CN207999038U - It is prefabricated that the flue being combined is poured after - Google Patents
It is prefabricated that the flue being combined is poured after Download PDFInfo
- Publication number
- CN207999038U CN207999038U CN201820397037.6U CN201820397037U CN207999038U CN 207999038 U CN207999038 U CN 207999038U CN 201820397037 U CN201820397037 U CN 201820397037U CN 207999038 U CN207999038 U CN 207999038U
- Authority
- CN
- China
- Prior art keywords
- poured
- prefabricated
- tablet
- side plate
- flue
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Fencing (AREA)
Abstract
The utility model is related to it is a kind of it is prefabricated the flue being combined is poured after, it includes being horizontally spaced about and pouring tablet after two blocks of horizontally extending prefabricated side plates, vertical interval setting and horizontally extending two pieces and pour the connection structure of tablet junction with after positioned at prefabricated side plate;It is to be poured in the case where prefabricated side plate coordinates with formwork for placing, and pour molded part after forming an entirety by connection structure and prefabricated side plate that tablet is poured after described.The purpose of this utility model is to provide it is a kind of it is prefabricated pour the flue being combined after, it is easily fabricated and can preferable control cost.
Description
Technical field
Prefabricated the flue being combined is poured after the utility model is related to a kind of.
Background technology
In construction, smoke evacuation discharge duct is indispensable important component.Due to rising steadily for cost of labor
With the limitation for making raw material, the manufacturing cost for discharge duct of discharging fume is difficult to control and technique is relatively complicated.
Invention content
The purpose of this utility model is to provide it is a kind of it is prefabricated pour the flue being combined after, it is easily fabricated and can be preferably
Control cost.
The purpose of this utility model is achieved through the following technical solutions:It is a kind of it is prefabricated the flue being combined is poured after, it wrap
It includes and is horizontally spaced about and two blocks of horizontally extending prefabricated side plates, vertical interval setting and horizontally extending two
Tablet is poured after block and pours the connection structure of tablet junction with after positioned at prefabricated side plate;It is in prefabricated side plate that tablet is poured after described
It is poured under coordinating with formwork for placing, and molded part is poured after forming an entirety by connection structure and prefabricated side plate.
For the prior art, the utility model has the advantage of:
By it is prefabricated and after pour to be combined and be manufactured, can overcome one-pass molding process latus inframedium material glide or because
Working-procedure problem leads to problems of crack so that the thickness of shaping pipe each section is uniform, meets production standard, product is effectively ensured
Quality, and manufacturing process is improved, reduce manufacturing cost.
Description of the drawings
Fig. 1 is a kind of end face structure schematic diagram of embodiment of the utility model.
Fig. 2 is the end face structure schematic diagram of prefabricated side plate in Fig. 1.
Fig. 3 be in Fig. 1 after pour the end face structure schematic diagram of tablet.
Fig. 4 is a kind of end face structure schematic diagram of embodiment of the utility model.
Fig. 5 is the end face structure schematic diagram of prefabricated side plate in Fig. 4.
Fig. 6 be in Fig. 4 after pour the end face structure schematic diagram of tablet.
Fig. 7 is the right view of Fig. 4.
Fig. 8 is a kind of end face structure schematic diagram of embodiment of the utility model.
Fig. 9 is the end face structure schematic diagram of prefabricated side plate in Fig. 8.
Figure 10 be in Fig. 8 after pour the end face structure schematic diagram of tablet.
Figure 11 is the vertical view of Figure 10.
Figure 12 is a kind of end face structure schematic diagram of embodiment of the utility model.
Figure 13 is the vertical view of Figure 12.
Figure 14 is the end face structure schematic diagram of prefabricated side plate in Figure 12.
Figure 15 is the left view of Figure 12.
Figure 16 be in Figure 12 after pour the end face structure schematic diagram of tablet.
Figure 17 is the vertical view of Figure 16.
Figure 18 is a kind of end face structure schematic diagram of embodiment of the utility model.
Figure 19 is the end face structure schematic diagram of prefabricated side plate in Figure 18.
Label declaration:Prefabricated side plate 1, after pour tablet 2, coarse joint surface 3, boarding hole 4, embedding in bolt 5, built-in connection 6,
It connects net 7, reinforce positioning bar 8, tenon 9, the fourth of the twelve Earthly Branches 10.
Specific implementation mode
The utility model content is described in detail with embodiment with reference to the accompanying drawings of the specification:
It is a kind of prefabricated the flue being combined to be poured after, it is characterised in that:It includes being horizontally spaced about and in the horizontal direction
Tablet 2 is poured after two blocks of prefabricated side plates 1 of extension, vertical interval setting and horizontally extending two pieces and positioned at prefabricated
Side plate 1 pours the connection structure of 2 junction of tablet with after;Tablet 2 is poured after described to be poured in the case where prefabricated side plate 1 coordinates with formwork for placing
It builds, and molded part is poured after forming an entirety by connection structure and prefabricated side plate 1.
Prefabricated side plate 1 is pre-formed in advance, can effectively avoid one-pass molding and occurs due to side plate is to be vertically arranged state in the process
Slurry downslide problem.
In one embodiment, as shown in Figures 1 to 3, the connection structure includes being set on prefabricated side plate 1 and being located to pour with after
Tablet 2 connects the coarse joint surface 3 at place.The coarse joint surface 3 can be that rake hook is marked with fluted asperities or pre-
The fluctuating rough surface marked is pressed when processed.Increase contact surface using coarse joint surface 3, it is better with prefabricated side plate 1 that tablet 2 is poured after allowing
It is bonded together.
In one embodiment, as shown in Fig. 4 to 7 or Fig. 8 to 11, the connection structure includes horizontally spaced laying
It is on tablet 2 and logical in being poured on prefabricated side plate 1 and positioned at several boarding holes 4 for pouring 2 place of connecting of tablet with after and after being set to
Cross several embedding in bolt 5 that cast is directly molded in boarding hole 4.
In one embodiment, as shown in Figure 12 to 17, the connection structure includes being set to prefabricated side plate 1 to pour tablet 2 with after
The joinery and its construction of junction.
In one embodiment, as shown in Figure 18 to 19, the connection structure include it is horizontally spaced be laid in it is prefabricated
On side plate 1 and positioned at pouring several built-in connections 6 that tablet 2 connects place with after;After 6 part of the built-in connection is stretched into
It pours in tablet 2.
In a preferred embodiment, as shown in Fig. 1 to 3 or Figure 18 to 19, bonded to allow prefabricated side plate 1 to pour tablet 2 with after
It obtains more preferably with crack resistence, the connection structure further includes the pre- company for being embedded in and being poured after in prefabricated side plate 1 and outer end can be stretched into tablet 2
Connect net 7.Shown connection net 7 is plastic net cloth or metal mesh.
In a preferred embodiment, as shown in Figures 1 to 3, in order to prefabricated side plate 1 and after pour and can preferably determine between tablet 2
Position is fixed, and convenient for the setting of connection structure, improves the firmness of combination, and tablet 2 is poured after described and is equipped with positioned at prefabricated side plate 1
The reinforcement positioning bar 8 of angle between tablet 2 is poured with after.
Claims (7)
- Prefabricated the flue being combined is poured after 1. a kind of, it is characterised in that:It includes being horizontally spaced about and prolonging in the horizontal direction Tablet (2) is poured after two pieces of prefabricated side plates (1) stretching, vertical interval setting and horizontally extending two pieces and positioned at prefabricated Side plate (1) pours the connection structure of tablet (2) junction with after;It is in prefabricated side plate (1) and formwork for placing that tablet (2) is poured after described It is poured under cooperation, and molded part is poured after forming an entirety by connection structure and prefabricated side plate (1).
- Prefabricated the flue being combined is poured after 2. according to claim 1, it is characterised in that:The connection structure includes setting In on prefabricated side plate (1) and positioned at the coarse joint surface (3) poured with after tablet (2) and connect place.
- Prefabricated the flue being combined is poured after 3. according to claim 1, it is characterised in that:The connection structure includes edge Horizontal direction interval be laid on prefabricated side plate (1) and positioned at poured with after tablet (2) connect several boarding holes (4) at place with And it is poured after being set on tablet (2) and is directly molded on several embedding in bolt (5) in boarding hole (4) by cast.
- Prefabricated the flue being combined is poured after 4. according to claim 1, it is characterised in that:The connection structure includes setting The joinery and its construction of tablet (2) junction is poured with after in prefabricated side plate (1).
- Prefabricated the flue being combined is poured after 5. according to claim 1, it is characterised in that:The connection structure includes edge Horizontal direction interval is laid on prefabricated side plate (1) and is located at pours several built-in connections that tablet (2) connects place with after (6);The built-in connection (6) is poured after partly stretching into tablet (2).
- 6. described prefabricated pouring the flue being combined after according to claim 2-5 is any one, it is characterised in that:The connection knot Structure further includes the pre- connection net (7) for being embedded in and being poured after in prefabricated side plate (1) and outer end can be stretched into tablet (2).
- 7. prefabricated according to claim 2-5 any one pours the flue being combined after, it is characterised in that:It is poured after described Tablet (2) be equipped with positioned at prefabricated side plate (1) and after pour the reinforcement positioning bar (8) of angle between tablet (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820397037.6U CN207999038U (en) | 2018-03-22 | 2018-03-22 | It is prefabricated that the flue being combined is poured after |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820397037.6U CN207999038U (en) | 2018-03-22 | 2018-03-22 | It is prefabricated that the flue being combined is poured after |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207999038U true CN207999038U (en) | 2018-10-23 |
Family
ID=63839021
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820397037.6U Expired - Fee Related CN207999038U (en) | 2018-03-22 | 2018-03-22 | It is prefabricated that the flue being combined is poured after |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207999038U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110528826A (en) * | 2019-09-26 | 2019-12-03 | 福建首聪世豪实业有限公司 | Precast slab pouring floor pipeline and manufacturing process thereof |
-
2018
- 2018-03-22 CN CN201820397037.6U patent/CN207999038U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110528826A (en) * | 2019-09-26 | 2019-12-03 | 福建首聪世豪实业有限公司 | Precast slab pouring floor pipeline and manufacturing process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208884783U (en) | Assembled architecture PCF plate and connection component | |
CN207999038U (en) | It is prefabricated that the flue being combined is poured after | |
CN109797901A (en) | A kind of prefabricated framework and prefabricated board | |
CN204221939U (en) | A kind of precast concrete cable channel cover plate mold system | |
CN111231067A (en) | Cement product mould platform and method for producing cement product by using mould platform | |
CN207469596U (en) | A kind of beam column outer rim is exempted to tear concrete mold open | |
CN208629652U (en) | Prefabricated stacking floor mold | |
CN205291228U (en) | Triangle -shaped precast concrete piece making devices | |
CN103252838B (en) | The preparation method of one-shot forming glass magnesium smoke exhaust pipe and mould thereof | |
CN105133630A (en) | Prefabricated part for constructing foundation forming molds | |
CN201032381Y (en) | Sheet iron attached to the fireproof brick | |
CN201962948U (en) | Concrete beam pouring template with embedded part at top | |
CN101280592A (en) | Cast-in-situ rib laminated floor slab | |
CN210551989U (en) | A mould for making roofing parapet flashing prefab | |
CN207711007U (en) | A kind of prefabricated mould of concrete prefabricated wallboard | |
CN209699444U (en) | Prefabricated components production mould | |
CN207775924U (en) | Piping lane top die board mounting structure, piping lane template installation system | |
CN100366826C (en) | Anti-cracking method for new-old concrete junction plane after gravity dam heightening | |
CN2749653Y (en) | Rapid forming die set for cement tank applied for farmland irrigation | |
CN201343793Y (en) | Energy-saving sandwich composite wall steel tie | |
CN110409596A (en) | The quick detachable template of cast-in-situ steel reinforced concrete inlet for stom water | |
CN210025691U (en) | Building prefabricated part mold | |
CN110253724B (en) | Die for manufacturing flashing prefabricated part of parapet of roof and manufacturing method of flashing prefabricated part | |
CN205399453U (en) | Separate house T shape concrete foundation who pours with concrete block | |
CN214136548U (en) | A mould that is used for concrete rainwater ditch apron to pour |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181023 Termination date: 20210322 |