CN208056578U CN201721324208.4U CN201721324208U CN208056578U CN 208056578 U CN208056578 U CN 208056578U CN 201721324208 U CN201721324208 U CN 201721324208U CN 208056578 U CN208056578 U CN 208056578U
Authority
CN
China
Prior art keywords
upright bar
fixes sleeve
combined type
pin bushing
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721324208.4U
Other languages
Chinese (zh)
Inventor
陈兆蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fan Xiaodong
Original Assignee
Suzhou Li Remember Mechanical Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Li Remember Mechanical Engineering Technology Co Ltd filed Critical Suzhou Li Remember Mechanical Engineering Technology Co Ltd
Priority to CN201721324208.4U priority Critical patent/CN208056578U/en
Application granted granted Critical
Publication of CN208056578U publication Critical patent/CN208056578U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of civil engineering combined type scaffolds,Including upright bar,Movable hitch,Fixed link,Pin bushing and fixes sleeve,The upright bar upper and lower side is welded with orthogonal fixes sleeve,Two adjacent upright bars are fixedly connected by the fixed link being plugged in fixes sleeve,The fixes sleeve upper and lower side outer wall is equipped with nut,Upright bar upper end inner wall is welded with pin bushing,Standing platform is installed at the top of the pin bushing,And standing platform is fixed on by bolt on pin bushing,The upright bar inner wall of the standing platform upper end offers slot,And limited block is installed in slot,The limited block is connected to by spring on upright bar inner wall,The movable sleeve retaining ring is connected on upright bar lower end,It is rotatably connected to fixing bracket on the outside of the activity hitch,The fixing bracket is rotatably connected on movable sleeve by rotation axis and buckles.The utility model is a kind of combined type scaffold, is easily installed and dismantles, and connect with ground and more consolidates, safety is higher.

Description

A kind of civil engineering combined type scaffold
Technical field
The utility model is related to civil engineering plant technical field, specially a kind of civil engineering combined type scaffold.
Background technology
In Construction of Civil Engineering, scaffold can assist staff to construct to eminence, but while construction, There are certain danger for working at height, so scaffold just needs stronger stability, during transport, due to construction The volume of frame is larger, certain influence caused by transport, and the utility model possesses stability height and is easy for installation and removal Advantage improves safety and saves human resources.
Utility model content
The purpose of this utility model is to provide a kind of civil engineering combined type scaffolds, have and are easily installed, dismantle The high advantage with stability solves the problems, such as that transport difficult and safety are relatively low.
To achieve the above object, the utility model provides the following technical solutions:A kind of civil engineering combined type scaffold, It is welded with orthogonal solid including upright bar, movable hitch, fixed link, pin bushing and fixes sleeve, the upright bar upper and lower side Determine sleeve, adjacent two upright bars are fixedly connected by the fixed link being plugged in fixes sleeve, in the fixes sleeve Lower end offers hole, and bolt is plugged in hole, and the fixes sleeve upper and lower side outer wall is equipped with nut, and nut and bolt It is connected through a screw thread, upright bar upper end inner wall is welded with pin bushing, and standing platform, the station are equipped at the top of the pin bushing Vertical platform bottom end quadrangle is welded with bolt, and standing platform is fixed on by bolt on pin bushing, the standing platform The upright bar inner wall of upper end offers slot, and limited block is equipped in slot, and the limited block is connected to by spring on upright bar inner wall, The movable sleeve retaining ring is connected on the lower end of upright bar, and fixing bracket, the fixing bracket are rotatably connected on the outside of the activity hitch Movable sleeve is rotatably connected on by rotation axis to buckle.
Preferably, the upright bar bottom end is installed by welding with upright bar bottom plate.
Preferably, the fixing bracket bottom end is installed by welding with holder bottom plate.
Preferably, the movable sleeve buckle back is plugged with fixing bolt from rotation axis side.
Preferably, ladder is installed between the fixed link and standing platform.
Preferably, the fixes sleeve upper and lower side offers hole respectively, and nut-welding is fixed on the side of fixes sleeve.
Compared with prior art, the beneficial effects of the utility model are as follows:
1, the utility model has achieved the effect that fixed support, fixing bracket improve construction by the way that fixing bracket is arranged The stability of frame makes scaffold whole even closer with being bonded for ground, when preventing construction personnel's operation, scaffold crank It causes to collapse, cause danger.
2, the utility model has achieved the effect that be easily installed and dismantle standing platform by setting bolt and pin bushing, Standing platform requires certain support force since area is larger, so standing platform is more heavier, in peace installation and dismantling The trouble that can compare when unloading can very easily install fixed standing platform by the bolt of standing platform bottom.
3, the utility model has achieved the effect that firm standing platform, when standing platform is installed to by the way that limited block is arranged After on pin bushing, spring pops up limited block, is stuck in the upper surface of standing platform, can preferably fix standing platform, prevents It only installs not enough to consolidate and causes danger.
4, the utility model is by being arranged fixes sleeve, reached be easily installed with fixed effect, fixes sleeve can be with Flexible installation and removal fixed link improves the efficiency of work and saves human resources, while the scaffold assembling also improved Flexibility and adaptability.
Description of the drawings
Fig. 1 is the main structure diagram of the utility model;
Fig. 2 is the side structure schematic view of the utility model;
Fig. 3 is the A structure enlargement diagrams of the utility model;
Fig. 4 is the B structure enlarged diagram of the utility model;
Fig. 5 is the fixes sleeve structural schematic diagram of the utility model.
In figure:1- upright bars;2- standing platforms;3- activity hitch;4- fixing brackets;5- holder bottom plates;6- upright bar bottom plates;7- Fixed link;8- ladders;9- pin bushings;10- fixes sleeves;11- springs;12- limited blocks;13- bolts;14- fixing bolts;15- Rotation is taken out;16- nuts;17- bolts.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
It please refers to Fig.1 to 5, a kind of embodiment provided by the utility model:A kind of civil engineering combined type scaffold, packet It includes upright bar 1, movable hitch 3, fixed link 7, pin bushing 9 and fixes sleeve 10,1 upper and lower side of upright bar and is welded with orthogonal solid Determine sleeve 10, for installing fixed link 7, adjacent two upright bars 1 are fixed by the fixed link 7 being plugged in fixes sleeve 10 to be connected It connects, 10 upper and lower side of fixes sleeve offers hole, and bolt 17 is plugged in hole, and 10 upper and lower side outer wall of fixes sleeve is equipped with spiral shell Mother 16,10 upper and lower side of fixes sleeve offers hole respectively, and nut 16 is weldingly fixed on the side of fixes sleeve 10, and nut 16 Be connected through a screw thread with bolt 17, by bolt 17 can by fixed link 7 it is even closer be mounted on fixes sleeve 10 in, upright bar 1 upper end inner wall is welded with pin bushing 9, and 9 top of pin bushing is equipped with standing platform 2, and 2 bottom end quadrangle of standing platform is welded with slotting Pin 13, and standing platform 2 is fixed on by bolt 13 on pin bushing 9, standing platform 2 is same by being plugged in pin bushing 9 When also play fixed function to upright bar 1, while being plugged on the stability that standing platform 2 is also improved inside pin bushing 9, 1 inner wall of upright bar of 2 upper end of standing platform offers slot, and limited block 12 is equipped in slot, and limited block 12 is connected by spring 11 On 1 inner wall of upright bar, limited block 12 also plays the fixed function to standing platform 2, and movable hitch 3 is socketed under upright bar 1 End, 3 outside of movable hitch are rotatably connected to fixing bracket 4, and 4 bottom end of fixing bracket is installed by welding with holder bottom plate 5, increases With the contact area on ground, whole stability is improved, fixing bracket 4 is rotatably connected on movable hitch 3 by rotation axis 15 On, movable hitch 3 is plugged with fixing bolt 14 away from 15 side of rotation axis, and 1 bottom end of upright bar is installed by welding with upright bar bottom plate 6, Ladder 8 is installed between fixed link 7 and standing platform 2, facilitates construction personnel to climb up standing platform 2 and constructs.
Operation principle:In utility model works, fixed link 7 is plugged in fixes sleeve 10 by operating personnel, by solid The bolt 17 for determining 10 upper and lower ends of sleeve is fixed, and fixing bracket 4 is prevented from being bonded with ground, is adjusted by movable hitch 3 Movable hitch 3 is fixed in upright bar 1 by corresponding position, rotary fixing screw bolt 14, and upright bar 1 and fixed link 7 will stand after installation is complete Vertical platform 2 is plugged on pin bushing 9, when limited block 12 pops up, indicates that standing platform 2 has firmly installed, operating personnel are logical It crosses ladder 8 and climbs up on standing platform 2 and construct.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing in the equivalent requirements of the claims will be fallen All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.

Claims (6)

1. a kind of civil engineering combined type scaffold, including upright bar (1), movable hitch (3), fixed link (7), pin bushing (9) With fixes sleeve (10), it is characterised in that:Upright bar (1) upper and lower side is welded with orthogonal fixes sleeve (10), phase Two adjacent upright bars (1) are fixedly connected by the fixed link (7) being plugged in fixes sleeve (10), the fixes sleeve (10) upper and lower side offers hole, and bolt (17) is plugged in hole, and fixes sleeve (10) the upper and lower side outer wall is equipped with spiral shell Female (16), and nut (16) is connected through a screw thread with bolt (17), upright bar (1) upper end inner wall is welded with pin bushing (9), institute It states and standing platform (2) is installed at the top of pin bushing (9), standing platform (2) the bottom end quadrangle is welded with bolt (13), and stands Vertical platform (2) is fixed on by bolt (13) on pin bushing (9), and upright bar (1) inner wall of standing platform (2) upper end is opened Limited block (12) is installed equipped with slot, and in slot, the limited block (12) is connected to by spring (11) on upright bar (1) inner wall, The activity hitch (3) is socketed in the lower end of upright bar (1), and fixing bracket (4) is rotatably connected on the outside of the activity hitch (3), The fixing bracket (4) is rotatably connected on by rotation axis (15) on movable hitch (3).
2. a kind of civil engineering combined type scaffold according to claim 1, it is characterised in that:Upright bar (1) bottom End is installed by welding with upright bar bottom plate (6).
3. a kind of civil engineering combined type scaffold according to claim 1, it is characterised in that:The fixing bracket (4) bottom end is installed by welding with holder bottom plate (5).
4. a kind of civil engineering combined type scaffold according to claim 1, it is characterised in that:The activity hitch (3) it is plugged with fixing bolt (14) away from rotation axis (15) side.
5. a kind of civil engineering combined type scaffold according to claim 1, it is characterised in that:The fixed link (7) Ladder (8) is installed between standing platform (2).
6. a kind of civil engineering combined type scaffold according to claim 1, it is characterised in that:The fixes sleeve (10) upper and lower side offers hole respectively, and nut (16) is weldingly fixed on the side of fixes sleeve (10).
CN201721324208.4U 2017-10-16 2017-10-16 A kind of civil engineering combined type scaffold Active CN208056578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721324208.4U CN208056578U (en) 2017-10-16 2017-10-16 A kind of civil engineering combined type scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721324208.4U CN208056578U (en) 2017-10-16 2017-10-16 A kind of civil engineering combined type scaffold

Publications (1)

Publication Number Publication Date
CN208056578U true CN208056578U (en) 2018-11-06

Family

ID=63997575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721324208.4U Active CN208056578U (en) 2017-10-16 2017-10-16 A kind of civil engineering combined type scaffold

Country Status (1)

Country Link
CN (1) CN208056578U (en)

Similar Documents

Publication Publication Date Title
TWI506190B (en) A?high-rise safety construction lifting platform
CN204590654U (en) A kind of dish button adjustable formwork bracing frame
CN109235861A (en) A kind of fabricated scaffold applied to small sized multiple story building
CN206667730U (en) A kind of scalable suspension scaffold of socket joint type disk button
CN101736896B (en) Cross-plate scaffold
CN105421757B (en) A kind of bowl buckle joint of total sub-semigroup
CN208056578U (en) A kind of civil engineering combined type scaffold
CN207003981U (en) A kind of movable altitude operation protective frame with safety supports
CN204311717U (en) Detachable combined Mobile operating platform
CN205206267U (en) Safe multi -functional scaffold
CN202031313U (en) Supporting connection structure for overhanging scaffold
CN109339470B (en) Outward-extending type support structure for horizontally connecting object net outside frame
CN207513125U (en) Self assembling type steel pipe scaffold
CN203361590U (en) Folding scaffold special for electric power construction
CN207092504U (en) A kind of scaffold for building
CN213062899U (en) Wheel buckle type scaffold connecting structure
CN205369892U (en) Bowl lock joint head of formula scaffold is detained to bowl
CN206016219U (en) A kind of construction operation platform for adapting to different gradient roofing
CN209194967U (en) A kind of construction combined type hanging cage
CN203922533U (en) A kind of anti-deformation climbing support safety device
CN209653333U (en) A kind of multifunctional wall body constructing operation frame
CN207436889U (en) A kind of special detachable cat ladder of hydraulic engineering
CN206495486U (en) A kind of means for fastening scaffolding
CN109898816A (en) A kind of housing construction scaffold
CN201574572U (en) Angle-adjustable hanging rack for operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200828

Address after: Room 02, building B, Houlong community, Zhangcheng Town, Yongtai County, Fuzhou City, Fujian Province

Patentee after: Fujian Shisheng Construction Engineering Co.,Ltd.

Address before: Room 1-077 of 2 buildings in Hefang, Xukou Town, Wuzhong District, Suzhou City, Jiangsu Province

Patentee before: SUZHOU LIJIDE MECHANICAL ENGINEERING TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240507

Address after: 231199 Min Zu, Gangdong Village, Lianhe Village, Luotang Township, Changfeng County, Hefei City, Anhui Province

Patentee after: Fan Xiaodong

Country or region after: China

Address before: 350700 room 02, building B, Houlong community, Zhangcheng Town, Yongtai County, Fuzhou City, Fujian Province

Patentee before: Fujian Shisheng Construction Engineering Co.,Ltd.