CN208009587U - A kind of greenbelt rain sewage collecting processing unit - Google Patents

A kind of greenbelt rain sewage collecting processing unit Download PDF

Info

Publication number
CN208009587U
CN208009587U CN201820007271.3U CN201820007271U CN208009587U CN 208009587 U CN208009587 U CN 208009587U CN 201820007271 U CN201820007271 U CN 201820007271U CN 208009587 U CN208009587 U CN 208009587U
Authority
CN
China
Prior art keywords
aqueduct
processing unit
sewage collecting
rain sewage
filtering ponds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820007271.3U
Other languages
Chinese (zh)
Inventor
赵玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Xianglong Garden Construction Co Ltd
Original Assignee
Suzhou Xianglong Garden Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Xianglong Garden Construction Co Ltd filed Critical Suzhou Xianglong Garden Construction Co Ltd
Priority to CN201820007271.3U priority Critical patent/CN208009587U/en
Application granted granted Critical
Publication of CN208009587U publication Critical patent/CN208009587U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)
  • Filtration Of Liquid (AREA)

Abstract

The utility model provides a kind of greenbelt rain sewage collecting processing unit, including afforesting band body, the greening band body side is connected with road tooth, the road tooth includes the hollow aqueduct for extending vertically through setting, the aqueduct is connect with the road pitch thread, and the aqueduct top is connected with electric rotating machine;The first filtering ponds are equipped with below the road tooth, the aqueduct extends in first filtering ponds;Several water outlets are offered on the aqueduct, the water outlet is spiral shape water outlet;The aqueduct bottom end is fixed with a positioning plate, and filter bag is also removably enclosed between the positioning plate and the road tooth.The utility model has the advantages that collection is convenient, drainage effect is good, filter element is easily replaced and cleaned.

Description

A kind of greenbelt rain sewage collecting processing unit
Technical field
The utility model belongs to rainwater treatment field, and in particular to a kind of greenbelt rain sewage collecting processing unit.
Background technology
In modern society, China is the country of a serious water shortage, currently, with the construction and development in China city, city Town is more and more nervous with water, and problem of water saving increasingly attracts much attention.It is water-saving mainly to pass through overall control and regeneration Two methods are realized, and Waste water utilization is the principal mode of regeneration.Usually by the daily wash vegetables of resident, laundry, have a bath, wash The water centralized collection washed, then carries out sewage disposal to it, become can be used for rinse road surface, pour greenery patches, carwash or The middle water of person's toilet flushing can greatly improve the utilization rate of water in this way, reduce waste.And the greenbelt on road, hold Easily aggregation sewage and rainwater, and it is huge resource that this part water resource, which is accumulated over a long period, is nowadays but allowed to waste, and needs to pass through receipts The mode of collection processing makes improvements.
To the part, rainwater is filtered collection mostly by way of lautertuns in the prior art, but its filter device is year in year out Month after month by rain drop erosion, it is but unable to get effective cleaning, is easy to cause secondary pollution to water resource, needs to make improvements.
Therefore it is badly in need of that the greenbelt rain sewage that a kind of collection is convenient, drainage effect is good, filter element is easily replaced and cleaned is wanted to receive Collect processing unit.
Utility model content
The purpose of this utility model is to provide a kind of greenbelt rain sewage collecting processing unit, to solve prior art drainage The problem of ineffective, filter element is not easy to be replaced and cleaned.
The utility model provides the following technical solution:
A kind of greenbelt rain sewage collecting processing unit, including greening band body, the greening band body side is connected with Road tooth, the road tooth include the hollow aqueduct for extending vertically through setting, and the aqueduct is connect with the road pitch thread, described to lead Water pipe top is connected with electric rotating machine;The first filtering ponds are equipped with below the road tooth, the aqueduct extends to first mistake In filter tank;Several water outlets are offered on the aqueduct, the water outlet is spiral shape water outlet;The aqueduct bottom end is solid Surely there is a positioning plate, filter bag is also removably enclosed between the positioning plate and the road tooth.
Preferably, first filtering ponds bottom is equipped with waterproof layer, and several LED lamp beads are equipped in the waterproof layer, described The end face of waterproof layer is equipped with transparent panel.
Preferably, first filtering ponds side is additionally provided with the second filtering ponds, first filtering ponds and second mistake Filter septum is equipped between filter tank.
Preferably, the transparent panel is tilted from first filtering ponds to second filtering ponds.
Preferably, the bottom of second filtering ponds is equipped with gravel layer.
Preferably, second filtering ponds are also communicated with an irrigation pump.
Preferably, road tooth end face is hinged with protective cover, and the protective cover matches with the aqueduct, the protection The side of covering is equipped with the limited block being connect with the aqueduct.
Preferably, several screw threads are additionally provided on the aqueduct.
Preferably, the road tooth side is equipped with fixture block, and the greening band body side is equipped with the card coordinated with the fixture block Slot.
The utility model has the beneficial effects that:
1, use with the road tooth that connect of greening band body, and road tooth is hollow road tooth, inside be connected to for receiving Collect the aqueduct of rainwater, filter bag is connected with below aqueduct, moved up and down relative to road tooth by aqueduct, and realizes filter bag and exist The effect that the extruding of positioning plate is rained to the sewage water filtration of its inside, filter efficiency is high, effect is good;
2, using filter bag, be conducive to often replace, avoid the devices such as filter screen repair and replacement in the prior art are inconvenient from asking Topic;
3, using LED lamp bead, be conducive to the illumination when repair of the first filtering ponds;
4, using the second filtering ponds and gravel layer, and coordinate irrigation pump, be conducive to fully filter rain sewage, and make full use of In irrigation, the utilization rate of rain sewage is improved.
Description of the drawings
Attached drawing is used to provide a further understanding of the present invention, and a part for constitution instruction, with this practicality Novel embodiment for explaining the present invention, does not constitute limitations of the present invention together.In the accompanying drawings:
Fig. 1 is the utility model structure diagram;
Fig. 2 is filter bag and positioning plate detailed schematic;
Fig. 3 is the card slot schematic diagram for afforesting band body;
The fixture block schematic diagram of the roads Tu4Shi tooth;
In figure:1. afforest band body, 2. first filtering ponds, 3. waterproof layers, 4.LED lamp beads, 5. transparent panels, 6. filtering every Plate, 7. irrigation pumps, 8. second filtering ponds, 9. gravel layers, 10. road teeth, 11. protective covers, 12. aqueducts, 13. limited blocks, 14. spiral shells Tooth, 15. filter bags, 16. positioning plates, 17. water outlets, 18. card slots, 19. fixture blocks.
Specific implementation mode
As shown in Figures 1 to 4, a kind of greenbelt rain sewage collecting processing unit, including greening band body 1, greenbelt sheet 1 side of body is connected with road tooth 10, and road tooth 10 includes the hollow aqueduct 12 for extending vertically through setting, aqueduct 12 and 10 screw thread of road tooth Connection, 12 top of aqueduct are connected with electric rotating machine, and aqueduct 12 is by electric rotating machine drives relative to 10 up/down position of road tooth It moves;Tooth 10 lower section in road is equipped with the first filtering ponds 2, and aqueduct 12 extends in the first filtering ponds 2;It is offered on aqueduct 12 several Water outlet 17, water outlet 17 are spiral shape water outlet;12 bottom end of aqueduct is fixed with a positioning plate 16, positioning plate 16 and Lu Ya 10 Between be also removably enclosed with filter bag 15.
Preferably, 2 bottom of the first filtering ponds is equipped with waterproof layer 3, and several LED lamp beads 4 are equipped in waterproof layer 3, waterproof layer 3 End face is equipped with transparent panel 5.First filtering ponds, 2 side is additionally provided with the second filtering ponds 8, between the first filtering ponds 2 and the second filtering ponds 8 Equipped with filter septum 6.Transparent panel 5 is tilted from the first filtering ponds 2 to the second filtering ponds 8.The bottom of second filtering ponds 8 is equipped with gravel Layer 9.Second filtering ponds 8 are also communicated with an irrigation pump 7.Tooth 10 end face in road is hinged with protective cover 11, protective cover 11 and aqueduct 12 Match, 11 top of protective cover is equipped with the limited block 13 being connect with aqueduct 12.Several screw threads 14 are additionally provided on aqueduct 12.Road 10 side of tooth is equipped with fixture block 19, and 1 side of greening band body is equipped with the card slot 18 coordinated with fixture block 19.
Enter in filter bag 15 specifically, rain sewage is collected by aqueduct 12, aqueduct 12 is driven by electric rotating machine, phase Up/down displacement is generated for road tooth 10, and then after filling rain sewage in filter bag 15, aqueduct 12 drives positioning plate 16 to moving up Dynamic, the rain sewage that positioning plate 16 squeezes in filter bag 15 can only replace filter as needed to accelerate the filtering of rain sewage in use Bag 15, simple operation;Filtered rain sewage is filtered by filter septum 6 into the second filtering ponds 8, by the gravel layer 9 of bottom Further filtering, extracted by irrigation pump 7, so utilize filtered water carry out irrigation.The utility model collects rain Sewage is convenient, drainage effect is good, filter element is easily replaced and cleaned, application easy to spread.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, although ginseng The utility model is described in detail according to previous embodiment, it for those skilled in the art, still can be with Technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features.It is all Within the spirit and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this practicality Within novel protection domain.

Claims (9)

1. a kind of greenbelt rain sewage collecting processing unit, including greening band body, which is characterized in that the greening band body side While being connected with road tooth, the road tooth includes the hollow aqueduct for extending vertically through setting, and the aqueduct connects with the road pitch thread It connects, the aqueduct top is connected with electric rotating machine;The first filtering ponds are equipped with below the road tooth, the aqueduct extends to institute It states in the first filtering ponds;Several water outlets are offered on the aqueduct, the water outlet is spiral shape water outlet;The water guide Tube bottom end is fixed with a positioning plate, and filter bag is also removably enclosed between the positioning plate and the road tooth.
2. a kind of greenbelt rain sewage collecting processing unit according to claim 1, which is characterized in that first filtering Bottom of pond portion is equipped with waterproof layer, and several LED lamp beads are equipped in the waterproof layer, and the end face of the waterproof layer is equipped with transparent panel.
3. a kind of greenbelt rain sewage collecting processing unit according to claim 2, which is characterized in that first filtering Pond side is additionally provided with the second filtering ponds, and filter septum is equipped between first filtering ponds and second filtering ponds.
4. a kind of greenbelt rain sewage collecting processing unit according to claim 3, which is characterized in that the transparent panel by First filtering ponds are tilted to second filtering ponds.
5. a kind of greenbelt rain sewage collecting processing unit according to claim 3, which is characterized in that second filtering The bottom in pond is equipped with gravel layer.
6. a kind of greenbelt rain sewage collecting processing unit according to claim 5, which is characterized in that second filtering Pond is also communicated with an irrigation pump.
7. a kind of greenbelt rain sewage collecting processing unit according to claim 1, which is characterized in that road tooth end face It is hinged with protective cover, the protective cover matches with the aqueduct, is equipped with above the protective cover and is connect with the aqueduct Limited block.
8. a kind of greenbelt rain sewage collecting processing unit according to claim 7, which is characterized in that on the aqueduct It is additionally provided with several screw threads.
9. a kind of greenbelt rain sewage collecting processing unit according to claim 8, which is characterized in that the road tooth side Equipped with fixture block, the greening band body side is equipped with the card slot coordinated with the fixture block.
CN201820007271.3U 2018-01-03 2018-01-03 A kind of greenbelt rain sewage collecting processing unit Expired - Fee Related CN208009587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820007271.3U CN208009587U (en) 2018-01-03 2018-01-03 A kind of greenbelt rain sewage collecting processing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820007271.3U CN208009587U (en) 2018-01-03 2018-01-03 A kind of greenbelt rain sewage collecting processing unit

Publications (1)

Publication Number Publication Date
CN208009587U true CN208009587U (en) 2018-10-26

Family

ID=63882521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820007271.3U Expired - Fee Related CN208009587U (en) 2018-01-03 2018-01-03 A kind of greenbelt rain sewage collecting processing unit

Country Status (1)

Country Link
CN (1) CN208009587U (en)

Similar Documents

Publication Publication Date Title
CN108579200B (en) Rainwater collecting and purifying device
CN203346959U (en) Domestic wastewater recycling irrigation system
CN106320429A (en) Rainwater collection device with purifying function
CN201914979U (en) Rain water treatment device
CN208009587U (en) A kind of greenbelt rain sewage collecting processing unit
CN210031964U (en) Residential district rainwater collecting equipment
CN206916820U (en) A kind of unpowered earthenware slab film rainwater purification apparatus
CN201411740Y (en) Rainwater purifying reservoir
CN109113127A (en) A kind of smart home device for collecting rain water
CN205584961U (en) Irrigation equipment for municipal garden
CN212405318U (en) Rainwater collection and utilization device for green building
CN203683294U (en) Water purifying device
CN202023232U (en) Household reclaimed water collection device
CN202081452U (en) Rainwater collecting and utilizing system
CN207392303U (en) A kind of rain collector for building
CN201520996U (en) Rain water collection device for parking lot
CN217352705U (en) Sponge city residential area rainwater cyclic utilization device
CN213670769U (en) Water-saving cleaning mechanism for high-pressure belt machine
CN215906929U (en) A road surface rainwater processing system for sponge city
CN212801844U (en) Greening rainwater comprehensive recovery system based on sponge city construction
CN207738543U (en) A kind of community's discharge water circle device
CN213978404U (en) Sponge city is with mounting structure of component that permeates water
CN203639984U (en) Rainwater collecting and purifying device for roof
CN202706131U (en) Domestic sewage automatic processing cyclic utilization device
CN204097259U (en) A kind of rainwater recycle utilizes integration apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181026

CF01 Termination of patent right due to non-payment of annual fee