CN207989049U - Tunnel Second Lining Construction double bolloon formula termination device - Google Patents

Tunnel Second Lining Construction double bolloon formula termination device Download PDF

Info

Publication number
CN207989049U
CN207989049U CN201820327420.4U CN201820327420U CN207989049U CN 207989049 U CN207989049 U CN 207989049U CN 201820327420 U CN201820327420 U CN 201820327420U CN 207989049 U CN207989049 U CN 207989049U
Authority
CN
China
Prior art keywords
air bag
tunnel
cylinder
countercheck
supporting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820327420.4U
Other languages
Chinese (zh)
Inventor
宋宏涛
张晓林
傅宏林
陈文夫
王文芳
任斌
胡庆林
吴先锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Water Resources Development Co Ltd
Original Assignee
Anhui Water Resources Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Water Resources Development Co Ltd filed Critical Anhui Water Resources Development Co Ltd
Priority to CN201820327420.4U priority Critical patent/CN207989049U/en
Application granted granted Critical
Publication of CN207989049U publication Critical patent/CN207989049U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Tunnel Second Lining Construction double bolloon formula termination device, it includes extending cylinder, several supporting rods, two annular air bags, several countercheck rods, supporting rod, the quantity of countercheck rod is identical, the length of supporting rod is not less than the axial length for extending cylinder, supporting rod is axially disposed at its inner wall and circumferential spaced along extend cylinder, the axis direction of two air bags is set as front-rear direction, two the front and back of air bag are more than the axial length for extending cylinder to of same size and width, the material of each air bag is elastic material, the front side of each air bag is equipped with gas nozzle, intussusception connects inside and outside two air bags, the Air sac cover of inside is on extension cylinder, the front end of each supporting rod connects with a countercheck rod on the inside of extension cylinder axis region, each frontside contacts of the countercheck rod far from the outside and two air bags for extending cylinder axis region.The present apparatus is fitted on trolley, can effectively improve construction efficiency so that the sealing end effect of tunnel Second Lining Construction is preferable.

Description

Tunnel Second Lining Construction double bolloon formula termination device
Technical field
The utility model is related to construction of tunnel apparatus fields, more particularly to a kind of double gas of tunnel Second Lining Construction Bellows termination device.
Background technology
Currently, tunnel builds generally use New Austrian Tunneling Method in hydraulic engineering, after the completion of tunnel excavation, according to surrounding rock category And barrel pressure-bearing situation, single shell lining or combined type lining cutting must be carried out.Combined type lining cutting (is commonly called as just in original single shell lining Lining, after tying up at country rock and squeeze into anchor pole, hanging up bar-mat reinforcement, one layer concrete of fill-before-fire) inside circumferentially pour one layer of steel again Reinforced concrete (i.e. secondary lining).
It is general for the Second Lining Construction of wholecircle section, pressurized tunnel with the continuous development of China's equipment manufacture Method is built using whole-circle needle beam type telescoping steel form (being referred to as trolley below) mould, the outer framework of trolley circumferential direction includes that circular mould is built Cylinder (being enclosed after bending using the steel plate of 8-10mm) is arranged and builds the reinforced frame of an inner wall (using channel steel, work in mould Word steel etc. is formed after connection).
To prevent country rock from seeping water, design is using annular and flat belt-like section at the construction joint of adjacent two moulds Second Lining Construction The sealing collar in face is closed, and to prevent country rock from seeping water, buried rubber fastening band encloses during sealing collar uses, waterstop Width is 230-500mm.
Implementing tunnel Second Lining Construction using trolley, there is following defects:It can not be quickly and easily to each lining cutting The front end of section is blocked, and spillage problem easily occurs in when closure, construction efficiency is relatively low, recruitment number is more, circulation material consumption greatly, Water-stagnating effect is also poor.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of tunnel Second Lining Construction double bolloon formula sealing ends to fill It sets, the present apparatus is fitted on trolley, can effectively improve construction efficiency so that the sealing end effect of tunnel Second Lining Construction is preferable.
In order to solve the above technical problems, the utility model provides a kind of tunnel Second Lining Construction double bolloon formula sealing end dress Set, it include extend cylinder, several supporting rods, two annular air bags, several countercheck rods, supporting rod, countercheck rod quantity phase Together, the length of supporting rod is axially disposed at its inner wall and week not less than the axial length for extending cylinder, supporting rod along extension cylinder To spaced, set the axis direction of two air bags as front-rear direction, two air bags it is front and back big to of same size and width It is elastic material in the material of the axial length for extending cylinder, each air bag, the front side of each air bag is equipped with gas nozzle, two air bags The connection of inside and outside intussusception, the Air sac cover of inside is mounted in extending on cylinder, and the front end of each supporting rod is with a countercheck rod close to prolonging Connect on the inside of long cylinder axis area, front side of each countercheck rod far from the outside and two air bags for extending cylinder axis region Contact.
For the sake of simple declaration problem, tunnel Second Lining Construction double bolloon formula described in the utility model is blocked below Device is referred to as the present apparatus.
The present apparatus is fitted on trolley, i.e.,:The front end vertical connection of the rear end of supporting rod and the reinforced frame of trolley, branch The length trend of strut builds that the axis direction of cylinder is consistent with the mould of trolley, extension cylinder be located at the front end of trolley and with trolley Mould builds a coaxial line.Said structure design is simple, reasonable, and convenient for assembly, bonding strength is preferable;
The rear side circle body of sealing collar is fixed on to the front side of the steel reinforcement cage of lining cutting section and ensures that its position is accurate, sealing collar Front side circle body (i.e. reserved circle body) although exposed except the front end of lining cutting section, its by non-bending it is round and smooth in a manner of be clamped in (i.e. inside and outside intussusception connects successively for an air bag, the front side circle body of sealing collar, another air bag between two air bags filled with compressed air Connect), countercheck rod to make the positioning of two air bags (set the side of sealing collar, steel reinforcement cage, air bag inside tunnel before, if Determine after sealing collar, steel reinforcement cage, air bag be far from the side inside tunnel, sealing collar it is front and back be more than each air bag to width before Backward width);
Both cylinder, country rock are built to the mould of trolley and is formed by casting concrete in space, and use two air bag conducts The plugging part of overall structure form circumferentially blocks the front end of lining cutting section, the front side circle of two air bags and sealing collar Body is in flexible contact, the front side circle body of sealing collar will not bending, impaired, the front side circle body of sealing collar is protected, realize quickly, Conveniently, steadily (compressed air in each air bag can reach certain pressure to sealing end, and deformation appropriate is suitable for lining cutting section The irregular face of front end, this plugging structure is quite time saving, it is laborsaving, save artificial, conveniently, be not in that the spillage of concrete is asked Topic, the consumption for effectively increasing construction efficiency, reducing circulation material, sealing end effect are preferable), the gasbag ektexine and tunnel in outside Country rock be directed toward country rock closely against the outer end of, countercheck rod;
After the concreting molding of lining cutting section, the air in two air bags is bled off, both is made mixed with lining cutting section The front end of solidifying soil layer mutually separates, then removes countercheck rod and two air bags (this makes the exposed sealing collar except lining cutting section front end Front side circle body be not in deformation or displacement problem, damaging problem will not occur, properly settle present in the prior art Relevant issues);
Therefore, the present apparatus is fitted on trolley, can effectively improve construction efficiency so that the sealing end of tunnel Second Lining Construction Effect is preferable.
The cross sectional shape and specification of the countercheck rod correspond to identical respectively;
The front end of each supporting rod is equipped with the casing for being used for inserting countercheck rod, cross sectional shape and the specification difference of several casings Corresponding identical, spinning trip bolt on each casing, inside and the respective sleeve grafting of each countercheck rod, and each countercheck rod profit It is positioned with the trip bolt in respective sleeve.
In this way, according to the concave-convex situation on country rock surface, each countercheck rod can move outside position along respective sleeve, with suitable Different size and the country rock of shape are answered, the construction demand of tunnel Second Lining Construction is fully met.
The material of each air bag uses rubber material;
The axial cross section shape of the air bag of inside is rectangular, and the axial cross section shape of the air bag in outside is round or oval Shape.
Using rubber material so that the wear-resistant strength of air bag is preferable, is not easy gas leakage;
The axially different cross sectional shape of interior outside air bag so that two air bags imitate the clamping of the front side circle body of sealing collar It is fruit, preferable to the sealing end effect of the front end of corresponding lining cutting section, it is ensured that construction joint is directly suitable.
Description of the drawings
Fig. 1 is the structure and Construction State schematic diagram for implementing tunnel Second Lining Construction using the trolley of the installation present apparatus.
Fig. 2 is the partial view of Fig. 1.
Fig. 3 is the A-A enlarged cross-sectional views of Fig. 2.
Fig. 4 is the B of Fig. 3 to enlarged view.
Fig. 5 is another structure and the Construction State signal for implementing tunnel Second Lining Construction using the trolley of the installation present apparatus Figure.
The label of each component is as follows in attached drawing:
1a, extend cylinder;1b, supporting rod;1c, casing;1d, trip bolt;2, air bag;2a, gas nozzle;3, countercheck rod;4、 Air gauge;5, compressor;T, the mould of trolley builds cylinder;J, the reinforced frame of trolley;D1, the first lining cutting section;L1, the first steel reinforcement cage; D2, the second lining cutting section;L2, the second steel reinforcement cage;F, construction joint;Y, country rock;Q1, the first sealing collar;Before Q11, the first sealing collar Side circle body;The rear side circle body of Q12, the first sealing collar;Q2, the second sealing collar;The front side circle body of Q21, the second sealing collar;Q22, The rear side circle body of two sealing collars;N, inside tunnel.
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with the accompanying drawings and implement Example, is described in further detail the utility model.It should be appreciated that specific embodiment described herein is only explaining this reality With novel, it is not used to limit the utility model.
Be not shown for the sake of concise description problem, in Fig. 1 several supporting rod 1b, several casing 1c, several trip bolt 1d, Several countercheck rods 3, and be to carry out concreting molding construction for the first lining cutting section D1.
It is country rock Y, the first lining cutting section D1, construction joint F, the second lining cutting after implementing tunnel Second Lining Construction shown in Fig. 5 The mated condition of section D2, the first sealing collar Q1, the second sealing collar Q2.
Referring to Fig. 1-Fig. 5, the present apparatus includes extending cylinder 1a, several supporting rod 1b, two annular air bags 2, several resistances Bar 3.
Supporting rod 1b, the quantity of countercheck rod 3 are identical.
The length of supporting rod 1b is equal to the axial length for extending cylinder 1a, and supporting rod 1b is axially disposed at along extension cylinder 1a's Its inner wall and circumferential spaced, is extended cylinder 1a and is enclosed using the steel plate of 5mm thickness, supporting rod 1b circumferentially spaced 30 ~50cm and supporting rod 1b use 10# channel steels.
Intussusception connects inside and outside two air bags 2, and the air bag 2 of inside, which is sleeved on, to be extended on cylinder 1a, the axial direction of the air bag 2 of inside Cross sectional shape is rectangular, and the axial cross section shape of the air bag 2 in outside is circle.The axis direction for setting two air bags 2 is front and back Direction, two the front and back of air bag 2 are more than the axial length for extending cylinder 1a to of same size and width, and setting extends cylinder 1a's Axial length is C, each air bag 2 it is front and back to width be K, then C:K is 1:1.05.
The material of each air bag 2 is rubber material, and the front side of each air bag 2 is equipped with gas nozzle 2a.When construction, gas nozzle 2a can divide Do not connect with air gauge 4, compressor 5.
The cross sectional shape and specification of countercheck rod 3 correspond to identical, the use 8# channel steels of countercheck rod 3 respectively.
The front end of each supporting rod 1b is equipped with by fastener to be used for inserting countercheck rod 3 and rectangular casing 1c, several The cross sectional shape and specification of casing 1c corresponds to identical respectively, and spinning trip bolt 1d, each countercheck rod 3 are close on each casing 1c The inside of extension cylinder 1a axis areas and respective sleeve 1c grafting are (i.e.:The front end of each supporting rod 1b with a countercheck rod 3 Inside connect), and each countercheck rod 3 is positioned using the trip bolt 1d on respective sleeve 1c (in this way, countercheck rod 3 weeks To spaced), frontside contacts of each countercheck rod 3 far from the outside and two air bags 2 for extending cylinder 1a axis areas.
Referring to Fig. 1-Fig. 5, implement processing step and the presence of tunnel Second Lining Construction using the trolley of the equipped present apparatus Corresponding advantage be:
1) the first cylindric steel reinforcement cage L1 that the first lining cutting section D1 (i.e. the first mould) is built in one end of tunnel (uses steel Muscle is welded), mobile trolley used to the first lining cutting section D1, the mould of trolley builds between a T and the first steel reinforcement cage L1 that there are between circumferential direction Gap, the front end vertical connection of the rear end of supporting rod 1b and the reinforced frame J of trolley, the mould of the length trend and trolley of supporting rod 1b The axis direction for building a T is consistent, extends cylinder 1a and is located at the front end of trolley and builds a T coaxial lines (above-mentioned knot with the mould of trolley Structure design is simple, reasonable, and convenient for assembly, bonding strength is preferable);
2) the rear side circle body Q12 of the first sealing collar Q1 is fixed on the front side of the first steel reinforcement cage L1 and ensures its position standard Really, the front side circle body Q11 (i.e. reserved circle body) of the first sealing collar Q1 is although exposed except the front end of the first lining cutting section D1, its By non-bending it is round and smooth in a manner of be clamped in (i.e. an air bag 2, the first sealing collar between two air bags 2 filled with compressed air The inside and outside intussusception connection successively of the front side circle body Q11 of Q1, another air bag 2), countercheck rod 3 is making two positioning of air bags 2 (setting the Before one sealing collar Q1, the first steel reinforcement cage L1, air bag 2 are close to the side of N inside tunnel, the first sealing collar Q1 of setting, the first steel After the side of muscle cage L1, air bag 2 far from N inside tunnel is, the first sealing collar Q1 it is front and back be more than each air bag 2 to width before Backward width);
3) both a T, country rock Y are built to mould and is formed by casting concrete in space, and using two air bags 2 as whole The plugging part of body structure type circumferentially blocks the front end of the first lining cutting section D1, two air bags 2 and the first sealing collar The front side circle body Q11 of Q1 is in flexible contact, and the front side circle body Q11 of the first sealing collar Q1 will not bending, impaired, the first sealing collar Q1 Front side circle body Q11 protected, realize quickly, conveniently, steadily sealing end (compressed air in each air bag 2 can reach one Fixed pressure, appropriate to deform the irregular face for being suitable for the first front ends lining cutting section D1, this plugging structure is quite time saving, saves Power is saved manually, conveniently, is not in the spillage problem of concrete, is effectively increased construction efficiency, reduces circulation material Consumption, sealing end effect are preferable), 2 outer wall of air bag in outside and the country rock Y of tunnel are closely against country rock is directed toward in the outer end of countercheck rod 3 Y;
4) after the concreting of the first lining cutting section D1 is molded, the air in two air bags 2 is bled off, both is made and the The front end of the concrete layer of one lining cutting section D1 mutually separates, then removes countercheck rod 3 and two air bags 2 (this makes exposed in the first lining The front side circle body Q11 for building the first sealing collar Q1 except the front ends section D1 is not in deformation or displacement problem, will not be broken Damage problem has properly settled the relevant issues present in the prior art);
5) cylindric the second steel reinforcement cage L2 for continuing to build the second lining cutting section D2 (i.e. the second mould) in tunnel (and is adopted It is formed with reinforcement welding, sets the second steel reinforcement cage L2 close to the side of N inside tunnel before, the second steel reinforcement cage L2 is far from tunnel for setting The side of N is rear inside hole), the second steel reinforcement cage L2 be located at the front side of the first lining cutting section D1 and between the first lining cutting section D1 there are Gap, moves forward trolley to the second lining cutting section D2 in tunnel, and the mould of trolley builds between a T and the second steel reinforcement cage L2 that there are weeks To gap;
6) by the front side circle body Q11 of the first sealing collar Q1 (i.e. reserved circle body) be fixed on the second steel reinforcement cage L2 rear side (because The front side circle body Q11 of first sealing collar Q1 is not in deformation or displacement problem, in this way, the front side circle body of the first sealing collar Q1 Corresponding twisting stress would not be generated in Q11 so that after the front side circle body Q11 and the second steel reinforcement cage L2 of the first sealing collar Q1 Side can it is smooth, sleekly fix);
7) the rear side circle body Q22 of the second sealing collar Q2 is fixed on the front side of the second steel reinforcement cage L2 and ensures that its position is accurate (the second sealing collar Q2, the structure of the first sealing collar Q1 and specification correspond to identical respectively), the front side circle body Q21 of the second sealing collar Q2 Although exposed except the front end of the second lining cutting section D2, its by non-bending it is round and smooth in a manner of be clamped in filled with compressed air (i.e. inside and outside intussusception connects successively for an air bag 2, the front side circle body Q21 of the second sealing collar Q2, another air bag 2 between two air bags 2 Connect), countercheck rod 3 is making the positioning of two air bags 2 (set the second sealing collar Q2 close to the side of N inside tunnel before, set the Sides of the two sealing collar Q2 far from N inside tunnel is rear);
8) both a T, country rock Y are built to mould and is formed by space casting concrete again, and use two gas again The plugging part of the structure type as a whole of capsule 2, circumferentially blocks the front end of the second lining cutting section D2, two air bags 2 with The front side circle body Q21 of second sealing collar Q2 is in flexible contact, the front side circle body Q21 of the second sealing collar Q2 will not bending, impaired, the The front side circle body Q21 of two sealing collar Q2 is protected, and realizes that quickly, conveniently, steadily (compression in each air bag 2 is empty for sealing end Gas can reach certain pressure, appropriate to deform the irregular face for being suitable for the second front ends lining cutting section D2, this plugging structure Quite time saving, laborsaving, saving is not in the spillage problem of concrete manually, conveniently, effectively increases construction efficiency, reduces The consumption of circulation material, sealing end effect are preferable), 2 outer wall of air bag in outside and the country rock Y of tunnel be closely against countercheck rod 3 It is directed toward country rock Y in outer end;
9) after the concreting of the second lining cutting section D2 is molded, the first sealing collar Q1 is in the first lining cutting section D1, second (the front side circle body Q11 of the first sealing collar Q1 is located at construction joint F in the adjacent area of lining cutting section D2 and at construction joint F For exposed part, first it is not in damaging problem when being blocked using two air bags 2, second in the actual use of tunnel In the process, because not will produce corresponding twisting stress in the front side circle body Q11 of the first sealing collar Q1, therefore its service life is prolonged Long, so that country rock Y can be effectively prevent to seep water, water-stagnating effect is preferable);
10) air in two air bags 2 is bled off again, makes the front end phase of the two and the concrete layer of the second lining cutting section D2 It separates, then removes countercheck rod 3 and two air bags 2 (this makes exposed the second sealing collar Q2 except the second front ends lining cutting section D2 Front side circle body Q21 be not in deformation or displacement problem, damaging problem will not occur, properly settle the prior art and deposited Relevant issues);
Be repeated several times 5) -10) processing step, to complete the Second Lining Construction of tunnel.
In conclusion implementing tunnel Second Lining Construction using the trolley of the installation present apparatus, there are following advantages:It can be fast Speed easily blocks the front end of each lining cutting section, and when closure is not in spillage problem, and construction efficiency is higher, recruitment Number is few, circulation material consumption is small, water-stagnating effect is also preferable.
Therefore, the present apparatus is fitted on trolley, can effectively improve construction efficiency so that the sealing end of tunnel Second Lining Construction Effect is preferable.
The above is only the preferred embodiment of the present invention, is not used for limiting the scope of the utility model; If not departing from the spirit and scope of the utility model, the utility model is modified or replaced equivalently, should all be covered In the protection domain of the utility model claims.Such as:
The length of supporting rod can also be more than the axial length for extending cylinder;
The front end of each supporting rod can also be equipped with the casing for being used for inserting countercheck rod by welding manner;
The inside extended line of each countercheck rod can also intersect with the axis for extending cylinder;
The axial cross section shape of the air bag in outside can also be ellipse;
Set extend the axial length of cylinder as C, each air bag it is front and back to width be K, then C:K can also be 1: Flexibly selection according to actual needs in the ratio range of (1.05-1.2).

Claims (3)

1. tunnel Second Lining Construction double bolloon formula termination device, it is characterised in that:It include extend cylinder, several supporting rods, Two annular air bags, several countercheck rods, supporting rod, the quantity of countercheck rod are identical, and the length of supporting rod is not less than extension cylinder Axial length, supporting rod is axially disposed at its inner wall and circumferential spaced along extend cylinder, sets the axis of two air bags Direction is front-rear direction, and two the front and back of air bag are more than the axial length for extending cylinder, each air bag to of same size and width Material be elastic material, the front side of each air bag is equipped with gas nozzle, and intussusception connection inside and outside two air bags, the Air sac cover of inside is mounted in Extend on cylinder, the front end of each supporting rod connects with a countercheck rod on the inside of extension cylinder axis region, each Frontside contacts of the countercheck rod far from the outside and two air bags for extending cylinder axis region.
2. tunnel Second Lining Construction double bolloon formula termination device according to claim 1, it is characterised in that:
The cross sectional shape and specification of the countercheck rod correspond to identical respectively;
The front end of each supporting rod is equipped with the casing for being used for inserting countercheck rod, and the cross sectional shape and specification of several casings correspond to respectively It is identical, spinning trip bolt on each casing, inside and the respective sleeve grafting of each countercheck rod, and each countercheck rod utilizes phase The trip bolt on casing is answered to be positioned.
3. tunnel Second Lining Construction double bolloon formula termination device according to claim 1 or 2, it is characterised in that:
The material of each air bag uses rubber material;
The axial cross section shape of the air bag of inside is rectangular, and the axial cross section shape of the air bag in outside is round or oval.
CN201820327420.4U 2018-03-10 2018-03-10 Tunnel Second Lining Construction double bolloon formula termination device Active CN207989049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820327420.4U CN207989049U (en) 2018-03-10 2018-03-10 Tunnel Second Lining Construction double bolloon formula termination device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820327420.4U CN207989049U (en) 2018-03-10 2018-03-10 Tunnel Second Lining Construction double bolloon formula termination device

Publications (1)

Publication Number Publication Date
CN207989049U true CN207989049U (en) 2018-10-19

Family

ID=63826612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820327420.4U Active CN207989049U (en) 2018-03-10 2018-03-10 Tunnel Second Lining Construction double bolloon formula termination device

Country Status (1)

Country Link
CN (1) CN207989049U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222972A (en) * 2018-03-10 2018-06-29 安徽水利开发股份有限公司 Tunnel Second Lining Construction double bolloon formula termination device
CN113802701A (en) * 2021-10-20 2021-12-17 中国十七冶集团有限公司 Cast-in-place concrete plugging air bag device and using method
CN115288745A (en) * 2022-08-26 2022-11-04 广东水电二局股份有限公司 Tunnel lining end socket template system and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222972A (en) * 2018-03-10 2018-06-29 安徽水利开发股份有限公司 Tunnel Second Lining Construction double bolloon formula termination device
CN108222972B (en) * 2018-03-10 2024-04-30 安徽水利开发有限公司 Double-airbag type end sealing device for tunnel secondary lining construction
CN113802701A (en) * 2021-10-20 2021-12-17 中国十七冶集团有限公司 Cast-in-place concrete plugging air bag device and using method
CN113802701B (en) * 2021-10-20 2022-09-16 中国十七冶集团有限公司 Cast-in-place concrete plugging air bag device and using method
CN115288745A (en) * 2022-08-26 2022-11-04 广东水电二局股份有限公司 Tunnel lining end socket template system and construction method
CN115288745B (en) * 2022-08-26 2023-08-15 广东水电二局股份有限公司 Tunnel lining end head template system and construction method

Similar Documents

Publication Publication Date Title
CN207989049U (en) Tunnel Second Lining Construction double bolloon formula termination device
CN207983642U (en) A kind of two-way compacting tool set of easily demoulding tubular blank
CN205936654U (en) A gasbag template for tunnel secondary lining
CN208137953U (en) A kind of quick slurry stop of double-shielded TBM
CN202448226U (en) Molding mould group for prestressed steel cylinder concrete pipe applied to jacking construction method
CN108222972A (en) Tunnel Second Lining Construction double bolloon formula termination device
CN110039649B (en) Concrete water pipe internal pouring device for water supply and drainage
CN206429784U (en) A kind of shield grouting pipe connecting structure
CN206928524U (en) Full grout sleeve
CN108638317A (en) A kind of spheroidal graphite cast-iron push pipe is with pouring tooling and its working method
CN103486349B (en) The preparation method of spheroidal graphite cast iron push pipe
CN109487813A (en) A kind of integrated prefabricated tube coupling and its construction method of pipe gallery street crossing push pipe
JPH0511195B2 (en)
CN211144514U (en) Tunnel cavity slip casting structure
CN1811251B (en) Small-flow oblique-stress green environment protection pipeline and its production process
CN100417856C (en) Pressure-resistant culvert pipe with small section and circumferential stress and preparation process thereof
CN110080466A (en) Grouting sleeve and preparation method and application thereof
CN203924042U (en) A kind of stake barrel structure of reducing cylinder stake
CN212054607U (en) Packer rubber cylinder and packer
CN217354387U (en) Transition ring structure for steel sleeve
CN208484006U (en) A kind of swollen pulling eye comprehensive pipe gallery die of Core Vibrated Casting Process band
CN211257564U (en) Device for secondary grouting repair of grouting sleeve
CN112160769B (en) Prefabricated shield segment formed by post-pouring, segment assembly and construction method
CN212454490U (en) Press-in type hollow grouting anchor pipe
CN219910468U (en) Pre-buried steel ring, station portal end wall and transition ring mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190617

Address after: 233010 No. 5183 Donghai Avenue, Bengbu City, Anhui Province

Patentee after: Anhui Water Resources Development Co., Ltd.

Address before: 233010 South of Zhanggongshan Road, Donghai Avenue, Bengbu City, Anhui Province

Patentee before: Anhui Water Resources Development Co., Ltd.

TR01 Transfer of patent right