CN208009215U - The standardization of absolute altitude pier makes mold - Google Patents
The standardization of absolute altitude pier makes mold Download PDFInfo
- Publication number
- CN208009215U CN208009215U CN201720847373.1U CN201720847373U CN208009215U CN 208009215 U CN208009215 U CN 208009215U CN 201720847373 U CN201720847373 U CN 201720847373U CN 208009215 U CN208009215 U CN 208009215U
- Authority
- CN
- China
- Prior art keywords
- main body
- absolute altitude
- die main
- compression bar
- pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
It is standardized the utility model discloses a kind of absolute altitude pier and makes mold, its key points of the technical solution are that:Including die main body, the die main body is the mesa-shaped cavity of bottom opening, and the base area of the die main body is more than top surface area and bottom surface is parallel with top surface.The utility model solves the problems, such as that absolute altitude pier is not sought unity of standard.
Description
Technical field
The utility model is related to architectural engineering and the construction field of road, more particularly to a kind of absolute altitude pier standardization makes
Mold.
Background technology
In the work progress of architectural engineering and road, when needing in ground laying concrete, in order to ensure to be laid with
Concrete be in unified plane, it usually needs in different location, absolute altitude pier is set.
It some concrete is directly taken during traditional construction is deposited into different location and form multiple absolute altitude piers, rule of thumb
Approximate height will be depressed into.Since error is difficult to control, take a lot of work later to the correction for being laid with surface evenness larger.
Utility model content
The purpose of this utility model is to provide a kind of absolute altitude piers to standardize making mold, it can make absolute altitude pier have system
One standard improves working efficiency.
The above-mentioned purpose of the utility model technical scheme is that:A kind of absolute altitude pier standardization making
Mold, including die main body, the die main body are the mesa-shaped cavitys of bottom opening, and the base area of the die main body is more than
Top surface area and bottom surface is parallel with top surface, is provided with surely high component on the die main body, the fixed high component includes that setting exists
Pressing plate inside die main body and the compression bar being fixedly mounted on pressing plate, the top surface offers the through-hole for making compression bar pass through.
By using above-mentioned technical proposal, need using absolute altitude pier when, first by the opening up placement of die main body, then to
Concrete is loaded in die main body.After filling, on the ground by the opening down pressing of die main body, mold master is pulled out then up
Body forms the absolute altitude pier of a level altitude.Corresponding different demand uses the die main body of different size.The use of the new type mould
It is provided with surely high component in tool main body, the absolute altitude pier of a variety of height can be made using a kind of die main body of specification.Simultaneously will
Die main body is set as the mesa-shaped structure that floor space is more than top area, and one can facilitate pulling out for mold, furthermore mesa-shaped structure
Absolute altitude pier have stronger stability.
Preferably:The die main body is positive terrace with edge or just round table-like cavity.
By using above-mentioned technical proposal, positive terrace with edge or positive round platform have better stability.
Preferably:The scale for embodying pressing plate corresponding height is axially marked on the compression bar.
By using above-mentioned technical proposal, can more easily height described in discharge by pressing absolute altitude pier.
Preferably:Handle is installed on the die main body.
By using above-mentioned technical proposal, facilitate pulling out for die main body.
Preferably:Two fixing ends of the handle are fixed on the monosymmetric position of die main body, and the becket bypasses
Top surface top.
By using above-mentioned technical proposal, die main body is facilitated to be pulled out to vertical direction.
Preferably:The through-hole for making compression bar pass through is offered on the handle, the compression bar top is provided with block.
By using above-mentioned technical proposal, the anti-high component of fastening undesirably falls off die main body.
Preferably:The block is set as the nut being threadedly coupled with compression bar.
By using above-mentioned technical proposal, facilitate the dismounting of block, being threadedly coupled has preferable stability, generally will not
There is axial fall off.Corresponding nut can be selected on the spot simultaneously.
Preferably:It is arranged with spring on the compression bar and in the position between block and handle.
By using above-mentioned technical proposal, surely high component can be made to bounce automatically, under the gravity for avoiding surely high component,
To the secondary pressing of absolute altitude pier.
Preferably:It is provided with catch between the spring top and block.
By using above-mentioned technical proposal, it can stop spring by catch, can be selected using the catch of different size
The spring of more polytypic makes absolute altitude pier standardization making mold convenient for gathering materials on the spot.
In conclusion the utility model has the advantages that:When needing using absolute altitude pier, first die main body is open
It places upward, concrete is then loaded into die main body.After filling, on the ground by the opening down pressing of die main body, lead to
The height that fixed high component adjusts die main body inner concrete is crossed, die main body is then pulled out by handle upwards, forms one admittedly
Determine the absolute altitude pier of height.
Description of the drawings
Fig. 1 is the structural schematic diagram that the standardization of absolute altitude pier makes mold;
Fig. 2 is the sectional view in the directions A-A in Fig. 1;
Fig. 3 is the explosive view that the standardization of absolute altitude pier makes mold.
In figure, 1, die main body;2, fixed high component;21, pressing plate;22, compression bar;23, block;24, spring;25, catch;3,
Handle.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1:A kind of absolute altitude pier standardization making mold, referring to Fig. 1, including die main body 1, die main body 1 is bottom
The base area of the mesa-shaped cavity of portion's opening, die main body 1 is more than top surface area and bottom surface is parallel with top surface.
It is positive terrace with edge or positive round to make the absolute altitude pier that die main body 1 generates that there is better stability, die main body 1
Mesa-shaped cavity.
In conjunction with Fig. 2, in order to use a kind of die main body 1 of specification that can make the absolute altitude pier of a variety of height, in mould
High component 2 surely is provided in tool main body 1.Fixed high component 2 includes setting in 1 inside of die main body and shape and 1 diameter of die main body
To the compression bar 22 section identical pressing plate 21 and be fixedly mounted on pressing plate 21, the top surface of die main body 1, which offers, makes compression bar
22 through-holes passed through.
The absolute altitude pier of discharge by pressing specified altitude assignment for convenience is axially marked on compression bar 22 and embodies the corresponding height of pressing plate 21
The scale of degree.
It is pulled out to vertical direction in order to facilitate die main body 1, handle 3 is installed on die main body 1.
Two fixing ends of handle 3 are fixed on 1 monosymmetric position of die main body, and handle 3 surround top surface top.Not only
Pulling out for die main body 1 can be made more convenient, and handle 3 can be utilized more to stablize the fixation of high component 2 surely, be not easy
It caves in.
In conjunction with Fig. 3, fixed high component 2 undesirably falls off die main body 1 in order to prevent, and being offered on handle 3 makes compression bar 22 pass through
Through-hole, 22 top of compression bar is provided with block 23.
The dismounting of block 23, block 23 is facilitated to be set as the nut being threadedly coupled with compression bar 22.Being threadedly coupled has preferably
Stability, be generally not in axial fall off.Corresponding nut can be selected on the spot simultaneously.
In order to make surely high component 2 bounce automatically, avoid under the gravity of high component 2 surely, to the secondary pressing of absolute altitude pier.
It is arranged with spring 24 on compression bar 22 and in the position between block 23 and handle 3.
It is provided with catch 25 between 24 top of spring and block 23.Stop spring 24 by catch 25, utilizes different size
Catch 25 can select the spring 24 of more polytypic, make the standardization of absolute altitude pier convenient for gathering materials on the spot and make mold.
The specifically used method of the utility model is:When needing using absolute altitude pier, first put die main body 1 is opening up
It sets, then loads concrete into die main body 1.After filling, on the ground by the opening down pressing of die main body 1, by fixed
High component 2 adjusts the height of 1 inner concrete of die main body.Downward moulded rod 22 when adjusting, by observing the scale on compression bar 22
Pressing plate 21 is set to be depressed into desired height, spring 24 can bounce compression bar 22 automatically later, and mold master is pulled out upwards finally by handle 3
Body 1 forms the absolute altitude pier of a corresponding height.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but
As long as all being protected by Patent Law in the right of the utility model.
Claims (9)
1. the standardization of absolute altitude pier makes mold, it is characterised in that:Including die main body (1), the die main body (1) is that bottom is opened
The base area of the mesa-shaped cavity of mouth, the die main body (1) is more than top surface area and bottom surface is parallel with top surface, the mold master
Be provided with surely high component (2) on body (1), the fixed high component (2) include setting the internal pressing plate (21) of die main body (1) with
And it is fixedly mounted on the compression bar (22) on pressing plate (21), the top surface offers the through-hole for making compression bar (22) pass through.
2. absolute altitude pier standardization according to claim 1 makes mold, it is characterised in that:The die main body (1) is just
Terrace with edge or just round table-like cavity.
3. absolute altitude pier standardization according to claim 1 makes mold, it is characterised in that:In the axial direction of the compression bar (22)
Indicate the scale for embodying pressing plate (21) corresponding height.
4. absolute altitude pier standardization according to claim 1 makes mold, it is characterised in that:Pacify on the die main body (1)
Equipped with handle (3).
5. absolute altitude pier standardization according to claim 4 makes mold, it is characterised in that:Two fixations of the handle (3)
End is fixed on die main body (1) monosymmetric position, and the handle (3) surround top surface top.
6. absolute altitude pier standardization according to claim 5 makes mold, it is characterised in that:It is offered on the handle (3)
The through-hole for making compression bar (22) pass through, compression bar (22) top are provided with block (23).
7. absolute altitude pier standardization according to claim 6 makes mold, it is characterised in that:The block (23) and compression bar
(22) it is threadedly coupled.
8. absolute altitude pier standardization according to claim 7 makes mold, it is characterised in that:On the compression bar (22) and it is in
Position between block (23) and handle (3) is arranged with spring (24).
9. absolute altitude pier standardization according to claim 8 makes mold, it is characterised in that:At the top of the spring (24) and keep off
Catch (25) is provided between block (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720847373.1U CN208009215U (en) | 2017-07-12 | 2017-07-12 | The standardization of absolute altitude pier makes mold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720847373.1U CN208009215U (en) | 2017-07-12 | 2017-07-12 | The standardization of absolute altitude pier makes mold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208009215U true CN208009215U (en) | 2018-10-26 |
Family
ID=63879078
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720847373.1U Active CN208009215U (en) | 2017-07-12 | 2017-07-12 | The standardization of absolute altitude pier makes mold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208009215U (en) |
-
2017
- 2017-07-12 CN CN201720847373.1U patent/CN208009215U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105951579A (en) | Prefabricated cover beam steel bar jig frame and manufacturing method of prefabricated cover beam reinforcement cage | |
CN201704628U (en) | Girder-end anchor recess plugging formwork for box girder | |
CN208072809U (en) | A kind of whole perception type stair of raising | |
CN208009215U (en) | The standardization of absolute altitude pier makes mold | |
CN208072775U (en) | It is a kind of not only to have can control plate face bar spacing but also utilized the levelling device of concrete | |
CN202672495U (en) | Reinforced horse stool capable of controlling spacing between upper row of bars and lower row of bars of construction cast-in-place board | |
CN201534572U (en) | Anti-skidding plate for engineering machinery | |
CN206815854U (en) | A kind of Height marker for improving the smooth thickness construction first-time qualification rate of cast-in-situ floor | |
CN206941968U (en) | Reinforcing bar limiting card with the upper oblique bayonet socket being parallel to each other | |
CN104818826B (en) | Adjustable mortar-free floor tile and laying method thereof | |
CN205604283U (en) | Building bar planting concrete column | |
CN104675127B (en) | A kind of building sleeve pipe pre-embedding clamp device | |
CN202351238U (en) | Slump testing device convenient for charging | |
CN205704719U (en) | A kind of aggregate weighing proportioning device | |
CN210767852U (en) | Reusable floor slab preformed hole die | |
CN208232028U (en) | A kind of prefabricated post of size adjustable | |
CN203646844U (en) | Climbing stool | |
CN204249041U (en) | Light wall-plate machine | |
CN205455654U (en) | Cake raw materials measurement die -filling device | |
CN208363656U (en) | A kind of portable constructional column bar planting positioning device | |
CN201367595Y (en) | Device for reserving hole of anchor bolt | |
CN109372258A (en) | A kind of adjustable building balcony mold | |
CN206545393U (en) | Stair tread formwork reinforcement tools and the mould for pouring Stereotype stairway | |
CN201195343Y (en) | Composite laminboard molding mould | |
CN205629216U (en) | Simple and convenient manual bending device for rebars of formula |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200121 Address after: Zijingguan Zhen Dong Qing Yuan Cun, Yi County, Baoding City, Hebei Province Patentee after: China Railway Construction Group Construction Development Co., Ltd. Address before: 100043 No. 20, Shijingshan Road, Beijing, Shijingshan District Patentee before: Zhongtie Construction Group Corporation Limited |