CN207987793U - A kind of road and bridge crack ruggedized construction - Google Patents

A kind of road and bridge crack ruggedized construction Download PDF

Info

Publication number
CN207987793U
CN207987793U CN201820251495.9U CN201820251495U CN207987793U CN 207987793 U CN207987793 U CN 207987793U CN 201820251495 U CN201820251495 U CN 201820251495U CN 207987793 U CN207987793 U CN 207987793U
Authority
CN
China
Prior art keywords
crack
anchor
hole
road
fastening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820251495.9U
Other languages
Chinese (zh)
Inventor
姚广柱
岳英龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820251495.9U priority Critical patent/CN207987793U/en
Application granted granted Critical
Publication of CN207987793U publication Critical patent/CN207987793U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Repair (AREA)

Abstract

A kind of road and bridge crack ruggedized construction provided by the utility model includes several anchor holes opened up on Bridge Crack inner wall;Card hole is symmetrically offered on the hole wall of the anchor hole;It is installed with anchor in the card hole;It is mutually fixedly connected by carbon fibre web between the opposite anchor of each two;Adhesion material is filled in the crack;It is placed with waterproof cover at the top of the adhesion material;The top surrounding in the crack is equipped with protection upper cover by fixing bolt;The utility model is compact-sized simple, reasonable design;Carbon fibre web is pulled to prevent the secondary expansion in gap by anchor on four walls in crack, and plays the role of reducing gap;And addition adhesion agent consolidates consolidation effect inside crack, keep the consolidation effect retention time longer, in addition, the setting of waterproof cover prevents gap water inlet from being destroyed by two, it protects the setting of upper cover to prevent bituminous concrete at road surface upper layer land for building and crack simultaneously to remove, to secondary formation crack.

Description

A kind of road and bridge crack ruggedized construction
Technical field
The utility model is related to field of civil engineering, more particularly to a kind of road and bridge crack ruggedized construction.
Background technology
Road and bridge is generally made of several majors such as roadbed, road surface, bridge, Tunnel Engineering and traffic engineering facilities, road Base is linear structure object made of being built with soil or building stones, it subjects ground dead weight and the road surface gravity of itself, and by road The traffic load that face is transmitted to is the important component of entire highway construction.After the completion of road and bridge is laid with, make in input During, it after being wrecked for a long time by high temperature, severe cold and rainwater, can gradually become fragile, add by big load, It, will be cracking when more than its bearing capacity;If repaired not in time, can gradually increase on the basis of original crack, directly It can't bear to road and bridge breakage, at this time with regard to needing to re-start to overhaul, cause additional economic expenditure, waste man power and money;Existing skill There is the shortcomings of reinforcing is unreliable, and the retention time is shorter in the ruggedized construction of art, be susceptible to steel plate and be subjected to displacement and dripped at crack Green concrete stripping, to secondary formation crack.
Utility model content
The utility model provides a kind of road and bridge crack ruggedized construction, compact-sized simple, reasonable design;
The utility model provide a kind of road and bridge crack ruggedized construction, include opened up on Bridge Crack inner wall it is several A anchor hole;Card hole is symmetrically offered on the hole wall of the anchor hole;It is installed with anchor in the card hole;Each two It is mutually fixedly connected by carbon fibre web between the opposite anchor;Adhesion material is filled in the crack;The adhesion Waterproof cover identical with fracture shape is placed at the top of material;The top surrounding in the crack is equipped with anti-by fixing bolt Protect upper cover;
The left end of the anchor is the anchorage head of tapered solid;The inside of the anchor offers through-hole; The through-hole internal thread is connected with fastening bolt, and the fastening that can be slided in through-hole is placed on the left of the fastening bolt Part;The anchor hole is mutually clamped by card hole and the fastener inside anchor.
Preferably, the fastener includes the two pieces of arcs of fastening disc and Symmetrical vertical on the right side of fastening disc Fastening plates;The right end of each fastening plates is connected with the fan-shaped snap-gauge parallel with fastening disc.
Preferably, the fan-shaped outlet with snap-gauge cooperation disengaging is offered on the anchor.
Preferably, the both ends of the carbon fibre web are each passed through fastening bolt and fastener, and are fixed on by gland On the fastening disc of fastener.
The utility model is compact-sized simple, reasonable design;Carbon fibre web is pulled by anchor on four walls in crack It prevents the secondary expansion in gap, and plays the role of reducing gap;And addition adhesion agent consolidates consolidation effect inside crack, makes to add Gu the effect retention time is longer, in addition, the setting of waterproof cover prevents gap water inlet from being destroyed by two, while the setting of upper cover is protected It has prevented bituminous concrete at road surface upper layer land for building and crack to remove, to secondary formation crack.
Description of the drawings
Fig. 1 is the utility model entirety schematic top plan view;
Fig. 2 is the utility model schematic side view;
Fig. 3 is the utility model anchor structural schematic diagram;
Fig. 4 is the schematic diagram after the utility model anchor is combined with anchor hole;
Fig. 5 is the utility model fastener constructions schematic diagram.
Reference sign:The cracks 1-, 2- carbon fibre webs, 3- anchors, 4- anchor holes, 5- fixing bolts, 6- protection Upper cover, 7- bridges, 8- adhesion material, 9- waterproof covers, 10- anchorage heads, 11- fan-shaped outlets, 12- fasteners, 13- through-holes, 14- are tight Fixing bolt, 15- glands.
Specific implementation mode
Below in conjunction with the accompanying drawings, a specific implementation mode of the utility model is described in detail, it is to be understood that this The protection domain of utility model is not restricted by specific implementation.
As shown in Figures 1 to 5, a kind of road and bridge crack ruggedized construction that the utility model embodiment provides, is included in Several anchor holes 4 opened up on 7 crack of bridge, 1 inner wall;Card hole is symmetrically offered on the hole wall of the anchor hole 4;The card Anchor 3 is installed in hole;It is fixedly connected by 2 phase of carbon fibre web between the opposite anchor 3 of each two; Adhesion material 8 is filled in the crack 1;The top of the adhesion material 8 is placed with waterproof cover identical with 1 shape of crack 9;Institute The top surrounding for stating crack 1 is equipped with protection upper cover 6 by fixing bolt 5;
The left end of the anchor 3 is the anchorage head 10 of tapered solid;The inside of the anchor 3 offers logical Hole 13;13 internal thread of the through-hole is connected with fastening bolt 14, and the left side of the fastening bolt 14 is placed with can be in through-hole The fastener 12 of sliding;The anchor hole 4 is clamped by card hole and 12 phase of fastener inside anchor 3.
Preferably, the fastener 12 includes the two pieces of arcs of fastening disc and Symmetrical vertical on the right side of fastening disc Shape fastening plates;The right end of each fastening plates is connected with the fan-shaped snap-gauge parallel with fastening disc.
Preferably, the fan-shaped outlet with snap-gauge cooperation disengaging is offered on the anchor 3.
Preferably, the both ends of the carbon fibre web 2 are each passed through fastening bolt 14 and fastener 12, and pass through gland 15 It is fixed on the fastening disc of fastener 12.
In use, existing hammer anchor 3 in anchor hole 4, utilize screwdriver by fastening bolt 14 and fastening later Part 12 is to screwing in inside through-hole 13, until the snap-gauge on fastener 12 passes through fan-shaped outlet, and is pierced by from fan-shaped outlet, is stuck in hole In the card hole opened up on wall, later toward pouring adhesion material 8 in gap and add waterproof cover 9 and protection upper cover 6.
The utility model provides a kind of road and bridge crack ruggedized construction, compact-sized simple, reasonable design;Crack Carbon fibre web is pulled to prevent the secondary expansion in gap by anchor on four walls, and plays the role of reducing gap;And crack Inside addition adhesion agent consolidates consolidation effect, keeps the consolidation effect retention time longer, in addition, the setting of waterproof cover 9 prevents from stitching Gap water inlet is destroyed by two, while being protected the setting of upper cover to prevent bituminous concrete at road surface upper layer land for building and crack and being removed, from And secondary formation crack.
Disclosed above is only specific embodiment of the utility model, and still, the utility model embodiment is not limited to This, the changes that any person skilled in the art can think of should all fall into the scope of protection of the utility model.

Claims (4)

1. a kind of road and bridge crack ruggedized construction, which is characterized in that be included in bridge (7) crack (1) if being opened up on inner wall Dry anchor hole (4);Card hole is symmetrically offered on the hole wall of the anchor hole (4);Anchoring dress is installed in the card hole It sets (3);It is mutually fixedly connected by carbon fibre web (2) between the opposite anchor (3) of each two;In the crack (1) Filled with adhesion material (8);Waterproof cover (9) identical with crack (1) shape is placed at the top of the adhesion material (8);It is described The top surrounding in crack (1) is equipped with protection upper cover (6) by fixing bolt (5);
The left end of the anchor (3) is the anchorage head (10) of tapered solid;The inside of the anchor (3) offers Through-hole (13);Through-hole (13) internal thread is connected with fastening bolt (14), and energy is placed on the left of the fastening bolt (14) Enough fasteners (12) slided in through-hole;The anchor hole (4) passes through the internal fastener (12) of card hole and anchor (3) Mutually it is clamped.
2. a kind of road and bridge crack ruggedized construction according to claim 1, which is characterized in that fastener (12) packet Include the two pieces of arc fastening plates of fastening disc and Symmetrical vertical on the right side of fastening disc;Each the fastening plates is most right End is connected with the fan-shaped snap-gauge parallel with fastening disc.
3. a kind of road and bridge crack ruggedized construction according to claim 1, which is characterized in that the anchor (3) On offer with snap-gauge cooperation disengaging fan-shaped outlet.
4. a kind of road and bridge crack ruggedized construction according to claim 1, which is characterized in that the carbon fibre web (2) Both ends be each passed through fastening bolt (14) and fastener (12), and the fastening of fastener (12) is fixed on by gland (15) On disk.
CN201820251495.9U 2018-02-11 2018-02-11 A kind of road and bridge crack ruggedized construction Expired - Fee Related CN207987793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820251495.9U CN207987793U (en) 2018-02-11 2018-02-11 A kind of road and bridge crack ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820251495.9U CN207987793U (en) 2018-02-11 2018-02-11 A kind of road and bridge crack ruggedized construction

Publications (1)

Publication Number Publication Date
CN207987793U true CN207987793U (en) 2018-10-19

Family

ID=63824529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820251495.9U Expired - Fee Related CN207987793U (en) 2018-02-11 2018-02-11 A kind of road and bridge crack ruggedized construction

Country Status (1)

Country Link
CN (1) CN207987793U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281257A (en) * 2018-11-02 2019-01-29 董小瑞 A kind of bracing means of reinforced concrete arch bridge and floorings
CN112442950A (en) * 2020-12-01 2021-03-05 李品 Crack reinforcing apparatus for road and bridge
CN114150549A (en) * 2021-12-13 2022-03-08 朱英智 Safe reinforcing apparatus in road and bridge crack

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281257A (en) * 2018-11-02 2019-01-29 董小瑞 A kind of bracing means of reinforced concrete arch bridge and floorings
CN112442950A (en) * 2020-12-01 2021-03-05 李品 Crack reinforcing apparatus for road and bridge
CN114150549A (en) * 2021-12-13 2022-03-08 朱英智 Safe reinforcing apparatus in road and bridge crack

Similar Documents

Publication Publication Date Title
CN207987793U (en) A kind of road and bridge crack ruggedized construction
CN106284044B (en) A kind of novel steel-concrete combined bridge and its construction method
CN108951425A (en) Cast-in-situ prestressed concrete continuous box girder primary concreting molding construction method
CN102535355B (en) Method for reinforcing bridge structure separated steel-concrete combined truss
CN103382704B (en) Unbonded prestress of box girder or T-shaped girder, and steel-concrete combined reinforcement structure and construction method
US7470092B2 (en) System and method for reinforcing aggregate particles, and structures resulting therefrom
CN110904867B (en) Construction method for dismantling upper-span existing line arch bridge
CN207846444U (en) A kind of municipal administration slope reinforcement device
CN106758637A (en) A kind of road and its construction method for having enough to meet the need quick-assembling
CN107165177B (en) A kind of side slope supporting construction method
CN104264584B (en) Combined cable-girder anchoring structure of pre-stressed concrete cable-stayed bridge top
CN107143141A (en) External wall of high-rise building warming plate construction
US8215869B2 (en) Reinforced soil arch
CN108330849A (en) A kind of road and bridge crack ruggedized construction device
CN207775920U (en) A kind of mountain area electric power pylon strengthening of foundation device
CN208328585U (en) A kind of assembled road structure
CN205804237U (en) A kind of recycling roadbed concrete guardrail
JPS58185823A (en) Removal of head of on-site concrete pile
CN112855168B (en) Suspension cable bridge type tunnel construction method for crossing oversized karst cave
CN208854833U (en) A kind of prefabricated components reserve the grouting of hanging ring hole and use formwork structure
CN202482727U (en) Temporary road surface pavement structure for ultra-shallow burying excavation underground project
CN213925903U (en) Road and bridge crack reinforced structure
RU2552741C2 (en) Foundation under column grid
CN210315109U (en) Large platform pavement for getting on underground garage with exposed top plate
CN214459801U (en) Deceleration strip structure for concrete pavement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019

Termination date: 20200211

CF01 Termination of patent right due to non-payment of annual fee