A kind of slip casting pilework Download PDFInfo
- Publication number
- CN208023561U CN208023561U CN201820467866.7U CN201820467866U CN208023561U CN 208023561 U CN208023561 U CN 208023561U CN 201820467866 U CN201820467866 U CN 201820467866U CN 208023561 U CN208023561 U CN 208023561U
- Authority
- CN
- China
- Prior art keywords
- stake holes
- grouting
- slip casting
- hole
- aperture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007569 slipcasting Methods 0.000 title claims abstract description 61
- 239000011799 hole material Substances 0.000 claims abstract description 183
- 239000000463 material Substances 0.000 claims abstract description 109
- 239000002002 slurry Substances 0.000 claims abstract description 71
- 239000011440 grout Substances 0.000 claims abstract description 46
- 238000007789 sealing Methods 0.000 claims abstract description 27
- 238000004891 communication Methods 0.000 claims abstract description 6
- 239000002689 soil Substances 0.000 claims description 13
- 239000002390 adhesive tape Substances 0.000 claims description 12
- 239000007788 liquid Substances 0.000 claims description 5
- 230000000903 blocking effect Effects 0.000 claims 1
- 238000007711 solidification Methods 0.000 abstract description 8
- 230000008023 solidification Effects 0.000 abstract description 8
- 239000010410 layer Substances 0.000 description 37
- 238000000034 method Methods 0.000 description 20
- 238000010276 construction Methods 0.000 description 7
- 238000012545 processing Methods 0.000 description 6
- 230000015572 biosynthetic process Effects 0.000 description 5
- 150000001875 compounds Chemical class 0.000 description 5
- 239000004567 concrete Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000005452 bending Methods 0.000 description 4
- 238000009408 flooring Methods 0.000 description 4
- 239000002131 composite material Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000009792 diffusion process Methods 0.000 description 3
- 238000004062 sedimentation Methods 0.000 description 3
- 230000006641 stabilisation Effects 0.000 description 3
- 238000011105 stabilization Methods 0.000 description 3
- 239000011800 void material Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 125000006850 spacer group Chemical group 0.000 description 2
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 229920002472 Starch Polymers 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 210000004911 serous fluid Anatomy 0.000 description 1
- 239000002356 single layer Substances 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 235000019698 starch Nutrition 0.000 description 1
- 238000009955 starching Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Abstract
The utility model is related to a kind of slip casting pileworks, including stake holes, exhaust pipe and the Grouting Pipe being vertically arranged in ground, and the bottom of stake holes is inserted into stake holes and is abutted in the lower end of Grouting Pipe, and the upper end of Grouting Pipe is stretched out the aperture of stake holes and is connected to and in communication with filling system;The lower end of exhaust pipe is placed in stake holes, and the aperture of stake holes is stretched out in the upper end;Exhaust pipe leans on Grouting Pipe and is fixedly connected with the top of Grouting Pipe;Under-filled in stake holes has hole inner filling material, and forms hole inner filling material layer, from the upper end of hole inner filling material layer to being filled with aperture sealing of hole material between the aperture of stake holes in stake holes, and forms the aperture sealing of hole bed of material;The top of the hole inner filling material layer is inserted into the lower end of the exhaust pipe, the utility model is after grouting pile is formed, filling system stops slip casting when grouting pressure maximum is gradually increased to 1.0MPa, grout material slurries have diffused in the ground of stake holes periphery the filling and solidification for carrying out hole at this time, and low-pressure grouting may be implemented.
Description
Technical field
The utility model is related to injecting treatment fields, more particularly to one kind of basement process is carried out to indoor existing miscellaneous fill
Slip casting pilework.
Background technology
Miscellaneous fill is artificial unordered backfill formation, and foundation bearing capacity is relatively low, generally cannot directly as soil supporting layer, but
In engineering construction, especially when basis uses the strip footing either single layer, multi-storey building or workshop of isolated footing, one
As basement process only is carried out to the miscellaneous fill under basic scope, it is higher that foundation load is such as delivered in bearing capacity under ground using stake
Stratum in, and carry out treatment (about 30cm thickness) as miscellaneous fill is often only simple within the scope of room cubsoil other than basis
Afterwards with regard to the construction of the indoor waterproof of progress or concrete topping, for a long time, although miscellaneous fill overlying doors structure load is not high,
But because miscellaneous fill is less closely knit, porosity is big in soil, does not complete, from consolidating, itself to will produce sedimentation, indoor earth's surface is caused to send out
Raw sedimentation, pre-buried underground utilities indoor at this time may be damaged, and especially the pipelines such as water, heating power once settle change up and down
Shape is damaged leakage, and miscellaneous fill is impregnated and caused the collapsibility banketed by percolating water, and flooring will generate bigger
Sedimentation or differential settlement, the normal use on extreme influence ground within doors, therefore permanent work is both needed to in compartment
The miscellaneous fill of table structural load is handled.
Although there are many method for processing foundation at present, because being located in interior, large scale equipment can not march into the arena construction at all, so just
Method is extremely limited, at present there are mainly two types of interior room cubsoil method for processing foundation:(1) cushion is dug out, that is, digs out miscellaneous fill, is changed
The construction material being filled into, because constructing indoors, big machinery can not pass in and out and construct, can only hand excavation, therefore this
A method is generally adapted the smaller miscellaneous fill of processing thickness, when miscellaneous fill is thicker, such as exceeds 1.0m, then uneconomical.(2) conventional
High-pressure slip-casting method, i.e. vibration sink to slip casting steel pipe, inject cement mortar by Grouting Pipe high pressure (general 3-5 MPa) to reach
Cure the purpose of miscellaneous fill, but because of the inhomogeneities of miscellaneous fill, high-pressure slip-casting slurries flow to no controllability, are as a result exactly miscellaneous
Banketing, it is uneven to reinforce, and miscellaneous fill intensity after slip casting in part improves, intensity does not improve substantially after room cubsoil in part is reinforced,
Slip casting effect is uneven, while uncontrollable grouting serous fluid is seized every opportunity under high pressure, indoor section pipeline such as heating power pipe trench
So that it is can not operate normally etc. filling, causes secondary loss.
Utility model content
Technical problem to be solved in the utility model is in view of the deficiencies of the prior art, to provide a kind of slip casting pilework,
At least one to solve the above technical problems.
The technical solution that the utility model solves above-mentioned technical problem is as follows:A kind of slip casting pilework, including be vertically arranged
The lower end of stake holes, exhaust pipe in ground and Grouting Pipe, the Grouting Pipe is inserted into the stake holes and abuts the stake holes
The upper end of bottom, the Grouting Pipe is stretched out the aperture of the stake holes and is connected to and in communication with filling system;Under the exhaust pipe
End is placed in the stake holes, and the aperture of the stake holes is stretched out in the upper end;The exhaust pipe lean on the Grouting Pipe and with the note
The top of slurry pipe is fixedly connected;Under-filled in the stake holes has hole inner filling material, and forms hole inner filling material layer, the stake
In hole from the upper end of the hole inner filling material layer between the aperture of the stake holes be filled with aperture sealing of hole material, and formed aperture envelope
The hole bed of material;The top of the hole inner filling material layer is inserted into the lower end of the exhaust pipe.
The utility model has the beneficial effects that:By the way that the Grouting Pipe in stake holes is arranged, institute is stretched out in the upper end of the Grouting Pipe
It states stake holes and is connected to and in communication with filling system, the injecting treatment to ground may be implemented;Grouting Pipe and exhaust pipe are put into described
After stake holes, hole inner filling material is inserted and forms hole inner filling material layer in the stake holes, reinject aperture sealing of hole material formed it is closely knit
The aperture sealing of hole bed of material, the sturdy stabilization of the aperture sealing of hole bed of material can so that the grout material slurries injected during slip casting will not be from
Aperture is emerged, but by being filled and being cured, slip casting in the void diffusion of stake holes side wall to the gap of stake holes periphery ground
The ground of stake and stake periphery after grout material fills curing process is with regard to form compound foundation, the structure lotus of shared flooring
It carries, achievees the purpose that consolidated subsoil, improves its bearing capacity;During slip casting, it can observe whether stake holes has filled by exhaust pipe
Full grout material, the slip casting in stake holes when normal pressure, waits for that slip casting feed liquid surface moves up and to the upper end pulp of exhaust pipe, shows that stake holes has been filled
Full grout material, has formed grouting pile at this time in stake holes, then bending exhaust pipe and seals, and the slip casting pressure of filling system is gradually increased
Grout material slurries are diffused in the ground of stake holes periphery the filling and solidification for carrying out hole by power;It may be implemented in normal pressure and be less than
The curing process to ground is completed under the grouting pressure of 1.0MPa;The utility model is by grout material filling curing process
Base, ground after processing are the major volume portions of composite foundation, except a small amount of slag for generating stake own vol when site operation
Native outer, generation dregs amount is less, belongs to environmental protection construction, Green civilization construction.
Based on the above technical solution, the utility model can also do following improvement.
Further, the hole inner filling material further includes grout material slurries, and the grout material slurries are passed through by the filling system
The Grouting Pipe fills the hole inner filling material layer.
It is using above-mentioned further advantageous effect:Grout material slurries fill the hole inner filling material through the Grouting Pipe
The grouting pressure of filling system is gradually increased by the cementing formation grouting pile of solidification in layer, hole inner filling material and grout material slurries, will
Grout material slurries diffuse in the ground of stake holes periphery the filling and solidification for carrying out hole
Further, Grouting Pipe includes integrally formed slip casting connecting tube and grouting tube, slip casting connecting tube upper end connection note
Slurry system, lower end connect the upper end of grouting tube, and the lower end of grouting tube is connected to the bottom of stake holes;It is offered on grouting tube
Several slurry outlets;The slip casting connecting tube is located at the aperture sealing of hole bed of material, and the grouting tube is located at the hole inner filling material
Layer.
It is using above-mentioned further advantageous effect:It may be implemented grout material slurries being injected into hole by slurry outlet and fill out
Charge layer.
Further, the slurry outlet is horizontal runs through the grouting tube, and the two neighboring slurry outlet between the upper and lower every
It is arranged and is mutually perpendicular to;The pulp bore dia 5mm, 4~6cm of the two neighboring pulp pitch of holes.
Further, closure is covered on slurry outlet, closure is outer to be tied with adhesive tape;The tube bottom of Grouting Pipe is tied with the glue for back cover
Band.
It is using above-mentioned further advantageous effect:Closure is covered on slurry outlet, closure is outer to be tied with adhesive tape;Grouting Pipe
Tube bottom is tied with the adhesive tape for back cover, is that will not enter sundries such as hole inner filling material in Grouting Pipe before slip casting to protect
Starting the surge of grouting behind shaft or drift lining slurry liquid Deng, slip casting will can easily block and adhesive tape is washed open, realize grout material slurries
The purpose come out from slurry outlet.
Further, the upper layer of the ground is miscellaneous fill layer, and lower layer is original state soil layer, 80~100mm of the stake holes diameter,
The stake holes is inserted into the original state soil layer and its bottom hole is 50cm at a distance from the upper end of the undisturbed soil.
Further, the bottom end of the exhaust pipe is 60cm at a distance from the aperture.
Further, the height of the aperture sealing of hole bed of material is 50cm.
Further, hole inner filling material is rubble, and grain size is 0.5~2.0cm.
Further, the maximum grouting pressure of filling system is 1.0MPa.
Advantageous effect using above-mentioned further scheme is:Compared to conventional high-pressure grouting method, the utility model waits noting
After starching stake formation, filling system stops slip casting when grouting pressure maximum is gradually increased to 1.0MPa, grout material slurries have expanded at this time
It is dissipated to the filling and solidification for carrying out hole in the ground of stake holes periphery, low-pressure grouting may be implemented.
Description of the drawings
Fig. 1 is a kind of grouting pile schematic diagram of the utility model;
Fig. 2 is a kind of grouting pile slip casting schematic diagram of the utility model;
Fig. 3 is that the utility model carries out processing figure to ground;
Fig. 4 is the utility model grouting tube schematic diagram.
In attached drawing, parts list represented by the reference numerals are as follows:
1, ground, 11, miscellaneous fill layer, 12, original state soil layer, 2, stake holes, 3, hole inner filling material layer, 4, Grouting Pipe, 41, slip casting
Connecting tube, 42, grouting tube, 421, slurry outlet, 5, exhaust pipe, 6, the aperture sealing of hole bed of material, 7, block, 8, adhesive tape, 9, grout material
Slurries, 13, filling system.
Specific implementation mode
The principles of the present invention and feature are described below in conjunction with attached drawing, example is served only for explaining this practicality
It is novel, it is not intended to limit the scope of the utility model.
As shown in Figs. 1-3, a kind of slip casting pilework, including stake holes 2, exhaust pipe 5 and Grouting Pipe 4 in ground 1, the note
The bottom of the stake holes 2 is inserted into the stake holes 2 and is abutted in the lower end of slurry pipe 4, and the stake holes is stretched out in the upper end of the Grouting Pipe 4
It 2 and is connected to and in communication with filling system 13;The lower end of the exhaust pipe 5 is placed in the stake holes 2, and the stake holes is stretched out in the upper end
2 aperture;The exhaust pipe 5 leans on the Grouting Pipe 4 and is fixedly connected with the top of the Grouting Pipe 4;Under the stake holes 2
End filling hole inner filling material forms hole inner filling material layer 3, and the aperture of upper end to the stake holes 2 of the hole inner filling material layer 3 is filled out
It fills aperture sealing of hole material and forms the aperture sealing of hole bed of material 6;The top of the hole inner filling material layer 3 is inserted into the lower end of the exhaust pipe 5;Institute
The bottom for stating exhaust pipe 5 is 60cm at a distance from the aperture;The height of the aperture sealing of hole bed of material 6 is 50cm;It is filled in hole
Material is rubble, and grain size is 0.5~2.0cm;Grout material slurries 9, the maximum of filling system 13 are equipped in the filling system 13
Grouting pressure is 1.0MPa;The upper layer of the ground 1 is miscellaneous fill layer 11, and lower layer is original state soil layer 12,2 diameter 80 of the stake holes
The bottom hole of~100mm, the stake holes 2 are inserted into the original state soil layer 12 and are at a distance from the upper end of the original state soil layer 12
50cm。
By being arranged the Grouting Pipe 4 in stake holes 2, the upper end of the Grouting Pipe 4 stretch out the stake holes 2 and with filling system 13
It is connected to and in communication with, the injecting treatment to ground 1 may be implemented;Grouting Pipe 4 and exhaust pipe 5 are put into after the stake holes 2, will be in hole
Filler material, which is inserted, forms hole inner filling material layer 3 in the stake holes 2, reinject aperture sealing of hole material and form the closely knit aperture sealing of hole bed of material
6, the sturdy stabilization of the aperture sealing of hole bed of material 6 can make the grout material slurries 9 injected during slip casting not emerge from aperture, and
It is to be filled and cured in the void diffusion to the gap of 2 periphery ground 1 of stake holes by 2 side wall of stake holes, grouting pile and stake week
While the ground 1 after grout material fills curing process is with regard to form compound foundation 1, the structural load of shared flooring reaches
To consolidated subsoil 1, improve the purpose of its bearing capacity;During slip casting, it can observe whether stake holes 2 has been filled with by exhaust pipe 5
Grout material, the slip casting in stake holes 2 when normal pressure, waits for that slip casting feed liquid surface moves up and to the upper end pulp of exhaust pipe 5, shown stake holes 2
Full of grout material, grouting pile having been formed in stake holes 2 at this time, then bending exhaust pipe 5 and having been sealed, the note of filling system 13 is gradually increased
Pressure is starched, grout material slurries 9 are diffused in 2 periphery ground 1 of stake holes to the filling and solidification for carrying out hole.
As shown in Figs. 1-3, the hole inner filling material further includes grout material slurries 9, and the grout material slurries 9 are by filling system
13 fill the hole inner filling material layer 3 through the Grouting Pipe 4.
Grout material slurries 9 fill the hole inner filling material layer 3, hole inner filling material and grout material slurries 9 through the Grouting Pipe 4
By curing cementing formation grouting pile, the grouting pressure of filling system 13 is gradually increased, grout material slurries 9 are diffused into stake holes 2
The filling and solidification of hole are carried out in periphery ground 1.
As shown in Figs. 1-3, Grouting Pipe 4 includes integrally formed slip casting connecting tube 41 and grouting tube 42, slip casting connecting tube
41 upper ends connect filling system 13, and lower end connects the upper end of grouting tube 42, and the lower end of grouting tube 42 is connected to the bottom of stake holes 2
Portion;Several slurry outlets 421 are offered on grouting tube 42;The slip casting connecting tube 41 is located at the aperture sealing of hole bed of material 6, described
Grouting tube 42 is located at the hole inner filling material layer 3.It may be implemented grout material slurries 9 being injected into hole by slurry outlet 421
Fill the bed of material 3.
As shown in Figs 1-4, slurry outlet 421 is horizontal runs through the grouting tube 42, and the two neighboring slurry outlet 421
Between the upper and lower every being arranged and be mutually perpendicular to;The slurry outlet 421 diameter 5mm, 421 4~6cm of spacing of the two neighboring slurry outlet.
As shown in figure 4, a slurry outlet 421 is horizontal to form two correspondences through the grouting tube 42 on grouting tube 42
Hole, and the two neighboring slurry outlet 421 is covered with closure 7 between the upper and lower every being arranged and being mutually perpendicular on slurry outlet 421, envelope
It is tied with adhesive tape 8 outside stifled 7;The tube bottom of Grouting Pipe 4 is tied with the adhesive tape 8 for back cover, and closure 7 is covered on slurry outlet 421, blocks 7
It is tied with adhesive tape 8 outside;The tube bottom of Grouting Pipe 4 is tied with the adhesive tape 8 for back cover, and being will not in Grouting Pipe 4 before slip casting in order to protect
Into sundries such as the inner filling material of hole, the surge that slip casting starts grouting behind shaft or drift lining slurry liquid 9 will can easily block 7 Hes
Adhesive tape 8 is washed open, realizes the purpose that grout material slurries 9 come out from slurry outlet 421.
The course of work of the present embodiment is:Slip casting connecting tube 41 and grouting tube 42 on same root plastic tube, wherein on
80~100cm of portion is slip casting connecting tube 41, and lower part is grouting tube 42, and the exhaust pipe 5 is bound with iron wire in grouting tube 42
Outside;In stake holes 2, the slip casting connecting tube 41 with the exhaust pipe 5 and grouting tube 42 are put into bottom hole, then artificial filling
Under hole inner filling material to 2 aperture absolute altitude of stake holes at 50cm, while the position for adjusting the slip casting connecting tube 41 is allowed in stake holes 23
Centre position, the indoor making aperture sealing of hole material in scene, aperture sealing of hole material is filled up at the aperture absolute altitude of stake holes 2 later, and
With reinforcing bar vibration compacting, the aperture sealing of hole bed of material 6 is formed, indoor maintenance carries out Cementer work after 2~3 days, when slip casting first passes through note
It starches connecting tube 41 and grouting tube 42 and carries out common pressure grouting, wait for that the grout material slurries 9 move up in stake holes 2 and to exhaust pipe 5
Exposed nozzle pulp shows that stake holes 2 has been filled with grout material slurries 9, at this time the hole inner filling material and grout material slurries 9 in stake holes 2
Formed non-fine concrete grouting pile, then bending exhaust pipe 5 and bind on exhaust pipe 5, grouting pressure maximum is gradually increased extremely
Stop slip casting when 1.0MPa, grout material slurries 9 diffuse to 2 periphery miscellaneous fill layer 11 of stake holes by 2 Sidewall spacers of stake holes at this time
Filling and curing process, such grouting pile and stake periphery miscellaneous filling out after grout material slurries 9 fill curing process are carried out in gap
Soil layer 11 reaches with regard to form compound foundation 1, shared flooring structural load and reinforces miscellaneous fill layer 11, improves its carrying
The purpose of power.
Wherein, hole inner filling material is rubble, and 0.5~2.0cm of grain size, filling height is from 2 bottom hole of stake holes to aperture absolute altitude
At lower 50cm;Aperture sealing of hole material is live hand mixed concrete, and intensity C20 is filled described on hole inner filling material top
Reinforcing bar vibration compacting is used in combination until stopping at 2 aperture absolute altitude of stake holes in aperture sealing of hole material.The aperture sealing of hole bed of material 6 need to carry out intensity and support
Shield, indoor curing time:At least 48 hours in summer, at least 72 hours winter.
Grout material slurries 9 are plain-water slurry, strength of cement grade P.O 42.5, the ratio of mud 0.6~0.8, grout material slurries 9
Entered in the stake holes 2 full of hole inner filling material by Grouting Pipe 4 by filling system 13,2 inner pore air of stake holes passes through exhaust pipe 5
Discharge, until grout material slurries 9 are flowed out in 5 exposed aperture of exhaust pipe, grout material slurries 9 have been at this time for slip casting always under normal pressure
Full of all gaps in stake holes 2 and hole inner filling material, 2 endoporus inner filling material of stake holes and grout material slurries 9 cure cementing, formation
Non-fine concrete grouting pile.
After non-fine concrete grouting pile is formed, then bending exhaust pipe 5 and with iron wire binding on exhaust pipe 5, gradually carry
Stop slip casting when high grouting pressure is to 1.0MPa, grout material slurries 9 diffuse to 2 periphery of stake holes by 2 Sidewall spacers of stake holes at this time
Miscellaneous fill layer 11 gap in filled and cured, such grouting pile and periphery are through the cured miscellaneous fill layer of grout filling
11 with regard to form compound foundation 1, achievees the purpose that reinforce miscellaneous fill layer 11, improves its bearing capacity.
Stake holes 2 is laid in 40~50cm by horizontal and vertical spacing, every grouting pile is applied with above-mentioned technique
Work, more grouting piles and periphery fill cured miscellaneous fill layer 11 with regard to full wafer composite foundation 1 in forming chamber through grout material slurries 9,
Surface infrastructure load in shared room.
The present embodiment has the beneficial effect that:The sturdy stabilization of the aperture sealing of hole bed of material can make the note injected during slip casting
Slurry slurries will not emerge from aperture, but by being filled in the void diffusion of stake holes side wall to the gap of stake holes periphery ground
It fills out and cures, the ground of grouting pile and stake periphery after grout material fills curing process is with regard to form compound foundation, shared room
The structural load on interior ground achievees the purpose that consolidated subsoil, improves its bearing capacity, and the utility model is filled by grout material slurries
Curing process ground is filled out, ground after processing is the major volume portion of composite foundation, except generating grouting pile when site operation
Outside a small amount of dregs of own vol, generation dregs amount is less, belongs to environmental protection construction, Green civilization construction.It compares and conventional high-pressure
Grouting method, after grouting pile is formed, filling system stops the utility model when grouting pressure maximum is gradually increased to 1.0MPa
Slip casting, at this time grout material slurries diffused in the ground of stake holes periphery carry out hole filling and solidification, may be implemented low pressure note
Slurry.
In the description of this specification, reference term " embodiment one ", " embodiment two ", " example ", " specific example " or
The description of " some examples " etc. means that specific method, device or feature described in conjunction with this embodiment or example are contained in this reality
With in novel at least one embodiment or example.In the present specification, schematic expression of the above terms are necessarily directed to
Be identical embodiment or example.Moreover, description specific features, method, apparatus or feature can any one or it is more
It can be combined in any suitable manner in a embodiment or example.In addition, without conflicting with each other, those skilled in the art can
The feature of different embodiments or examples described in this specification and different embodiments or examples to be combined.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all in this practicality
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (10)
1. a kind of slip casting pilework, which is characterized in that including stake holes, exhaust pipe and the Grouting Pipe being vertically arranged in ground, institute
The bottom of the stake holes is inserted into the stake holes and is abutted in the lower end for stating Grouting Pipe, and the stake holes is stretched out in the upper end of the Grouting Pipe
Aperture and be connected to and in communication with filling system;The lower end of the exhaust pipe is placed in the stake holes, and the stake is stretched out in the upper end
The aperture in hole;The exhaust pipe leans on the Grouting Pipe and is fixedly connected with the top of the Grouting Pipe;Under in the stake holes
Portion is filled with hole inner filling material, and forms hole inner filling material layer, from the upper end of the hole inner filling material layer to institute in the stake holes
It states and is filled with aperture sealing of hole material between the aperture of stake holes, and form the aperture sealing of hole bed of material;Described in the lower end of the exhaust pipe is inserted into
The top of hole inner filling material layer.
2. a kind of slip casting pilework according to claim 1, it is characterised in that, the hole inner filling material further includes slip casting slurry
Liquid, the grout material slurries fill the hole inner filling material layer by the filling system through the Grouting Pipe.
3. a kind of slip casting pilework according to claim 1, it is characterised in that, the Grouting Pipe includes integrally formed slip casting
Connecting tube and grouting tube, slip casting connecting tube upper end connect filling system, and lower end connects the upper end of the grouting tube, institute
The lower end for stating grouting tube is connected to the bottom of the stake holes;Several slurry outlets are offered on the grouting tube;The slip casting
Connecting tube is located at the aperture sealing of hole bed of material, and the grouting tube is located at the hole inner filling material layer.
4. a kind of slip casting pilework according to claim 3, it is characterised in that, the slurry outlet is horizontal to run through the slip casting
Floral tube, and the two neighboring slurry outlet is between the upper and lower every being arranged and be mutually perpendicular to;The pulp bore dia 5mm, two neighboring institute
State 4~6cm of pulp pitch of holes.
5. a kind of slip casting pilework according to claim 3, which is characterized in that closure is covered on the slurry outlet, it is described
It is tied with adhesive tape outside blocking;The tube bottom of the Grouting Pipe is tied with the adhesive tape for back cover.
6. a kind of slip casting pilework according to claim 1, which is characterized in that the upper layer of the ground is miscellaneous fill layer, under
Layer is original state soil layer, 80~100mm of the stake holes diameter, the stake holes be inserted into the original state soil layer and its bottom hole with it is described
The distance of the upper end of undisturbed soil is 50cm.
7. a kind of slip casting pilework according to claim 1, it is characterised in that, the bottom end of the exhaust pipe and the stake holes
The distance in aperture is 60cm.
8. a kind of slip casting pilework according to claim 1, it is characterised in that, the height of the aperture sealing of hole bed of material is
50cm。
9. a kind of slip casting pilework according to claim 1, which is characterized in that the hole inner filling material is rubble, grain size
For 0.5~2.0cm.
10. a kind of slip casting pilework according to claim 1, it is characterised in that, the maximum grouting pressure of the filling system
For 1.0MPa.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820467866.7U CN208023561U (en) | 2018-04-03 | 2018-04-03 | A kind of slip casting pilework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820467866.7U CN208023561U (en) | 2018-04-03 | 2018-04-03 | A kind of slip casting pilework |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208023561U true CN208023561U (en) | 2018-10-30 |
Family
ID=63909020
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820467866.7U Expired - Fee Related CN208023561U (en) | 2018-04-03 | 2018-04-03 | A kind of slip casting pilework |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208023561U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736302A (en) * | 2019-02-28 | 2019-05-10 | 长江勘测规划设计研究有限责任公司 | High-pressure rotary jet grouting pile Grouting Pipe plugging structure |
-
2018
- 2018-04-03 CN CN201820467866.7U patent/CN208023561U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736302A (en) * | 2019-02-28 | 2019-05-10 | 长江勘测规划设计研究有限责任公司 | High-pressure rotary jet grouting pile Grouting Pipe plugging structure |
CN109736302B (en) * | 2019-02-28 | 2023-12-19 | 长江勘测规划设计研究有限责任公司 | High-pressure jet grouting pile grouting pipe plugging structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103074891B (en) | Double-layer plastic sleeve bulk material and concrete stiffness core composite pile and construction method thereof | |
CN204059124U (en) | A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure | |
CN102433876B (en) | Multi-compartment casing composite pile and construction method thereof | |
CN101858077B (en) | Construction method of composite foundation with bagged compacting and slurry cementing small-diameter gravel pile | |
CN102146679A (en) | Construction method for complex geological section earth pressure balance shield passing middle air shaft | |
CN103469701B (en) | On-the-spot integrated form is prepared Foam lightweight soil and is filled high ferro roadbed construction method | |
CN105239555A (en) | Method for treating soft soil foundation through combination of bagged grouting gravel pile and vacuum preloading | |
CN104499479A (en) | Dig-hole pile construction method based on penetration of sand gravel backfilling layer | |
CN101285309A (en) | Compound support method for deep foundation pit of tall buildings | |
CN108560542A (en) | A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag | |
CN110106883A (en) | A kind of Real-time Feedback grouting method for correcting subway tunnel horizontal distortion | |
CN108677912A (en) | A kind of CFG core sands stone built pile, its composite foundation constituted and construction method | |
CN105386610A (en) | Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit | |
CN114575355A (en) | Soil protection and descent construction method | |
CN208023561U (en) | A kind of slip casting pilework | |
CN104763127A (en) | Heavy load resisting and acid-preventing terrace and construction method thereof | |
CN104141304B (en) | The construction method of a kind of extrusion molding preformed pile stiff-core cement soil Y shape stake | |
CN101793027B (en) | Core-grouted static pressure anchor rod pile | |
CN105780764A (en) | Light cemented soil composite mixing pile | |
CN111424695B (en) | Seepage-proofing and leakage-stopping method for deep-buried karst pipeline | |
CN105804045A (en) | Equipment for strengthening deep soft soil foundation by vacuum preloading of filter well and method | |
CN106917402A (en) | A kind of CFG pile precast piles head and CFG pile construction methods | |
CN207525774U (en) | A kind of cantilever retaining wall structure | |
CN201635072U (en) | Centrally grouted static-pressured anchor pile former | |
CN104775414A (en) | Super-soft dredger fill surface layer solidification crusting and foundation treatment method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181030 |
|
CF01 | Termination of patent right due to non-payment of annual fee |