CN208055894U CN201820531146.2U CN201820531146U CN208055894U CN 208055894 U CN208055894 U CN 208055894U CN 201820531146 U CN201820531146 U CN 201820531146U CN 208055894 U CN208055894 U CN 208055894U
Authority
CN
China
Prior art keywords
hanging basket
truss
hanging
bed die
curing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820531146.2U
Other languages
Chinese (zh)
Inventor
柏佳文
魏洋
程勋煜
李国芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Forestry University
Original Assignee
Nanjing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University filed Critical Nanjing Forestry University
Priority to CN201820531146.2U priority Critical patent/CN208055894U/en
Application granted granted Critical
Publication of CN208055894U publication Critical patent/CN208055894U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A kind of Hanging Basket closing insulated curing device, including bearing system, template system, close heat-insulation system, curing system and temperature control system, it is characterized in that, bearing system is by top bearing structure, anchor structure afterwards, front overhang hanging hang structure, post-suspension structure, bed die longeron, side form truss, core model truss, protect bottom girder, protect front-axle beam and beam-ends suspended structure composition, template system is by bed die, side form, core model forms, heat-insulation system is closed by side plate wall, preceding board wall, cover board and bottom plate composition, its fully wrapped around template system and curing system, curing system is by heating tube, temperature sensor, thermal insulation layer forms, it is covered in bed die, side form, the outer surface of core model, the temperature control box and regulating device of temperature control system are separately connected heating tube and temperature sensor.The utility model realizes the rapid curing of cradle construction, compensates for the defect of winter construction, can all-weather construction, not only can effectively curing concrete, while preventing top from falling material and causing security risk.

Description

A kind of Hanging Basket closing insulated curing device
Technical field
The utility model belongs to field of civil engineering, is related to a kind of temporary facility of bridge structure construction, and in particular to one Kind Hanging Basket closes insulated curing device.
Background technology
Using relatively broad in the cast-in-place cantilever method construction of Large Span Bridges at home and abroad, be developed so far, technology nor Often ripe, main equipment is exactly a pair of of walking Hanging Basket in cast-in-place cantilever method, and in China, prestressed concrete continuous beam is outstanding The construction hanging basket used in arm construction mostly uses functional form design, as long as meeting the intensity of structure, rigidity, stability and dead weight limit System requires, but cradle construction belongs to high-altitude dangerous operation, it is contemplated that safe and environment-friendly, standardization construction requirement, to it It is essential to carry out safeguard procedures.Chinese patent 200720032252.8 discloses a kind of semi-enclosed Hanging Basket, in Hanging Basket surrounding Equipped with dense mesh, construction personnel is damaged with preventing article from falling.Chinese patent 200810230522.5 discloses A kind of totally enclosed type Hanging Basket and the construction method using Hanging Basket progress concrete suspension casting, which includes walking system and anchoring System, walking system draw the load carrier for being connected with bottom die platform, and bottom die platform is connected to load carrier by hangar system It has poured in box beam, has been equipped with closed protection system along bottom die platform periphery, closed protection system and bottom die platform surround totally-enclosed Construction space.
The operation platform of above-mentioned several closed Hanging Baskets mainly from the point of view of construction safety, is equipped with guard system more, To prevent safety accident caused by falling tool, material etc. on Hanging Basket, the working environment of operating personnel is improved, of low pollution, but It is to still have many disadvantages, the workbench size of either semiclosed first or totally enclosed type Hanging Basket, construction personnel is deposited It is limiting, can not be modified according to on-site actual situations, secondly, although totally enclosed type Hanging Basket plays one to concrete curing It is set for using, but curing time is longer, in temperature lower season, cannot still pour curing concrete.More existing Hanging Basket For operation platform, the preceding board wall of the guard system of the utility model can be in vertical direction with 0 °~90 ° towards construction advance side To free-open-close, working region when necessary is expanded, can both play safety protection function, can also play the work of workbench With, and covering curing system and temperature control system are installed in template system outer surface, provide good ring for the health of concrete Border, can easily efficiently to concrete formed rapidly, round-the-clock maintenance, considerably reduce the construction period, reduce Cost.
Invention content
The purpose of this utility model is to provide a kind of Hanging Basket closing insulated curing device, the covering curing system on template system System, and be connected with temperature control system, by heating tube so that template keeps a temperature for being conducive to conserve box beam to be poured, utilize temperature Control case and regulating device monitor in real time adjusts curing temperature, realizes that Hanging Basket conserves rapid construction, while it is complete to close heat-insulation system Template system and curing system are wrapped up, not only provides a good environment to box beam health to be poured, while there is safety Anti-lost drop safely and effectively ensures to be provided below cradle construction.
The technical solution of the utility model is:A kind of Hanging Basket closing insulated curing device, including bearing system, template system System, closing heat-insulation system, curing system and temperature control system, which is characterized in that bearing system is by top bearing structure, rear anchoring knot Structure, front overhang hanging hang structure, post-suspension structure, bed die longeron, side form truss, core model truss, protection bottom girder, protection front-axle beam, beam-ends are outstanding Hanging hang structure forms, and top bearing structure is anchored in by rear anchor structure and has been poured on box beam, and front overhang hanging hang structure hangs on top Bearing structure end, successively by side form truss, bed die longeron and the end hanging anchoring for protecting bottom girder, post-suspension structure suspension In top bearing structure, hanging anchoring side form truss and core model truss are distinguished in lower end, and beam-ends suspended structure upper anchorage is in having poured It builds in box beam, lower part hanging anchoring bed die longeron and protection bottom girder successively from top to bottom are pre- between bed die longeron and protection bottom girder It stays construction operation space, template system to be made of bed die, side form, core model, is located at bottom plate bottom surface, the abdomen of box beam to be poured Plate lateral surface and cavity inner surface, closing heat-insulation system are made of side plate wall, preceding board wall, cover board and bottom plate, fully wrapped around mould Plate system and curing system, and preceding board wall can be in vertical direction with 0 °~90 ° towards construction direction of advance free-open-close, maintenance is System is connected with temperature control system, and curing system is made of heating tube, temperature sensor, thermal insulation layer, is covered in bed die, side form, core The outer surface of mould, thermal insulation layer are located at the outmost surface of curing system, cover heating tube and temperature sensor, temperature control system is by temperature control Case and regulating device composition, temperature control system connect heating tube and temperature sensor, realize freely adjusting to the temperature of curing system Section.
Bed die longeron, side form truss, core model truss, protection bottom girder and the protection front-axle beam is one in proximate matter, truss Kind.
The bottom plate of the closing heat-insulation system is placed on protection bottom girder, and passes through beam-ends suspended structure and forward mounting knot Structure hanging anchoring is in bed die longeron lower part.
Side plate wall, preceding board wall, cover board and the bottom plate of the closing heat-insulation system are common by thermal insulation plate and mesh grid Composition, thermal insulation plate is extrusion molding polystyrol plastic foam plate, polystyrene foam plate, expanded pearlite sillar, rock-wool heat insulation plate In one kind, mesh grid is metal mesh, plastic wire, composite material net, one kind in natural fiber net.
The preceding board wall of the closing heat-insulation system forms an entirety with protection front-axle beam by mechanical connection.
A kind of Hanging Basket closes insulated curing device, which is characterized in that the preceding board wall is logical with back plate connections Hinge is crossed to fix, hinge opening and closing angle be 0 °~90 °, preceding board wall both sides by movable pull rod respectively with left and right two pieces of side plate walls End connects, and the scope of activities of movable pull rod is consistent with preceding board wall free-open-close angular range, and foreboard wall top portion is by being anchored at Pulley blocks on front overhang hanging hang structure control its folding.
The heating tube is one kind in water circulating-heating pipe, Resistant heating, and wherein water circulating-heating tube material is One kind in crosslinked polyethylene pipe, Polybutylene Pipe, three type PA tubes, heat-resisting polyethylene tube.
The top bearing structure is one in triangle hanging basket, Diamond-Shape Form Traveler, arch Hanging Basket, parallel truss Hanging Basket Kind.
The utility model provides a kind of Hanging Basket closing insulated curing device, and advantage is notable, has the advantages that:
(1) by that in bed die, side form and core model outer surface covering curing system and temperature control system, can monitor and adjust in real time Curing temperature, easily efficiently to concrete formed rapidly, round-the-clock maintenance.
(2) the closing heat-insulation system of Hanging Basket closing insulated curing device is formed using thermal insulation plate and mesh grid, is to be poured The concrete curing for building box beam provides good environment, achievees the purpose that rapid curing.
(3) the closing heat-insulation system in Hanging Basket closing insulated curing device treat pour box beam and conserved when, in complete Closed state can effectively prevent falling object from high altitude, avoid influence of the construction to road or pedestrian below Hanging Basket.
(4) the closing heat-insulation system in Hanging Basket closing insulated curing device conserves early period, preceding board wall court in box beam to be poured Direction of advance of constructing is opened, and can be used as expansion construction platform, construction personnel is facilitated to pour the installation of template system and inside When emergency processing.
Description of the drawings:
Fig. 1 is a kind of side schematic view of the preceding board wall closure maintenance state of Hanging Basket closing insulated curing device;
Fig. 2 is a kind of side schematic view of 45 ° of the preceding board wall opening of Hanging Basket closing insulated curing device;
Fig. 3 is a kind of completely open side schematic view of preceding board wall of Hanging Basket closing insulated curing device;
Fig. 4 is a kind of front schematic view of Hanging Basket closing insulated curing device;
Fig. 5 is a kind of vertical view face schematic diagram of Hanging Basket closing insulated curing device;
Fig. 6 is a kind of closing thermal-insulation system material composition schematic diagram of Hanging Basket closing insulated curing device;
Fig. 7 is a kind of template system front schematic view of Hanging Basket closing insulated curing device;
Fig. 8 is a kind of template system side schematic view of Hanging Basket closing insulated curing device;
Fig. 9 is a kind of curing system decomposition diagram of the side form of Hanging Basket closing insulated curing device;
Figure 10 is a kind of curing system decomposition diagram of the core model of Hanging Basket closing insulated curing device;
Figure 11 is a kind of curing system decomposition diagram of the bed die of Hanging Basket closing insulated curing device;
Figure 12 is a kind of heating tube front arrangement schematic diagram of Hanging Basket closing insulated curing device;
Figure 13 is a kind of heating tube side arrangement schematic diagram of Hanging Basket closing insulated curing device;
Figure 14 is a kind of operation principle schematic diagram of Hanging Basket closing insulated curing device;
In the accompanying drawings, 1 is bearing system;11 be top bearing structure;Anchor structure after 12;13 front overhang hanging hang structures;14 are Post-suspension structure;15 be bed die longeron;16 be side form truss;17 be core model truss;18 be protection bottom girder;19 be protection front-axle beam; 20 be beam-ends suspended structure;2 be template system;21 be bed die;22 be side form;23 be core model;3 be closing heat-insulation system;31 are Side plate wall;32 be preceding board wall;33 be cover board;34 be bottom plate;300 be thermal insulation plate;301 be mesh grid;4 be curing system;41 For heating tube;42 be temperature sensor;43 be thermal insulation layer;5 be temperature control system;51 be temperature control box;52 be regulating device;6 be hinge Chain;7 be movable pull rod;8 be pulley blocks;100 be to have poured box beam.
Specific implementation mode:
For a clearer understanding of the technical features, objectives and effects of the utility model, existing control description of the drawings Specific embodiment of the present utility model.The utility model provides a kind of Hanging Basket closing insulated curing device, including bearing system 1, template system 2, closing heat-insulation system 3, curing system 4 and temperature control system 5, which is characterized in that bearing system 1 is carried by top Structure 11, rear anchor structure 12, front overhang hanging hang structure 13, post-suspension structure 14, bed die longeron 15, side form truss 16, core model truss 17, bottom girder 18, protection front-axle beam 19, beam-ends suspended structure 20 is protected to form, top bearing structure 11 is anchored by rear anchor structure 12 In having poured on box beam 100, front overhang hanging hang structure 13 hangs on 11 end of top bearing structure, successively by side form truss 16, The end hanging anchoring of bed die longeron 15 and protection bottom girder 18, post-suspension structure 14 hang on top bearing structure 11, lower end point Other hanging anchoring side form truss 16 and core model truss 17,20 upper anchorage of beam-ends suspended structure is in having poured in box beam 100, lower part From top to bottom successively hanging anchoring bed die longeron 15 and protection bottom girder 18, bed die longeron 15 and protection bottom girder 18 between reserve construction Operating space, template system 2 are made of bed die 21, side form 22, core model 23, be located at box beam to be poured bottom plate bottom surface, Web outside face and cavity inner surface, closing heat-insulation system 3 are made of side plate wall 31, preceding board wall 32, cover board 33 and bottom plate 34, Fully wrapped around template system 2 and curing system 4, and preceding board wall 32 can in vertical direction with 0 °~90 ° towards construction direction of advance Free-open-close, curing system 4 are connected with temperature control system 5, and curing system 4 is by heating tube 41, temperature sensor 42,43 groups of thermal insulation layer At, be covered in the outer surface of bed die 21, side form 22, core model 23, thermal insulation layer 43 is located at the outmost surface of curing system 4, covering Heating tube 41 and temperature sensor 42, temperature control system 5 are made of temperature control box 51 and regulating device 52, the connection heating of temperature control system 5 Pipe 41 and temperature sensor 42 realize freely adjusting to the temperature of curing system 4.
The bed die longeron 15, side form truss 16, core model truss 17, protection bottom girder 18 and protection front-axle beam 19 be proximate matter, One kind in truss, structure should meet safely design requirement.
The bottom plate 34 of the closing heat-insulation system 3 is placed on protection bottom girder 18, and passes through 20 He of beam-ends suspended structure 13 hanging anchoring of front overhang hanging hang structure is in 15 lower part of bed die longeron.
Side plate wall 31, preceding board wall 32, cover board 33 and the bottom plate 34 of the closing heat-insulation system 3 are by thermal insulation plate 300 It is collectively constituted with mesh grid 301, thermal insulation plate 300 is extrusion molding polystyrol plastic foam plate, polystyrene foam plate, expansion treasure One kind in pearl sillar, rock-wool heat insulation plate, mesh grid 301 are in metal mesh, plastic wire, composite material net, natural fiber net It is a kind of.
The preceding board wall 32 of the closing heat-insulation system 3 forms an entirety with protection front-axle beam 19 by mechanical connection.
The preceding board wall 32 is fixed with 34 junction of bottom plate by hinge 6, and it is 0 °~90 ° that hinge 6, which opens and closes angle, foreboard 32 both sides of wall by movable pull rod 7 respectively with left and right two pieces of 31 ends of side plate wall connect, the scope of activities of movable pull rod 7 and 32 free-open-close angular range of preceding board wall is consistent, and 32 top of preceding board wall is controlled by the pulley blocks 8 being anchored on front overhang hanging hang structure 13 It is opened and closed.
The heating tube 41 is one kind in water circulating-heating pipe, Resistant heating, wherein water circulating-heating tube material It is one kind in crosslinked polyethylene pipe, Polybutylene Pipe, three type PA tubes, heat-resisting polyethylene tube.
The top bearing structure 11 is one in triangle hanging basket, Diamond-Shape Form Traveler, arch Hanging Basket, parallel truss Hanging Basket Kind.

Claims (8)

1. a kind of Hanging Basket closes insulated curing device, including bearing system (1), template system (2), closing heat-insulation system (3), support Protecting system (4) and temperature control system (5), which is characterized in that bearing system (1) is by top bearing structure (11), rear anchor structure (12), front overhang hanging hang structure (13), post-suspension structure (14), bed die longeron (15), side form truss (16), core model truss (17), anti- River bottom protection beam (18), protection front-axle beam (19), beam-ends suspended structure (20) composition, top bearing structure (11) is by rear anchor structure (12) It is anchored in and has poured on box beam (100), front overhang hanging hang structure (13) hangs on top bearing structure (11) end, successively by side The end hanging anchoring of mould truss (16), bed die longeron (15) and protection bottom girder (18), post-suspension structure (14) hang on top Hanging anchoring side form truss (16) and core model truss (17), beam-ends suspended structure (20) top are distinguished in bearing structure (11), lower end Be anchored in and poured in box beam (100), lower part from top to bottom successively hanging anchoring bed die longeron (15) and protection bottom girder (18), bottom Reserve construction operation space between mould longeron (15) and protection bottom girder (18), template system (2) by bed die (21), side form (22), Core model (23) forms, and is located at the bottom plate bottom surface, web outside face and cavity inner surface of box beam to be poured, closing heat preservation system System (3) is made of side plate wall (31), preceding board wall (32), cover board (33) and bottom plate (34), fully wrapped around template system (2) and foster Protecting system (4), and preceding board wall (32) can in vertical direction with 0 °~90 ° towards construction direction of advance free-open-close, curing system (4) it is connected with temperature control system (5), curing system (4) is made of heating tube (41), temperature sensor (42), thermal insulation layer (43), It is covered in the outer surface of bed die (21), side form (22), core model (23), thermal insulation layer (43) is located at the outmost surface of curing system (4), Heating tube (41) and temperature sensor (42) are covered, temperature control system (5) is made of temperature control box (51) and regulating device (52), temperature control System (5) connects heating tube (41) and temperature sensor (42), realizes freely adjusting to the temperature of curing system (4).
2. a kind of Hanging Basket according to claim 1 closes insulated curing device, which is characterized in that the bed die longeron (15), side form truss (16), core model truss (17), protection bottom girder (18) and protection front-axle beam (19) are one kind in proximate matter, truss.
3. a kind of Hanging Basket according to claim 1 closes insulated curing device, which is characterized in that the closing heat preservation system The bottom plate (34) of system (3) is placed on protection bottom girder (18), and outstanding by beam-ends suspended structure (20) and front overhang hanging hang structure (13) Extension is anchored at bed die longeron (15) lower part.
4. a kind of Hanging Basket according to claim 1 closes insulated curing device, which is characterized in that the closing heat preservation system Side plate wall (31), preceding board wall (32), cover board (33) and the bottom plate (34) of system (3) are by thermal insulation plate (300) and mesh grid (301) It collectively constitutes, thermal insulation plate (300) is extrusion molding polystyrol plastic foam plate, polystyrene foam plate, expanded pearlite sillar, rock One kind in cotton thermal insulation board, mesh grid (301) are one kind in metal mesh, plastic wire, composite material net, natural fiber net.
5. a kind of Hanging Basket according to claim 1 closes insulated curing device, which is characterized in that the closing heat preservation system The preceding board wall (32) of system (3) passes through mechanical connection with protection front-axle beam (19) and forms an entirety.
6. a kind of Hanging Basket according to claim 5 closes insulated curing device, which is characterized in that the preceding board wall (32) Fixed by hinge (6) with bottom plate (34) junction, it is 0 °~90 ° that hinge (6), which opens and closes angle, and preceding board wall (32) both sides pass through work Dynamic formula pull rod (7) is connect with two pieces of side plate wall (31) ends in left and right respectively, scope of activities and the preceding board wall of movable pull rod (7) (32) free-open-close angular range is consistent, is controlled by the pulley blocks (8) being anchored on front overhang hanging hang structure (13) at the top of preceding board wall (32) Make its folding.
7. a kind of Hanging Basket according to claim 1 closes insulated curing device, which is characterized in that the heating tube (41) It is one kind in water circulating-heating pipe, Resistant heating, wherein water circulating-heating pipe is crosslinked polyethylene pipe, Polybutylene Pipe, three One kind in type PA tube, heat-resisting polyethylene tube.
8. a kind of Hanging Basket according to claim 1 closes insulated curing device, which is characterized in that the top carrying knot Structure (11) is one kind in triangle hanging basket, Diamond-Shape Form Traveler, arch Hanging Basket, parallel truss Hanging Basket.
CN201820531146.2U 2018-04-09 2018-04-09 A kind of Hanging Basket closing insulated curing device Active CN208055894U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820531146.2U CN208055894U (en) 2018-04-09 2018-04-09 A kind of Hanging Basket closing insulated curing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820531146.2U CN208055894U (en) 2018-04-09 2018-04-09 A kind of Hanging Basket closing insulated curing device

Publications (1)

Publication Number Publication Date
CN208055894U true CN208055894U (en) 2018-11-06

Family

ID=63985004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820531146.2U Active CN208055894U (en) 2018-04-09 2018-04-09 A kind of Hanging Basket closing insulated curing device

Country Status (1)

Country Link
CN (1) CN208055894U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108517787A (en) * 2018-04-09 2018-09-11 南京林业大学 A kind of Hanging Basket rapid curing operation platform
CN111851310A (en) * 2020-08-14 2020-10-30 中铁二局集团有限公司 Heating and heat-insulating system, heat-insulating method and construction method for winter construction pouring template

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108517787A (en) * 2018-04-09 2018-09-11 南京林业大学 A kind of Hanging Basket rapid curing operation platform
CN111851310A (en) * 2020-08-14 2020-10-30 中铁二局集团有限公司 Heating and heat-insulating system, heat-insulating method and construction method for winter construction pouring template

Similar Documents

Publication Publication Date Title
CN101413251B (en) 0 type block anti-cracking construction method of high pier large across creeping formwork
CN208055894U (en) A kind of Hanging Basket closing insulated curing device
CN109972517A (en) A kind of construction method of steel reinforced concrete bondbeam cable-stayed bridge main-beam
CN108517787A (en) A kind of Hanging Basket rapid curing operation platform
CN203174510U (en) Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction
CN105421236B (en) Closing method for cable-stayed and suspension composite bridge
CN104631342A (en) Device and method for closure construction of girder side span of cable-stayed bridge
CN206667079U (en) Basket double-deck button in hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom hangs constructing device
CN111188268A (en) Super-large cast-in-situ gravity type anchorage and construction method
CN107503297A (en) Basket protection maintenance canopy integrated with beam body steam curing and its construction method
CN105040813B (en) The preceding facade system in aluminium alloy house
CN108678400A (en) Automatic climbing brooder system in extremely frigid zones building structure and its construction method
CN105178451B (en) The anticorrosion structure and its construction method of the cladding node of assembled architecture outer wall
CN201280693Y (en) Totally enclosed hanging basket
CN105484389B (en) A kind of steel structure shear wall structure
CN206487178U (en) Distribution box protection canopy is used in one kind construction
CN103669231B (en) Highway bridge widens improvement project cross-line safeguard structure and installation method
CN207244473U (en) Basket protection maintenance canopy integrated with beam body steam curing
CN114016763B (en) Independent type cave dwelling reinforcing system
WO2019047300A1 (en) Attachment type protection roof extending across highway for continuous girder
CN208578156U (en) Fast assembling-disassembling can plug-type heat preservation steel structure
CN205894421U (en) Case is filled to striate gypsum
CN207878714U (en) A kind of sub- wall of assembled light concrete
CN208455931U (en) A kind of heat preservation assembled wallboard with decorative layer
CN102345274A (en) Box body type movable sand-protecting barrier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhenjiang Heng An Civil Technology Co., Ltd.

Assignor: Nanjing Forestry University

Contract record no.: 2018320000418

Denomination of utility model: A kind of Hanging Basket closing insulated curing device

Granted publication date: 20181106

License type: Common License

Record date: 20181219

Assignee: Hefei Shuang Dao run Highway Engineering Co., Ltd.

Assignor: Nanjing Forestry University

Contract record no.: 2018320000417

Denomination of utility model: A kind of Hanging Basket closing insulated curing device

Granted publication date: 20181106

License type: Common License

Record date: 20181219

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Limited by Share Ltd Beijing nine road detection technology

Assignor: Nanjing Forestry University

Contract record no.: X2019320000056

Denomination of utility model: Hang basket and seal heat -insulating maintenance device

Granted publication date: 20181106

License type: Common License