sheathed on the dowel in one of the embodiments, and the relatively described dowel is along the anchor
Muscle it is axially movable.
Further include threaded fastener in one of the embodiments, one end of the fixed plate offers fastener hole, described
Threaded fastener is arranged in the fastener hole and fixes the relative position of the relatively described dowel of the fixed plate.
The dowel includes in one of the embodiments,:
Attaching nut is welded in one end of the groove body;And
Connecting rod, is screwed together in the one end of the attaching nut far from the groove body, and the fixed plate is sheathed on the connection
On bar, and the relatively described connecting rod is along the axially movable of the connecting rod.
The dowel is screw rod in one of the embodiments, and the pre-buried channel flow further includes adjusting nut, the adjusting
Nut is contained in the groove, and the groove body offers through-hole close to one end of the dowel, and the dowel is arranged in described
Through-hole is simultaneously screwed with the adjusting nut.
The adjusting nut includes threaded hole for screwing togather the dowel and for accommodating in one of the embodiments,
The tooling hole of tool.
The groove body includes bottom plate and side plate in one of the embodiments, and the side plate is two, two side plates
The both sides of the bottom plate are respectively arranged at, two side plates connect to form the groove with the bottom plate.
The side plate includes side and bending part in one of the embodiments, and the side is connect with the bottom plate, institute
It states bending part and is connected to the one end of the side far from the bottom plate, two bending part directions close toward each other are prolonged
It stretches.
The side of the bending part towards the bottom plate is provided with teeth, the teeth edge in one of the embodiments,
The length direction of the groove body is distributed at row pattern.
Further include auxiliary member in one of the embodiments, the auxiliary member includes threaded shank and is connected to the screw rod
The fixed part of portion one end, one end that the fixed part is connect with the threaded shank are provided with and the matched grinding tooth of the teeth.
Then above-mentioned pre-buried channel flow is adjusted solid when mounted by the way that groove body to be fitted in the side of stirrup frame by dowel
Fixed board is moved relative to groove body with the spacing size between adjustment fixing plate and groove body, so that the other side phase of fixed plate and stirrup frame
It supports, to realize that pre-buried channel flow grips installation with respect to stirrup frame, in this way, template need to be only bonded with pre-buried channel flow
It fixes without trepanning, so that template can reuse, economizes on resources, reduce cost, while ensure that pre-buried channel flow
Installation accuracy.
Description of the drawings
Fig. 1 is the scheme of installation of pre-buried channel flow in one embodiment of the utility model;
Fig. 2 is the structural schematic diagram of pre-buried channel flow shown in Fig. 1;
Fig. 3 is the structural schematic diagram at another visual angle of pre-buried channel flow shown in Fig. 1;
Fig. 4 is the structural schematic diagram of pre-buried channel flow in another embodiment of the utility model;
Fig. 5 is the structural schematic diagram of pre-buried channel flow shown in Fig. 4.
Specific implementation mode
The utility model is more fully retouched below with reference to relevant drawings for the ease of understanding the utility model,
It states.The better embodiment of the utility model is given in attached drawing.But the utility model can come in many different forms
It realizes, however it is not limited to embodiments described herein.On the contrary, the purpose of providing these embodiments is that making new to this practicality
The disclosure of type understands more thorough and comprehensive.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element
Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it can be directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
" right side " and similar statement for illustrative purposes only, are not offered as being unique embodiment.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with the technology for belonging to the utility model
The normally understood meaning of technical staff in domain is identical.Terminology used in the description of the utility model herein only be
The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term " and or " used herein packet
Include any and all combinations of one or more relevant Listed Items.
As shown in Figure 1, the pre-buried channel flow 100 in one embodiment of the utility model is for being cast in concrete slab 200.It is mixed
Concrete board 200 includes stirrup frame 210 and the concrete 220 for being cast in 210 surrounding of stirrup frame.Pre-buried channel flow 100 includes groove body
110, multiple dowels 120 and fixed plate 130.
As shown in Figures 2 and 3, groove body 110 has groove 111.Multiple dowels 120 are connect with one end of groove body 110, and edge
The length direction of groove body 110 is spaced apart.Fixed plate 130 is set on multiple dowels 120, and is in a determining deviation with groove body 110
Setting.Fixed plate 130 can be moved by dowel 120 relative to groove body 110, so that the spacing between fixed plate 130 and groove body 110
It is adjustable.
Then above-mentioned pre-buried channel flow 100 passes through anchor when mounted by the way that groove body 110 to be fitted in the side of stirrup frame 210
120 adjustment fixing plate 130 of muscle is moved relative to groove body 110 with the spacing size between adjustment fixing plate 130 and groove body 110, so that
Fixed plate 130 and the other side of stirrup frame 210 offset, to realize the gripping with respect to stirrup frame 210 of pre-buried channel flow 100
Installation, can be fixed in this way, template need to be only bonded with pre-buried channel flow 100 without trepanning, so that template can repeat profit
With economizing on resources, reduce cost, while ensure that the installation accuracy of pre-buried channel flow 100.
As shown in Figure 2, it should be noted that specifically in the present embodiment, multiple dowels 120 are along the length side of groove body 110
To being evenly spaced on.It is arranged such so that groove body 110 is more uniformly stressed, and further ensure that the peace of pre-buried channel flow 100
Fill precision.
As shown in figure 3, in one embodiment, groove body 110 includes bottom plate 112 and side plate 113.Bottom plate 112 is used for and dowel
120 are connected.Side plate 113 is two.Two side plates 113 are respectively arranged at the both sides of bottom plate 112.Two side plates 113 are towards bottom plate
112 extend away from the direction of dowel 120.Two side plates 113 connect to form groove 111 with bottom plate 112.
Further, side plate 113 includes side 114 and bending part 115.Side 114 is connect with bottom plate 112.Bending part 115
It is connected to the one end of side 114 far from bottom plate 112.Connection forms L-shaped structure between bending part 115 and side 114.Two bendings
The direction close toward each other of portion 115 extends.
In one embodiment, dowel 120 includes attaching nut 122 and connecting rod 124.Attaching nut 122 is welded in groove body
110 one end.Connecting rod 124 is screwed together in the one end of attaching nut 122 far from groove body 110.So set, ensureing attaching nut
122 with the stable connection of groove body 110, while facilitating the installation, dismounting and repair of pre-buried channel flow 100, it is easy-to-use.In this reality
It applies in example, attaching nut 122 is welded in one end of bottom plate 112.
In one embodiment, fixed plate 130 is sheathed on dowel 120, and opposite dowel 120 can along the axial direction of dowel 120
It is mobile.In the present embodiment, fixed plate 130 is sheathed in connecting rod 124, and opposite connecting rod 124 is along the axial direction of connecting rod 124
It is removable.When needing adjustment fixing plate 130 with respect to spacing between groove body 110, fixed plate 130 can be driven with respect to dowel 120
Along the axial movement of dowel 120, to realize gripping for the stirrup frame 210 of different specification size relatively of pre-buried channel flow 100
Installation.
In one embodiment, further, above-mentioned pre-buried channel flow 100 may also include threaded fastener 140.Fixed plate 130
One end offer fastener hole (figure do not mark).Threaded fastener 140 is arranged in fastener hole and by fixed plate 130 with respect to dowel 120
Relative position fix.So set, the relatively inclined of caused pre-buried channel flow 100 can be shaken to avoid in casting concrete 220
It moves, to improve the installation stability of pre-buried channel flow 100.In one embodiment, threaded fastener 140 can be interior hexagonal spiral shell
Bar.In this way, in order to which installation personnel is by tool rotary screwing thread fastener 140, the installation effectiveness of pre-buried channel flow 100 is improved.
Further, the side of bending part 115 towards bottom plate 112 may be provided with teeth (figure is not marked).Teeth are triangle
Structure.Teeth are distributed along the length direction of groove body 110 at row pattern.So set, can by teeth are engaged with auxiliary member with it is outer
Portion's structure is connected, and ensures the anti-shearing force and tension force effect of pre-buried channel flow 100, to improve the installation of pre-buried channel flow 100
Stability.
In one embodiment, above-mentioned pre-buried channel flow 100 may also include auxiliary member (figure is not marked).Auxiliary member can be T shape spiral shells
Bolt.Auxiliary member includes threaded shank and the fixed part for being connected to threaded shank one end.One end that fixed part is connect with threaded shank is provided with
With the matched grinding tooth of teeth.Specifically, the fixed part of auxiliary member is installed in the groove 111 of groove body 110 from one end of groove body 110
Interior, the threaded shank of auxiliary member is slideably positioned in the gap between two bending parts 115 of groove body 110, the threaded shank of auxiliary member with
External structure is connected, by the intermeshing of the grinding tooth and teeth, to realize being fixedly connected for auxiliary member and groove body 110.
As shown in Figures 4 and 5, in one embodiment, dowel 120 is screw rod.Pre-buried channel flow 100 further includes adjusting nut
150.Adjusting nut 150 is contained in groove 111.Groove body 110 offers through-hole close to one end of dowel 120 (figure is not marked).It is logical
Hole is connected with groove 111.Dowel 120 is arranged in through-hole and is screwed with adjusting nut 150.By knob adjusting nut 150,
Axial movement of the dowel 120 with respect to groove body 110 along dowel 120 can be driven, to pass through 120 adjustment fixing plate of dowel, 130 opposed slot
Spacing size between body 110, to realize gripping for the stirrup frame 210 of different specification size relatively of pre-buried channel flow 100
Installation.Optionally, adjusting nut 150 can be hexagonal socket nut.In this way, in order to which installation personnel screws adjusting spiral shell by tool
Mother 150 improves the installation effectiveness of pre-buried channel flow 100.In one embodiment, adjusting nut 150 includes for screwing togather dowel 120
Threaded hole 152 and tooling hole 154 for accommodating tool.Threaded hole 152 and 154 Relative distribution of tooling hole are in adjusting nut 150
Both ends.
It should be pointed out that in one embodiment, groove body 110 is hot-rolled steel groove body 110, hot-rolled steel is by high-temperature heating
Steel made of rolling have intensity height, good toughness, the excellent performances such as easily processed into type and good weldability.It can be with
Understand, in other embodiments, the material for constituting above-mentioned groove body 110 is not limited to hot-rolled steel material, can also be other materials, only
Its intensity, toughness, plasticity and weldability is needed to meet the requirements.
Each technical characteristic of above example can be combined arbitrarily, to keep description succinct, not to above-described embodiment
In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance
Shield is all considered to be the range of this specification record.
Above example only expresses the several embodiments of the utility model, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to utility model patent range therefore be interpreted as.It should be pointed out that for the ordinary skill people of this field
For member, without departing from the concept of the premise utility, various modifications and improvements can be made, these belong to this reality
With novel protection domain.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (10)
1. a kind of pre-buried channel flow, which is characterized in that including:
Groove body, the groove body have groove;
Multiple dowels are connect with one end of the groove body, and are spaced apart along the length direction of the groove body;And
Fixed plate is set on multiple dowels, and is arranged in a determining deviation with the groove body, and the fixed plate can pass through
The dowel is moved relative to the groove body, so that the adjustable interval between the fixed plate and the groove body.
2. pre-buried channel flow according to claim 1, which is characterized in that the fixed plate is sheathed on the dowel, and phase
To the dowel along the axially movable of the dowel.
3. pre-buried channel flow according to claim 2, which is characterized in that further include threaded fastener, the one of the fixed plate
End offers fastener hole, and the threaded fastener is arranged in the fastener hole and by the opposite of the relatively described dowel of the fixed plate
Position is fixed.
4. pre-buried channel flow according to claim 2, which is characterized in that the dowel includes:
Attaching nut is welded in one end of the groove body;And
Connecting rod is screwed together in the one end of the attaching nut far from the groove body, and the fixed plate is sheathed in the connecting rod,
And the relatively described connecting rod is along the axially movable of the connecting rod.
5. pre-buried channel flow according to claim 1, which is characterized in that the dowel is screw rod, and the pre-buried channel flow also wraps
Adjusting nut is included, the adjusting nut is contained in the groove, and the groove body offers through-hole close to one end of the dowel,
The dowel is arranged in the through-hole and is screwed with the adjusting nut.
6. pre-buried channel flow according to claim 5, which is characterized in that the adjusting nut includes for screwing togather the dowel
Threaded hole and tooling hole for accommodating tool.
7. pre-buried channel flow according to claim 1, which is characterized in that the groove body includes bottom plate and side plate, the side plate
It it is two, two side plates are respectively arranged at the both sides of the bottom plate, and two side plates connect to form institute with the bottom plate
State groove.
8. pre-buried channel flow according to claim 7, which is characterized in that the side plate includes side and bending part, the side
Portion is connect with the bottom plate, and the bending part is connected to the one end of the side far from the bottom plate, two bending part courts
Close direction extends to each other.
9. pre-buried channel flow according to claim 8, which is characterized in that the bending part is arranged towards the side of the bottom plate
There are teeth, the teeth to be distributed at row pattern along the length direction of the groove body.
10. pre-buried channel flow according to claim 9, which is characterized in that further include auxiliary member, the auxiliary member includes screw rod
Portion and the fixed part for being connected to described threaded shank one end, one end that the fixed part is connect with the threaded shank be provided with it is described
The matched grinding tooth of teeth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820151962.0U CN208072620U (en) | 2018-01-26 | 2018-01-26 | Pre-buried channel flow |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820151962.0U CN208072620U (en) | 2018-01-26 | 2018-01-26 | Pre-buried channel flow |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208072620U true CN208072620U (en) | 2018-11-09 |
Family
ID=64036560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820151962.0U Active CN208072620U (en) | 2018-01-26 | 2018-01-26 | Pre-buried channel flow |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208072620U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109811898A (en) * | 2019-03-13 | 2019-05-28 | 悉地国际设计顾问(深圳)有限公司 | A kind of connection structure and its construction method of reinforced concrete member |
CN110158781A (en) * | 2019-05-22 | 2019-08-23 | 刘丽 | Slot type embedded part |
CN111809895A (en) * | 2020-06-28 | 2020-10-23 | 中国二十冶集团有限公司 | Positioning device and positioning method for positioning embedded channel |
CN113775061A (en) * | 2021-08-24 | 2021-12-10 | 上海拓铁通信科技有限公司 | Prevent not hard up anchor assembly of arc channel |
-
2018
- 2018-01-26 CN CN201820151962.0U patent/CN208072620U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109811898A (en) * | 2019-03-13 | 2019-05-28 | 悉地国际设计顾问(深圳)有限公司 | A kind of connection structure and its construction method of reinforced concrete member |
CN110158781A (en) * | 2019-05-22 | 2019-08-23 | 刘丽 | Slot type embedded part |
CN110158781B (en) * | 2019-05-22 | 2021-02-09 | 刘丽 | Groove type embedded part |
CN111809895A (en) * | 2020-06-28 | 2020-10-23 | 中国二十冶集团有限公司 | Positioning device and positioning method for positioning embedded channel |
CN113775061A (en) * | 2021-08-24 | 2021-12-10 | 上海拓铁通信科技有限公司 | Prevent not hard up anchor assembly of arc channel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208072620U (en) | Pre-buried channel flow | |
EP2792804B1 (en) | Anchoring device for a concrete ceiling, concrete ceiling and installation method | |
CN207988492U (en) | A kind of strip Quick Release support system for beam | |
CN209260969U (en) | Supporting and positioning device and precast shear wall | |
CN204781970U (en) | Template fixing device with adjustable | |
CN205063187U (en) | Bar reinforcement positioning device | |
CN114108837A (en) | Embedded sleeve device and installation method thereof | |
CN103967042B (en) | Mounting correction tool for protection corner angle of frame column and manufacturing method thereof | |
EP2140992B1 (en) | Manufacturing of construction elements, especially wall or facade elements, and corresponding construction element | |
CN207878929U (en) | A kind of concrete frame column template fastening system | |
CN206591839U (en) | A kind of reinforcing bar posting having enough to meet the need | |
CN215104493U (en) | Bubble mixing light soil panel leveling device | |
CN211114443U (en) | Reinforcing bar pre-embedding auxiliary device | |
CN203821432U (en) | Power equipment base fastening device | |
CN103953065B (en) | A kind of power-equipment pedestal fastener and fixing means | |
CN209466454U (en) | A kind of vertical muscle protective frame of PC component | |
CN211286655U (en) | Connecting and locking device for building template | |
CN207582978U (en) | A kind of floorslab thickness control device | |
DE102010036117A1 (en) | Concrete component with a load attachment arrangement and method for providing and planning a load attachment arrangement | |
RU84420U1 (en) | BEACON FOR CONCRETE, FINISHING AND INSTALLATION WORKS | |
CN210820179U (en) | Lifting rod fastening structure for concrete mixing | |
DE1683433B2 (en) | ADJUSTABLE FASTENING DEVICE FOR VENTILATED WALL CLADDING PANELS | |
KR100731303B1 (en) | Height adjusting device for concrete form panel | |
CN204266601U (en) | A kind of pre-stress stretching device of fibre sheet material | |
CN215764024U (en) | Foundation bolt fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |