CN207999026U - Accomodation ground - Google Patents

Accomodation ground Download PDF

Info

Publication number
CN207999026U
CN207999026U CN201721910197.8U CN201721910197U CN207999026U CN 207999026 U CN207999026 U CN 207999026U CN 201721910197 U CN201721910197 U CN 201721910197U CN 207999026 U CN207999026 U CN 207999026U
Authority
CN
China
Prior art keywords
hole
area
ground
floor tile
platform basin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721910197.8U
Other languages
Chinese (zh)
Inventor
王骝
周东珊
余广
尤陈刚
黄慧
钟诚
潘�清
王金泉
王倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201721910197.8U priority Critical patent/CN207999026U/en
Application granted granted Critical
Publication of CN207999026U publication Critical patent/CN207999026U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of accomodation ground, the ground includes waterproof back box and floor tile, the shape and area of waterproof back box are identical as the shape on the primitive architecture ground of toilet to be fitted up and area comprising water bar and the portion of the areas dry area Bu Heshi positioned at water bar both sides;Ground tile paving is inside the waterproof back box.The back side of floor tile is compounded with adhesive layer, and the back side is the one side contacted with the waterproof back box.Accomodation ground provided by the utility model only needs simply to be installed, realizes rapid construction, and avoids the dirty and messy of traditional finishing effect scene at finishing scene.

Description

Accomodation ground
Technical field
The utility model is related to building decoration area, more particularly to a kind of accomodation ground.
Background technology
Currently, being laid with accomodation ground using wet-laid process usually using floor tile, i.e., brick is laid on using cement mortar and is defended Between life on ground, this method difficulty of construction is big, and operating procedure is complicated, requires the technical merit of worker very high, it is difficult to ensure Construction quality.
Invention content
In view of this, being badly in need of a kind of accomodation ground for being easy to be laid in practical application, the utility model provides one kind Accomodation ground, the ground include waterproof back box and floor tile, wherein:
The shape and area phase of the waterproof back box, shape and area and the primitive architecture ground of toilet to be fitted up Together comprising water bar and the portion of the areas dry area Bu Heshi positioned at the water bar both sides;The floor tile is pasted on the anti-bottom Inside box.
Preferably, the back side of the floor tile is compounded with adhesive layer, and the back side of the floor tile is to be contacted with the waterproof back box One side.
Preferably, closestool hole and platform basin hole are formed in the dry portion of area;Ground leakage hole is formed in the wet portion of area;Covering The first through hole coordinated with the closestool hole is formed in the floor tile on the closestool hole;The floor tile being covered on the platform basin hole Form the second through-hole coordinated with the platform basin hole;The floor tile being covered on described ground leakage hole is formed matches with described ground leakage hole The third through-hole of conjunction;Wherein, the closestool hole, the platform basin hole, described ground leakage hole respectively with the closestool on primitive architecture ground Sewer hole, platform basin sewer hole and floor drain sewer hole are opposite.
Preferably, the ground further includes toilet flange, platform basin flange and floor drain;The toilet flange passes through described first It is fixed after through-hole and the closestool hole;The platform basin flange is fixed after passing through second through-hole and the platform basin hole;Describedly Leakage is fixed in the third through-hole.
Preferably, the wet portion of area further includes enhancement bar, and the enhancement bar is set to the back side of wet portion of area bottom plate, described wet The back side of portion of area bottom plate is wet portion of the area bottom plate and the close one side in primitive architecture ground.
Preferably, the ground further includes at least one positioning element, and the positioning element includes bottom surface and is set to institute State the positioning fastener on bottom surface;At least one and positioning element shape is formed in the dry portion of area and the wet portion of area The locating slot matched, its bottom surface is located at the dry portion of area, the wet portion of area after the positioning element is set in the locating slot On same plane, the positioning fastener is for positioning the floor tile being laid in the dry portion of area, the wet portion of area.
Preferably, the bottom surface of the positioning element and the positioning fastener are decussate texture;Alternatively, described fixed The bottom surface of position component is T font structures comprising transverse slat and the riser being vertically installed on the transverse slat;The positioning card Part is the bar blocks being set on the riser.
Accomodation ground provided by the utility model, all components are produced in factory industry metaplasia, are only needed at finishing scene Simply to be installed, scene realizes rapid construction without masterful technique worker without the too many construction time, and And avoid the dirty and messy of traditional finishing effect scene.
Description of the drawings
Fig. 1 is the schematic diagram for the accomodation ground that the utility model embodiment one provides;
Fig. 2 a are the schematic diagram for the accomodation ground that the utility model embodiment two provides;
Fig. 2 b are the schematic diagram for the floor tile that the accomodation ground that the utility model embodiment two provides is laid with;
The enhancement bar signal for the waterproof back box being arranged on the accomodation ground that Fig. 2 c provide for the utility model embodiment two Figure;
Fig. 2 d are a kind of schematic diagram of the positioning element for the accomodation ground that the utility model embodiment two provides;
Fig. 2 e are the schematic diagram of another positioning element for the accomodation ground that the utility model embodiment two provides.
Specific implementation mode
To keep the purpose of this utility model, technical solution and advantage clearer, implement hereinafter with reference to the utility model Attached drawing in example, clearly and completely describes the technical solution of the utility model, it is clear that described implementation by embodiment Example is a part of the embodiment of the utility model, instead of all the embodiments.
Embodiment one
Accomodation ground provided in this embodiment includes waterproof back box and floor tile.
As shown in Figure 1, accomodation ground includes waterproof back box and floor tile a, the shape of waterproof back box and area with wait fitting up Toilet primitive architecture ground shape it is identical with area comprising water bar 3 and the dry portion of area positioned at 3 both sides of water bar 1 and wet portion of area 2;Polylith floor tile a is layed in inside waterproof back box.
Accomodation ground provided in this embodiment includes waterproof back box and floor tile, and all components are produced in factory industry metaplasia, It only needs simply to be installed at finishing scene, scene is not necessarily to masterful technique worker, real without the too many construction time Show rapid construction, and avoids the dirty and messy of traditional finishing effect scene.
Embodiment two
Accomodation ground provided in this embodiment includes at least one positioning element, wherein the ground being laid in waterproof back box The back side of brick is compounded with adhesive layer.
As shown in Fig. 2 a to Fig. 2 e, accomodation ground include waterproof back box, floor tile a, toilet flange, platform basin flange, floor drain, Positioning element.As shown in Figure 2 b, the floor tile a being laid in waterproof back box is compounded with adhesive layer b on the back side, wherein floor tile a's The back side is the one side contacted with waterproof back box.Waterproof back box includes dry portion of area 1, wet portion of area 2, water bar 3, does portion of area 1, wet portion of area 2 are located at the both sides of water bar 3.Wherein, portion of area 1, wet portion of area 2 and water bar 3 is done to be integrally formed.It is formed in dry portion of area 1 Closestool hole 100 and platform basin hole 101;Ground leakage hole 23 is formed in wet portion of area 2;The floor tile a being covered on closestool hole 100 form with The first through hole that closestool hole 100 coordinates;The floor tile a being covered on platform basin hole 101 forms second coordinated with platform basin hole 101 and leads to Hole;The floor tile a being covered on ground leakage hole 23 forms the third through-hole coordinated with ground leakage hole 23;Wherein, closestool hole 100, platform basin Hole 101, leakage hole 23 respectively with closestool sewer hole, platform basin sewer hole and the floor drain sewer hole phase on primitive architecture ground It is right.Toilet flange is fixed after passing through first through hole and closestool hole 100;Platform basin flange is solid after the second through-hole and platform basin hole 101 It is fixed;Floor drain is fixed in third through-hole.As shown in Figure 2 c, wet portion of area 2 further includes the enhancement bar 24 for being set to wet 2 back side of portion of area, The back side in the wet portion of area 2 is wet portion of area 2 and the close one side in primitive architecture ground.Height is presented in 24 portion of the areas Shi Shi 2 of enhancement bar Water in wet portion of area 2 is introduced ground leakage hole 23, played a role in the drainage by slope.
The dry portion of area 1 and wet portion of area 2 of waterproof back box form at least one and matched locating slot 40 of positioning element shape, Positioning element includes bottom surface 411 and the positioning fastener 412 that is set on bottom surface 411, after positioning element is set in locating slot 40, Bottom surface 411 and dry portion of area 1, wet portion of area 2 are in the same plane, and positioning fastener 412 is used for being laid in dry portion of area 1, wet portion of area 2 Brick positioned.As shown in Figure 2 d, a kind of realization method of positioning element is:The bottom surface 411 of positioning element and positioning fastener 412 be decussate texture, the intersection of four pieces of floor tiles for bathroom floor;As shown in Figure 2 e, positioning element is another Planting realization method is:The bottom surface 411 of positioning element is T font structures comprising transverse slat and is vertically installed on the transverse slat Riser;It is the bar blocks being set on riser to position fastener 412, the phase for two pieces of floor tiles in the fringe region of bathroom floor At friendship.
Accomodation ground provided in this embodiment positions the floor tile being layed in waterproof back box by positioning element, Keep positioning more accurate, greatly reduces difficulty of construction.The floor tile back side being laid in waterproof back box is compounded with adhesive layer, when laying Without cement mortar, only floor tile need to be adhered directly onto waterproof back box inside using adhesive layer.All components are in factory's work Industry metaplasia is produced, and only needs simply to be installed at finishing scene, scene is not necessarily to masterful technique worker, applies without too many Between working hour, rapid construction is realized, and avoids the dirty and messy of traditional finishing effect scene.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, do not depart from the utility model it is original under the premise of, several improvements and modifications can also be made, these improve and Retouching also should be regarded as the scope of protection of the utility model.

Claims (7)

1. a kind of accomodation ground, which is characterized in that the ground includes waterproof back box and floor tile, wherein:
The waterproof back box, shape and area are identical as the shape on the primitive architecture ground of toilet to be fitted up and area, It includes water bar and the portion of the areas dry area Bu Heshi positioned at the water bar both sides;The ground tile paving is in the waterproof back box Portion.
2. accomodation ground according to claim 1, which is characterized in that the back side of the floor tile is compounded with adhesive layer, institute The back side for stating floor tile is the one side contacted with the waterproof back box.
3. accomodation ground according to claim 1, which is characterized in that form closestool hole and platform basin in the dry portion of area Hole;Ground leakage hole is formed in the wet portion of area;The floor tile being covered on the closestool hole, which is formed, to be coordinated with the closestool hole First through hole;The floor tile being covered on the platform basin hole forms the second through-hole coordinated with the platform basin hole;It is covered in described Floor tile on ground leakage hole forms the third through-hole coordinated with described ground leakage hole;Wherein, the closestool hole, the platform basin hole, institute State ground leakage hole respectively on primitive architecture ground closestool sewer hole, platform basin sewer hole and floor drain sewer hole it is opposite.
4. accomodation ground according to claim 3, which is characterized in that the ground further includes toilet flange, platform basin method Blue and floor drain;The toilet flange is fixed after passing through the first through hole and the closestool hole;The platform basin flange passes through described It is fixed after second through-hole and the platform basin hole;The floor drain is fixed in the third through-hole.
5. accomodation ground according to claim 1, which is characterized in that the wet portion of area further includes enhancement bar, the increasing Strong item is set to the back side of wet portion of area bottom plate, and the back side of wet portion of the area bottom plate is wet portion of the area bottom plate and primitive architecture ground Close one side.
6. accomodation ground according to claim 1, which is characterized in that the ground further includes at least one positioning region Part, the positioning element include bottom surface and the positioning fastener that is set on the bottom surface;In the dry portion of area and the wet portion of area At least one and matched locating slot of positioning element shape is formed, after the positioning element is set in the locating slot Its bottom surface and the dry portion of area, the wet portion of area are in the same plane, and the positioning fastener is used for the dry portion of area, described The floor tile being laid in wet portion of area is positioned.
7. accomodation ground according to claim 6, which is characterized in that the bottom surface of the positioning element and described fixed Bit card part is decussate texture;Alternatively, the bottom surface of the positioning element is T font structures comprising transverse slat and vertical The riser being set on the transverse slat;The positioning fastener is the bar blocks being set on the riser.
CN201721910197.8U 2017-12-30 2017-12-30 Accomodation ground Active CN207999026U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721910197.8U CN207999026U (en) 2017-12-30 2017-12-30 Accomodation ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721910197.8U CN207999026U (en) 2017-12-30 2017-12-30 Accomodation ground

Publications (1)

Publication Number Publication Date
CN207999026U true CN207999026U (en) 2018-10-23

Family

ID=63836485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721910197.8U Active CN207999026U (en) 2017-12-30 2017-12-30 Accomodation ground

Country Status (1)

Country Link
CN (1) CN207999026U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149886A (en) * 2017-12-30 2018-06-12 浙江亚厦装饰股份有限公司 Accomodation ground and laying method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149886A (en) * 2017-12-30 2018-06-12 浙江亚厦装饰股份有限公司 Accomodation ground and laying method

Similar Documents

Publication Publication Date Title
US7493732B2 (en) Litho-mosaic
CN102140836B (en) Construction method of large-size floor tile
CN108457442B (en) Interior decoration system and decoration method
US2484240A (en) Shower pan construction
CN101565997A (en) Construction method for large-area irregular floor tile
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN108468413A (en) A kind of air-entrained concrete building block exempts from anti-hollowing construction method of plastering
CN106836718A (en) Precast floor system and its assembly method
CN207999026U (en) Accomodation ground
CN104153535A (en) Method for splicing and laying flexible hinged face brick units
CN108149886A (en) Accomodation ground and laying method
CN204781464U (en) Water bar between shower
KR20160016350A (en) The construction method of floor covering materials using concrete stain
CN207063424U (en) A kind of epoxy floor structure
CN205502318U (en) Wall structure with decorate wire casing
CN207974465U (en) Toilet is moved into one's husband's household upon marriage stone module
CN207974462U (en) Waterproof back box
CN208533945U (en) A kind of flexible assembly floor tile
CN206784767U (en) A kind of stair drip construction
CN110130643A (en) A kind of plastic cement, flax ground construction technique
CN109868955A (en) The construction method of wall is used for after various plane materiels and cellular board are compound
KR101869417B1 (en) floor surface water proof structure and the method of construction of floor surface water proof structure
CN110318522A (en) A kind of quick paving structure of compound ceramic tile
CN109779255A (en) A kind of aerated concrete wall face brushing gypsum plastering construction method
CN209353585U (en) A kind of interim whole drain structure of roofing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant