CN207983917U - A kind of jig for the substep action that is delayed - Google Patents
A kind of jig for the substep action that is delayed Download PDFInfo
- Publication number
- CN207983917U CN207983917U CN201721738227.1U CN201721738227U CN207983917U CN 207983917 U CN207983917 U CN 207983917U CN 201721738227 U CN201721738227 U CN 201721738227U CN 207983917 U CN207983917 U CN 207983917U
- Authority
- CN
- China
- Prior art keywords
- movement device
- jig
- delayed
- pedestal
- delay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000003111 delayed effect Effects 0.000 title claims abstract description 13
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 18
- 238000004519 manufacturing process Methods 0.000 claims abstract description 15
- 238000001746 injection moulding Methods 0.000 claims description 7
- 238000000605 extraction Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 description 3
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 2
- 239000004411 aluminium Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010924 continuous production Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
Landscapes
- Respiratory Apparatuses And Protective Means (AREA)
Abstract
The utility model is related to a kind of jig for the substep action that is delayed, including pedestal, the side above the pedestal is fixed with Pneumatic time-delay valve, and the Pneumatic time-delay valve is connected with the first movement device and the second movement device in turn by pipeline;First movement device and the second movement device are matched at least three kinds of jigs according to production status, and Pneumatic time-delay valve is equipped with the adjusting knob for adjusting air pressure, and the adjusting of delay time is carried out by adjusting knob.The utility model carries out product after capable of pushing product elder generation side and takes out operation again, improves special-shaped product and is not easily taken out, and needs the behavior of manually sliding door semiautomatic working, reduces bad products output capacity, reduce production cost, improve production efficiency.And Pneumatic time-delay valve can play delay function with the action of offside push cylinder and fixture, to realize the function of substep action.
Description
Technical field
The utility model is related to a kind of jig, specifically a kind of jig for the substep action that can be delayed belongs to injection molding
Produce the technical field of corollary equipment.
Background technology
At present injection molding production process due to shape of product diversity, for have oblique guide sleeve or product die sinking after cannot
The product demoulded very well needs manually to carry out product taking-up operation, therefore considerably increases in production process and throw to human resources
Enter, production process causes continuous production that cannot ensure as the mode artificially taken out becomes semiautomatic working, produces
Quality fluctuation is larger.
Utility model content
The shortcomings that technical problem to be solved in the utility model is, overcomes the prior art, provide it is a kind of it is reasonable for structure, make
With the jig for the substep action that can easily be delayed, can improve, which improves special-shaped product, is not easily taken out, and needs manually sliding door half
The behavior of automatic job.
In order to solve the above technical problems, the utility model provides a kind of jig for the substep action that is delayed, feature exists
In:Including pedestal, the side above the pedestal is fixed with Pneumatic time-delay valve, and the Pneumatic time-delay valve is sequentially connected by pipeline
There are the first movement device and the second movement device;First movement device and the second movement device are matched with according to production status
At least three kinds of jigs, Pneumatic time-delay valve play the action delay function of the first movement device and the second movement device, and can be with
The adjusting knob that is adjusted to that the adjusting air pressure of delay time is carried out by the size of air pressure is adjusted.
The technical solution that the utility model further limits is:First movement device needs to match according to production status
There are fixture, sucker or cylinder;First movement device is fixed on pedestal, is fixed and is connected by pedestal and manipulator extraction arm
It connects.
Further, second movement device needs to match fixture, sucker or cylinder according to production status;Described second
Movement device is fixed on pedestal, and corresponding slot is offered on the pedestal with stationary fixture or cylinder, it is ensured that stablize, air source with
Sequencing is connected with delay air valve.The fixture of described device needs to be mounted on mechanical arm taking-up position, realizes that substep acts
Gripping, air-breathing or promotion.
Further, the fixture sucker of first, second movement device or cylinder are to play the air pressure provided hand in hand
Power realizes two actions using one group of air source.
Further, first, second movement device takes out position to realize that substep is dynamic by being installed on mechanical arm
It grips, air-breathing or promotion.
Further, the both sides of the Pneumatic time-delay valve are respectively equipped with gas outlet and air inlet, the gas outlet respectively with
First, second movement device is connected, and the air inlet is connected with the air valve of manipulator.
The utility model has the beneficial effects that:The utility model is matched using side push cylinder and fixture, can will be produced
Product elder generation side carries out product and takes out operation again after pushing, improve special-shaped product and be not easily taken out, need manually to pull semi-automatic
The behavior of operation reduces bad products output capacity, reduces production cost, improves production efficiency.And Pneumatic time-delay valve can
Delay function is played with the action of offside push cylinder and fixture, to realize the function of substep action.The utility model occupied space
Small, installation and clean operation are convenient, will not cause environmental pollution, will not be damaged to human body, noise pollution is small, using just
Victory, process is simple, can reduce personnel's input and effective improving production efficiency.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the side view of the utility model.
Specific implementation mode
Embodiment 1
A kind of jig of substep action that is delayed provided in this embodiment, shown in Fig. 1, Fig. 2, including pedestal 1, first is dynamic
Make device 2, the second movement device 3 and Pneumatic time-delay valve 4.
Wherein, pedestal is made of aluminium sheet, the company for the stationary positioned of all spare and accessory parts and with arm for injection molding
Connect fixation.And Pneumatic time-delay valve is installed at the upper side of pedestal, which goes out equipped with adjusting knob 45 and first
Gas port 43, the second gas outlet 44, the first air inlet 41 and the second air inlet 42.The size that air pressure is adjusted by adjusting knob, with
Realize the function of delay.First gas outlet is connected with the air inlet of the first, second movement device 21 respectively with the second gas outlet
It connects, the first air inlet is connected with the second air inlet with the air valve of manipulator.
And the first, second movement device can need to select assembling fixture according to operating mode, which can be fixture, sucker
Or cylinder, the actions such as push, blow, grip to realize.
When installation, first, by Pneumatic time-delay valve, fixture, thrust cylinder is fixed on pedestal aluminium sheet by fastener on demand
On.
Secondly, by the first movement device, the second movement device tracheae respectively with the first gas outlet of Pneumatic time-delay valve, the
Two gas outlets are connected.
Again, the first air inlet of Pneumatic time-delay valve, the second air inlet are connected with the air valve of arm for injection molding respectively
It connects, and air source is provided.
Later, entire jig is fixed on to the fixture fixed position of the extraction arm of arm for injection molding, jig installs
At.
Finally, the delay effect that Pneumatic time-delay valve is confirmed using manual mode is revolved by adjusting the delay of Pneumatic time-delay valve
Button confirms suitable delay time.
In use, first whole device install after check cylinder whether gas leakage, with ensure cycle run well.Step
It is rapid as follows:
The first step:The air inlet pipe for opening arm for injection molding starts to supply, to confirm that air inlet pipe connects whether normal, nothing
Gas leakage;
Second step:Using manual mode, adjust manipulator signal, confirm when air-breathing and outlet act the first movement device and
Whether the second movement device acts according to demand substep;
Third walks:Product, which takes out process, first product to be pushed to deviate outward, then clamps material head by fixture, realize product
Lateral taking-up;
4th step:Master-slave manipulator is operated to designated position after product takes out;
5th step:Manipulator gives fixture Pneumatic time-delay valve and closes air pressure, and material folding fixture unclamps, and product placement is completed certainly
The dynamic action process taken out.
In addition to the implementation, the utility model can also have other embodiment.It is all to use equivalent replacement or equivalent change
The technical solution to be formed is changed, the protection domain of the requires of the utility model is all fallen within.
Claims (6)
1. a kind of jig for the substep action that is delayed, it is characterised in that:Including pedestal, the side above the pedestal is fixed with gas
Dynamic time-delay valve, the Pneumatic time-delay valve are connected with the first movement device and the second movement device in turn by pipeline;Described first
Movement device and the second movement device are matched at least three kinds of jigs according to production status, and Pneumatic time-delay valve, which is equipped with, adjusts air pressure
Adjusting knob, pass through adjusting knob carry out delay time adjusting.
2. the jig of the substep action according to claim 1 that is delayed, it is characterised in that:The first movement device foundation
Production status needs to be matched with fixture, sucker or cylinder;First movement device is fixed on pedestal, passes through pedestal and machinery
Hand extraction arm is fixedly connected.
3. the jig of the substep action according to claim 1 that is delayed, it is characterised in that:The second movement device foundation
Production status needs to match fixture, sucker or cylinder;Second movement device is fixed on pedestal, is offered on the pedestal
Corresponding slot is with stationary fixture or cylinder.
4. the jig of the substep action according to claim 2 or 3 that is delayed, it is characterised in that:First, second action
The air pressure that device is provided using the manipulator of injection molding machine configuration realizes two actions as power, using one group of air source.
5. the jig of the substep action according to claim 1 that is delayed, it is characterised in that:The first, second action dress
It sets and takes out position by being installed on mechanical arm to realize substep action gripping, air-breathing or promotion.
6. the jig of the substep action according to claim 1 that is delayed, it is characterised in that:The both sides of the Pneumatic time-delay valve
It is respectively equipped with gas outlet and air inlet, the gas outlet is connected with the first, second movement device respectively, the air inlet and machine
The air valve of tool hand is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721738227.1U CN207983917U (en) | 2017-12-13 | 2017-12-13 | A kind of jig for the substep action that is delayed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721738227.1U CN207983917U (en) | 2017-12-13 | 2017-12-13 | A kind of jig for the substep action that is delayed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207983917U true CN207983917U (en) | 2018-10-19 |
Family
ID=63817525
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721738227.1U Expired - Fee Related CN207983917U (en) | 2017-12-13 | 2017-12-13 | A kind of jig for the substep action that is delayed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207983917U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112848155A (en) * | 2020-12-28 | 2021-05-28 | 南京华格电汽塑业有限公司 | Irregular product taking-out detection clamp |
-
2017
- 2017-12-13 CN CN201721738227.1U patent/CN207983917U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112848155A (en) * | 2020-12-28 | 2021-05-28 | 南京华格电汽塑业有限公司 | Irregular product taking-out detection clamp |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204818675U (en) | Sealing washer mechanism of packing into | |
CN207983917U (en) | A kind of jig for the substep action that is delayed | |
CN208231334U (en) | Aligning gear is held out against automatically on a kind of machining apparatus | |
CN206868945U (en) | A kind of pressing equipment automatic oil feeding device | |
CN201436040U (en) | A system for connecting plastic hose | |
CN208213543U (en) | A kind of robot coating device | |
CN206533766U (en) | A kind of peach grafting equipment | |
CN207872636U (en) | A kind of full-automatic battery detection machine | |
CN204911985U (en) | Automatic switching formula glue pressure pot | |
CN104385196B (en) | Auxiliary valve body assembly tooling | |
CN208841909U (en) | A kind of packing carton sizer | |
CN206588559U (en) | A kind of efficiently automatic dress card taking needle device | |
CN202846105U (en) | Semi-automatic installation package sleeve machine | |
CN206702102U (en) | A kind of iron-clad riveter | |
CN203293205U (en) | Novel swing manipulator | |
CN202895744U (en) | Hydraulic machine travelling table air source automatic docking device | |
CN205705468U (en) | The paper of scraps of paper shaping packager transmits shaped device | |
CN205629890U (en) | Cylinder cap pipe and seat circle mounting plate | |
CN201274820Y (en) | Machine for automatically assembling zipper head | |
CN206825364U (en) | A kind of banked direction control valves assembles servicing unit | |
CN204894355U (en) | Public young toy buttockss parts pick -and -place frock clamp | |
CN205009161U (en) | Chest expander rubber tube stopper pearl machine | |
CN109383075A (en) | A kind of quick bag overturning machine | |
CN202097356U (en) | Pin riveting machine | |
CN205455637U (en) | Semi -automatic korea spro's formula cake machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181019 |