CN208039045U - A kind of connection structure and deck structrue of floorings and I-steel - Google Patents

A kind of connection structure and deck structrue of floorings and I-steel Download PDF

Info

Publication number
CN208039045U
CN208039045U CN201820180326.0U CN201820180326U CN208039045U CN 208039045 U CN208039045 U CN 208039045U CN 201820180326 U CN201820180326 U CN 201820180326U CN 208039045 U CN208039045 U CN 208039045U
Authority
CN
China
Prior art keywords
steel
floorings
fixed plate
connection structure
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820180326.0U
Other languages
Chinese (zh)
Inventor
董寅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI CHANGNING NEW MATERIAL Co Ltd
Original Assignee
ANHUI CHANGNING NEW MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI CHANGNING NEW MATERIAL Co Ltd filed Critical ANHUI CHANGNING NEW MATERIAL Co Ltd
Priority to CN201820180326.0U priority Critical patent/CN208039045U/en
Application granted granted Critical
Publication of CN208039045U publication Critical patent/CN208039045U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model is related to the connection structures of a kind of floorings and I-steel, further relate to a kind of deck structrue, wherein, floorings are floorings made of being laid with by the first I-steel, the lower part of first I-steel is provided with the second I-steel, first I-steel and the second I-steel are arranged in a crossed manner, it is connected with fixed plate between wherein adjacent two first I-steel, connection structure includes hook and the connector for being connected and fixed plate and hook, in the case where the first I-steel and the second I-steel are in clamped condition, hook catches the top flange of the second I-steel, connector sequentially passes through hook and fixed plate, and the second I-steel is fixed on to the lower section of the first I-steel.In this way, so that the connection of the second I-steel and the first I-steel is more secured, and it is easy for installation, time saving, connection structure does not pass through the first I-steel and the second I-steel simultaneously, first I-steel and the second I-steel will not be damaged, be convenient for the recycling of the first I-steel, the second I-steel and connection structure.

Description

A kind of connection structure and deck structrue of floorings and I-steel
Technical field
The utility model is related to bridge building operations fields, and in particular to the connection structure of a kind of floorings and I-steel and Deck structrue.
Background technology
During architectural engineering is set up temporarily, it usually needs integrated deck plate, current conventional construction floorings are adopted It is built with 12 I-steel, and can staggeredly set up 25 I-steel as support in the lower layer of 12 I-steel, usual levels are staggeredly put The fixed form for the I-steel put uses electric welding, so that it is securely joined together, in actual use, floorings are set up It is working at height, makes troubles to electrical welding operation.
In order to solve the above-mentioned technical problem, as (application publication number is Patent No. CN201610911243.X CN106436567A Chinese patent application)《A kind of trestle bridge floor》, including I-steel, keel, gasket, wedge block, connecting plate, Bolt, nut, the edge of a wing, keel are fixed on using bolt, nut, gasket on the outer side wing edge of I-steel, between two blocks of I-steel It is fixedly connected using connecting plate, equally bolt, nut, gasket is used to be fixedly connected between connecting plate and I-steel, although equally The connection of I-steel is realized, still, bolt needs to sequentially pass through connecting plate, the edge of a wing of I-steel, wedge block and passes through nut Locking, cumbersome for installation, assembled efficiency is low.
Therefore, it is necessary to the connection structures to existing floorings and I-steel to be improved further.
Utility model content
First technical problem to be solved in the utility model is the present situation for the prior art, provides a kind of installation side Just, the connection structure of timesaving floorings and I-steel.
Second technical problem to be solved in the utility model is the present situation for the prior art, provides a kind of installation side Just application that is, time saving and firmly installing has the deck structrue of the connection structure of floorings and I-steel.
Technical solution is used by the utility model solves above-mentioned first technical problem:A kind of floorings and I-steel Connection structure, the floorings be by the first I-steel be laid with made of floorings, first I-steel lower part setting There are the second I-steel, first I-steel and the second I-steel arranged in a crossed manner, it is characterised in that:Wherein adjacent two described first It is connected with fixed plate between I-steel, the connection structure includes hook and the connector for being connected and fixed plate and hook, Under first I-steel and the second I-steel are in clamped condition, the hook catches the top flange of the second I-steel, the connection Part sequentially passes through hook and fixed plate, and second I-steel is fixed on to the lower section of the first I-steel.
There are many structure types for hook, it is preferable that the hook includes mounting portion and can catch the upper of the second I-steel The handgrip on the edge of a wing, the handgrip are located at the both sides of the mounting portion and are rotatablely connected with mounting portion.
There are many shapes of mounting portion, it is preferable that the shape of the mounting portion is substantially in H-type, and the mounting portion includes The first side wall second sidewall and the intermediate plate for connecting the first side wall and second sidewall, the first side wall second sidewall and centre Plate is formed with the mounting groove installed for handgrip, and the mounting groove is located at the both sides of the intermediate plate.In this way, facilitating handgrip Installation.
There are many structure types of handgrip, it is preferable that there is hook portion, the other end to offer for axis pin for one end of the handgrip The two side of the first mounting hole passed through, the mounting groove offers the second mounting hole in the corresponding position of the first mounting hole, The axis pin passes through the first mounting hole and the second mounting hole, and handgrip is rotatably connected in the mounting groove of mounting portion both sides.This Sample facilitates the processing of handgrip while facilitating the installation of handgrip.
In order to reinforce the intensity of handgrip, it is preferable that have the first reinforcing rib on the lateral wall of the handgrip.
Preferably, the shape of the fixed plate is L-shaped, and perpendicular with the web of adjacent two first I-steel.In this way, Increase the installation stability of the first I-steel and the second I-steel.
There are many modes for being fixed on the first I-steel web of fixed plate, it is preferable that distinguishes at the both ends of the fixed plate It is fixedly connected on by welding manner on the web of adjacent two first I-steel.
Second technical problem to be solved in the utility model is the present situation for the prior art, and providing a kind of application has The deck structrue of the connection structure of above-mentioned floorings and I-steel includes the first bridge made of being laid with by the first I-steel Panel, it is characterised in that:The connection structure is located at the both sides of the first floorings, and between the length direction of the first I-steel Between being set to adjacent two first I-steel;Pass through rib between adjacent two first I-steel among the first floorings Plate is fixedly connected.
Preferably, further include having
Second floorings are formed and are connected to each other in the longitudinal direction with the first floorings and connect by the laying of the first I-steel, And the first fixed plate and the second fixed plate are provided on opposite contact surface, first fixed plate and the second fixed plate is adjacent sets It sets, and is respectively positioned on the both sides of opposite contact surface;
First fixed plate is set between adjacent two first I-steel of the first floorings, and is exposed at accordingly institute It states between adjacent two first I-steel of the second floorings;
Second fixed plate is set between adjacent two first I-steel of the second floorings, and is exposed at accordingly Between adjacent two first I-steel of one floorings;
Second I-steel is fixed on first by first fixed plate and the second fixed plate by the connection structure The lower section of I-steel.
In order to enhance the intensity of the first fixed plate and the second fixed plate, it is preferable that first fixed plate and second is fixed The second reinforcing rib is both provided on plate.
Compared with prior art, the utility model has the advantage of:The bridge floor of the connection structure of the floorings and I-steel Plate is floorings made of being laid with by the first I-steel, and the lower part of the first I-steel is provided with the second I-steel, the first I-steel Arranged in a crossed manner with the second I-steel, wherein being connected with fixed plate between adjacent two first I-steel, connection structure includes hook Part and connector for being connected and fixed plate and hook, in the case where the first I-steel and the second I-steel are in clamped condition, hook The top flange of the second I-steel is caught, connector sequentially passes through hook and fixed plate, and second I-steel is fixed on The lower section of one I-steel.In this way so that the connection of the second I-steel and the first I-steel is more secured, and easy for installation, province When, while connection structure does not pass through the first I-steel and the second I-steel, it will not be to the first I-steel of floorings and second I-steel damages, and is convenient for the recycling of the first I-steel, the second I-steel and connection structure.
Description of the drawings
Fig. 1 is the assembling structure schematic diagram of first I-steel and the second I-steel of the utility model embodiment;
Fig. 2 is the dimensional decomposition structure diagram of Fig. 1;
Fig. 3 is first floorings of the utility model embodiment or the structural schematic diagram (removing cover board) of the second floorings;
Fig. 4 is the assembling structure schematic diagram of first floorings and the second floorings of the utility model embodiment;
Fig. 5 is the enlarged structure schematic diagram in the portions A in Fig. 4;
Fig. 6 is part decomposition texture schematic diagram in Fig. 5.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing embodiment.
As shown in Figures 1 to 6, be the utility model floorings and I-steel connection structure preferred embodiment.This reality The floorings for applying example include be to be laid with by the first I-steel 111, and the top of the first I-steel is provided with cover board, first The lower part of I-steel 111 is provided with the second I-steel 2, and the first I-steel 111 and the second I-steel 2 are arranged in a crossed manner, wherein adjacent It is connected with fixed plate 3 between two first I-steel 111, connection structure includes hook 4 and for being connected and fixed plate 3 and hook 4 Connector 43, in the case where the first I-steel 111 and the second I-steel 2 are in clamped condition, hook 4 catches the upper of the second I-steel 2 The edge of a wing 21, connector 43 sequentially passes through hook 4 and fixed plate 3, and second I-steel 2 is fixed on the first I-shaped by nut 6 The lower section of steel 111, wherein connector 43 is bolt, and the notch conveniently tightened or unscrewed, the shape of fixed plate 3 are offered on nut 6 Shape is L-shaped, and both ends are perpendicular with the web 111a of adjacent two first I-steel 111, in the present embodiment, fixed plate 3 Both ends are fixedly connected on the web 111a of adjacent two first I-steel 111 respectively by welding manner.
In the present embodiment, hook 4 includes mounting portion 42 and can catch the handgrip 41 of the top flange 21 of the second I-steel 2, Handgrip 41 is located at the both sides of mounting portion 42 and is rotatablely connected with mounting portion 42, wherein
The shape of mounting portion 42 is substantially in H-type, and mounting portion 42 includes the first side wall 421, second sidewall 423 and connection The first side wall 421 and the intermediate plate of second sidewall 423 422, the first side wall 421, second sidewall 423 and intermediate plate 422 are formed with For the mounting groove 424 that handgrip 41 is installed, mounting groove 424 is located at the both sides of intermediate plate 422.
There is hook portion 411, the other end to offer the first mounting hole 412 passed through for axis pin 5, mounting groove for one end of handgrip 41 424 two side offers the second mounting hole 424a in 412 corresponding position of the first mounting hole, and axis pin 5 passes through the first installation Hole 412 and the second mounting hole 424a, and handgrip 41 is rotatably connected in the mounting groove 424 of 42 both sides of mounting portion, in order to increase The intensity of handgrip 41 has the first reinforcing rib 413 on the lateral wall of handgrip 41.
As shown in Figures 4 to 6, being applied in the present embodiment has the bridge floor of the connection structure of above-mentioned floorings and I-steel hardened Structure includes the first floorings 11 and is connected to each other the second floorings 12 connecting in the longitudinal direction with the first floorings 11, and first Floorings 11 and the second floorings 12 are laid with by the first I-steel 111, and in the first floorings 11, connection structure is located at The both sides of first floorings 11, and along the length direction of the first I-steel 111 be arranged at intervals at adjacent two first I-steel 111 it Between;It is fixedly connected by floor 112 between adjacent first I-steel 111 among the first floorings 11;In the second bridge In panel 12, connection structure is located at the both sides of the second floorings 12, and is arranged at intervals at along the length direction of the first I-steel 111 Between adjacent two first I-steel 111;Pass through floor between adjacent first I-steel 111 among the second floorings 12 112 are fixedly connected.
In the present embodiment, the first fixed plate 31 is provided on 12 opposite contact surface of the first floorings 11 and the second floorings With the second fixed plate 32, the first fixed plate 31 and the second fixed plate 32 are disposed adjacent, and are respectively positioned on the both sides of opposite contact surface;Tool Body, the first fixed plate 31 is set between adjacent two first I-steel 111 of the first floorings 11, and is exposed at corresponding second Between 12 adjacent two first I-steel 111 of floorings;Second fixed plate 32 is set to adjacent two first works of the second floorings 12 Between word steel 111, and it is exposed between adjacent two first I-steel 111 of corresponding first floorings 11;First fixed plate, 31 He Second fixed plate 32 by connection structure the second I-steel 2 is fixed on to the lower section of the first I-steel 111.
In order to enhance the intensity of the first fixed plate 31 and the second fixed plate 32, in the present embodiment, the first fixed plate 31 and The second reinforcing rib 30 is both provided in two fixed plates 32, specifically, the first fixed plate 31 and the second fixed plate 32 include peace The extension board 312 that the side of loading board 311 and self installation plate 311 upwardly extends, the upper surface of 30 self installation plate 311 of the second reinforcing rib It upwardly extends and one end is connected with extension board 312.
Above-described embodiment makes the connection of the second I-steel and the first I-steel more secured, and easy for installation, time saving, Connection structure does not pass through the first I-steel and the second I-steel simultaneously, will not be to the first I-steel and the second I-shaped of floorings Steel damages, and is convenient for the recycling of the first I-steel, the second I-steel and connection structure.

Claims (10)

1. the connection structure of a kind of floorings and I-steel, the floorings are bridges made of being laid with by the first I-steel (111) The lower part of panel, first I-steel (111) is provided with the second I-steel (2), first I-steel (111) and the second work Word steel (2) is arranged in a crossed manner, it is characterised in that:It is connected with fixed plate (3) between wherein adjacent two first I-steel (111), The connection structure includes hook (4) and the connector (43) for being connected and fixed plate (3) and hook (4), in the first I-steel (111) with the second I-steel (2) it is in clamped condition under, the hook (4) catches the top flange (21) of the second I-steel (2), The connector (43) sequentially passes through hook (4) and fixed plate (3), and second I-steel (2) is fixed on the first I-shaped The lower section of steel (111).
2. the connection structure of floorings according to claim 1 and I-steel, it is characterised in that:The hook (4) includes There is mounting portion (42) and the handgrip (41) of the top flange (21) of the second I-steel (2), the handgrip (41) can be caught to be located at The both sides of the mounting portion (42) are simultaneously rotatablely connected with mounting portion (42).
3. the connection structure of floorings according to claim 2 and I-steel, it is characterised in that:The mounting portion (42) Shape is substantially in H-type, and the mounting portion (42) includes the first side wall (421), second sidewall (423) and connection the first side wall (421) and the intermediate plate of second sidewall (423) (422), the first side wall (421), second sidewall (423) and intermediate plate (422) it is formed with the mounting groove (424) installed for handgrip (41), the mounting groove (424) is located at the intermediate plate (422) Both sides.
4. the connection structure of floorings according to claim 3 and I-steel, it is characterised in that:The one of the handgrip (41) There is hook portion (411), the other end to offer the first mounting hole (412) passed through for axis pin (5) at end, the mounting groove (424) Two side offers the second mounting hole (424a) in the first mounting hole (412) corresponding position, and the axis pin (5) passes through first Mounting hole (412) and the second mounting hole (424a), and handgrip (41) is rotatably connected on to the mounting groove of mounting portion (42) both sides (424) in.
5. the connection structure of floorings according to claim 2 and I-steel, it is characterised in that:Outside the handgrip (41) There is the first reinforcing rib (413) on side wall.
6. the connection structure of the floorings and I-steel according to any one of claim 1 to 5 claim, feature exist In:The shape of the fixed plate (3) is L-shaped, and web (111a) of the both ends with adjacent two first I-steel (111) mutually hangs down Directly.
7. the connection structure of floorings according to claim 6 and I-steel, it is characterised in that:The fixed plate (3) Both ends are fixedly connected on the web (111a) of adjacent two first I-steel (111) respectively by welding manner.
The connection structure of floorings and I-steel described in any one of requirement 1 to 7 claim 8. a kind of application is had the right Deck structrue includes the first floorings (11) made of being laid with by the first I-steel (111), it is characterised in that:Described Connection structure is located at the both sides of the first floorings (11), and is arranged at intervals at along the length direction of the first I-steel (111) adjacent Between two first I-steel (111);Pass through between adjacent two first I-steel (111) intermediate positioned at the first floorings (11) Floor (112) is fixedly connected.
9. deck structrue according to claim 8, it is characterised in that:Further include having
Second floorings (12), formed by the first I-steel (111) laying and with the first floorings (11) phase in the longitudinal direction Docking connection, and the first fixed plate (31) and the second fixed plate (32) are provided on opposite contact surface, first fixed plate (31) it is disposed adjacent with the second fixed plate (32), and is respectively positioned on the both sides of opposite contact surface;
First fixed plate (31) is set between adjacent two first I-steel (111) of the first floorings (11), and exposed Between adjacent two first I-steel (111) of correspondence second floorings (12);
Second fixed plate (32) is set between adjacent two first I-steel (111) of the second floorings (12), and exposed Between adjacent two first I-steel (111) of corresponding first floorings (11);
First fixed plate (31) and the second fixed plate (32) are fixed by the second I-steel (2) by the connection structure Lower section in the first I-steel (111).
10. deck structrue according to claim 9, it is characterised in that:First fixed plate (31) and second is fixed The second reinforcing rib (30) is both provided on plate (32).
CN201820180326.0U 2018-02-01 2018-02-01 A kind of connection structure and deck structrue of floorings and I-steel Expired - Fee Related CN208039045U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820180326.0U CN208039045U (en) 2018-02-01 2018-02-01 A kind of connection structure and deck structrue of floorings and I-steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820180326.0U CN208039045U (en) 2018-02-01 2018-02-01 A kind of connection structure and deck structrue of floorings and I-steel

Publications (1)

Publication Number Publication Date
CN208039045U true CN208039045U (en) 2018-11-02

Family

ID=63951269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820180326.0U Expired - Fee Related CN208039045U (en) 2018-02-01 2018-02-01 A kind of connection structure and deck structrue of floorings and I-steel

Country Status (1)

Country Link
CN (1) CN208039045U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485297A (en) * 2019-08-30 2019-11-22 广州宏途设备工程有限公司 A kind of device of quick connection floorings and distribution beam
CN113969540A (en) * 2020-07-24 2022-01-25 天津电力工程监理有限公司 Construction temporary trestle and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485297A (en) * 2019-08-30 2019-11-22 广州宏途设备工程有限公司 A kind of device of quick connection floorings and distribution beam
CN113969540A (en) * 2020-07-24 2022-01-25 天津电力工程监理有限公司 Construction temporary trestle and construction method thereof
CN113969540B (en) * 2020-07-24 2024-02-20 天津电力工程监理有限公司 Construction temporary trestle and construction method thereof

Similar Documents

Publication Publication Date Title
CN208039045U (en) A kind of connection structure and deck structrue of floorings and I-steel
CN213115486U (en) Beam type template connecting structure and floor support plate system
KR19980059046U (en) Deck Panel of Reinforced Concrete Slab
CN107524082A (en) A kind of attachment structure applied to bridge temporary project
CN107130734B (en) Corrugated plate dst Horizontal H-shaped structure beam and its construction method
CN214402285U (en) Assembly type building connection structure
CN107326813B (en) Connection structure applied to connection of I-steel and bailey piece
CN211286592U (en) Aluminum formwork device for reinforcing large wallboard
CN112922323A (en) Concatenation formula aluminum mould board for building
CN106320692A (en) Building splicing formwork
CN212866679U (en) Rail fixing connector
CN211923331U (en) Mounting structure of wallboard
CN211899665U (en) Building engineering construction building templates
CN111576774B (en) Mounting structure and mounting method of wallboard
CN212104513U (en) Outer wall covers connects shaped steel structure prefabricated building
CN207919767U (en) A kind of connection structure being connect with beret slice applied to I-steel
CN211369529U (en) A template for expansion joint department
CN208563572U (en) Construction steel structure
CN214657828U (en) Device for reinforcing and connecting aluminum template, PC (polycarbonate) wallboard and cast-in-place floor slab
CN209817420U (en) Diamond column template reinforcing device
CN218667218U (en) T-shaped reinforcing structure of bridge
CN211545613U (en) Assembled stand for elevator
CN214498404U (en) Back ridge for aluminum template
CN211548797U (en) Unilateral fixed split bolt
CN210507792U (en) Modular steel structure component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181102

Termination date: 20220201