CN208039983U - Tower and base station - Google Patents

Tower and base station Download PDF

Info

Publication number
CN208039983U
CN208039983U CN201721886511.3U CN201721886511U CN208039983U CN 208039983 U CN208039983 U CN 208039983U CN 201721886511 U CN201721886511 U CN 201721886511U CN 208039983 U CN208039983 U CN 208039983U
Authority
CN
China
Prior art keywords
side plate
tower
air duct
power part
sealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721886511.3U
Other languages
Chinese (zh)
Inventor
彭锋
赵峰
王兴
朱寒雨
姚家伟
危文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201721886511.3U priority Critical patent/CN208039983U/en
Application granted granted Critical
Publication of CN208039983U publication Critical patent/CN208039983U/en
Priority to EP18896083.5A priority patent/EP3715562B1/en
Priority to PCT/CN2018/122752 priority patent/WO2019128874A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/003Access covers or locks therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/30Arrangement or mounting of heat-exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/007Ventilation with forced flow

Abstract

A kind of tower of the utility model offer and base station, the receiving space and radiator surrounded including tower wall, by the tower wall, the tower wall is equipped with the hatch door for including air inlet and air outlet, the receiving space includes receiving cabin, the receiving cabin includes sealing room and the draft chamber above sealing room, the hatch door closing receiving cabin, the air outlet are penetrated through with draft chamber, and the air inlet is located at receiving portion out of my cabin;The radiator includes outer power part, the first power part and first heat exchanger, first power part is located at sealing ceiling portion, the first heat exchanger is set on the side wall of sealing room and includes air duct and the first outer air duct being isolated with air duct in first in first, the outer power part is located in draft chamber to be connected to first outer air duct one end, the first outer air duct other end is connected to air inlet, first power part is used for the air-flow dynamic in the indoor formation circulation of sealing, and by air duct in described first by the heat transfer of air-flow to sealing outdoor.

Description

Tower and base station
Technical field
The utility model is related to communicate to make technical field more particularly to a kind of tower and base station.
Background technology
The development of mobile communication business brings a large amount of communication site demand, preceding base station to be all set to earth's surface, including communication Tower and cabinet with tower tube cooperation, wherein single-pipe tower is easy to install due to having, simple in structure, the characteristics of good appearance, increasingly In the planned projects such as the more communication base station for being applied to down town, plaza lighting, street lamp, power Transmission, landscape mark, often What is seen is that cabinet is separately provided on tower periphery to install power supply, automatically controlled and communication equipment etc. and cooling system is arranged simultaneously; And mesh its drawback is that computer room need to individually take up an area, and is unsightly unfavorable for urban planning and easily stolen.
Utility model content
Bottom surface occupied space is stored in a kind of tower of the utility model embodiment offer and base station for solving tower and cabinet Big problem.
The tower, including tower wall, the receiving space and radiator that are surrounded by the tower wall, the tower wall are equipped with Hatch door including air inlet and air outlet, the receiving space include receiving cabin, and the receiving cabin includes sealing room and positioned at institute State the draft chamber above sealing room, the hatch door closes the receiving cabin, and the air outlet is penetrated through with the draft chamber, it is described into Air port is located at receiving portion out of my cabin;The sealing room is not necessarily to and is arranged outside for accommodating communication apparatus and power supply of base station etc. The cabinet being connect with tower is saved and occupies external space, and then saves cost.
The radiator includes outer power part, the first power part and first heat exchanger, and first power part is located at The sealing ceiling portion, the first heat exchanger are set on the side wall of the sealing room and include air duct and first in first Outer air duct, the outer power part is located in the draft chamber to be connected to first outer air duct one end, and first outer air duct is another One end is connected to the air inlet, the outer power part by from the air quantity that the air inlet sucks after first outer air duct It is excluded by air outlet;
First power part is used for the air-flow dynamic in the indoor formation circulation of the sealing, and passes through air duct in described first By the heat transfer of air-flow to the sealing outdoor.The outer power part and the first power part are that sealing indoor and outdoor is carried out at the same time Heat dissipation improves radiating efficiency.
Wherein, the receiving cabin is by top plate and the bottom plate being oppositely arranged in the top plate and positioned at the top plate and described Tower wall between bottom plate surrounds, partition board, the first side plate, the second side plate being equipped in the receiving cabin between top plate and bottom plate With third side plate;First side plate, the second side plate are between top plate and bottom plate and the partition board, the third side plate is passed through to be located at Between partition board and the bottom plate, first side plate, the second side plate and third side plate are provided at circumferentially spaced along the tower wall, and And first side plate, the second side plate and third side plate are by tower wall connection described in opposite sides to surround the sealing room Side wall, the partition board form the draft chamber with the top plate and tube wall.The receiving cabin directly utilizes the tower wall of tower to make Heat dissipation wall and receiving space are surrounded in conjunction with the first side plate, the second side plate and third side plate for side wall, reaches and rationally utilizes tower Inner space and structure.
Wherein, first side plate, the second side plate formed between the tower wall for cabling by run through the top The cable tray of plate and bottom plate can store arrangement cable, avoid be set to tower outside two damage with it is in disorder.
Wherein, the radiator includes the second power part being disposed adjacent with first power part, the second heat exchange Device, the second heat exchanger are set on the third side plate backwards to the outside of the sealing room, the second heat exchanger packet Air duct and the second air duct in second are included, second outer air duct one end is connected to the outer power part, and the other end connects with air inlet Logical, second heat exchanger is located in second outer air duct, second power part be used for by it is described seal indoor heat at The dynamic air-flow of circulation, and pass through the heat transfer of air duct air-flow in described second to the sealing outdoor.
Wherein, air duct is equipped with the ventilation opening being connected to the sealing room and the first power part in described first, and described second Interior air duct is equipped with the ventilation opening being connected to the sealing room and the second power part.
Wherein, first side plate, the second side plate and third side plate are arc-shaped in the indoor arrangement of the sealing, the cabin Door is located at the center location of the arc.Indoor be equipped with of the sealing connects first side plate, the second side plate and third side plate Supporting rack, support frame as described above and the first side plate, the second side plate and third side plate are separated into multiple supporting zones, multiple branch Support the arrangement of region camber.The arrangement can conveniently pick and place the indoor equipment of sealing opening the rear of hatch door.
Wherein, the hatch door includes doorframe and door-plate and sealing, the doorframe be opened in the tower wall with it is described Receiving cabin is connected, and the door-plate is turnover to be loaded on the doorframe, door-plate described in the both seals and the doorframe Between, effectively sealing room can be sealed.
Wherein, the outer power part and the first power part and the second power part are including air deflector and in air deflector Centrifugal type fan.Wherein, it is set on the bottom plate there are two through-hole, two through-holes are respectively communicated with first outer air duct and the Two outer air ducts and the air inlet.
Wherein, the receiving space further includes the several receiving chambers being located above the receiving cabin, for storing other Equipment.
Base station provided by the utility model, including the tower, base station applies equipment and power supply, the base station applies are set It is indoor that the standby and described power supply is installed in the sealing.
Wherein, first side plate, the second side plate formed between the tower wall for cabling by run through the top The cabling of the cable tray of plate and bottom plate, the base station applies equipment and power supply is connected by channel and the tower other equipment It connects.
Tower described in the present embodiment in the internal sealing room for being provided with receiving base station applies equipment and power supply and is walked Line passage and radiator not only solve and the problem of cabinet area occupied influences appearance are arranged outside tower, and save The design of cabinet, while accomplishing that fully sharp tower inner space carries out rational deployment equipment riding position, wiring and heat dissipation, in turn Really realize the integrated purpose of cabinet tower.
Description of the drawings
It, below will be to this practicality in order to illustrate more clearly of the technical solution in the utility model embodiment or background technology Attached drawing illustrates needed in new embodiment or background technology.
Fig. 1 is the schematic diagram of tower described in the utility model;
Fig. 2 is the structural schematic diagram for being equipped with receiving cabin part of tower shown in FIG. 1;
Fig. 3 to Fig. 5 is the schematic diagram of the receiving cabin internal structure different angle of tower shown in Fig. 2, wherein removing tower wall Part;
Fig. 6 is the schematic diagram that outer power part and the first power part, the second power part are housed in tower shown in Fig. 2;
Fig. 7 is the vertical view that tower shown in Fig. 2 can see internal structure;
Fig. 8 is that Fig. 1 tower internal heat dissipatings move towards schematic diagram.
Specific implementation mode
The utility model embodiment is described with reference to the attached drawing in the utility model embodiment.
Tower during the utility model reality is open, what is generally referred to as used in tower type base station is used to set in inner containment Standby tower structure, but not limited to this, can also be the tower structure being used in inner containment equipment applied to other occasions. The tower using the installation of upright or near upright, the expression such as so-called upper and lower, height installed with tower after upright state As premise.It is described positioned at the top or lower part of certain object, refer to the top half in the object or lower half portion Position;It is described to be located above or below certain object, refer to being located at except the object and on the object or it Under position;It is corresponding refer to there is the common cooperation for realizing function or the correspondence on position between corresponding object, Those skilled in the art can determine corresponding meaning according to scene.
It please refers to Fig.1 and Fig. 2, the tower that the utility model embodiment provides, including tower wall 10, is surrounded by the tower wall 10 Receiving space 11 and radiator (figure be mark), the tower wall 10 be equipped with include air inlet 121 and air outlet 122 cabin Door 12.The receiving space 11 includes receiving cabin 20, and the receiving cabin 20 includes sealing room 21 and is located on the sealing room 21 The draft chamber 22 of side, the hatch door 12 close the receiving cabin 20, and the air outlet 122 is penetrated through with the draft chamber 22, described Air inlet 121 is located at outside the receiving cabin 20.The sealing room 21 is for accommodating communication apparatus and power supply of base station etc..
Together refering to shown in Fig. 3, Fig. 6 and Fig. 8, the radiator includes outer power part 30, the first power part 31 and One heat exchanger (not shown);First power part 31 is located at 21 top of the sealing room, and the first heat exchanger is set to On the side wall of the sealing room 21 and include with first in air duct (not shown) and the first outer air duct for being isolated with air duct in first A.The outer power part 30 is located in the draft chamber 22 to be connected to described one end first outer air duct A, and the first outer air duct A is another One end is connected to the air inlet 121, and the air quantity sucked from the air inlet 121 is passed through the first exogenous wind by the outer power part 30 It is excluded by air outlet 122 after road A, to carry out outer loop heat dissipation to the sealing room 21.First power part 31 is used for Form the dynamic air-flow of circulation in the sealing room 21, and by air duct in first by the heat transfer of air-flow to the sealing room To form the interior circulation air path to radiate to the sealing room 21 outside 21.Specifically, the heat exchanger core of first heat exchanger The shell of body and heat exchanger forms in mutually isolated described first air duct and the first outer air duct A, and air duct is set in described first There are the second ventilation opening 216 of the first ventilation opening 215 and the connection of the first power part 31 that are connected to the sealing room 21, and first Ventilation opening 215 is located at the sealing room bottom, and second ventilation opening 216 is located at the sealing ceiling portion and first power Portion 31 is connected to.
In the present embodiment, the tower wall 10 of the tower surrounds cylindric receiving space 11, inside further include being located at institute State several receiving chambers of 20 top of receiving cabin, equipment such as communication for storing base station etc..The receiving cabin is receiving space Interior cylinder-like structure, in the present embodiment, the receiving cabin 20 is by top plate 201 and the bottom plate being oppositely arranged in the top plate 201 202 and the tower wall between the top plate 201 and the bottom plate 202 surround, that is, be located at the top plate 201 and the bottom plate Tower wall between 202 is to accommodate the side wall in cabin.
Also referring to Fig. 3 to Fig. 5 and Fig. 7, further, in the receiving cabin 20 it is equipped with and is located at top plate 201 and bottom Partition board 23, the first side plate 24, the second side plate 25 between plate 202 and third side plate 26.First side plate 24, the second side plate 25 Between top plate 201 and bottom plate 202 and pass through the partition board 23.The third side plate 26 is located at partition board 23 and the bottom plate 202 Between.First side plate 24, the second side plate 25 and third side plate 26 (are located at the top plate 201 and institute along the tower wall 10 State the part between bottom plate 202) it is provided at circumferentially spaced, and first side plate 24, the second side plate 25 and third side plate 26 are equal It is connected by tower wall described in opposite sides 10 to surround the sealing room 21, the partition board 23 and the top plate 201 and tube wall 10 form the draft chamber 22, and the outer power part 30 is fixed in the draft chamber 22 and includes air deflector and centrifugal fan.
Such as Fig. 2, Fig. 3 and Fig. 5 specifically, 23 generally circular plate body of the top plate 201, bottom plate 202 and partition board, the top Plate 201, partition board 23 and bottom plate 202 are successively along the spaced and parallel receiving space surrounded set on the tube wall 10 of tower length direction It is interior.It is set on the bottom plate 202 there are two through-hole (figure be mark), through-hole connection first exogenous wind in two through-holes Road A and the air inlet 121.Side of the bottom wall 202 far from the top plate 201 is additionally provided with baffle 203, the baffle 203 Air inlet cavity is formed between bottom plate 202, the air inlet 121 of the hatch door 12 is connected to the air inlet cavity, to by into The wind in air port 121 is flowed into from air inlet cavity in the first outer air duct A.The partition board 23 is equipped with through-hole and first exogenous wind Road A is connected to, and the wind that the first outer air duct of diameter A comes out is discharged by the draft chamber 22 between partition board 23 and the top plate 201.Described Tower wall, the second side plate 25 between side plate 24 and the second side plate 25 and the tower wall between third side plate 26, third side plate 26 with Tower wall and the first side plate 24, the second side plate 25 and third side plate 26 between first side plate 24 collectively form the sealing room 21 All side walls.The first heat exchanger is fixed on first side plate 24 and in the sealing room 21.
First side plate, 24 section is substantially V-shaped comprising V-type surface 241,24 opposite sides of the first side plate with 10 inner surface of the tower wall connects, and V-type surface 241 forms cable tray 242 towards the tower wall 10 and between tower wall.Institute It is substantially V-shaped to state 25 section of the second side plate comprising V-type surface 251,25 opposite sides of the second side plate and the tower wall 10 Inner surface connects, and V-type surface 251 forms cable tray 252 towards the tower wall 10 and between tower wall.Cable tray 242 Run through the top plate 201 and/or bottom plate 202 with channel 252.The opposite sides of the third side plate 26 connect with the tower wall and Cavity is formed between the tower wall, the cavity runs through the partition board 23.
Further, first side plate 24, the second side plate 25 and third side plate 26 are arranged in the sealing room 21 is in Arc, the hatch door 12 are probably located at the first side plate 24 of center of circle displacement direction, the second side plate 25 and the third side plate of the arc 26 and first side plate 24, the second side plate 25 and third side plate 26 be located on the camber line in the same center of circle.Further, described Seal the supporting rack 27 for being equipped in room 21 and connecting first side plate 24, the second side plate 25 and third side plate 26, support frame as described above 27 and first side plate 24, the second side plate 25 and third side plate 26 be separated into multiple supporting zone B (Fig. 2 and Fig. 4), for accommodating simultaneously The base station applies equipment of fixed telecommunication base station and power supply etc., multiple supporting zone camber arrangements, take full advantage of tower Cylindric space structure.The equipment is close to first heat exchanger outer wall or the second side plate 25 and third side plate 26 is set It sets, more conducively the heat dissipation of equipment.The sealing chamber interior structure of the present embodiment and the design of hatch door can facilitate from hatch door 12 It picks and places the equipment in the sealing room 21 and replaces the first side plate 24,26 place wind of the second side plate 25 and third side plate The element in road, achieving the purpose that rationally to arrange utilizes tower inner space.
Referring again to Fig. 2, the hatch door 12 includes doorframe 123 and door-plate 124 and sealing, the doorframe is opened in It is connected with the receiving cabin 20 in the tower wall 10, the equipment for picking and placeing sealing chamber interior.The door-plate 124 is turnover Loaded on the doorframe 123, the sealing is the sealing ring set on 123 periphery of 124 periphery of prime number door-plate and doorframe, door-plate It is sealed between the door-plate 124 and the doorframe 123 after 124 closings.The air inlet 121 and air outlet 122 are set to the door To end positions on plate 124, the first side plate 24, the second side plate 25 and third side plate 26 are arranged in house type and multiple supports Region camber arrangement, makes to reduce tower perforated area while tower and high device integration, promotes the strong of tower itself Degree and reliability.
In the present embodiment, the first heat exchanger is set on first side plate 24, and first side plate 24 can be made For the shell of first heat exchanger.Certain first side plate 24 can be as the holder of first heat exchanger.The outer power Portion 30, which is located in the draft chamber 22, to be connected to by the through-hole on partition board 23 with the first outer air duct A.Referring to Fig. 8, described Outer power part 30 sucks air quantity from the air inlet 121 after startup and enters the first outer air duct A, then existed by outer power part 30 Tower is discharged in draft chamber 22, and to form the runner of the outer loop heat dissipation carried out to the sealing room 21, and air flow direction is as schemed Middle W.And after the first power part 31 starts, it extracts and seals indoor heat and the first heat exchange is discharged by the second ventilation opening 216 It is returned in sealing room 21 through the first ventilation opening 215 behind air duct in the first of device, to form air-flow and circulate, in this process In, the heat that air duct in first is discharged by the first power part 31 returns after the wind of heat exchanger core and the first outer air duct is radiated Into the sealing room 21, the runner of the inside circulation cooling carried out to the sealing room 21 is formed, and in air flow direction such as figure N, and then realize the effect that interior circulation cooling and outer circulation heat dissipation are carried out at the same time to sealing room 21.
Tower described in the present embodiment it is internal be provided with accommodate base station applies equipment and power supply sealing room 21 and Cable tray and radiator not only solve and the problem of cabinet area occupied influences appearance are arranged outside tower, and save The shell of cabinet, while accomplishing that fully sharp tower inner space carries out rational deployment equipment riding position, wiring and heat dissipation, into And the anti-theft effect really realized the integrated purpose of cabinet tower, and internal unit can be enhanced etc..
As shown in fig. 6, further, the radiator further includes second be disposed adjacent with first power part 31 Power part 33 and second heat exchanger, the second heat exchanger are set on the third side plate 26 backwards to the sealing room 21 In outside, that is, the cavity, the second heat exchanger includes air duct and the second outer air duct C in second, outside described second Air duct one end C is connected to the outer power part 30, and the other end is connected by another through-hole set on bottom plate 202 with air inlet 121 It is logical.Second power part 33 is connected to the gas for flowing the heat cyclization of shape in the sealing room 21 with air duct in second Stream, and the heat transfer of air-flow to the sealing outdoor is further enhanced by sealing room 21 by the second heat exchanger Heat dissipation effect.First power part, 31 and second power part 33 includes air deflector and centrifugal fan, passes through centrifugal fan Extraneous air quantity and internal heat are formed air-flow to flow.
The third side plate 26 can be as the shell of the second heat exchanger, the heat exchanging core of second heat exchanger Air duct and the second outer air duct C in mutually isolated described second are formed with the shell of heat exchanger.Air duct is equipped in described second 4th ventilation opening 218 of the third venting mouth 217 and the connection of the second power part 33 that are connected to the sealing room 21.The third is logical Air port 217 is located at the sealing room bottom, and the 4th ventilation opening 218 is located at the sealing ceiling portion and second power Portion 33 is connected to, and air quantity is sucked into the second outer air duct C from the air inlet 121 after the startup of outer power part 30, then by Tower is discharged in draft chamber 22 in outer power part 30, is radiated with the outer loop carried out to the sealing room 21.And the second power part After 33 start, extracts and seal indoor heat and be discharged into the second of second heat exchanger behind air duct by the second ventilation opening 216 It is returned in sealing room 21 through third venting mouth 217, to form internal circulation cooling, and equipment is by being installed in supporting zone, can With with third side plate 26 close to being conducive to the deletion of heat.The setting of the second heat exchanger facilitates the first heat and hands in turn The heat dissipation of parallel operation, the damage of equipment can be reduced with the heat dissipation of higher efficiency by carrying out book for the larger communication apparatus of calorific value.
Tower in the present embodiment by the first power part 31 is set and the second power part 33 coordinate first heat exchanger and Second heat exchanger, in two internal circulatory flows of the indoor formation of sealing and in sealing two outer loop streams of outdoor formation Road is combined with outer power part 30 and the first outer air duct and the second outer air duct by the heat of first heat exchanger and second heat exchanger It takes away, realizes high efficiency heat radiation effect.
The utility model also provides a kind of base station, including above-described tower, base station applies equipment and power supply, the base It stands application apparatus and the power supply is installed in the sealing room 20.The base station applies equipment include communication apparatus, monitoring set It is standby etc..Optical cable, cable of cable and tower of the base station applies equipment and power supply etc. can be stretched out from cable tray, with External cable or tower other equipment connection.
The components such as base station applies equipment and power supply, optical cable, cable are set to inside tower and are added by the base station of the utility model If cooling system radiates, additional floor setting cabinet is not needed, saves the design and cost of cabinet, and save and account for With floor space, twisted wire base station entirety floor space, the appearance globality for increasing base station.
Upper act preferred embodiment, has been further described the purpose of this utility model, technical solution and advantage, It should be understood that the above is only the preferred embodiment of the utility model only, it is not intended to limit the utility model, it is all Within the spirit and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this practicality Within novel protection domain.

Claims (13)

1. a kind of tower, which is characterized in that the receiving space and radiator surrounded including tower wall, by the tower wall, it is described For tower wall equipped with the hatch door for including air inlet and air outlet, the receiving space includes receiving cabin, and the receiving cabin includes sealing Room and the draft chamber above the sealing room, the hatch door close the receiving cabin, the air outlet and the draft chamber Perforation, the air inlet are located at receiving portion out of my cabin;
The radiator includes outer power part, the first power part and first heat exchanger, and first power part is located at described Seal ceiling portion, the first heat exchanger be set on the side wall of the sealing room and include in first air duct and with first in First outer air duct of air duct isolation, the outer power part is located in the draft chamber to be connected to first outer air duct one end, institute It states the first outer air duct other end to be connected to the air inlet, the air quantity sucked from the air inlet is passed through institute by the outer power part It is excluded by air outlet after stating the first outer air duct;
First power part is used for the air-flow dynamic in the indoor formation circulation of the sealing, and by air duct in described first by gas The heat transfer of stream is to the sealing outdoor.
2. tower as described in claim 1, which is characterized in that the receiving cabin was oppositely arranged by top plate and in the top plate Bottom plate and the tower wall between the top plate and the bottom plate surround, be equipped in the receiving cabin positioned at top plate and bottom plate it Between partition board, the first side plate, the second side plate and third side plate;First side plate, the second side plate between top plate and bottom plate and are worn The partition board is crossed, the third side plate is between partition board and the bottom plate, first side plate, the second side plate and third side plate It is provided at circumferentially spaced along the tower wall, and first side plate, the second side plate and third side plate pass through opposite sides institute Tower wall connection is stated to surround the side wall of the sealing room, the partition board forms the draft chamber with the top plate and tube wall.
3. tower as claimed in claim 2, which is characterized in that first side plate, the second side plate are between the tower wall Formed for cabling by the cable tray through the top plate and bottom plate.
4. tower as claimed in claim 2, which is characterized in that the radiator includes sets adjacent with first power part The second power part for setting, second heat exchanger, the second heat exchanger are set on the third side plate backwards to the sealing room Outside, the second heat exchanger includes air duct and the second outer air duct in second, second outer air duct one end with it is described outer Power part is connected to, and the other end is connected to air inlet, and second power part is connected to air duct in second for by the sealing room The air-flow of interior heat cyclization flowing, and pass through the heat transfer of air duct air-flow in described second to the sealing outdoor.
5. tower as claimed in claim 4, which is characterized in that air duct is equipped with dynamic with the sealing room and first in described first The ventilation opening of power portion connection, air duct is equipped with the ventilation opening being connected to the sealing room and the second power part in described second.
6. such as claim 2-5 any one of them towers, which is characterized in that first side plate, the second side plate and third side Plate is arc-shaped in the indoor arrangement of the sealing, and the hatch door is located at the center location of the arc.
7. tower as claimed in claim 6, it is characterised in that:Indoor be equipped with of the sealing connects first side plate, second The supporting rack of side plate and third side plate, support frame as described above and the first side plate, the second side plate and third side plate are separated into multiple supports Region, multiple supporting zone camber arrangements.
8. tower as claimed in claim 6, which is characterized in that the hatch door includes doorframe and door-plate and sealing, described Doorframe is opened in the tower wall to be connected with the receiving cabin, and the door-plate is turnover to be loaded on the doorframe, described close Envelope portion seals between the door-plate and the doorframe.
9. tower as claimed in claim 5, which is characterized in that the outer power part and the first power part and the second power part are equal Centrifugal type fan including air deflector and in air deflector.
10. tower as claimed in claim 5, which is characterized in that set on the bottom plate there are two through-hole, two through-holes divide It is not connected to first outer air duct and the second outer air duct and the air inlet.
11. tower as described in claim 1, which is characterized in that the receiving space further includes being located above the receiving cabin Several receiving chambers.
12. a kind of base station, which is characterized in that including claim 1-11 any one of them tower, base station applies equipment and electricity It is indoor that source, the base station applies equipment and the power supply are installed in the sealing.
13. base station as claimed in claim 12, which is characterized in that first side plate, the second side plate with the tower wall it Between formed for cabling by the cable tray through the top plate and bottom plate, the cabling of the base station applies equipment and power supply leads to Channel is crossed to connect with the tower other equipment.
CN201721886511.3U 2017-12-28 2017-12-28 Tower and base station Active CN208039983U (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201721886511.3U CN208039983U (en) 2017-12-28 2017-12-28 Tower and base station
EP18896083.5A EP3715562B1 (en) 2017-12-28 2018-12-21 Pipe tower and base station
PCT/CN2018/122752 WO2019128874A1 (en) 2017-12-28 2018-12-21 Pipe tower and base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721886511.3U CN208039983U (en) 2017-12-28 2017-12-28 Tower and base station

Publications (1)

Publication Number Publication Date
CN208039983U true CN208039983U (en) 2018-11-02

Family

ID=63955681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721886511.3U Active CN208039983U (en) 2017-12-28 2017-12-28 Tower and base station

Country Status (3)

Country Link
EP (1) EP3715562B1 (en)
CN (1) CN208039983U (en)
WO (1) WO2019128874A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019128874A1 (en) * 2017-12-28 2019-07-04 华为技术有限公司 Pipe tower and base station
CN112739096A (en) * 2020-12-23 2021-04-30 安徽科达自动化集团股份有限公司 Motor controller shell structure with good heat dissipation performance

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4133554A1 (en) 2020-04-10 2023-02-15 CommScope Technologies LLC Improved module for a cellular communications monopole

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7363769B2 (en) * 2005-03-09 2008-04-29 Kelix Heat Transfer Systems, Llc Electromagnetic signal transmission/reception tower and accompanying base station employing system of coaxial-flow heat exchanging structures installed in well bores to thermally control the environment housing electronic equipment within the base station
DK2151833T3 (en) * 2008-08-07 2013-04-15 Starkstrom Geraetebau Gmbh transformer System
US20120168116A1 (en) * 2009-03-13 2012-07-05 Xemc Darwind B.V. Method of constructing a wind turbine and bottom tower section of wind turbine
JP5204216B2 (en) * 2010-02-08 2013-06-05 三菱重工業株式会社 Wind power generator
CN202483209U (en) * 2012-02-01 2012-10-10 上海正动通信技术有限公司 Integrated power-saving device of self-ventilation air conditioning machine room and communication pipe tower
JP5992176B2 (en) * 2012-02-10 2016-09-14 エムエイチアイ ヴェスタス オフショア ウィンド エー/エス Wind power generator
CN102561749A (en) * 2012-03-20 2012-07-11 广州同方瑞风空调有限公司 Energy-saving type integrated communication base station room
US9782710B2 (en) * 2015-07-01 2017-10-10 General Electric Company Multi-sided ventilation assembly for wind turbine tower access door
CN206000230U (en) * 2016-07-13 2017-03-08 李增珍 A kind of single-pipe tower with ventilation and heat function
CN206674404U (en) * 2017-02-21 2017-11-24 华为技术有限公司 Pipe tower and base station
CN208039983U (en) * 2017-12-28 2018-11-02 华为技术有限公司 Tower and base station

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019128874A1 (en) * 2017-12-28 2019-07-04 华为技术有限公司 Pipe tower and base station
CN112739096A (en) * 2020-12-23 2021-04-30 安徽科达自动化集团股份有限公司 Motor controller shell structure with good heat dissipation performance
CN112739096B (en) * 2020-12-23 2022-01-11 安徽科达自动化集团股份有限公司 Motor controller shell structure with good heat dissipation performance

Also Published As

Publication number Publication date
EP3715562A4 (en) 2021-01-20
EP3715562B1 (en) 2022-03-09
EP3715562A1 (en) 2020-09-30
WO2019128874A1 (en) 2019-07-04

Similar Documents

Publication Publication Date Title
CN208039983U (en) Tower and base station
CN201115064Y (en) A machine cabinet
CN206674404U (en) Pipe tower and base station
CN205938754U (en) All -round waterproof stage lamps and lanterns with air supply cooling system
CN104832838B (en) Concealed waterproof air guide structure
CN202353960U (en) Bottom-in split-flow introduction type air cooling outdoor communication cabinet
WO2013139151A1 (en) Modular data centre
CN202166128U (en) Integrated air-conditioner
WO2021212776A1 (en) Heat dissipation cabinet
CN106550305B (en) Outdoor speaker cooling system
CN206112833U (en) Take stage lamp support frame of waterproof function and have its waterproof stage lamp
CN103687384B (en) Communication cabinet with refrigeration air conditioner
CN204554560U (en) Concealed waterproof air guide structure
CN105407685A (en) Communication product and base station system
CN205648310U (en) Horizontal heat radiation structure of large screen tiled display system
CN205247833U (en) Ventilation cooling LED display screen
CN102545295A (en) Communication power wall-mounted unit
CN205336687U (en) Dustproof and waterproof fan housing and have dc -to -ac converter of this fan housing
CN201302253Y (en) Novel heat exchanger
CN206817657U (en) A kind of kitchen, defend dual-purpose integrated air conditioner
CN209497791U (en) The tower cabinet of high efficiency and heat radiation
CN205793922U (en) A kind of desktop communication devices cabinet of oriented heat dissipating
CN201773263U (en) contraposition exposure
CN206906979U (en) The servicing unit that a kind of computer server big data processing ensures
CN206497693U (en) A kind of electronic presentation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant