CN208056643U - What a kind of leakage of fire cistern pipeline was buried remedies constructing device - Google Patents

What a kind of leakage of fire cistern pipeline was buried remedies constructing device Download PDF

Info

Publication number
CN208056643U
CN208056643U CN201820056752.3U CN201820056752U CN208056643U CN 208056643 U CN208056643 U CN 208056643U CN 201820056752 U CN201820056752 U CN 201820056752U CN 208056643 U CN208056643 U CN 208056643U
Authority
CN
China
Prior art keywords
wall
buried
remedies
template
pipe laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820056752.3U
Other languages
Chinese (zh)
Inventor
孙学柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Silver Guangsha Group Ltd
Original Assignee
Silver Guangsha Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Silver Guangsha Group Ltd filed Critical Silver Guangsha Group Ltd
Priority to CN201820056752.3U priority Critical patent/CN208056643U/en
Application granted granted Critical
Publication of CN208056643U publication Critical patent/CN208056643U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model is related to fire cistern pipelines to leak the construction equipment buried, the problem of pipeline location is buried in wall leakage can not be filled up for existing, provide that a kind of leakage of fire cistern pipeline buries remedies constructing device, it includes being arranged in wall both sides and the rack template that covers the position in wall leakage pipe laying road, rack template is fixed by fastener and wall, rack template is connected with the conveying part for grouting, further includes the drilling part that reinforced hole is dug at the position in wall leakage pipe laying road.The both sides that wall is leaked to the position in pipe laying road by two pieces of rack templates cover, to facilitate cement injection slurry to be filled up, fixing piece is first passed through to be fixed on rack template at the position in wall leakage pipe laying road, and the conveying part poured is connected on one piece of rack template wherein, conveying part fills up the position in wall leakage pipe laying road, reinforced hole is dug by drilling part, the cement slurry filled up and the direct connectivity of wall can be enhanced, to improve the stability that pipeline location is buried in repairing leakage.

Description

What a kind of leakage of fire cistern pipeline was buried remedies constructing device
Technical field
The utility model is related to fire cistern pipelines to leak the construction equipment buried, more specifically, it relates to a kind of fire water What pond pipeline leakage was buried remedies constructing device.
Background technology
Fire cistern is manually built for fixed or movable fire-fighting water pumping water water storage facility, and fire cistern needs logical Pond pipeline is crossed to connect with indoor fire-fighting facility.
It generally requires to hole on wall when fire cistern Pipe installing, before installation, but during practice of construction, by It slips up in design-calculated, some mounting holes dug can leak pipe laying road, asking for infiltration and leak occur so as to cause wall Topic, therefore, there is an urgent need for a kind of devices of the wall in repairing leakage pipe laying road at present.
Utility model content
In view of the deficienciess of the prior art, buried the purpose of this utility model is to provide a kind of leakage of fire cistern pipeline Constructing device is remedied, has the advantages that repairing wall leakage buries pipeline location.
To achieve the above object, the utility model provides following technical solution:
What a kind of leakage of fire cistern pipeline was buried remedies constructing device, including the rack template in wall both sides is arranged, described Rack template covers the position in wall leakage pipe laying road, and the rack template is fixed by fastener and wall, the holder mould Plate is connected with the conveying part towards grouting at the position in wall leakage pipe laying road, and what the fire cistern pipeline leakage was buried remedies construction dress Set further includes digging the drilling part for having reinforced hole at the position in wall leakage pipe laying road.
Using above-mentioned technical proposal, the both sides that wall is leaked to the position in pipe laying road by two pieces of rack templates cover, To facilitate the cement injection slurry at the position in wall leakage pipe laying road to be filled up, rack template is fixed by fastener first At the position in wall leakage pipe laying road, and it is communicated with the conveying part poured on one piece of rack template wherein, by defeated Materials and parts fill up the position in wall leakage pipe laying road, and are directly connect with wall to enhance the cement slurry filled up Property, worker can dig reinforced hole on the side wall for the position that wall leaks pipe laying road by drilling part, to improve repairing leakage pipe laying The stability of road position.
Preferably, the drilling part includes drill bit, and the working end of the drill bit is sharply arranged.
Using above-mentioned technical proposal, the side wall for burying pipeline location to wall leakage by drill bit is dug, and end is worked at the same time Sharp setting so that drill bit preferably digs wall.
Preferably, the one end of the drill bit far from tip is equipped with lever.
Using above-mentioned technical proposal, lever facilitates operation drill bit to carry out the side wall of the position in wall leakage pipe laying road It digs.
Preferably, the conveying part is connected to by feed pipe for mortar through rack template and with the position in wall leakage pipe laying road, institute State the position force piece for being equipped in conveying part and slurry being driven to enter wall leakage pipe laying road.
Using above-mentioned technical proposal, cement slurry is injected to realize the position to the leakage pipe laying road in the position that wall leaks pipe laying road It sets and is repaired, cement slurry is provided by conveying part, and by feed pipe for mortar under the driving of force piece, cement slurry is by conveying The position that part is input to wall leakage pipe laying road is repaired, easy to operate.
Preferably, the fastener is through rack template and to penetrate wall with the cement nail of fixing bracket template.
Using above-mentioned technical proposal, cement nail is typically to be made of carbon steel, and hardness is big, thick and short, and ability of giving a farfetched interpretation is strong, It is easy to install and use.
Preferably, drawstring is equipped between two pieces of rack templates, the drawstring is equipped with sealing piece.
Using above-mentioned technical proposal, sealing piece has the function of that there is the high resiliency of rubber and compression to become for waterproof, sealing piece The characteristics of shape, generates flexible deformation under various load, to play effective fit sealing, prevent building structure leak, Infiltration and cushioning buffer effect, it is easy to operate between sealing piece is positioned over two pieces of rack templates by drawstring, and drawstring Cost is low, is easy to get, to reduce the loss of building materials.
Preferably, the drawstring is to be detachably connected with rack template, and the rack template is equipped with consolidating for fixed pulling rope Determine part.
Using above-mentioned technical proposal, drawstring is detachably connected with rack template, so that leaking pipe laying having repaired wall Behind the position in road, rack template can be dismantled, since drawstring has part to be located in the position for having repaired wall leakage pipe laying road, can be incited somebody to action Drawstring is detached with rack template, to facilitate the dismounting and use next time of rack template, while during repairing, is led to Fixing piece fixed pulling rope and rack template are crossed, the stability of drawstring is improved.
Preferably, the drawstring runs through rack template, and the fixing piece includes the glue being attached on drawstring on rack template Band.
Using above-mentioned technical proposal, adhesive tape has being longitudinally extended property and the anti-tear performance of good transverse direction, and self-adhesion is taken Connecing property is excellent, and drawstring can be attached on rack template by adhesive tape fixed pulling rope, when needing removal bracket template, by adhesive tape It tears, it is easy to operate.
In conclusion the utility model has the advantages that:
1. by the way that rack template branch to be located to the position in wall leakage pipe laying road and is covered to the position, it is connected to later defeated Materials and parts are in the milk to the position, to be repaired to the position, and the flatness of the preferable control surface of energy, it is ensured that work The quality of journey, easy to operate, construction is simple have preferable applicability;
2. rack template is also detachably reused, reduce the loss of building materials, energy conservation and environmental protection reduces cost payout, drop Low project cost;
3. the position for leaking pipe laying road to wall by sealing piece carries out waterproof action, and passes through drawstring pair in installation process The position of sealing piece is defined, and the cost of drawstring is low, is easy to get, to reduce the loss of building materials.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the portions the A enlarged drawing of Fig. 1;
Fig. 3 is the structural schematic diagram of drilling part in the utility model;
Fig. 4 is the schematic diagram for illustrating material conveying box internal structure in the utility model.
In figure:1, rack template;11, sealing rubber layer;2, fastener;21, cement nail;3, conveying part;31, material conveying box; 32, helical blade;33, motor;34, feed pipe for mortar;35, force piece;5, drawstring;6, sealing piece;7, fixing piece;71, adhesive tape;8, it bores Orifice;81, drill bit;82, helicla flute;83, lever;9, wall;91, reinforced hole.
Specific implementation mode
With reference to the accompanying drawings and embodiments, the utility model is described in detail.
What a kind of leakage of fire cistern pipeline was buried remedies constructing device, and referring to Fig. 1, Fig. 2 and Fig. 3, including setting is in 9 liang of wall The rack template 1 of side, two pieces of rack templates 1 are fixed on wall 9 by fastener 2 and wall 9 are leaked to the hole progress in pipe laying road It covers, it further includes leaking pipe laying road through rack template 1 and with wall 9 that the leakage of fire cistern pipeline was buried in addition, which remedies constructing device, The conveying part 3 of hole connection, the sky being made up of to the hole in the leakage pipe laying of wall 9 road and two pieces of rack templates 1 conveying part 3 Interior cement injection slurry, at the same in order to enhance perfusion cement slurry and wall 9 connectivity, by drilling part 8 in wall The side wall that body 9 leaks the hole in pipe laying road offers the reinforced hole 91 extended radially towards wall 9 along hole, portion's hole to improve Stability.
Drilling part 8 includes drill bit 81, and the working end of drill bit 81 is sharply arranged, and the outer wall of drill bit 81 is equipped with helicla flute 82, being formed by aggregate chips by 81 dug reinforced hole 91 of drill bit can drain from helicla flute 82, in addition in drill bit 81 far from tip One end be additionally provided with the lever 83 for facilitating operation drill bit 81 to punching, the size of lever 83 is more than the diameter of drill bit 81 To area.
Referring to Fig. 1 and Fig. 4, conveying part 3 includes the material conveying box 31 containing cement slurry, is rotated in material conveying box 31 and is equipped with stirring The helical blade 32 of cement slurry, while being equipped with the motor 33 of rotation helical blade 32, material conveying box 31 at the top of material conveying box 31 Rack template 1 and and wall are run through in the feed pipe for mortar 34 being connected to clinker case equipped with one, the one end of feed pipe for mortar 34 far from material conveying box 31 Body 9 leaks the hole connection in pipe laying road, while the one end of feed pipe for mortar 34 far from material conveying box 31 is threadedly coupled with rack template 1, to Realization feed pipe for mortar 34 is detachably connected with rack template 1.
It is additionally provided on feed pipe for mortar 34 and cement slurry is pumped to moving in the hole for leaking pipe laying road into wall 9 by feed pipe for mortar 34 Power part 35, force piece 35 are cement pump.
Fastener 2 includes the cement nail 21 for running through rack template 1 and being inserted into wall 9 with fixing bracket template 1, cement nail 21 It is typically made of carbon steel, hardness is big, thick and short, and penetration power is strong, easy to install and use.
Drawstring 5 is equipped between two pieces of rack templates 1, drawstring 5 is equipped with and is fixed with sealing piece 6, and sealing piece 6 is parallel to holder Template 1 is arranged, and drawstring 5 runs through the rack template 1 of both sides, to realize being detachably connected for drawstring 5 and rack template 1, together When the fixing piece 7 of fixed pulling rope 5 is equipped on rack template 1, fixing piece 7 is to stick drawstring 5 and be fixed on rack template 1 Adhesive tape 71, in addition, by adjusting the position of drawstring 5 so that sealing piece 6 is located at the centre position of two pieces of rack templates 1.
Two pieces of rack templates 1 are additionally provided with sealing rubber layer 11 close to the side of wall 9.
Specific work process:When encountering the case where leakage of fire cistern pipeline is buried, pipe laying road can be leaked by wall 9 now Hole goes out the rack template 1 installed for covering hole, and rack template 1 is fixed with fastener 2, while in setting holder When template 1, adjustment drawstring 5 makes sealing piece 6 be located at position between two pieces of rack templates 1, and keeps drawstring 5 tight, adjusts After whole, drawstring 5 is fixed using adhesive tape 71.
Feed pipe for mortar 34 is connect with rack template 1 later, is pumped the cement in material conveying box 31 into wall by cement pump Body 9 leaks in the hole and two pieces of 1 formed spaces of rack template in pipe laying road, and after cement slurry hardening, extremely come unglued band 71, removes Rack template 1, and the part of template that drawstring 5 is longer than to cement slurry formation is wiped out with tool, formwork is convenient, can subtract significantly The labor intensity of few construction personnel, rack template 1 can also be used repeatedly after dismantling, and reduce the loss of building materials.
The stability in perforations adding hole in order to improve, worker can be leaked using drilling part 8 in wall 9 before installing rack template 1 Several reinforced holes 91 are dug at the hole in pipe laying road, increase the connectivity between institute's cement injection slurry and wall 9, to improve The stability of repaired hole.
The sealing piece 6 being arranged between two pieces of templates can play the role of waterproof, and sealing piece 6 has the high resiliency of rubber The characteristics of with compressive deformation, generates flexible deformation under various load, to play the role of effective fit sealing, prevents from building Leak, infiltration and the cushioning buffer effect of building structure.
Sealing rubber layer 11 on rack template 1 can push against wall 9 so that be filled at the hole for leaking pipe laying road toward wall 9 The effect that sealing can be played when cementing slurry, to reduce the leakage of cement slurry.
The above is only the preferred embodiment of the utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (8)

  1. What 1. a kind of fire cistern pipeline leakage was buried remedies constructing device, it is characterized in that:Including the holder in wall (9) both sides is arranged Template (1), the rack template (1) cover the position in wall (9) leakage pipe laying road, and the rack template (1) passes through fastener (2) fixed with wall (9), the rack template (1) is connected with the conveying part towards grouting at the position in wall (9) leakage pipe laying road (3), it further includes digging to have at the position in wall (9) leakage pipe laying road to add that the fire cistern pipeline leakage was buried, which remedies constructing device, The drilling part (8) of solid hole (91).
  2. What 2. a kind of fire cistern pipeline leakage according to claim 1 was buried remedies constructing device, it is characterized in that:The drilling Part (8) includes drill bit (81), and the working end of the drill bit (81) is sharply arranged.
  3. What 3. a kind of fire cistern pipeline leakage according to claim 2 was buried remedies constructing device, it is characterized in that:The drill bit (81) one end far from tip is equipped with lever (83).
  4. What 4. a kind of fire cistern pipeline leakage according to claim 1 was buried remedies constructing device, it is characterized in that:The conveying The position that part (3) leaks pipe laying road by feed pipe for mortar (34) through rack template (1) and with wall (9) is connected to, the conveying part (3) In be equipped with the force piece (35) of the position for driving cement slurry to enter wall (9) leakage pipe laying road.
  5. What 5. a kind of fire cistern pipeline leakage according to claim 1 was buried remedies constructing device, it is characterized in that:The fastening Part (2) is through rack template (1) and to penetrate wall (9) with the cement nail (21) of fixing bracket template (1).
  6. What 6. a kind of fire cistern pipeline leakage according to claim 1 was buried remedies constructing device, it is characterized in that:Described in two pieces Drawstring (5) is equipped between rack template (1), the drawstring (5) is equipped with sealing piece (6).
  7. What 7. a kind of fire cistern pipeline leakage according to claim 6 was buried remedies constructing device, it is characterized in that:The drawstring (5) it is to be detachably connected with rack template (1), the rack template (1) is equipped with the fixing piece (7) of fixed pulling rope (5).
  8. What 8. a kind of fire cistern pipeline leakage according to claim 7 was buried remedies constructing device, it is characterized in that:The drawstring (5) run through rack template (1), the fixing piece (7) includes the adhesive tape (71) drawstring (5) being attached on rack template (1).
CN201820056752.3U 2018-09-05 2018-09-05 What a kind of leakage of fire cistern pipeline was buried remedies constructing device Expired - Fee Related CN208056643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820056752.3U CN208056643U (en) 2018-09-05 2018-09-05 What a kind of leakage of fire cistern pipeline was buried remedies constructing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820056752.3U CN208056643U (en) 2018-09-05 2018-09-05 What a kind of leakage of fire cistern pipeline was buried remedies constructing device

Publications (1)

Publication Number Publication Date
CN208056643U true CN208056643U (en) 2018-11-06

Family

ID=63994414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820056752.3U Expired - Fee Related CN208056643U (en) 2018-09-05 2018-09-05 What a kind of leakage of fire cistern pipeline was buried remedies constructing device

Country Status (1)

Country Link
CN (1) CN208056643U (en)

Similar Documents

Publication Publication Date Title
CN107387123B (en) The construction method of pressure grouting leak stopping is carried out for shield duct piece piece leakage phenomenon
CN101666234B (en) Fracture rock no-slurry-blocking wall compound grouting construction method
CN102536253A (en) Construction method of earth cabin back filling and cabin entering operation during earth pressure shielding
CN106480993B (en) Administration structure and construction method in a kind of construction exterior wall leak repairing reinforcement
CN101936113A (en) Method for grouting sealing of gap between steel door frame of protective sealed door and wall
CN106284295A (en) Multichannel high-pressure vibro-grouting jet groutinl construction method
CN111927505A (en) Waterproof and leaking stoppage construction method for subway tunnel cracks
RU2382883C1 (en) Erection method of filling connection strap
CN103437779B (en) The construction method of regulation tunnel lining pore gas flow
CN208056643U (en) What a kind of leakage of fire cistern pipeline was buried remedies constructing device
CN110259465A (en) A kind of method that list shield double mode TBM pre-grouting reinforces fault belt
CN106284342A (en) Mechanical agitation type expands body anti-float anchor rod construction method
CN109235668A (en) Residential building curtain wall and wall crack plugging structure
CN112195970A (en) River-crossing tunnel engineering waterproof construction method
JPH02153199A (en) Water-proof treatment of tunnel
CN109681243B (en) Comprehensive restoration method for tunnel lining two-lining concrete waterproof board exposure
CN207864776U (en) A kind of jacking construction structure
JP2000096989A (en) Air bleeder device in secondary lining of tunnel
CN105888702B (en) Waterproofing Technology of Underground Works method
KR101745363B1 (en) complex Temporary utility and its construction Method
CN104988981B (en) A kind of well construction method of riding on present situation operation shield method drainage pipeline
KR100795849B1 (en) Nature stone engineering method use self drilling nail
Hognestad et al. Pre‐excavation grouting in rock tunneling–Dealing with high groundwater pressures
JP5528200B2 (en) Groundwater level lowering method using well points
CN104975623A (en) Non-excavation leaking inspection well repairing method and repairing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181106