CN208060354U - A kind of cold and hot water circulation system for pipe part test - Google Patents

A kind of cold and hot water circulation system for pipe part test Download PDF

Info

Publication number
CN208060354U
CN208060354U CN201820263072.9U CN201820263072U CN208060354U CN 208060354 U CN208060354 U CN 208060354U CN 201820263072 U CN201820263072 U CN 201820263072U CN 208060354 U CN208060354 U CN 208060354U
Authority
CN
China
Prior art keywords
water
cold
electric
ball valve
booster pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820263072.9U
Other languages
Chinese (zh)
Inventor
王鲲
万珺
贾欣
掌成明
李宗明
朱玮
钱玲
王琼
路通
王嘉慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Supervision and Inspection Institute for Product Quality
Original Assignee
Jiangsu Supervision and Inspection Institute for Product Quality
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Supervision and Inspection Institute for Product Quality filed Critical Jiangsu Supervision and Inspection Institute for Product Quality
Priority to CN201820263072.9U priority Critical patent/CN208060354U/en
Application granted granted Critical
Publication of CN208060354U publication Critical patent/CN208060354U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model discloses a kind of cold and hot water circulation systems for pipe part test, it includes cold water booster pump, hot water booster pump, first electric three passes ball valve, second electric three passes ball valve and accumulator, the water inlet of cold water booster pump and hot water booster pump is separately connected cold water storage cistern and boiler, the water outlet of cold water booster pump and hot water booster pump is separately connected two water inlet ends of the first electric three passes ball valve, the accumulator is equipped at the water outlet of first electric three passes ball valve, and the water outlet connects one end of pipe part to be tested by water outlet mouthpiece, the other end of pipe part to be tested connects the water inlet end of solenoid valve by return water interface, the water outlet of solenoid valve connects the water inlet end of the second electric three passes ball valve, two water outlets of the second electric three passes ball valve are separately connected cold water storage cistern and boiler.The utility model uses double pump pressurized construction, so that medium temperature is not had greatly changed, and the operation is stable, service life are long, failure rate is low.

Description

A kind of cold and hot water circulation system for pipe part test
Technical field
The utility model is related to a kind of cold and hot water circulation systems for pipe part test, belong to quality safety detection skill Art field.
Background technology
Hot and cold water cycle (impact) testing machine is plastics, metal pipe material pipe fitting special inspecting equipment, and national standard is to experiment Equipment probably requires:(1.6MPa or 2.5MPa) under a certain pressure, (20 DEG C) cycle 15min of cold water, hot water (93 DEG C) 15min is recycled, hot and cold handoff procedure is no more than 1min;Purpose be test pipe part and pipe part connector for a long time by Under conditions of high pressure and hot and cold transformation, leakage, fracture phenomena are seen whether.
The equipment of domestic pharmaceutical industry industry manufacture at present is usually a booster pump while meeting heating and cooling condition;Thus An experiment, and in hot and cold handoff procedure, temperature could be completed by causing a pump to have to more than 1,300 a hour of continuous work It spends widely different, causes the sealing ring aging speed in pump to be accelerated, failure rate is very high.
Invention content
Hot water or cold water is pressurized with two pumps respectively the purpose of this utility model is to provide a kind of, and medium temperature Degree will not have greatly changed, the cold and hot water cycle test system that service life is long, failure rate is low.
The technical scheme adopted by the utility model is that:A kind of cold and hot water circulation system for pipe part test, including Cold water booster pump, hot water booster pump, the first electric three passes ball valve, the second electric three passes ball valve and accumulator, the cold water supercharging The water inlet of pump and hot water booster pump is separately connected cold water storage cistern and boiler, the water outlet point of cold water booster pump and hot water booster pump Two water inlet ends of the first electric three passes ball valve are not connected, and the accumulation of energy is equipped at the water outlet of the first electric three passes ball valve Device, and the water outlet connects one end of pipe part to be tested by water outlet mouthpiece, the other end of pipe part to be tested passes through Return water interface connects the water inlet end of electric control valve, the water outlet of electric control valve connect the second electric three passes ball valve into Two water outlets of water end (W.E.), the second electric three passes ball valve are separately connected cold water storage cistern and boiler.
Further, two of the cold water booster pump, the water outlet of hot water booster pump and the first electric three passes ball valve into The overflow valve for preventing system pressure excessively high is respectively provided between water end (W.E.).
Further, the inlet of the electric control valve is equipped with leaving water temperature sensors.
Further, pass through stainless steel between the hydraulic pressure nozzle of the accumulator and the water outlet of the first electric three passes ball valve Bellows connects, and pressure sensor is equipped at the hydraulic pressure nozzle of accumulator.
Further, manual ball valve is equipped between the water outlet and water outlet mouthpiece of the first electric three passes ball valve.
Further, the cooling-water machine for adjusting cold water temperature, and cold water storage cistern and boiler are connected on the cold water storage cistern Interior to be equipped with liquid level sensor, which connect with automatic watering apparatus.
The utility model advantageous effect is:
(1) this system uses double pump pressurized construction, and two pumps are service intermittents, and medium temperature will not occur it is larger Variation, the operation is stable, service life are long, failure rate is low.
(2) this system installs electric control valve (or proportional pressure control valve) on circuit, by throttling come control system pressure; And it is connected using stainless steel screwed tube using accumulator steady pressure to avoid influence of the temperature to Pressure Sensor Precision Pressure sensor can effectively prevent influence of the medium temperature to sensor accuracy.
(3) triple valve switch operating pipeline is used, realizes intermittent hot and cold water alternating, and each water tank increases water level prison The functions such as low water level power-off are crossed in brake and water shortage automatic water supplement, are prevented no-water dry combustion, are caused equipment damage.
The additional aspect and advantage of the utility model will be set forth in part in the description, partly will be from following description In become apparent, or recognized by the practice of the utility model.
Description of the drawings
Fig. 1 is the stereogram of the utility model.
Fig. 2 is the vertical view of the utility model.
Fig. 3 is that the utility model matches figure.
In figure label for:1- cold water storage cisterns, 2- boilers, the cold and hot water circulation systems of 3-, 301- cold water booster pumps, 302- hot water Booster pump, 303- flange rubber soft joints, 304- the first electric three passes ball valves, 305- the second electric three passes ball valves, 306- overflows Valve, 307- accumulators, 308- pressure sensors, 309- corrugated stainless steel tubings, 310- manual ball valves, 311- electric control valves, 312- leaving water temperature sensors, 4- sample cabinets, 5- cooling-water machines.
Specific implementation mode
The utility model is described in detail in the following with reference to the drawings and specific embodiments.
As shown in Figures 1 to 3, a kind of cold and hot water circulation system for pipe part test, it is characterised in that it includes cold Water booster pump 301, hot water booster pump 302, the first electric three passes ball valve 304, the second electric three passes ball valve 305 and accumulator 307, the water inlet of the cold water booster pump 301 and hot water booster pump 302 is separately connected cold water storage cistern 1 and boiler 2, cold water supercharging The water outlet of pump 301 and hot water booster pump 302 is separately connected two water inlet ends of the first electric three passes ball valve 304, and first The accumulator 307 is equipped at the water outlet of electric three passes ball valve 304, and the water outlet connects test tube to be measured by water outlet mouthpiece One end of material pipe fitting, the other end of pipe part to be tested connects the water inlet end of electric control valve 311 by return water interface, electronic The water outlet of regulating valve 311 connects the water inlet end of the second electric three passes ball valve 305, and the two of the second electric three passes ball valve 305 A water outlet is separately connected cold water storage cistern 1 and boiler 2.
In the utility model, the cold water booster pump 301, the water outlet of hot water booster pump 302 and the first electric three passes ball It is respectively provided with the overflow valve 306 for preventing system pressure excessively high between two water inlet ends of valve 304.The electric control valve 311 inlet is equipped with leaving water temperature sensors 312, for monitoring whether water temperature complies with standard.The liquid of the accumulator 307 It is connected by corrugated stainless steel tubing 309 between pressure pipe mouth and the water outlet of the first electric three passes ball valve 304, and in accumulator 307 Hydraulic pressure nozzle at be equipped with pressure sensor 308.It is set between the water outlet and water outlet mouthpiece of the first electric three passes ball valve 304 There is manual ball valve 310.The cooling-water machine 5 for adjusting cold water temperature is connected on the cold water storage cistern 1, cooling-water machine 5 is used for cold water Water temperature in case 1 controls in critical field;And liquid level sensor is equipped in cold water storage cistern 1 and boiler 2, the liquid level sensor with Automatic watering apparatus connects.
The working process of the utility model is as follows:First by quick coupling and connecting tube by the both ends of pipe part to be tested It is connected to water outlet mouthpiece and backwater joint, and is fixed on pipe part on the inner wall of sample cabinet 4 simultaneously by clamping regulation mechanism A loop checking installation is formed, sample cabinet sliding door is closed after the completion of fixed.Then by switching the first electric three passes ball valve 304 and the Two electric three passes ball valves 305 realize the break-make of cold water storage cistern 1 or boiler 2 and pipe part circuit, and start cold water booster pump 301 Start to treat the loop test tested pipe part 7 and carry out hot and cold water with hot water booster pump 302.
The basic principles and main features and advantage of the utility model have been shown and described above.The ordinary skill of this field Personnel are not it should be appreciated that above-described embodiment limits the scope of protection of the utility model, all use equivalent replacements etc. in any form The technical solution that mode is obtained, falls in the scope of protection of the utility model.
The parts not involved in the utility model is the same as those in the prior art or can be realized by using the prior art.

Claims (6)

1. a kind of cold and hot water circulation system for pipe part test, which is characterized in that it includes cold water booster pump, hot water increasing Press pump, the first electric three passes ball valve, the second electric three passes ball valve and accumulator, the cold water booster pump and hot water booster pump into The mouth of a river is separately connected cold water storage cistern and boiler, and it is electronic that the water outlet of cold water booster pump and hot water booster pump is separately connected described first Two water inlet ends of three-way ball valve are equipped with the accumulator at the water outlet of the first electric three passes ball valve, and the water outlet passes through Water outlet mouthpiece connects one end of pipe part to be tested, and the other end of pipe part to be tested connects electric adjustable by return water interface The water inlet end of valve is saved, the water outlet of electric control valve connects the water inlet end of the second electric three passes ball valve, the second electric three passes Two water outlets of ball valve are separately connected cold water storage cistern and boiler.
2. a kind of cold and hot water circulation system for pipe part test according to claim 1, which is characterized in that described It is respectively provided between cold water booster pump, the water outlet of hot water booster pump and two water inlet ends of the first electric three passes ball valve anti- The overflow valve of locking system hypertonia.
3. a kind of cold and hot water circulation system for pipe part test according to claim 1, which is characterized in that described The inlet of electric control valve is equipped with leaving water temperature sensors.
4. a kind of cold and hot water circulation system for pipe part test according to claim 1, which is characterized in that described It is connected by corrugated stainless steel tubing between the hydraulic pressure nozzle of accumulator and the water outlet of the first electric three passes ball valve, and in accumulator Hydraulic pressure nozzle at be equipped with pressure sensor.
5. a kind of cold and hot water circulation system for pipe part test according to claim 1, which is characterized in that described Manual ball valve is equipped between the water outlet and water outlet mouthpiece of first electric three passes ball valve.
6. a kind of cold and hot water circulation system for pipe part test according to claim 1, which is characterized in that described It is connected with the cooling-water machine for adjusting cold water temperature on cold water storage cistern, and is equipped with liquid level sensor, the liquid in cold water storage cistern and boiler Level sensor is connect with automatic watering apparatus.
CN201820263072.9U 2018-02-23 2018-02-23 A kind of cold and hot water circulation system for pipe part test Active CN208060354U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820263072.9U CN208060354U (en) 2018-02-23 2018-02-23 A kind of cold and hot water circulation system for pipe part test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820263072.9U CN208060354U (en) 2018-02-23 2018-02-23 A kind of cold and hot water circulation system for pipe part test

Publications (1)

Publication Number Publication Date
CN208060354U true CN208060354U (en) 2018-11-06

Family

ID=63990504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820263072.9U Active CN208060354U (en) 2018-02-23 2018-02-23 A kind of cold and hot water circulation system for pipe part test

Country Status (1)

Country Link
CN (1) CN208060354U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113533181A (en) * 2021-07-06 2021-10-22 英利能源(中国)有限公司 Design test method and device for photovoltaic module in seawater environment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113533181A (en) * 2021-07-06 2021-10-22 英利能源(中国)有限公司 Design test method and device for photovoltaic module in seawater environment

Similar Documents

Publication Publication Date Title
CN206710039U (en) It is a kind of special full-automatic to suppress equipment
CN108760279B (en) Harsh working condition valve test device capable of monitoring valve torque and sealing
CN208060354U (en) A kind of cold and hot water circulation system for pipe part test
CN108088749A (en) Pipeline pressure testing device and pipeline pressure pilot system
WO2024082961A1 (en) Temporary thermal power station boiler water pressure test system
CN109506928B (en) Valve pressing test method
CN217237113U (en) Quick leak detection system for tube type heat exchanger
CN103884472A (en) Die leakage detection device
CN213022649U (en) Explosion-proof motor hydrostatic test device with drainage function
KR101477577B1 (en) The water pressure cap for pressure testing a pipe
CN216144463U (en) Valve gas tightness detection device
CN207599062U (en) Safety valve with emulsion recycling function
CN113176047A (en) Sealing section detection device and method
CN209559444U (en) A kind of pipeline or die waterway intelligence detecting leakage press flow measuring system
CN208254746U (en) Pressure test tool
CN203069333U (en) Cooler water leakage on-line detection device
CN108489831A (en) A kind of cold and hot water cycle test equipment
CN111721040A (en) Method for overhauling and cleaning blockage of expansion valve of heat pump unit
CN214373190U (en) Integrated device for pressure test
CN203732410U (en) Hose testing machine
CN220508185U (en) Novel flowmeter calibration device
CN202994387U (en) Mold oil channel leakage detection device
CN216788841U (en) Test device and test system
KR890004368B1 (en) Checking of leakage
CN209672072U (en) A kind of detection positioning device of pressure pipeline leak source

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant