CN208053901U - A kind of container of quick calculating scaffolding steel pipe quantity - Google Patents
A kind of container of quick calculating scaffolding steel pipe quantity Download PDFInfo
- Publication number
- CN208053901U CN208053901U CN201820348680.XU CN201820348680U CN208053901U CN 208053901 U CN208053901 U CN 208053901U CN 201820348680 U CN201820348680 U CN 201820348680U CN 208053901 U CN208053901 U CN 208053901U
- Authority
- CN
- China
- Prior art keywords
- container body
- steel pipe
- container
- scaffolding steel
- trunk
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 66
- 239000010959 steel Substances 0.000 title claims abstract description 66
- 238000005192 partition Methods 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a kind of container of quick calculating scaffolding steel pipe quantity, including container body and traveling wheel;The container body is front and rear sides and the box-like structure that top is open, and the traveling wheel is mounted on the bottom four corners of the container body;The container body height is 0.5 m, and the inside of container body is separated by multiple with container body side wall partition board disposed in parallel, forms the empty slot that several width match with scaffolding steel pipe outer diameter, the scaffolding steel pipe stacking is positioned in each empty slot.The utility model can place 10 steel pipes since container body height is 0.5 m in each empty slot, and while steel pipe arranges completion, the empty slot quantity filled up according to steel pipe can quickly calculate the quantity of steel pipe.
Description
Technical field
The utility model belongs to Architectural Equipment technical field, and in particular to a kind of container for placing scaffolding steel pipe.
Background technology
Building Trade in China comes into the fast-developing phase, and the building scale of construction is increasing, and the quantity of required scaffold is more next
It is more, when building site input and output material it is spent manpower and materials it is also more and more.Original scaffolding steel pipe is all directly to be deposited in steel
In Guan Chi, haul is very inconvenient, moreover, when checking at the scene, scaffolding steel pipe quantity is manually to check, time-consuming and laborious, also
It is easy error, causes unnecessary loss.
Invention content
Goal of the invention:The utility model aim is in view of the deficiencies of the prior art, to provide a kind of quickly calculating scaffold
The container of steel pipe quantity, while facilitating haul, convenient for statistics steel pipe quantity.
According to《Construction fastener type steel pipe scaffold technical specification of security》Scaffolding steel pipe uniform sizes are diameter
48.3*3.6mm, length of steel pipe usually have 1m, 2m, 3m, 4m, 6m these types specifications according to building site actual conditions.
Technical solution:The container of quick calculating scaffolding steel pipe quantity described in the utility model, including container body and row
Walk wheel;The container body is front and rear sides and the box-like structure that top is open, and the traveling wheel is mounted on the container master
The bottom four corners of body;The container body height is 0.5 m, and the inside of container body is by multiple and container body side wall
Partition board disposed in parallel separates, and forms the empty slot that several width match with scaffolding steel pipe outer diameter, the scaffolding steel pipe heap
It stacks and is placed in each empty slot.
Further preferably technical solution is the utility model, and trunk, institute are additionally provided on rear side of the container body
The shapes and sizes for stating trunk are consistent with the container body, pass through connector between the trunk and the container body
Connection.
Preferably, the length between the front and rear sides of the container body be 2m, the container body, connector and after
The total length of boot is 6 m.
Preferably, be additionally provided with flapper on the container body or trunk, be provided on the flapper with
The consistent block of the number and shape of empty slot, the flapper are inserted into any position of the container body or trunk, institute
Block is stated to close the rear side of the empty slot.
Preferably, the top of the partition board of the container body and arranged on left and right sides wall is both provided with chamfering.
Preferably, 10 or 20 empty slots are provided between the arranged on left and right sides wall of the container body.
Preferably, the thickness of the partition board is 50 mm.
Preferably, it is additionally provided with knob on front side of the container body.
Advantageous effect:(1)The container body inner route clapboard of the utility model is divided into outside several width and scaffolding steel pipe
The empty slot that diameter matches, steel pipe pour into container, and under gravity, steel pipe enters empty slot, and orderly distribution in a reservoir, is convenient for work
People is by steel pipe fast finishing, when needing haul, by the traveling wheel of bottom, easily carries out the transport in place;Meanwhile by
It is 0.5 m in container body height, 10 steel pipes can be placed in each empty slot, while steel pipe arranges completion, according to steel pipe
The empty slot quantity filled up can quickly calculate the quantity of steel pipe;
(2)Be additionally provided with trunk in the utility model on rear side of container body, trunk and the container body it
Between connected by connector, it is easy to disassemble, length of steel pipe be 1 ~ 3 m when, without installing trunk, length of steel pipe be 3 ~ 6
Trunk is installed when m, it is easy to use;
(3)It is also provided with flapper in the utility model, flapper can be inserted into container master according to the length of steel pipe
The corresponding position of body or trunk prevents the steel pipe in empty slot from sliding;
(4)It is both provided with chamfering on the top of partition board and container body and trunk two side in the utility model, it is convenient
When toppling over steel pipe, steel pipe slides into empty slot.
Description of the drawings
Fig. 1 is the structural schematic diagram of container described in the utility model;
Fig. 2 is the sectional view of container body described in the utility model;
In figure, 1- container bodies, 2- trunks, 3- traveling wheels, 4- handles, 5- connectors, 6- partition boards, 7- steel pipes.
Specific implementation mode
Technical solutions of the utility model are described in detail below by attached drawing, but the scope of protection of the utility model
It is not limited to the embodiment.
Embodiment:A kind of container of quick calculating scaffolding steel pipe quantity, including container body 1, trunk 2, traveling wheel 3
With handle 4.
Container body 1 is consistent with the shapes and sizes of trunk 2.Pass through connector 5 between trunk 2 and container body 1
Connection.Traveling wheel 3 is mounted on the bottom four corners of container body 1 and trunk 2.Handle 4 is mounted on the front side of container body 1.
Container body 1 and trunk 2 are front and rear sides and the box-like structure that top is open, before container body 1,
The length between both sides is 2m, is highly 0.5 m afterwards.The inside of container body 1 is separated by the partition board 6 of nine 50 mm thickness, partition board
6 are arranged in parallel with the side wall of container body 1, form the empty slot that ten width match with scaffolding steel pipe outer diameter.Container body 1
It is both provided with chamfering with the partition board 6 of trunk 2 and the top of two side.
According to the length of steel pipe 7, determine whether trunk 2 is installed, when 7 length of steel pipe is 1 ~ 3 m, without installing rear molding
Case 2 installs trunk 2 when 7 length of steel pipe is 3 ~ 6 m.Meanwhile according to the length of steel pipe 7, being inserted into flapper, active catch
The block consistent with the number and shape of empty slot is provided on plate, flapper is inserted into the arbitrary position of container body 1 or trunk 2
It sets, block closes the rear side of empty slot.
Steel pipe is arranged using said vesse and is the step of calculating steel pipe quantity:
1, according to the length of steel pipe 7, in the present embodiment by taking 6 m steel pipes as an example, with connector 5 by trunk 2 and container master
Body 1 is connected and fixed, and flapper is fixed at the front side 6m apart from container body 1;
2, steel pipe 7 is directly put upside down in container body 1, under the action of gravity and chamfering, steel pipe 7 will enter sky
Slot, and gather in empty slot;
3, when steel pipe 7 is fully filled with container body 1, according to the diameter of steel pipe 7, it is 100 to calculate steel pipe 7, with this
As a metering units;
4, container body 1 is dragged using traveling wheel 3, handle 4, you can dragging steel pipe 7 moves at the scene;
5, step is constantly repeated, to the last steel pipe counts up to, the steel pipe of last vehicle, even if when steel pipe is not arranged completely
Full container is also easy to obtain the quantity of steel pipe from the point of view of cross section.
As described above, although the utility model has been indicated and described with reference to specific preferred embodiment, it must not
It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define
Under the premise of, it can various changes can be made in the form and details to it.
Claims (8)
1. a kind of container of quick calculating scaffolding steel pipe quantity, which is characterized in that including container body and traveling wheel;The appearance
Device main body is front and rear sides and the box-like structure that top is open, and the traveling wheel is mounted on the bottom four of the container body
Angle;The container body height is 0.5 m, and the inside of container body is by multiple disposed in parallel with the side wall of the container body
Partition board separates, and forms the empty slot that several width match with scaffolding steel pipe outer diameter, and the scaffolding steel pipe stacking is positioned over each
In empty slot.
2. the container of quick calculating scaffolding steel pipe quantity according to claim 1, which is characterized in that the container body
Rear side be additionally provided with trunk, the shapes and sizes of the trunk are consistent with the container body, the trunk and institute
It states and is connected by connector between container body.
3. the container of quick calculating scaffolding steel pipe quantity according to claim 2, which is characterized in that the container body
Front and rear sides between length be 2m, the total length of the container body, connector and trunk is 6 m.
4. the container of quick calculating scaffolding steel pipe quantity according to claim 2, which is characterized in that the container body
Or flapper is additionally provided on trunk, the block consistent with the number and shape of empty slot is provided on the flapper,
The flapper is inserted into any position of the container body or trunk, and the block closes the rear side of the empty slot.
5. the container of quick calculating scaffolding steel pipe quantity according to claim 1, which is characterized in that the container body
Partition board and the top of arranged on left and right sides wall be both provided with chamfering.
6. the container of quick calculating scaffolding steel pipe quantity according to claim 1, which is characterized in that the container body
Arranged on left and right sides wall between be provided with 10 or 20 empty slots.
7. the container of quick calculating scaffolding steel pipe quantity according to claim 6, which is characterized in that the thickness of the partition board
Degree is 50 mm.
8. the container of quick calculating scaffolding steel pipe quantity according to claim 1, which is characterized in that the container body
Front side be additionally provided with knob.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820348680.XU CN208053901U (en) | 2018-03-14 | 2018-03-14 | A kind of container of quick calculating scaffolding steel pipe quantity |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820348680.XU CN208053901U (en) | 2018-03-14 | 2018-03-14 | A kind of container of quick calculating scaffolding steel pipe quantity |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208053901U true CN208053901U (en) | 2018-11-06 |
Family
ID=63989386
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820348680.XU Expired - Fee Related CN208053901U (en) | 2018-03-14 | 2018-03-14 | A kind of container of quick calculating scaffolding steel pipe quantity |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208053901U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110015377A (en) * | 2019-03-15 | 2019-07-16 | 沪东中华造船(集团)有限公司 | The evaluation method of foot hand object amount during a kind of shipbuilding |
-
2018
- 2018-03-14 CN CN201820348680.XU patent/CN208053901U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110015377A (en) * | 2019-03-15 | 2019-07-16 | 沪东中华造船(集团)有限公司 | The evaluation method of foot hand object amount during a kind of shipbuilding |
CN110015377B (en) * | 2019-03-15 | 2020-11-10 | 沪东中华造船(集团)有限公司 | Method for estimating amount of scaffold in ship building process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204960264U (en) | Novel scaffold | |
CN208053901U (en) | A kind of container of quick calculating scaffolding steel pipe quantity | |
CN204762408U (en) | Plant cultivation system | |
CN207683565U (en) | A kind of portable gypsum core model transport trolley | |
CN206633231U (en) | Anti-skidding slot device is opened in a kind of stair step | |
CN204881445U (en) | Inspection groove of roofing tile size | |
CN203271145U (en) | Diversion slot for pouring concrete in cylindrical slipform construction | |
CN206237789U (en) | A kind of fertilising box structure suitable for fertilizer applicator for orchard | |
CN114411506A (en) | Automatic brick paving machine | |
CN206769420U (en) | A kind of wall-building brick puts fixture with stone brick | |
CN214690800U (en) | Fire-fighting equipment transfer box convenient to move | |
CN207697749U (en) | A kind of construction scaffold handling device | |
CN208594760U (en) | One kind is laid bricks operation platform | |
CN212311995U (en) | Civil engineering pipe fitting rack | |
CN209225940U (en) | A kind of filling block packing process tray library | |
CN205239554U (en) | Handcart that is fit for transportation ceramic tile | |
CN206525764U (en) | Portable engineering cost operating desk | |
CN206032576U (en) | Automatic change equipment of oil drum direction | |
CN201777729U (en) | Oil pipe support | |
CN109941655A (en) | Full-automatic noodles inventory system | |
CN205633645U (en) | Building construction material secure conveyance device | |
CN205066632U (en) | Building works survey chi | |
CN206511473U (en) | A kind of SIP wallboards Automatic Guided Vehicle | |
CN207739296U (en) | A kind of building pile foundation dead-load detection device | |
CN206048162U (en) | A kind of stirrup bin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181106 |
|
CF01 | Termination of patent right due to non-payment of annual fee |