CN208056045U - A kind of continuous forced-ventilated pipe device - Google Patents

A kind of continuous forced-ventilated pipe device Download PDF

Info

Publication number
CN208056045U
CN208056045U CN201820495307.7U CN201820495307U CN208056045U CN 208056045 U CN208056045 U CN 208056045U CN 201820495307 U CN201820495307 U CN 201820495307U CN 208056045 U CN208056045 U CN 208056045U
Authority
CN
China
Prior art keywords
forced
water pipe
ventilated
ventilated water
end connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820495307.7U
Other languages
Chinese (zh)
Inventor
汤连生
王玉玺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sun Yat Sen University
Original Assignee
Sun Yat Sen University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sun Yat Sen University filed Critical Sun Yat Sen University
Priority to CN201820495307.7U priority Critical patent/CN208056045U/en
Application granted granted Critical
Publication of CN208056045U publication Critical patent/CN208056045U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model is related to a kind of continuous forced-ventilated pipe devices, including forced-ventilated water pipe Outer Tube, forced-ventilated water pipe interior conduit, air inlet pipe, vacuum source, upper end connector and lower end connector, the wherein described forced-ventilated water pipe interior conduit, vacuum source are arranged in forced-ventilated water pipe Outer Tube, upper end connector and lower end connector respectively block the top and bottom of forced-ventilated water pipe Outer Tube, and opening is offered on upper end connector and lower end connector;One end of forced-ventilated water pipe interior conduit connects and is connected to the outlet side of vacuum source, and the other end of forced-ventilated water pipe interior conduit is pierced by upper end connector by the opening on upper end connector;One end of air inlet pipe is penetrated in forced-ventilated water pipe Outer Tube by the opening of lower end connector, and is connect with the inlet end of vacuum source;The filter eye in communicating pipe is offered on the outer wall of the forced-ventilated water pipe Outer Tube, and filter membrane is coated on the forced-ventilated water pipe Outer Tube.

Description

A kind of continuous forced-ventilated pipe device
Technical field
The present invention relates to foundation drainages to consolidate field, more particularly, to a kind of continuous forced-ventilated pipe device.
Background technology
For at present, one of most common method is the strong discharging consolidation of rigid forced-ventilated water pipe in Soft Ground field Method, the method need first to vacuumize, and are sucked the water in surrounding soil in forced-ventilated water pipe by pull of vacuum and groundwater pressure, Again from air inlet pipe to draining bottom of the tube gas injection, the water in forced-ventilated water pipe is got by injecting high pressure gas;Pumping note repeatedly Gas, so that foundation drainage consolidates.
However, the patent of the existing mistake of forced-ventilated water pipe of rigid cast, all fails thoroughly to solve problems with:
(1)With regard to the gas injection after pumping, but also in entire forced-ventilated water pipe no longer while the water in forced-ventilated water pipe is got Possess vacuum(Its interior air pressure is more than an atmospheric pressure), when vacuumizing again, need first to extract the high pressure gas in drainpipe out; High pressure gas when gas injection simultaneously can be squeezed out along the filter eye of forced-ventilated water pipe, squeeze the moisture in the soil body near enhancement drainpipe; And the positive pressure that generates to water in soil of gas injection pumping repeatedly and negative pressure are repeatedly so that water discharge is discontinuous in soil, and is turning A part of construction time is wasted between alternatively, efficiency reduces.
(2)During forced-ventilated water pipe is constantly filled by the water ejected in soil, the prefabricating load of Groundwater pressure difference is made With fading away, until it is zero that it, which is pressure difference, when the complete water of forced-ventilated water pipe is full, this process makes the Groundwater pressure difference utilized It gradually decreases, has lost the prefabricating load pressure difference of draining.The deficiency of this point is a serious defect.
It can be seen that there are energy wastes is larger, the construction period is long, draining for the strong draining concretion method of existing rigidity forced-ventilated water pipe There are gap and it is inefficient the deficiencies of place.
Invention content
The present invention is to solve the technology of the existing technology for draining discontinuous, loss draining prefabricating load pressure difference to lack It falls into, research and development provide a kind of continuous forced-ventilated water installations.
To realize the above goal of the invention, the technical solution adopted is that:
A kind of continuous forced-ventilated pipe device, including the life of forced-ventilated water pipe Outer Tube, forced-ventilated water pipe interior conduit, air inlet pipe, vacuum It grows up to be a useful person, upper end connector and lower end connector, wherein the forced-ventilated water pipe interior conduit, vacuum source are arranged in forced-ventilated water pipe Outer Tube Interior, upper end connector and lower end connector respectively block the top and bottom of forced-ventilated water pipe Outer Tube, upper end connector and lower end Opening is offered on connector;One end of forced-ventilated water pipe interior conduit connects and is connected to, forced-ventilated water with the outlet side of vacuum source The other end of pipe interior conduit is pierced by upper end connector by the opening on upper end connector;It is opened by lower end connector one end of air inlet pipe Mouth penetrates in forced-ventilated water pipe Outer Tube, and is connect with the inlet end of vacuum source;On the outer wall of the forced-ventilated water pipe Outer Tube The filter eye in communicating pipe is offered, filter membrane is coated on the forced-ventilated water pipe Outer Tube.
When carrying out foundation drainage consolidation process or underground water precipitation, high pressure gas is injected to air inlet pipe, gas is given birth to from vacuum The outlet side high speed grown up to be a useful person is discharged, and negative pressure of vacuum is formed in vacuum source at this time, in the forced-ventilated waterpipe outside interior conduit Water is all emptied and quickly enters vacuum source, and constantly via forced-ventilated water pipe interior conduit follow high-speed flow together by Earth's surface is discharged, thus forms vacuum in forced-ventilated water pipe.Underground water hydraulic pressure and the common shape of negative pressure generated with vacuum source in this way At pressure difference load make foundation soil consolidation discharge water continuously enter forced-ventilated water pipe Outer Tube inside, outside forced-ventilated water pipe Water in pipeline is persistently emptied and enters in vacuum source, and continuously via forced-ventilated water pipe interior conduit with high speed Air-flow is discharged earth's surface together.Its precipitation depth can be substantially larger than 10m, and the pressure difference load for playing consolidation can be substantially larger than a vacuum Pressure remains in forced-ventilated water pipe Outer Tube, in forced-ventilated water pipe interior conduit to ground discharging consolidation excellent and empties shape State, and high vacuum state is within the scope of forced-ventilated water pipe Outer Tube overall length, Tu Zhongshui is in is discharged state always, drains Process is smooth, energy-efficient, the construction time greatly shortened.
Preferably, the opening opened up on the upper end connector and lower end connector is circular open, the size of circular open It is consistent with forced-ventilated water pipe interior conduit/outer diameter of air inlet pipe.
Preferably, the vacuum source includes nozzle and receives casing, nozzle and receives casing and is oppositely arranged, nozzle and Receive between casing that there are gaps to be connected to as external interface with forced-ventilated water pipe Outer Tube, one end of nozzle as inlet end with into Tracheae connects and connection;The one end for receiving casing connect and is connected to forced-ventilated water pipe interior conduit as outlet side.High-velocity fluid passes through After when crossing the nozzle in vacuum source, the turbulent jet of formation.In turbulent jet, due to wherein each groupuscule be make it is miscellaneous It disorderly moves, therefore the still air of their inevitably collision jet both sides, by the viscosity of fluid, drives Jetstream fluid Some air of both sides rise and travel forward, and the gas in vacuum source is taken away to form vacuum area.At vacuum area By vacuum source external tapping with inside forced-ventilated water pipe Outer Tube water and gas connect, to have pull of vacuum.Xiang Jin Tracheae persistently injects high pressure gas and carries out foundation drainage processing until reaching construction requirement.
Preferably, the vacuum source is cylindrical, the length of 100mm, a diameter of 15mm;The internal diameter of air inlet pipe is 5mm, outer diameter 7mm, a length of 12m;The internal diameter of forced-ventilated water pipe interior conduit is 7.5mm, outer diameter 9.5mm, long 9.9m;Forced-ventilated water pipe A diameter of 50mm of Outer Tube, a length of 10m;Upper end connector is in round pie, and a diameter of 50mm is highly 20mm, and center has The circular open of one a diameter of 9.5mm, lower end connector are in round pie, and a diameter of 50mm is highly 20mm, and center has always Diameter is the circular open of 7mm.
Said program is one of the device for realizing continuous strong drain function scheme, and the present invention is providing above scheme On the basis of, the scheme that can realize said function effect of another is additionally provided, specific scheme is as follows:
A kind of continuous forced-ventilated pipe device, including grating type forced-ventilated water pipe, vacuum source, upper end connector, lower end connector, Air inlet pipe;Wherein its axial direction of the outer wall upper edge of grating type forced-ventilated water pipe is etched with the drainage channel of periodic distribution, grid It is provided with filter membrane on the outer wall of formula forced-ventilated water pipe;The internal diameter of the upper end connector is equal with the outer diameter of grating type forced-ventilated water pipe, lattice The top of grating forced-ventilated water pipe is inserted in end connector, its radial direction of the inner wall upper edge of upper end connector is provided with closed loop, lattice When the top of grating forced-ventilated water pipe is inserted in end connector, closed loop carries out the top of the drainage channel of grating type forced-ventilated water pipe It is closed;The internal diameter of the lower end connector is equal with the outer diameter of grating type forced-ventilated water pipe, and the bottom end of grating type forced-ventilated water pipe is inserted in down In end connector, vacuum source is arranged in lower end connector, and the outer diameter of outlet side is equal with the internal diameter of grating type forced-ventilated water pipe, It extracts in the bottom end of grating type forced-ventilated water pipe its outlet side;Air inlet pipe is pierced by after the opening on lower end connector and vacuum source Inlet end connection and connection;Vacuum source is connected to the bottom end of the drainage channel of grating type forced-ventilated water pipe.
When carrying out foundation drainage consolidation process or underground water precipitation, high pressure gas is injected to air inlet pipe, gas is given birth to from vacuum The outlet side high speed grown up to be a useful person is discharged, and negative pressure of vacuum is formed in vacuum source at this time, in grating type forced-ventilated water pipe drainage channel Water be all emptied and quickly enter vacuum source, and constantly follow high-speed flow together via grating type forced-ventilated water pipe It is discharged earth's surface, thus forms vacuum in the drainage channel of forced-ventilated water pipe.In this way underground water hydraulic pressure and with vacuum source generate The pressure difference load that is collectively formed of negative pressure the water of foundation soil consolidation discharge is continuously entered in grating type forced-ventilated water pipe Portion, the water in grating type forced-ventilated water pipe drainage channel be persistently emptied and into vacuum source, and continuously via Grating type forced-ventilated water pipe is discharged earth's surface together with high-speed flow.Its precipitation depth can be substantially larger than 10m, play the pressure of consolidation Poor load can be substantially larger than a vacuum pressure, to ground discharging consolidation excellent, remain clear in grating type forced-ventilated water pipe Dummy status, and high vacuum state is within the scope of grating type forced-ventilated water pipe overall length, Tu Zhongshui is in is discharged state always, Drainage procedure is smooth, energy-efficient, the construction time greatly shortened.
Preferably, the grating type forced-ventilated water pipe is using the thicker pvc pipe of outer wall.
Preferably, the depth of the drainage channel of the etching accounts for the 2/3 of the wall thickness of grating type forced-ventilated water pipe.
Preferably, the lower end connector is made of pvc pipe, outside be coated with filter membrane.
Preferably, the opening on the lower end connector is circular open.
Preferably, the vacuum source includes nozzle and receives casing, nozzle and receives casing and is oppositely arranged, nozzle and Receive between casing that there are gaps to be connected to as external interface with the bottom end of the drainage channel of grating type forced-ventilated water pipe, the one of nozzle End connect and is connected to air inlet pipe as inlet end;Receive bottom end of the one end of casing as outlet side and grating type forced-ventilated water pipe Connection and connection.After high-velocity fluid is when the nozzle in vacuum source, the turbulent jet of formation.In turbulent jet, by Make random motion in wherein each groupuscule, therefore the still air of their inevitably collision jet both sides, relies on The viscosity of fluid drives some air of Jetstream fluid both sides to rise and travels forward, by the gas in vacuum source take away to Form vacuum area.It is gentle by vacuum source external tapping and the water in grating type forced-ventilated water pipe drainage channel at vacuum area Body connects, to have pull of vacuum.High pressure gas is persistently injected to air inlet pipe carries out foundation drainage processing until reaching construction It is required that.
Compared with prior art, the beneficial effects of the invention are as follows:
(1)Entire drainage procedure is completely continuous, and gas injection and pumping repeatedly, does not reduce the duration substantially, greatly saves The about energy, improves weak soil discharging consolidation efficiency.
(2)Always the weight stress of underground water is completely utilized, the process of Groundwater difference pressuring loss is not present, then folds Pull of vacuum, the constant High Pressure Difference load of formation is added to can be substantially larger than 1 atmospheric pressure, not only greatly saved energy, but also It can not be more than 10m by underground water precipitation depth to solve the problems, such as common suction pump just, and weak soil discharging consolidation effect is high.
Description of the drawings
Fig. 1 is the overall structure diagram for the continuous forced-ventilated pipe device that embodiment 1 provides.
Fig. 2 is the structural schematic diagram of vacuum source.
Fig. 3 is the structural schematic diagram of nozzle.
Fig. 4 is the horizontal section schematic diagram for the continuous forced-ventilated pipe device that embodiment 2 provides.
Fig. 5 is the overall structure diagram for the continuous forced-ventilated pipe device that embodiment 2 provides.
Specific implementation mode
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;
Below in conjunction with drawings and examples, the present invention is further elaborated.
Embodiment 1
As shown in Figure 1, present embodiments providing a kind of continuous forced-ventilated pipe device, including forced-ventilated water pipe Outer Tube 2, forced-ventilated Water pipe interior conduit 1, air inlet pipe 3, vacuum source 6, upper end connector 8 and lower end connector 9, wherein the forced-ventilated water pipe interior conduit 1, Vacuum source 6 is arranged in forced-ventilated water pipe Outer Tube 2, and upper end connector 8 and lower end connector 9 are respectively to forced-ventilated water pipe Outer Tube 2 Top and bottom blocked, offer circular open on upper end connector 8 and lower end connector 9, the size of circular open with Forced-ventilated water pipe interior conduit 1, the outer diameter of air inlet pipe 3 are consistent;One end of forced-ventilated water pipe interior conduit 1 goes out with vacuum source 6 Gas end connects and connection, the other end of forced-ventilated water pipe interior conduit 1 are pierced by upper end connector 8 by the opening on upper end connector 8;Air inlet One end of pipe 3 is penetrated by the opening of lower end connector 9 in forced-ventilated water pipe Outer Tube 2, and is connected with the inlet end of vacuum source 6 It connects;The filter eye 4 in communicating pipe is offered on the outer wall of the forced-ventilated water pipe Outer Tube 2, is coated on the forced-ventilated water pipe Outer Tube 2 There is filter membrane 5.
If soft soil foundation underground 2-10m is all pending soil layer, vacuum source 6 is to be about 100mm, a diameter of 15mm's It is cylindric;The internal diameter of air inlet pipe 3 is 5mm, outer diameter 7mm, long 12m;The internal diameter of forced-ventilated water pipe interior conduit 1 is 7.5mm, and outer diameter is 9.5mm, long 9.9m;A diameter of 50mm of forced-ventilated water pipe Outer Tube 2, long 10m;Upper end connector 8 is diameter 50mm, is highly 20mm Round pie, there is a circular open of an a diameter of 9.5mm at center, and lower end connector 9 is diameter 50mm, is highly the cake of 20mm There is the circular open of an a diameter of 7mm at shape, center.
The inlet end of vacuum source 6, outlet side are separately connected air inlet pipe 3, forced-ventilated water pipe interior conduit 1 and use raw material band And seccotine is fixed.Plastic cement is coated in outside upper end connector 8 and lower end connector 9, it is made to be each passed through forced-ventilated water pipe interior conduit 1 With air inlet pipe 3, and the top and bottom of forced-ventilated water pipe Outer Tube 2 are tightly connected to, are distributed on the forced-ventilated water pipe Outer Tube 2 Many filter eyes 4, and one layer of filter membrane 5 is surrounded by outside forced-ventilated water pipe Outer Tube 2.After ensureing all device connections and interface sealing, Device is set after determining vacuum preloading place.
When carrying out foundation drainage consolidation process or underground water precipitation, high pressure gas is injected to air inlet pipe 3, gas is given birth to from vacuum The 6 outlet side high speed of growing up to be a useful person is discharged, and forms negative pressure of vacuum in the vacuum source 6 at this time, the water in forced-ventilated water pipe Outer Tube 2 is complete Portion is emptied and quickly enters vacuum source 6, and constantly follows high-speed flow to be arranged together via forced-ventilated water pipe interior conduit 1 Go out earth's surface, thus forms vacuum in the drainage channel of forced-ventilated water pipe.It underground water hydraulic pressure and is generated in this way with vacuum source 6 negative Press the pressure difference load being collectively formed that the water of foundation soil consolidation discharge is continuously entered inside forced-ventilated water pipe Outer Tube 2, Water in forced-ventilated water pipe Outer Tube 2 is persistently emptied and enters in vacuum source 6, and continuously via in forced-ventilated water pipe Pipeline 1 is discharged earth's surface together with high-speed flow.Its precipitation depth can be substantially larger than 10m, and the pressure difference load for playing consolidation can Much larger than one vacuum pressure, to ground discharging consolidation excellent, in forced-ventilated water pipe Outer Tube 2, in forced-ventilated water pipe interior conduit 1 It remains empty, and high vacuum state is within the scope of 2 overall length of forced-ventilated water pipe Outer Tube, Tu Zhongshui is in always It is discharged state, drainage procedure is smooth, energy-efficient, the construction time greatly shortened.
As shown in Figure 2,3, mainly by nozzle 10 and receive casing 11 inside vacuum source 6 and form.10 contraction section of nozzle Angle is 30 °, and diffuser angle is 15 °, and 10 neutral straight segment length of nozzle is 10mm, and internal diameter is 2 ~ 3mm.Wherein, nozzle 10 The extended line of diffuser both wings is just met in the flat segments for receiving casing 11.High-velocity fluid is by the spray in vacuum source 6 After when mouth 10, the turbulent jet of formation.In turbulent jet, since wherein each groupuscule makees random motion, it The still airs of inevitably collision jet both sides drive some air of Jetstream fluid both sides by the viscosity of fluid It rises and travels forward, the gas in vacuum source 6 is taken away to form vacuum area.Pass through vacuum source at vacuum area 6 external tappings 7 with inside forced-ventilated water pipe Outer Tube 2 water and gas connect, to have pull of vacuum.It is persistently noted to air inlet pipe 3 Enter high pressure gas and carries out foundation drainage processing until reaching construction requirement.
Embodiment 2
As shown in Figure 4,5, a kind of continuous forced-ventilated pipe device is present embodiments provided, including grating type forced-ventilated water pipe 12, Vacuum source 6, upper end connector 15, lower end connector 16, air inlet pipe 3;Wherein its axis of the outer wall upper edge of grating type forced-ventilated water pipe 12 It is etched with the drainage channel 14 of periodic distribution to direction, filter membrane 5 is provided on the outer wall of grating type forced-ventilated water pipe 12;On described The internal diameter of end connector 15 is equal with the outer diameter of grating type forced-ventilated water pipe 12, and end connector is inserted on the top of grating type forced-ventilated water pipe 12 In 15, its radial direction of the inner wall upper edge of upper end connector 15 is provided with closed loop 17, and the top of grating type forced-ventilated water pipe 12 is inserted in When in upper end connector 15, closed loop 17 carries out the top of the drainage channel 14 of grating type forced-ventilated water pipe 12 closed;The lower end The internal diameter of connector 16 is equal with the outer diameter of grating type forced-ventilated water pipe 12, and lower end connector 16 is inserted in the bottom end of grating type forced-ventilated water pipe 12 Interior, vacuum source 6 is arranged in lower end connector 16, and the outer diameter of outlet side is equal with the internal diameter of grating type forced-ventilated water pipe 12, It extracts in the bottom end of grating type forced-ventilated water pipe 12 its outlet side;Air inlet pipe 3 is pierced by after the opening on lower end connector 16 and vacuum The inlet end of generator 6 connects and connection;Vacuum source 6 and the bottom end of the drainage channel 14 of grating type forced-ventilated water pipe 12 connect It is logical.
If soft soil foundation underground 2-10m is all pending soil layer, vacuum source 6 is to be about 100mm, a diameter of 15mm's It is cylindric;The internal diameter of air inlet pipe 3 is 5mm, outer diameter 7mm, long 12m;The internal diameter of grating type forced-ventilated water pipe 12 is 7.5mm, outer diameter For 20mm, long 9.9m, outer wall is carved with the equidistant drainage channel 14 of several depth 6mm, is grid 13 between drainage channel 14; Upper end connector 15 is internal diameter 20mm, is highly the hollow open circles column of 400mm, and it is the closed loop of 7.5mm that, which there is an internal diameter in inside, 17, for closed loop 17 away from upper end interface bottom about 300mm, lower end connector 16 is diameter 20mm, is highly the unidirectional opening of 500mm sky There is the circle interface of an a diameter of 7mm at heart cylinder, its underpart center.
The inlet end of vacuum source 6, outlet side are separately connected air inlet pipe 3, grating type forced-ventilated water pipe 12 and use raw material Band and seccotine are fixed.Lower end connector 16, grating type forced-ventilated water pipe 12 is passed through when end connector 16, to be incited somebody to action under connection air inlet pipe 3 Wait for that the filter membrane 5 of join domain, to turning over, applies one layer of plastic cement, by grid in appearance along grating type forced-ventilated water pipe 12 in its grid Formula forced-ventilated water pipe 12 and lower end connector 16 connect so that grid together with lower 16 tight union of end connector and drainage channel 14 not It is impacted, by retrousse filter membrane 5 again turn down come, make its just wrap lower end connector 16 and its with grating type forced-ventilated water pipe 12 junction.Upper end connector 15 is identical as lower end connector 16 as the connection type of grating type forced-ventilated water pipe 12, by grating type The filter membrane 5 of 12 top 300mm of forced-ventilated water pipe turns over downwards along forced-ventilated water pipe, and plastic cement is coated on all grids of top 300mm, Grating type forced-ventilated water pipe 12 is inserted at 15 depth 300mm of upper end connector so that closed loop 17 just seals up grating type forced-ventilated water The top of the drainage channel 14 of pipe 12, by the filter membrane 5 turned over downwards again roll up come, make its just wrap end connector 15 and its With the junction of grating type forced-ventilated water pipe 12.The top of upper end connector 15 connects vacuum pump simultaneously, is more efficiently completed draining. After grating type forced-ventilated water pipe 12 is connect with end connector 15 thereon and lower end connector 16, wrap up and grating type forced-ventilated on its external wall The filter membrane 5 of 12 same of water pipe makes drainage channel 14 therein have good drain function.Ensure all device connections and connects After being sealed at mouthful, device is set after determining vacuum preloading place.High pressure gas is persistently injected to air inlet pipe 3 carries out ground Drainage sunk well is until reach construction requirement.
When carrying out foundation drainage consolidation process or underground water precipitation, high pressure gas is injected to air inlet pipe 3, gas is given birth to from vacuum The 6 outlet side high speed of growing up to be a useful person is discharged, and forms negative pressure of vacuum in the vacuum source 6 at this time, the draining of grating type forced-ventilated water pipe 12 is logical Water in road 14 is all emptied and quickly enters vacuum source 6, and constantly follows height via grating type forced-ventilated water pipe 12 Fast air-flow is discharged earth's surface together, thus forms vacuum in the drainage channel of forced-ventilated water pipe.Underground water hydraulic pressure and and vacuum in this way The pressure difference load that the negative pressure that generator 6 generates is collectively formed makes the water of foundation soil consolidation discharge continuously enter grating type Inside forced-ventilated water pipe 12, the water in 12 drainage channel 14 of grating type forced-ventilated water pipe is persistently emptied and enters in vacuum source 6, And continuously via grating type forced-ventilated water pipe 12 as high-speed flow is discharged earth's surface together.Its precipitation depth can be substantially larger than 10m, the pressure difference load for playing consolidation can be substantially larger than a vacuum pressure, and to ground discharging consolidation excellent, grating type is strong Empty is remained in drainpipe 12, and is in high vacuum state within the scope of 12 overall length of grating type forced-ventilated water pipe, soil Middle water is in is discharged state always, and drainage procedure is smooth, energy-efficient, the construction time greatly shortened.
As shown in Figure 2,3, mainly by nozzle 10 and receive casing 11 inside vacuum source 6 and form.10 contraction section of nozzle Angle is 30 °, and diffuser angle is 15 °, and 10 neutral straight segment length of nozzle is 10mm, and internal diameter is 2 ~ 3mm.Wherein, nozzle 10 The extended line of diffuser both wings is just met in the flat segments for receiving casing 11.High-velocity fluid is by the spray in vacuum source 6 After when mouth 10, the turbulent jet of formation.In turbulent jet, since wherein each groupuscule makees random motion, it The still airs of inevitably collision jet both sides drive some air of Jetstream fluid both sides by the viscosity of fluid It rises and travels forward, the gas in vacuum source 6 is taken away to form vacuum area.Pass through vacuum source at vacuum area 6 external tappings 7 in 12 drainage channel 14 of grating type forced-ventilated water pipe water and gas connect, to have pull of vacuum.To air inlet Pipe 3 persistently injects high pressure gas and carries out foundation drainage processing until reaching construction requirement.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this All any modification, equivalent and improvement etc., should be included in the claims in the present invention made by within the spirit and principle of invention Protection domain within.

Claims (10)

1. a kind of continuous forced-ventilated pipe device, it is characterised in that:Including forced-ventilated water pipe Outer Tube, forced-ventilated water pipe interior conduit, air inlet Pipe, vacuum source, upper end connector and lower end connector, wherein the forced-ventilated water pipe interior conduit, vacuum source are arranged in forced-ventilated In water pipe Outer Tube, upper end connector and lower end connector respectively block the top and bottom of forced-ventilated water pipe Outer Tube, upper end Opening is offered on connector and lower end connector;One end of forced-ventilated water pipe interior conduit and the outlet side of vacuum source connect and connect Logical, the other end of forced-ventilated water pipe interior conduit is pierced by upper end connector by the opening on upper end connector;Under one end of air inlet pipe passes through The opening of end connector is penetrated in forced-ventilated water pipe Outer Tube, and is connect with the inlet end of vacuum source;The forced-ventilated water pipe outer tube The filter eye in communicating pipe is offered on the outer wall in road, and filter membrane is coated on the forced-ventilated water pipe Outer Tube.
2. continuous forced-ventilated pipe device according to claim 1, it is characterised in that:On the upper end connector and lower end connector The opening opened up is circular open, and the size of circular open is consistent with forced-ventilated water pipe interior conduit/outer diameter of air inlet pipe.
3. continuous forced-ventilated pipe device according to claim 1, it is characterised in that:The vacuum source include nozzle and Receive casing, nozzle and receive casing and be oppositely arranged, nozzle and receives between casing that there are gaps as external interface and forced-ventilated Water pipe Outer Tube is connected to, and one end of nozzle connect and is connected to air inlet pipe as inlet end;Receive one end of casing as outlet End connect and is connected to forced-ventilated water pipe interior conduit.
4. according to the continuous forced-ventilated pipe device of claim 1 ~ 3 any one of them, it is characterised in that:The vacuum source is in It is cylindric, the length of 100mm, a diameter of 15mm;The internal diameter of air inlet pipe is 5mm, outer diameter 7mm, a length of 12m;Forced-ventilated water pipe The internal diameter of interior conduit is 7.5mm, outer diameter 9.5mm, long 9.9m;A diameter of 50mm of forced-ventilated water pipe Outer Tube, a length of 10m;On End connector is in round pie, and a diameter of 50mm is highly 20mm, and there are the circular open of an a diameter of 9.5mm, lower termination in center Head is in round pie, and a diameter of 50mm is highly 20mm, and there is the circular open of an a diameter of 7mm at center.
5. a kind of continuous forced-ventilated pipe device, it is characterised in that:Including grating type forced-ventilated water pipe, vacuum source, upper end connector, Lower end connector, air inlet pipe;Wherein its axial direction of the outer wall upper edge of grating type forced-ventilated water pipe is etched with the draining of periodic distribution Channel is provided with filter membrane on the outer wall of grating type forced-ventilated water pipe;The internal diameter of the upper end connector is outer with grating type forced-ventilated water pipe Diameter is equal, and the top of grating type forced-ventilated water pipe is inserted in end connector, its radial direction of the inner wall upper edge of upper end connector is provided with When the top of closed loop, grating type forced-ventilated water pipe is inserted in end connector, drainage channel of the closed loop to grating type forced-ventilated water pipe Top carry out it is closed;The internal diameter of the lower end connector is equal with the outer diameter of grating type forced-ventilated water pipe, grating type forced-ventilated water pipe Bottom end is inserted in lower end connector, and vacuum source is arranged in lower end connector, outer diameter and the grating type forced-ventilated water pipe of outlet side Internal diameter it is equal, outlet side is extracted in the bottom end of grating type forced-ventilated water pipe;After air inlet pipe is pierced by the opening on lower end connector It connect and is connected to the inlet end of vacuum source;The bottom end of vacuum source and the drainage channel of grating type forced-ventilated water pipe connects It is logical.
6. continuous forced-ventilated pipe device according to claim 5, it is characterised in that:The grating type forced-ventilated water pipe is using outer The thicker pvc pipe of wall.
7. continuous forced-ventilated pipe device according to claim 6, it is characterised in that:The depth of the drainage channel of the etching Substantially account for the 2/3 of the wall thickness of grating type forced-ventilated water pipe.
8. continuous forced-ventilated pipe device according to claim 6, it is characterised in that:The lower end connector uses pvc pipe system At, outside be coated with filter membrane.
9. continuous forced-ventilated pipe device according to claim 5, it is characterised in that:Opening on the lower end connector is circle Shape is open.
10. according to the continuous forced-ventilated pipe device of claim 5 ~ 9 any one of them, it is characterised in that:The vacuum source Including nozzle and receive casing, nozzle and receive casing and be oppositely arranged, nozzle and receives between casing that there are gaps as external Interface is connected to the bottom end of the drainage channel of grating type forced-ventilated water pipe, and one end of nozzle connect and connected with air inlet pipe as inlet end It is logical;The one end for receiving casing connect and is connected to the bottom end of grating type forced-ventilated water pipe as outlet side.
CN201820495307.7U 2018-04-09 2018-04-09 A kind of continuous forced-ventilated pipe device Active CN208056045U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820495307.7U CN208056045U (en) 2018-04-09 2018-04-09 A kind of continuous forced-ventilated pipe device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820495307.7U CN208056045U (en) 2018-04-09 2018-04-09 A kind of continuous forced-ventilated pipe device

Publications (1)

Publication Number Publication Date
CN208056045U true CN208056045U (en) 2018-11-06

Family

ID=63985501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820495307.7U Active CN208056045U (en) 2018-04-09 2018-04-09 A kind of continuous forced-ventilated pipe device

Country Status (1)

Country Link
CN (1) CN208056045U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411892A (en) * 2018-04-09 2018-08-17 中山大学 A kind of continuous forced-ventilated pipe device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411892A (en) * 2018-04-09 2018-08-17 中山大学 A kind of continuous forced-ventilated pipe device
CN108411892B (en) * 2018-04-09 2023-12-29 中山大学 Continuous strong drain pipe device

Similar Documents

Publication Publication Date Title
CN104115586B (en) Heavy salinized ground administering method in one
CN107653931A (en) Alkaline land improvement system and method
CN207083719U (en) A kind of ancient tree deep insertion filtration irrigation device
CN107354951B (en) Light well point water collecting pipe capable of being used for hydraulic punching and using method thereof
CN111945735B (en) Microorganism alternate grouting device for soft soil solidification and use method
CN208501642U (en) A kind of water conservancy irrigation water channel with dredging function
CN202688943U (en) Self-suction drainage system for barrier lake
CN208056045U (en) A kind of continuous forced-ventilated pipe device
CN207543908U (en) A kind of Landscape water-saving irrigation device
CN202031076U (en) Compound vacuum tube well for reinforcing dredging soft soil
CN108385661B (en) Full-vacuum strong drainage device and strong drainage method
CN207004493U (en) A kind of non-mixed phase air water of low-permeability oil deposit hands over note fluctuation increasing injection device
CN108411892A (en) A kind of continuous forced-ventilated pipe device
CN204982853U (en) Aqueous vapor separation frequency conversion vacuum pre -compaction device
CN109417875A (en) A kind of hidden pipe desalinization of soil by flooding or leaching apparatus and method
CN207862937U (en) A kind of foundation surface of concrete dams and lift surface ponding remove device
CN202023185U (en) Concrete tubular pile
CN202247855U (en) Device for rapidly solidifying soft foundation
CN202000365U (en) Seepage-proof structure for underground continuous wall
CN201588205U (en) Drainage pile pipe
CN204753503U (en) Seam face drainage structures of big dam structure seam or induced seam
CN108916129B (en) A kind of efficient self-vibration air lift mud pump
CN204305748U (en) A kind of Catchwork irrigation device be applied in gardens, hillside fields
CN208830299U (en) Soft Soil Ground And Foundation waterproof/drainage structure
CN206352304U (en) Pumping well-points dewatering system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant