CN208039011U - A kind of steel structure bridge node connecting structure - Google Patents
A kind of steel structure bridge node connecting structure Download PDFInfo
- Publication number
- CN208039011U CN208039011U CN201820307671.6U CN201820307671U CN208039011U CN 208039011 U CN208039011 U CN 208039011U CN 201820307671 U CN201820307671 U CN 201820307671U CN 208039011 U CN208039011 U CN 208039011U
- Authority
- CN
- China
- Prior art keywords
- groove
- node
- support beam
- wedge
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 24
- 239000010959 steel Substances 0.000 title claims abstract description 24
- 238000009434 installation Methods 0.000 claims description 13
- 230000007704 transition Effects 0.000 claims description 7
- 238000003466 welding Methods 0.000 abstract description 5
- 238000010276 construction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型涉及一种钢结构桥梁节点连接结构,包括横向梁,所述横向梁中间位置设置有节点主体,所述节点主体包括方形块,所述方形块竖向方向设置有第一凹槽,所述方形块水平方向设置第二凹槽,所述节点主体下方连接竖向梁,所述竖向梁顶部设置有与第一凹槽相啮合的凸台,所述节点主体左侧连接左支撑梁,所述左支撑梁端部设置有与所述第二凹槽相吻合的连接杆,所述连接杆端部设置有楔形块,所述节点主体右侧连接右支撑梁,所述右支撑梁端部设置有与所述楔形块相啮合的楔形槽。本实用新型提供的节点连接结构,需要安装的螺栓数量较少,且不要焊接作业,安装方便,连接强度高,连接可靠。
The utility model relates to a steel structure bridge node connection structure, comprising a transverse beam, a node body is arranged in the middle of the transverse beam, the node body includes a square block, and a first groove is arranged in the vertical direction of the square block, The square block is provided with a second groove in the horizontal direction, the bottom of the node body is connected to a vertical beam, and the top of the vertical beam is provided with a boss engaged with the first groove, and the left side of the node body is connected to the left support Beam, the end of the left support beam is provided with a connecting rod matching the second groove, the end of the connecting rod is provided with a wedge block, the right side of the node main body is connected to the right support beam, and the right support The end of the beam is provided with a wedge-shaped groove engaged with the wedge-shaped block. The node connection structure provided by the utility model requires fewer bolts to be installed, does not require welding work, is convenient to install, has high connection strength, and is reliable to connect.
Description
技术领域technical field
本实用新型涉及钢结构桥梁技术领域,具体地说,涉及一种钢结构桥梁节点连接结构。The utility model relates to the technical field of steel structure bridges, in particular to a node connection structure of steel structure bridges.
背景技术Background technique
随着城市基础设施建设的不断发展,道路桥梁的建设规模不断扩大,而钢结构桥梁由于施工周期短,对各种复杂环境的适应性强等优点得到了广泛运用。钢结构桥梁主要采用各种型钢通过螺栓连接或焊接连接,构成钢结构桥梁主体。各个型钢在连接处的节点形式,对钢结构桥梁的受力状态以及使用安全性均有重要的影响。对于采用螺栓连接的节点形式,节点处螺栓的安装孔过多,容易造成型钢由于加工过多的安装孔,而降低了型钢本身的强度;对于采用焊接连接的节点形式,多条焊缝交汇在节点处,容易造成应力集中,对节点处的受力状态会造成不利有效,会降低节点处的连接强度,影响钢结构桥梁的使用寿命。With the continuous development of urban infrastructure construction, the construction scale of roads and bridges continues to expand, and steel structure bridges have been widely used due to their short construction period and strong adaptability to various complex environments. The steel structure bridge mainly adopts various types of steel to be connected by bolts or welding to form the main body of the steel structure bridge. The joint form of each section steel at the connection has an important impact on the stress state and safety of the steel structure bridge. For the joint form of bolt connection, there are too many bolt installation holes at the joint, which may easily cause the strength of the steel section to be reduced due to the processing of too many installation holes; for the joint form of welding connection, multiple welds meet at At the node, it is easy to cause stress concentration, which will be unfavorable and effective to the stress state at the node, reduce the connection strength at the node, and affect the service life of the steel structure bridge.
实用新型内容Utility model content
本实用新型的目的是为了解决现有钢结构桥梁中的节点连接结构存在的不足,提供一种安装便捷的节点连接结构。The purpose of the utility model is to provide a node connection structure with convenient installation in order to solve the deficiency of the node connection structure in the existing steel structure bridge.
为了实现上述目的,本实用新型通过以下技术方案来实现:In order to achieve the above object, the utility model is achieved through the following technical solutions:
一种钢结构桥梁节点连接结构,包括横向梁,所述横向梁中间位置设置有节点主体,所述节点主体包括方形块,所述方形块两侧设置护板,所述护板上设置安装孔,所述方形块竖向方向设置有第一凹槽,所述方形块水平方向设置第二凹槽;A steel structure bridge node connection structure, comprising a transverse beam, a node body is arranged in the middle of the transverse beam, the node body includes a square block, guard plates are arranged on both sides of the square block, and installation holes are arranged on the guard plate , the square block is provided with a first groove in the vertical direction, and the square block is provided with a second groove in the horizontal direction;
所述节点主体下方连接竖向梁,所述竖向梁顶部设置有与第一凹槽相啮合的凸台,所述凸台内部设置有连接凹槽,所述凸台与所述第一凹槽啮合安装时,所述连接凹槽与所述第二凹槽相贯穿;The bottom of the node body is connected with a vertical beam, and the top of the vertical beam is provided with a boss engaged with the first groove, and a connecting groove is arranged inside the boss, and the boss and the first groove When the grooves are engaged and installed, the connection groove and the second groove penetrate;
所述节点主体左侧连接左支撑梁,所述左支撑梁端部设置有与所述第二凹槽相吻合的连接杆,所述连接杆端部设置有楔形块,所述楔形块内部设置过渡孔;The left side of the main body of the node is connected to the left support beam, the end of the left support beam is provided with a connecting rod matching the second groove, the end of the connecting rod is provided with a wedge, and the inside of the wedge is provided Transition hole;
所述节点主体右侧连接右支撑梁,所述右支撑梁端部设置有与所述楔形块相啮合的楔形槽,所述右支撑梁端部在所述安装孔对应位置设置有锁紧孔。The right side of the node main body is connected to the right support beam, the end of the right support beam is provided with a wedge-shaped groove engaged with the wedge block, and the end of the right support beam is provided with a locking hole at the corresponding position of the installation hole .
上述的一种钢结构桥梁节点连接结构,所述右支撑梁、所述左支撑梁及所述节点主体采用高强度螺栓依次通过所述安装孔、所述锁紧孔及所述过渡孔进行固定连接。In the above-mentioned node connection structure of a steel structure bridge, the right support beam, the left support beam and the node main body are fixed by using high-strength bolts through the installation hole, the locking hole and the transition hole in sequence connect.
与现有技术相比,本实用新型的有益效果如下:该钢结构桥梁节点连接结构包括横向梁,在横向梁中间位置设置有节点主体,节点主体下方连接竖向梁,竖向梁通过凸台与第一凹槽啮合连接,安装到节点主体,节点主体左侧连接左支撑梁,左支撑梁通过连接杆与第二凹槽啮合连接,安装到节点主体上,并通过连接杆与连接凹槽的连接对竖向梁进行固定,节点主体右侧连接右支撑梁,右支撑梁通过楔形槽与楔形块,安装到左支撑梁上,并通过高强度螺栓将右支撑梁、左支撑梁与节点主体固定连接,该钢结构桥梁节点连接结构,安装的螺栓数量较少,安装方便,连接强度高,与现有的钢结构桥梁节点连接形式相比,不要焊接作业,减少了节点处的焊接应力集中对连接强度影响,提高了钢结构桥梁在节点连接处的连接可靠性。Compared with the prior art, the beneficial effects of the utility model are as follows: the steel structure bridge node connection structure includes a transverse beam, a node body is arranged in the middle of the transverse beam, a vertical beam is connected below the node body, and the vertical beam passes through the boss Engaged with the first groove, installed to the node body, the left side of the node body is connected to the left support beam, the left support beam is engaged with the second groove through the connecting rod, installed on the node body, and connected to the connecting groove through the connecting rod The connection of the vertical beam is fixed, the right side of the main body of the node is connected to the right support beam, the right support beam is installed on the left support beam through the wedge groove and the wedge block, and the right support beam, the left support beam and the node are connected by high-strength bolts The main body is fixedly connected. The steel structure bridge node connection structure has fewer bolts installed, easy installation, and high connection strength. Compared with the existing steel structure bridge node connection form, no welding operation is required, which reduces the welding stress at the node. The concentrated influence on the connection strength improves the connection reliability of the steel structure bridge at the node connection.
附图说明Description of drawings
图1是本实用新型的结构示意图;Fig. 1 is a structural representation of the utility model;
图2是本实用新型的横向梁的结构示意图;Fig. 2 is the structural representation of transverse beam of the present utility model;
图3是本实用新型中竖向梁的结构示意图;Fig. 3 is the structural representation of vertical beam in the utility model;
图4是本实用新型中左支撑梁的结构示意图;Fig. 4 is the structural representation of the left supporting beam in the utility model;
图5是本实用新型中右支撑梁的结构示意图。Fig. 5 is a structural schematic diagram of the right support beam in the utility model.
附图中:1、横向梁;2、节点主体;21、方形块;22、护板;23、第一凹槽;24、第二凹槽;3、竖向梁;31、凸台;32、连接凹槽;4、左支撑梁;41、连接杆;42、楔形块;5、右支撑梁;51、楔形槽。In the drawings: 1. Transverse beam; 2. Node main body; 21. Square block; 22. Guard plate; 23. First groove; 24. Second groove; 3. Vertical beam; 31. Boss; 32 , connection groove; 4, left support beam; 41, connecting rod; 42, wedge block; 5, right support beam; 51, wedge groove.
具体实施方式:Detailed ways:
参阅图1至图5,一种钢结构桥梁节点连接结构,包括横向梁1,横向梁1中间位置设置有节点主体2,节点主体2包括方形块21,方形块21两侧设置护板22,护板22上设置安装孔,方形块21竖向方向设置有第一凹槽23,方形块21水平方向设置第二凹槽24;Referring to Figures 1 to 5, a steel structure bridge node connection structure includes a transverse beam 1, a node body 2 is arranged in the middle of the transverse beam 1, the node body 2 includes a square block 21, and guard plates 22 are arranged on both sides of the square block 21, The guard plate 22 is provided with mounting holes, the square block 21 is provided with a first groove 23 in the vertical direction, and the square block 21 is provided with a second groove 24 in the horizontal direction;
节点主体2下方连接竖向梁3,竖向梁3顶部设置有与第一凹槽23相啮合的凸台31,凸台31内部设置有连接凹槽32,凸台31与第一凹槽23啮合安装时,连接凹槽32与第二凹槽24相贯穿;The bottom of the node main body 2 is connected to the vertical beam 3, and the top of the vertical beam 3 is provided with a boss 31 meshing with the first groove 23, and the inside of the boss 31 is provided with a connecting groove 32, and the boss 31 and the first groove 23 When engaging and installing, the connecting groove 32 runs through the second groove 24;
节点主体2左侧连接左支撑梁4,左支撑梁4端部设置有与第二凹槽24相吻合的连接杆41,连接杆41端部设置有楔形块42,楔形块42内部设置过渡孔;The left side of the node main body 2 is connected to the left support beam 4, the end of the left support beam 4 is provided with a connecting rod 41 matching the second groove 24, the end of the connecting rod 41 is provided with a wedge block 42, and a transition hole is provided inside the wedge block 42 ;
节点主体2右侧连接右支撑梁5,右支撑梁5端部设置有与楔形块42相啮合的楔形槽51,右支撑梁5端部在安装孔对应位置设置有锁紧孔。The right side of the node body 2 is connected to the right support beam 5, the end of the right support beam 5 is provided with a wedge-shaped groove 51 engaged with the wedge-shaped block 42, and the end of the right support beam 5 is provided with a locking hole at the corresponding position of the mounting hole.
本实施例中,右支撑梁5、左支撑梁4及节点主体2采用高强度螺栓依次通过安装孔、锁紧孔及过渡孔进行固定连接。In this embodiment, the right support beam 5, the left support beam 4 and the node main body 2 are fixedly connected through the installation hole, the locking hole and the transition hole in sequence by using high-strength bolts.
本实用新型的工作原理:该钢结构桥梁节点连接结构包括横向梁1,在横向梁1中间位置设置有节点主体2,节点主体2下方连接竖向梁3,节点主体2包括方形块21,方形块21竖向方向设置有第一凹槽23,第一凹槽23设置成圆形,竖向梁3通过凸台31与第一凹槽23的啮合安装到节点主体2上,第一凹槽23设置成圆形,以便于竖向梁3与节点主体2的连接安装,凸台31与第一凹槽23啮合安装到位后,连接凹槽32与第二凹槽24相贯穿;进一步,从节点主体2左侧将连接杆41插入第二凹槽24,第二凹槽24设置成方形,连接杆41设置与第二凹槽24相啮合,也设置成方形,以避免连接杆41在第二凹槽24内的转动,提高了左支撑梁4连接稳定性,连接杆41同时也穿过连接凹槽32,通过连接杆41能够对竖向梁3进行固定连接;进一步,从节点主体2右侧安装右支撑梁5,右支撑梁5通过楔形槽51与楔形块42相啮合结构,将右支撑梁5与连接杆41连接在一起,右支撑梁5安装完成后,右支撑梁5端部的锁紧孔与左支撑梁4端部的过渡孔以及护板22上设置安装孔相互贯穿,通过高强度螺栓将右支撑梁5、左支撑梁4与横向梁1固定连接。该钢结构桥梁节点连接结构通过左支撑梁将竖向梁与横向梁固定连接,右支撑梁通过楔形槽与楔形块啮合连接形式与左支撑梁连接,再通过高强度螺栓将右支撑梁、左支撑梁及节点主体固定连接,安装方便,安装效率高,节点处的连接强度高,连接性能稳定可靠。Working principle of the present utility model: the steel structure bridge node connection structure includes a transverse beam 1, a node body 2 is arranged in the middle of the transverse beam 1, the vertical beam 3 is connected below the node body 2, and the node body 2 includes a square block 21, a square The block 21 is provided with a first groove 23 in the vertical direction, and the first groove 23 is arranged in a circular shape. The vertical beam 3 is installed on the node body 2 through the engagement of the boss 31 and the first groove 23. The first groove 23 is set in a circular shape to facilitate the connection and installation of the vertical beam 3 and the node body 2. After the boss 31 is engaged with the first groove 23 and installed in place, the connecting groove 32 penetrates the second groove 24; further, from Insert the connecting rod 41 into the second groove 24 on the left side of the node main body 2. The second groove 24 is set in a square shape. The connecting rod 41 is set to engage with the second groove 24 and is also set in a square shape to avoid the connecting rod 41 in the second groove. The rotation in the second groove 24 improves the connection stability of the left support beam 4, and the connecting rod 41 also passes through the connecting groove 32 at the same time, and the vertical beam 3 can be fixedly connected by the connecting rod 41; further, from the node main body 2 The right support beam 5 is installed on the right side, and the right support beam 5 is engaged with the wedge block 42 through the wedge groove 51, and the right support beam 5 is connected with the connecting rod 41. After the installation of the right support beam 5, the right support beam 5 ends The locking hole at the top and the transition hole at the end of the left support beam 4 and the mounting holes on the guard plate 22 penetrate each other, and the right support beam 5, the left support beam 4 and the transverse beam 1 are fixedly connected by high-strength bolts. The steel structure bridge node connection structure fixedly connects the vertical beam and the transverse beam through the left support beam, and connects the right support beam with the left support beam through the meshing connection form of the wedge groove and the wedge block, and then connects the right support beam and the left support beam through high-strength bolts. The support beam and the main body of the node are fixedly connected, which is convenient for installation and high in installation efficiency. The connection strength at the node is high, and the connection performance is stable and reliable.
综上所述,以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点,仅为本实用新型的实施例而已,并非用来限定本实用新型实施的范围。本实用新型不受上述实施例的限制,凡依本实用新型权利要求范围的形状、构造、特征及精神所为的均等变化与修饰,均应落入本实用新型的范围内。本实用新型的保护范围由所附的权利要求书及其等同物界定。In summary, the basic principles, main features and advantages of the utility model shown and described above are only examples of the utility model, and are not intended to limit the implementation scope of the utility model. The utility model is not limited by the above-mentioned embodiments, and all equal changes and modifications made according to the shape, structure, characteristics and spirit of the claims of the utility model shall fall within the scope of the utility model. The protection scope of the utility model is defined by the appended claims and their equivalents.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820307671.6U CN208039011U (en) | 2018-03-06 | 2018-03-06 | A kind of steel structure bridge node connecting structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820307671.6U CN208039011U (en) | 2018-03-06 | 2018-03-06 | A kind of steel structure bridge node connecting structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208039011U true CN208039011U (en) | 2018-11-02 |
Family
ID=63950617
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820307671.6U Expired - Fee Related CN208039011U (en) | 2018-03-06 | 2018-03-06 | A kind of steel structure bridge node connecting structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208039011U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110230254A (en) * | 2019-06-25 | 2019-09-13 | 杭州固益强新材料科技有限公司 | A kind of steel truss bridge assembling type node connection structure |
| CN111254811A (en) * | 2020-03-09 | 2020-06-09 | 江苏宝力重工科技有限公司 | A steel structure bridge node connection structure |
-
2018
- 2018-03-06 CN CN201820307671.6U patent/CN208039011U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110230254A (en) * | 2019-06-25 | 2019-09-13 | 杭州固益强新材料科技有限公司 | A kind of steel truss bridge assembling type node connection structure |
| CN111254811A (en) * | 2020-03-09 | 2020-06-09 | 江苏宝力重工科技有限公司 | A steel structure bridge node connection structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN208039011U (en) | A kind of steel structure bridge node connecting structure | |
| CN201738456U (en) | L-shaped connecting joint of steel I-beam | |
| CN103255946B (en) | Cross inserting plate for power transmission line steel tube tower | |
| CN104233944B (en) | A kind of two L shape combination type T type power consumption connector and manufacture craft thereof | |
| CN104234212A (en) | Socket and spigot type light steel frame connecting joint and construction method thereof | |
| CN204098273U (en) | A kind of triangular steel plate damper | |
| CN204151667U (en) | A kind of two L shape combination type T type power consumption connector | |
| CN208039008U (en) | A kind of bridge I-steel | |
| CN219060611U (en) | Connecting structure of bored pile steel bars | |
| CN216918335U (en) | Novel variable cross-section structure node of steel crane beam | |
| CN208183956U (en) | A kind of assembling type steel structure structures with semi-rigid joints | |
| CN205382563U (en) | Steel structure support frame | |
| CN204096928U (en) | A kind of main beam of gantry crane | |
| CN211873349U (en) | Steel structure connecting structure | |
| CN211172612U (en) | Double T-plate bolt connection structure | |
| CN202990120U (en) | H-shaped steel column connection node | |
| CN201567683U (en) | Side-sway resistant end face tightening temporary connecting joint structure | |
| CN205769977U (en) | A kind of large-scale combined hull quick connector | |
| CN111058372A (en) | Mortise and tenon socket joint formula steel trestle crossbeam and steel-pipe pile connected node | |
| CN208039009U (en) | A kind of bridge formed steel construction | |
| CN205062651U (en) | Guardrail sleeve pipe installation mechanism | |
| CN204823744U (en) | Crane end beam end plate welded structure | |
| CN221627259U (en) | Box girder splicing structure | |
| CN204326122U (en) | Foundation pile pressure-resistant static load test girder connector | |
| CN218816527U (en) | A new type of external hanging channel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181102 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |