CN208056042U - Ram machine construction sounding gear - Google Patents

Ram machine construction sounding gear Download PDF

Info

Publication number
CN208056042U
CN208056042U CN201820342887.6U CN201820342887U CN208056042U CN 208056042 U CN208056042 U CN 208056042U CN 201820342887 U CN201820342887 U CN 201820342887U CN 208056042 U CN208056042 U CN 208056042U
Authority
CN
China
Prior art keywords
pulley blocks
pulley
arm
swing arm
installation chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820342887.6U
Other languages
Chinese (zh)
Inventor
高强
梁兴龙
朱兰花
肖普
马科
关兆龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Vibroflotation Construction Engineering Co Ltd
Original Assignee
ZHENCHONG ENGINEERING Co LTD BEIJING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENCHONG ENGINEERING Co LTD BEIJING filed Critical ZHENCHONG ENGINEERING Co LTD BEIJING
Priority to CN201820342887.6U priority Critical patent/CN208056042U/en
Application granted granted Critical
Publication of CN208056042U publication Critical patent/CN208056042U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a kind of ram machine construction sounding gear, it is mounted on the top of crane arm support, and the boom hoist cable that hook block stake machine moves up and down passes through the ram machine construction sounding gear.The ram machine construction sounding gear includes installation chassis, pulley blocks I, pulley blocks II, swing arm, swinging arm pulley group, connecting shaft and encoder;Pulley blocks I and pulley blocks II are fixed on by axis pin on installation chassis respectively;Installation chassis is fixed on crane arm support;One end of swing arm and pulley blocks II are coaxial, and can be freely rotated around the axis;The other end, swinging arm pulley group and the encoder of swing arm are linked together by connecting shaft.Boom hoist cable passes through pulley blocks I, pulley blocks II and swinging arm pulley group, moving up and down for steel wire rope drives the rotation of swinging arm pulley group, it is further driven to coaxial encoder rotation, measure the displacement distance of steel wire rope, further according to the multiplying power of the steel wire rope of hoist lifting hook stake machine, the final construction depth for obtaining suspension hook displacement distance, that is, stake machine.

Description

Ram machine construction sounding gear
Technical field
The utility model is related to a kind of devices measuring ram machine construction depth, belong to piling construction field.
Background technology
As infrastructure project construction scale is increasing, the requirement for construction quality is increasingly stringenter, in particular, Requirement for basement process is higher and higher, and more accurate, quantization is required to the construction parameter of offer.
Can quantitatively to measure ram machine construction depth, some enterprises add gear at the side plate that stake machine promotes hoist engine Rack and encoder drive encoder rotation, to extrapolate applying for a machine while hoist engine rotates by rack-and-pinion Work depth.The shortcomings that this measuring device is:1, precisely, what which measured is the number of turns of hoist engine rotation, is led to The number of turns for crossing hoist engine rotation extrapolates the construction depth of a machine, and there are errors.2, it due to the volume compact of hoist engine, is installed The limitation in space keeps the structure of hoist engine more complicated after increasing measuring device, and daily maintenance is very inconvenient.
Utility model content
In view of the foregoing, the purpose of this utility model be to provide it is a kind of measure it is accurate, simple in structure, be easily installed maintenance Ram machine construction sounding gear.
To achieve the above object, the utility model uses following technical scheme:A kind of ram machine construction sounding gear, it includes Chassis, pulley blocks I, pulley blocks II, swing arm, swinging arm pulley group, connecting shaft and encoder are installed;
The pulley blocks I and pulley blocks II are fixed on by axis pin on the installation chassis respectively;The installation chassis is solid It is scheduled on the first half of crane arm support;
One end of the swing arm and the pulley blocks II are coaxial, and can be freely rotated around the axis;It is the other end of swing arm, described Swinging arm pulley group and encoder are linked together by the connecting shaft;
The boom hoist cable that hook block stake machine moves up and down passes through the pulley blocks I, pulley blocks II and swinging arm pulley group.
Preferably, the ram machine construction sounding gear further includes a pull rod;It is connected with swinging arm pulley group in the swing arm One end is additionally provided with fixed otic placode;One end of the pull rod is connected with fixed otic placode, and the other end passes through the installation chassis, installation The pull rod is divided into two parts by chassis, and tensioning spring is cased on the part below the pull rod is located at the installation chassis.
Preferably, the pulley blocks I, pulley blocks II and swinging arm pulley group are all made of nylon pulley, and take turns slot bottom diameter and be 6cm--10cm。
The advantages of the utility model:The ram machine construction depth of measurement is accurate;It is simple and reliable for structure, do not have in measurement process Obstruction;Manufacturing cost is low;It is fixed on crane arm support, it is time saving and energy saving to safeguard, is convenient for checking after the completion of piling daily, tie up Shield;Convenient for vibrating and impacting construction of ballast pile integration of equipments, intelligence.
Description of the drawings
Fig. 1 is the installation site structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model;
Fig. 3 is the A-A sectional views of Fig. 2;
Fig. 4 is the B-B sectional views of Fig. 2;
Fig. 5 is the utility model swing arm structure schematic diagram;
Fig. 6 is the utility model installation Undercarriage structure schematic diagram.
Specific implementation mode
The structure of the utility model and feature are described in detail with reference to the accompanying drawings and examples.It needs to illustrate It is that can disclosed embodiments be made with various modifications, therefore, embodiment disclosed in specification should not be considered as to this The limitation of utility model, and only as the example of embodiment, the purpose is to keep the feature of the utility model apparent.
Fig. 1 is common construction stake machine structural schematic diagram, as shown, crane 1 is played by boom hoist cable 2, suspension hook 4 Stake machine 5 moves up and down, drives piles.Accurately to measure the depth of the piling of a machine 5, the utility model is installed on the arm support of crane 1 There is a sounding gear 3, the boom hoist cable 2 for playing the up and down motion of a machine 5 passes through the sounding gear 3.The utility model passes through survey The depth length gauge for measuring boom hoist cable 2 calculates the construction depth of stake machine.
As shown in Fig. 2-Fig. 6, the utility model ram machine construction sounding gear includes installation chassis 31, pulley blocks I 32, pulley Group II 33, swing arm 34, swinging arm pulley group 35, connecting shaft 36, encoder 37.
Pulley blocks I 32 and pulley blocks II 33 are fixed on by axis pin on installation chassis 31 respectively;One end of swing arm 34 and cunning Wheel group II 33 is coaxial, and can be freely rotated around the axis;The other end, swinging arm pulley group 35 and the encoder 37 of swing arm 34 pass through connection Axis 36 links together.
As shown in Fig. 2, being additionally provided with fixed otic placode 341 in one end that swing arm 34 is connected with swinging arm pulley group 35.Pull rod 38 One end be connected with fixed otic placode 341, the other end passes through installation chassis 31, installs chassis 31 and pull rod 38 is divided into two parts, It is cased with tensioning spring 39 on the part that pull rod 38 is located at below installation chassis 31.Boom hoist cable 2 passes through pulley blocks I 32, pulley After group II 33 and swinging arm pulley group 35, by adjusting the elasticity of tensioning spring 39, swinging arm pulley group 35 is made to be pressed on promotion steel In cord 2, it is effectively prevented the skidding of boom hoist cable 2, keeps measurement more accurate.
The utility model is mounted on the top of crane arm support, and boom hoist cable 2 passes through pulley blocks I 32, II 33 and of pulley blocks Swinging arm pulley group 35, moving up and down for steel wire rope drive swinging arm pulley group 35 to rotate, are further driven to 37 turns of coaxial encoder It is dynamic, the displacement distance of boom hoist cable is measured, further according to the multiplying power of the steel wire rope of hoist lifting hook stake machine 5, the final suspension hook that obtains moves Dynamic distance is the construction depth of stake machine.
The pulse electrical signal that encoder 37 exports is connected by conducting wire with controller or control room computer, records stake in real time The construction depth of machine.
In specific embodiment of the utility model, the pulley blocks I, pulley blocks II and swinging arm pulley group are all made of nylon Pulley, and slot bottom diameter is taken turns in 6cm--10cm, advantage:It is not easy to skid compared with steel sheave, measures more accurate;And it is not easy Cause steel rope abrasion;In addition, nylon pulley itself also has light-weight, intensity height, advantage at low cost.
The advantages of the utility model:The ram machine construction depth of measurement is accurate;It is simple and reliable for structure, do not have in measurement process Obstruction;Manufacturing cost is low;It is fixed on crane arm support, it is time saving and energy saving to safeguard, is convenient for checking after the completion of piling daily, tie up Shield;Convenient for vibrating and impacting construction of ballast pile integration of equipments, intelligence.
Finally it should be noted that:Above-described each embodiment is merely to illustrate the technical solution of the utility model, rather than It is limited;Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art It should be understood that:It can still modify to the technical solution recorded in previous embodiment, or to which part or whole Technical characteristic carries out equivalent replacement;And these modifications or substitutions, it does not separate the essence of the corresponding technical solution the utility model The range of each embodiment technical solution.

Claims (3)

1. a kind of ram machine construction sounding gear, it is characterised in that:It includes installation chassis, pulley blocks I, pulley blocks II, swing arm, pendulum Arm pulley blocks, connecting shaft and encoder;
The pulley blocks I and pulley blocks II are fixed on by axis pin on the installation chassis respectively;The installation chassis is fixed on The first half of crane arm support;
One end of the swing arm and the pulley blocks II are coaxial, and can be freely rotated around the axis;The other end of swing arm, the swing arm Pulley blocks and encoder are linked together by the connecting shaft;
The boom hoist cable that hook block stake machine moves up and down passes through the pulley blocks I, pulley blocks II and swinging arm pulley group.
2. ram machine construction sounding gear according to claim 1, it is characterised in that:It further includes a pull rod;
It is additionally provided with fixed otic placode in one end that the swing arm is connected with swinging arm pulley group;One end of the pull rod and fixed otic placode It is connected, the other end passes through the installation chassis, installation chassis that the pull rod is divided into two parts, is located at the peace in the pull rod It is cased with tensioning spring on part below dress chassis.
3. ram machine construction sounding gear according to claim 2, it is characterised in that:The pulley blocks I, pulley blocks II and pendulum Arm pulley blocks are all made of nylon pulley, and it is 6cm--10cm to take turns slot bottom diameter.
CN201820342887.6U 2018-03-13 2018-03-13 Ram machine construction sounding gear Active CN208056042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820342887.6U CN208056042U (en) 2018-03-13 2018-03-13 Ram machine construction sounding gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820342887.6U CN208056042U (en) 2018-03-13 2018-03-13 Ram machine construction sounding gear

Publications (1)

Publication Number Publication Date
CN208056042U true CN208056042U (en) 2018-11-06

Family

ID=63988922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820342887.6U Active CN208056042U (en) 2018-03-13 2018-03-13 Ram machine construction sounding gear

Country Status (1)

Country Link
CN (1) CN208056042U (en)

Similar Documents

Publication Publication Date Title
EP2530046B1 (en) Stepless luffing mechanism for super-lifting counterweight of crawler crane and operating method thereof
CN104727354B (en) The test system of simulation loop load lower plate anchor limit dynamic bearing capacity
CN204613750U (en) Intelligent inclinometer remote central control
CN210852854U (en) Large-load underwater four-degree-of-freedom swinging device
CN105502178B (en) A kind of telescopic arm crawler crane for possessing rotary digging function
CN104609326A (en) Dynamic compaction machine and winding device thereof
CN209741839U (en) A vibration pile driver for bridge construction
CN208056042U (en) Ram machine construction sounding gear
CN105649001A (en) Automatic monitoring system for dynamic compaction construction
CN201206463Y (en) Depth measurement apparatus for rotary drill rig
CN203786012U (en) Test device for monitoring dynamic micro-friction state of steel wire rope-friction liner
CN103344208A (en) Method and device for measuring compacting depth of oil-cylinder-type dynamic compactor and dynamic compactor
CN205348010U (en) Pull change of friction formula anchor jib and use device
CN211846906U (en) Crane hook positioning and overspeed detection device
CN202946144U (en) Hole depth measuring device for drilling machine
CN202947719U (en) Dynamic compactor and ramming depth measurement device thereof
CN205444155U (en) Automatic monitoring device of forced tamping construction
CN109357725B (en) Automatic mud layer height measuring device and measuring method
CN208933943U (en) A kind of architectural engineering rammer compacter
CN204643616U (en) Flat boom crane lifting altitude measurement mechanism
CN206232339U (en) A kind of small-sized lifting machine for building
CN202970702U (en) Rotary drilling rig with depth measurement function
CN110424399B (en) Traffic construction deep basal pit lateral wall skew monitoring devices
CN221299063U (en) Novel pore-forming data monitoring device
CN215854745U (en) Be arranged in prestressing force steel pipe wind-powered electricity generation tower pylon king post hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100102 Beijing City, Chaoyang District Wangjing Xiyuan No. 221 Botai building 12

Patentee after: China Power Construction Zhenchong Construction Engineering Co.,Ltd.

Address before: 100102 Beijing City, Chaoyang District Wangjing Xiyuan No. 221 Botai building 12

Patentee before: BEIJING VIBROFLOTATION ENGINEERING Co.,Ltd.