CN207999038U - It is prefabricated that the flue being combined is poured after - Google Patents

It is prefabricated that the flue being combined is poured after Download PDF

Info

Publication number
CN207999038U
CN207999038U CN201820397037.6U CN201820397037U CN207999038U CN 207999038 U CN207999038 U CN 207999038U CN 201820397037 U CN201820397037 U CN 201820397037U CN 207999038 U CN207999038 U CN 207999038U
Authority
CN
China
Prior art keywords
poured
prefabricated
tablet
side plate
flue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820397037.6U
Other languages
Chinese (zh)
Inventor
李志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820397037.6U priority Critical patent/CN207999038U/en
Application granted granted Critical
Publication of CN207999038U publication Critical patent/CN207999038U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fencing (AREA)

Abstract

The utility model is related to it is a kind of it is prefabricated the flue being combined is poured after, it includes being horizontally spaced about and pouring tablet after two blocks of horizontally extending prefabricated side plates, vertical interval setting and horizontally extending two pieces and pour the connection structure of tablet junction with after positioned at prefabricated side plate;It is to be poured in the case where prefabricated side plate coordinates with formwork for placing, and pour molded part after forming an entirety by connection structure and prefabricated side plate that tablet is poured after described.The purpose of this utility model is to provide it is a kind of it is prefabricated pour the flue being combined after, it is easily fabricated and can preferable control cost.

Description

It is prefabricated that the flue being combined is poured after
Technical field
Prefabricated the flue being combined is poured after the utility model is related to a kind of.
Background technology
In construction, smoke evacuation discharge duct is indispensable important component.Due to rising steadily for cost of labor With the limitation for making raw material, the manufacturing cost for discharge duct of discharging fume is difficult to control and technique is relatively complicated.
Invention content
The purpose of this utility model is to provide it is a kind of it is prefabricated pour the flue being combined after, it is easily fabricated and can be preferably Control cost.
The purpose of this utility model is achieved through the following technical solutions:It is a kind of it is prefabricated the flue being combined is poured after, it wrap It includes and is horizontally spaced about and two blocks of horizontally extending prefabricated side plates, vertical interval setting and horizontally extending two Tablet is poured after block and pours the connection structure of tablet junction with after positioned at prefabricated side plate;It is in prefabricated side plate that tablet is poured after described It is poured under coordinating with formwork for placing, and molded part is poured after forming an entirety by connection structure and prefabricated side plate.
For the prior art, the utility model has the advantage of:
By it is prefabricated and after pour to be combined and be manufactured, can overcome one-pass molding process latus inframedium material glide or because Working-procedure problem leads to problems of crack so that the thickness of shaping pipe each section is uniform, meets production standard, product is effectively ensured Quality, and manufacturing process is improved, reduce manufacturing cost.
Description of the drawings
Fig. 1 is a kind of end face structure schematic diagram of embodiment of the utility model.
Fig. 2 is the end face structure schematic diagram of prefabricated side plate in Fig. 1.
Fig. 3 be in Fig. 1 after pour the end face structure schematic diagram of tablet.
Fig. 4 is a kind of end face structure schematic diagram of embodiment of the utility model.
Fig. 5 is the end face structure schematic diagram of prefabricated side plate in Fig. 4.
Fig. 6 be in Fig. 4 after pour the end face structure schematic diagram of tablet.
Fig. 7 is the right view of Fig. 4.
Fig. 8 is a kind of end face structure schematic diagram of embodiment of the utility model.
Fig. 9 is the end face structure schematic diagram of prefabricated side plate in Fig. 8.
Figure 10 be in Fig. 8 after pour the end face structure schematic diagram of tablet.
Figure 11 is the vertical view of Figure 10.
Figure 12 is a kind of end face structure schematic diagram of embodiment of the utility model.
Figure 13 is the vertical view of Figure 12.
Figure 14 is the end face structure schematic diagram of prefabricated side plate in Figure 12.
Figure 15 is the left view of Figure 12.
Figure 16 be in Figure 12 after pour the end face structure schematic diagram of tablet.
Figure 17 is the vertical view of Figure 16.
Figure 18 is a kind of end face structure schematic diagram of embodiment of the utility model.
Figure 19 is the end face structure schematic diagram of prefabricated side plate in Figure 18.
Label declaration:Prefabricated side plate 1, after pour tablet 2, coarse joint surface 3, boarding hole 4, embedding in bolt 5, built-in connection 6, It connects net 7, reinforce positioning bar 8, tenon 9, the fourth of the twelve Earthly Branches 10.
Specific implementation mode
The utility model content is described in detail with embodiment with reference to the accompanying drawings of the specification:
It is a kind of prefabricated the flue being combined to be poured after, it is characterised in that:It includes being horizontally spaced about and in the horizontal direction Tablet 2 is poured after two blocks of prefabricated side plates 1 of extension, vertical interval setting and horizontally extending two pieces and positioned at prefabricated Side plate 1 pours the connection structure of 2 junction of tablet with after;Tablet 2 is poured after described to be poured in the case where prefabricated side plate 1 coordinates with formwork for placing It builds, and molded part is poured after forming an entirety by connection structure and prefabricated side plate 1.
Prefabricated side plate 1 is pre-formed in advance, can effectively avoid one-pass molding and occurs due to side plate is to be vertically arranged state in the process Slurry downslide problem.
In one embodiment, as shown in Figures 1 to 3, the connection structure includes being set on prefabricated side plate 1 and being located to pour with after Tablet 2 connects the coarse joint surface 3 at place.The coarse joint surface 3 can be that rake hook is marked with fluted asperities or pre- The fluctuating rough surface marked is pressed when processed.Increase contact surface using coarse joint surface 3, it is better with prefabricated side plate 1 that tablet 2 is poured after allowing It is bonded together.
In one embodiment, as shown in Fig. 4 to 7 or Fig. 8 to 11, the connection structure includes horizontally spaced laying It is on tablet 2 and logical in being poured on prefabricated side plate 1 and positioned at several boarding holes 4 for pouring 2 place of connecting of tablet with after and after being set to Cross several embedding in bolt 5 that cast is directly molded in boarding hole 4.
In one embodiment, as shown in Figure 12 to 17, the connection structure includes being set to prefabricated side plate 1 to pour tablet 2 with after The joinery and its construction of junction.
In one embodiment, as shown in Figure 18 to 19, the connection structure include it is horizontally spaced be laid in it is prefabricated On side plate 1 and positioned at pouring several built-in connections 6 that tablet 2 connects place with after;After 6 part of the built-in connection is stretched into It pours in tablet 2.
In a preferred embodiment, as shown in Fig. 1 to 3 or Figure 18 to 19, bonded to allow prefabricated side plate 1 to pour tablet 2 with after It obtains more preferably with crack resistence, the connection structure further includes the pre- company for being embedded in and being poured after in prefabricated side plate 1 and outer end can be stretched into tablet 2 Connect net 7.Shown connection net 7 is plastic net cloth or metal mesh.
In a preferred embodiment, as shown in Figures 1 to 3, in order to prefabricated side plate 1 and after pour and can preferably determine between tablet 2 Position is fixed, and convenient for the setting of connection structure, improves the firmness of combination, and tablet 2 is poured after described and is equipped with positioned at prefabricated side plate 1 The reinforcement positioning bar 8 of angle between tablet 2 is poured with after.

Claims (7)

  1. Prefabricated the flue being combined is poured after 1. a kind of, it is characterised in that:It includes being horizontally spaced about and prolonging in the horizontal direction Tablet (2) is poured after two pieces of prefabricated side plates (1) stretching, vertical interval setting and horizontally extending two pieces and positioned at prefabricated Side plate (1) pours the connection structure of tablet (2) junction with after;It is in prefabricated side plate (1) and formwork for placing that tablet (2) is poured after described It is poured under cooperation, and molded part is poured after forming an entirety by connection structure and prefabricated side plate (1).
  2. Prefabricated the flue being combined is poured after 2. according to claim 1, it is characterised in that:The connection structure includes setting In on prefabricated side plate (1) and positioned at the coarse joint surface (3) poured with after tablet (2) and connect place.
  3. Prefabricated the flue being combined is poured after 3. according to claim 1, it is characterised in that:The connection structure includes edge Horizontal direction interval be laid on prefabricated side plate (1) and positioned at poured with after tablet (2) connect several boarding holes (4) at place with And it is poured after being set on tablet (2) and is directly molded on several embedding in bolt (5) in boarding hole (4) by cast.
  4. Prefabricated the flue being combined is poured after 4. according to claim 1, it is characterised in that:The connection structure includes setting The joinery and its construction of tablet (2) junction is poured with after in prefabricated side plate (1).
  5. Prefabricated the flue being combined is poured after 5. according to claim 1, it is characterised in that:The connection structure includes edge Horizontal direction interval is laid on prefabricated side plate (1) and is located at pours several built-in connections that tablet (2) connects place with after (6);The built-in connection (6) is poured after partly stretching into tablet (2).
  6. 6. described prefabricated pouring the flue being combined after according to claim 2-5 is any one, it is characterised in that:The connection knot Structure further includes the pre- connection net (7) for being embedded in and being poured after in prefabricated side plate (1) and outer end can be stretched into tablet (2).
  7. 7. prefabricated according to claim 2-5 any one pours the flue being combined after, it is characterised in that:It is poured after described Tablet (2) be equipped with positioned at prefabricated side plate (1) and after pour the reinforcement positioning bar (8) of angle between tablet (2).
CN201820397037.6U 2018-03-22 2018-03-22 It is prefabricated that the flue being combined is poured after Expired - Fee Related CN207999038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820397037.6U CN207999038U (en) 2018-03-22 2018-03-22 It is prefabricated that the flue being combined is poured after

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820397037.6U CN207999038U (en) 2018-03-22 2018-03-22 It is prefabricated that the flue being combined is poured after

Publications (1)

Publication Number Publication Date
CN207999038U true CN207999038U (en) 2018-10-23

Family

ID=63839021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820397037.6U Expired - Fee Related CN207999038U (en) 2018-03-22 2018-03-22 It is prefabricated that the flue being combined is poured after

Country Status (1)

Country Link
CN (1) CN207999038U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528826A (en) * 2019-09-26 2019-12-03 福建首聪世豪实业有限公司 Precast slab pouring floor pipeline and manufacturing process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528826A (en) * 2019-09-26 2019-12-03 福建首聪世豪实业有限公司 Precast slab pouring floor pipeline and manufacturing process thereof

Similar Documents

Publication Publication Date Title
CN208884783U (en) Assembled architecture PCF plate and connection component
CN207999038U (en) It is prefabricated that the flue being combined is poured after
CN109797901A (en) A kind of prefabricated framework and prefabricated board
CN204221939U (en) A kind of precast concrete cable channel cover plate mold system
CN111231067A (en) Cement product mould platform and method for producing cement product by using mould platform
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN208629652U (en) Prefabricated stacking floor mold
CN205291228U (en) Triangle -shaped precast concrete piece making devices
CN103252838B (en) The preparation method of one-shot forming glass magnesium smoke exhaust pipe and mould thereof
CN105133630A (en) Prefabricated part for constructing foundation forming molds
CN201032381Y (en) Sheet iron attached to the fireproof brick
CN201962948U (en) Concrete beam pouring template with embedded part at top
CN101280592A (en) Cast-in-situ rib laminated floor slab
CN210551989U (en) A mould for making roofing parapet flashing prefab
CN207711007U (en) A kind of prefabricated mould of concrete prefabricated wallboard
CN209699444U (en) Prefabricated components production mould
CN207775924U (en) Piping lane top die board mounting structure, piping lane template installation system
CN100366826C (en) Anti-cracking method for new-old concrete junction plane after gravity dam heightening
CN2749653Y (en) Rapid forming die set for cement tank applied for farmland irrigation
CN201343793Y (en) Energy-saving sandwich composite wall steel tie
CN110409596A (en) The quick detachable template of cast-in-situ steel reinforced concrete inlet for stom water
CN210025691U (en) Building prefabricated part mold
CN110253724B (en) Die for manufacturing flashing prefabricated part of parapet of roof and manufacturing method of flashing prefabricated part
CN205399453U (en) Separate house T shape concrete foundation who pours with concrete block
CN214136548U (en) A mould that is used for concrete rainwater ditch apron to pour

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181023

Termination date: 20210322