CN207981781U - Process removing residues equipment - Google Patents
Process removing residues equipment Download PDFInfo
- Publication number
- CN207981781U CN207981781U CN201721761129.XU CN201721761129U CN207981781U CN 207981781 U CN207981781 U CN 207981781U CN 201721761129 U CN201721761129 U CN 201721761129U CN 207981781 U CN207981781 U CN 207981781U
- Authority
- CN
- China
- Prior art keywords
- workpiece
- gas supply
- mounting portion
- removing residues
- jet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Cleaning In General (AREA)
Abstract
The utility model discloses a kind of processing removing residues equipment, for removing the processing residue on workpiece, including gas supply part and mounting portion, the gas supply part is oppositely arranged with the mounting portion, the mounting portion is for installing workpiece, the gas supply part is used to, to the workpiece jet, blow the processing residue on the workpiece off by air-flow.Processing removing residues equipment provided by the utility model, by gas supply part on workpiece jet, the processing residue such as burr on workpiece is blown off by air-flow, on the one hand improves the efficiency of the deburring of workpiece.On the other hand, go flash removed not cause to damage to workpiece by air-flow, will not on workpiece entrapped contaminants, improve the quality and quality of workpiece.
Description
Technical field
The utility model is related to the process equipment of workpiece, especially a kind of processing removing residues equipment.
Background technology
Often there is burr and zinc silk in the flanging bore of heat exchanger side plate, if not handling or handling unclean, wears copper
Guan Shihui causes copper pipe to scratch tube expansion rupture, secondary refrigerant leakage occur.The burr of side plate is extruded in copper pipe and side after tube expansion
Among plate, when tube expansion, can't directly pierce through copper pipe, but heat exchanger can ceaselessly shake during air-conditioning use, burr meeting
Copper pipe is slowly scratched, coolant leakage is caused until piercing through copper pipe, when this problem quality inspection in each stage can not find that product is thrown
Inevitably complaint and unfavorable ratings are caused after entering market.Meanwhile burr can also fall into copper pipe, lead to capillary blockage etc..
Mode of operation is manually to be removed to each hole using wire brush or hairbrush at present, and inefficiency, consistency are poor, and need to each
Hole artificial detection puts into larger manpower and materials.In addition most metal plate cannot remove flash removed by pickling, oil wash, washing, no
Then destructible overlay coating.
Utility model content
In view of this, one of the purpose of this utility model is to provide a kind of adding for burr removed by air-flow on workpiece
Work residue eliminating equipment.
The utility model provides a kind of processing removing residues equipment, for removing the processing residue on workpiece, wraps
Gas supply part and mounting portion are included, the gas supply part is oppositely arranged with the mounting portion,
For installing workpiece, the gas supply part is used for the workpiece jet mounting portion, by air-flow by institute
The processing residue stated on workpiece is blown off.
Preferably, the gas supply part includes fixed structure and the jet structure that is arranged on the fixed structure, the spray
The gas outlet of depressed structure is towards the mounting portion.
Preferably, the jet structure is air amplifier.
Preferably, through-hole is provided on the workpiece, the jet structure is corresponding with the position of the through-hole, makes described
The air-flow that jet structure sprays can flow through the through-hole.
Preferably, the mounting portion includes support construction and location structure, and the location structure setting is tied in the support
On structure, the support construction is supported the workpiece, and the location structure positions the installation of the workpiece.
Preferably, the support construction is frame-shaped construction, and the frame-shaped construction leans on the workpiece part of proximal edge
It is supported.
Preferably, the location structure includes the first location structure and the second location structure,
First location structure and the second location structure are the string configuration being arranged along the edge of the support portion.
Preferably, the mounting portion further includes fastening structure, and the workpiece is fixed on the peace by the fastening structure
In dress portion.
Preferably, there are two the gas supply part settings, two gas supply parts are oppositely arranged and are located at the installation
The both sides in portion.
Preferably, in two gas supply parts, it is located at least in the side that the workpiece is installed on the mounting portion
The gas supply part and the distance between the mounting portion it is adjustable.
Preferably, two gas supply parts are alternately to the mounting portion jet.
Processing removing residues equipment provided by the utility model, by gas supply part on workpiece jet, pass through air-flow
Burr etc. on workpiece is processed residue to blow off, on the one hand improves the efficiency of the deburring of workpiece.On the other hand, lead to
Crossing air-flow goes flash removed not cause to damage to workpiece, will not on workpiece entrapped contaminants, improve the matter of workpiece
Amount and quality.
Description of the drawings
By referring to the drawings to the description of the utility model embodiment, the above-mentioned and other mesh of the utility model
, feature and advantage will be apparent from, in the accompanying drawings:
Fig. 1 shows the structural schematic diagram of processing removing residues equipment provided by the utility model;
Fig. 2 shows the schematic front view of processing removing residues equipment;
Fig. 3 shows the schematic diagram of processing removing residues equipment installation workpiece.
Specific implementation mode
The utility model is described below based on embodiment, but the utility model is not restricted to these implementations
Example.It should be understood by one skilled in the art that attached drawing is provided to the purpose of explanation provided herein, and attached drawing is not necessarily
It is drawn to scale.
Unless the context clearly requires otherwise, "include", "comprise" otherwise throughout the specification and claims etc. are similar
Word should be construed as the meaning for including rather than exclusive or exhaustive meaning;That is, being containing for " including but not limited to "
Justice.
In the description of the present invention, it should be understood that term " first ", " second " etc. are used for description purposes only,
It is not understood to indicate or imply relative importance.In addition, in the description of the present invention, unless otherwise indicated, it is " more
It is a " it is meant that two or more.
Processing removing residues equipment provided by the utility model is by high-speed flow to the processing residue on workpiece
Be purged, the processing residue avoided to cause to damage to other component, the processing residue for example including processing hole it
Afterwards in the residues such as the burr of the margin residual in hole or zinc silk.And it will not be to processing during except deburring or other residues
Part causes to damage, will not the dirts such as residual water or oil stain.
As shown in Figure 1, 2, 3, in a preferred embodiment, processing removing residues equipment packet provided by the utility model
Gas supply part 100 and mounting portion 200 are included, the mounting portion 200 is for installing workpiece 300 to be treated, the workpiece 300
Upper formation through-hole 310, and can generate the processing residue such as burr at edge in 310 forming process of the through-hole, it is preferable that institute
It is sheet metal component to state workpiece 300.The gas supply part 100 is oppositely arranged with the mounting portion 200, is used for the workpiece 300
The air-flow of upper injection high speed, is provided with multiple through-holes 310 on the workpiece 300, and by air-flow by 310 edge of the through-hole
The removings such as burr.
The gas supply part 100 includes fixed structure 110 and jet structure 120, and the jet structure 120 is arranged described solid
Determine in structure 110, the gas outlet of the jet structure 120 is towards the mounting portion 200, it is preferable that the jet structure 120 is
Air amplifier, the air amplifier are capable of providing transonic air-flow, and high-speed flow drives surrounding air to flow to be formed
High pressure, high-speed flow, flow are 50 times of air consumption, and high pressure, high-speed flow can be by the through-holes 310 on the workpiece 300
The burr etc. at edge is blown off.Further, the quantity of the jet structure 120 and distribution with it is described on the workpiece 300
The quantity and distribution situation of through-hole 310 are identical, i.e., each described jet structure 120 corresponds to a through-hole 310, preferably
Ground, after the workpiece 300 is installed, the axis collinear of the axis of the through-hole 310 and the jet structure 120 makes the spray
The high pressure of the ejection of depressed structure 120, high-speed flow can pass through the through-hole 310.In order to guarantee to reach better deburring
Effect, the distance between the gas supply part 100 and the workpiece 300 are 30 between 200mm.
The mounting portion 200 includes support construction 210 and location structure, and the support construction 210 is to the workpiece 300
It plays a supportive role, the location structure plays the role of positioning to the installation of the workpiece 300, ensures that the workpiece 300 is installed
It is aligned afterwards with the gas supply part 100.Preferably, 300 generally square in cross-section platy structure of the workpiece in the present embodiment, it is described
Support portion 210 is square box structure corresponding with the outer margin contour of the workpiece 300, and the square box structure is to the processing
The part that the through-hole 310 is not arranged for part 300 is supported, i.e., marginal portion of the described support portion 210 to the workpiece 300
It is supported, and the position for being provided with the through-hole 310 on the workpiece 300 is made not to be blocked.The location structure includes
Including at least the first location structure 220 and the second location structure 230, first location structure, 220 and second location structure 230
It is arranged on the support portion 210, and first location structure, 220 and second location structure 230 and the workpiece 300
Two adjacent contact asides the workpiece 300 is limited, make two adjacent sides when the workpiece 300
When abutting on first location structure, 220 and second location structure 230 simultaneously, the through-hole on the workpiece 300
310 is just corresponding with the jet structure 120 on the gas supply part 100.
Preferably, the mounting portion 200 further includes fastening structure (figure is always not shown), and the fastening structure is used for will be described
Workpiece 300 is fixed on the mounting portion 200, and the fastening structure for example can be fixture, and the fixture can be controlled manually
System is automatically controlled by components such as cylinders, to facilitate the installation of the workpiece 300.Further, in order to make the processing
Part 300 is easier for installation, and the distance between the gas supply part 100 and the mounting portion 200 can adjust, so that the processing
Operating space bigger when part 300 is installed.Preferably, it is logical that the distance between the gas supply part 100 and the mounting portion 200 are adjusted
It crosses and moves the realization of the gas supply part 100, that is, it is adjustable that the gas supply part 100 is set to position.
Further, there are two the settings of the gas supply part 100, two gas supply parts 100 are oppositely arranged, and make the peace
Dress portion 200 is located between two gas supply parts 100.The jet structure 120 on two gas supply parts 100 is towards institute
State 200 jet of mounting portion.The distribution mode of the jet structure 120 on two gas supply parts 100 is identical, i.e., described in two
Jet structure 120 on gas supply part 100 corresponds, and the jet structure 120 on two gas supply parts 100 with installation
The through-hole 310 on the workpiece 300 afterwards is opposite.Preferably, two gas supply parts 100 and the mounting portion 200 away from
From identical.When there are two be located on the mounting portion 200 to install when the gas supply part 100, in two gas supply parts 100 for setting
The gas supply part 100 and the distance between the mounting portion 200 of the side of the workpiece 300 are adjustable, another described confession
Gas portion 100 is fixedly installed, and position is non-adjustable, can either meet the needs of facilitating the workpiece 300 to install, equipment knot can be made by having
Structure is simpler.
Processing removing residues equipment provided by the utility model at work, the workpiece 300 is fixed to described
On mounting portion 200, and ensure that the mounting portion 200 is installed in place by the location structure on the mounting portion 200.Then pass through
Jet structure 120 on the gas supply part 100 jet on the sheet metal component 300, due to the jet structure 120 with it is described plus
Through-hole 310 on workpiece 300 is opposite, and the high pressure of the ejection of jet structure 120, high-speed flow is made to pass through the through-hole 310, and
The burr etc. of 310 edge of the through-hole is blown off.
Preferably, when there are two being arranged when the gas supply part 100, the jet on two gas supply parts 100
Structure 120 replaces jet, i.e., when 120 jet of jet structure on one of them described gas supply part 100, another described confession
Jet structure 120 in gas portion 100 not jet.Preferably, the jet structure 120 alternating on two gas supply parts 100
Jet duration when jet is 3-5 seconds.
Processing removing residues equipment provided by the utility model is provided the air-flow of high pressure, high speed by gas supply part, passed through
Air-flow by workpiece burr or other residues blow off, so that workpiece deburring is realized automation, improve plus
The efficiency of the deburring of workpiece.On the other hand, workpiece will not be caused to damage by air-flow deburring, it will not be in workpiece
Upper entrapped contaminants improve the quality and quality of workpiece.
Those skilled in the art will readily recognize that under the premise of not conflicting, above-mentioned each preferred embodiment can be free
Ground combination, superposition.
It should be appreciated that above-mentioned embodiment is merely exemplary, and not restrictive, without departing from the utility model
In the case of basic principle, those skilled in the art can be directed to the various apparent or equivalent modification that above-mentioned details is made
Or replace, all it is included in the right of the utility model.
Claims (11)
1. a kind of processing removing residues equipment, for removing the processing residue on workpiece, which is characterized in that including gas supply
Portion and mounting portion, the gas supply part are oppositely arranged with the mounting portion,
The mounting portion is used to, to the workpiece jet, by air-flow described to add for installing workpiece, the gas supply part
Processing residue on workpiece is blown off.
2. processing removing residues equipment according to claim 1, which is characterized in that the gas supply part includes fixed structure
With the jet structure being arranged on the fixed structure, the gas outlet of the jet structure is towards the mounting portion.
3. processing removing residues equipment according to claim 2, which is characterized in that the jet structure enhances for air
Device.
4. processing removing residues equipment according to claim 2, which is characterized in that be provided on the workpiece logical
Hole, the jet structure is corresponding with the position of the through-hole, and the air-flow that the jet structure sprays is enable to flow through the through-hole.
5. processing removing residues equipment according to claim 1, which is characterized in that the mounting portion includes support construction
And location structure, the location structure are arranged in the support construction, the support construction is supported the workpiece,
The location structure positions the installation of the workpiece.
6. processing removing residues equipment according to claim 5, which is characterized in that the support construction is frame shape knot
Structure, the frame-shaped construction are supported the workpiece by the part of proximal edge.
7. processing removing residues equipment according to claim 5, which is characterized in that the location structure includes first fixed
Bit architecture and the second location structure,
First location structure and the second location structure are the string configuration being arranged along the edge of the support portion.
8. the processing removing residues equipment according to one of claim 5-7, which is characterized in that the mounting portion further includes
The workpiece is fixed on the mounting portion by fastening structure, the fastening structure.
9. processing removing residues equipment according to claim 1, which is characterized in that there are two the gas supply part settings,
Two gas supply parts are oppositely arranged and are located at the both sides of the mounting portion.
10. processing removing residues equipment according to claim 9, which is characterized in that in two gas supply parts, at least
It can positioned at the distance between the gas supply part for the side for installing the workpiece on the mounting portion and the mounting portion
It adjusts.
11. processing removing residues equipment according to claim 9, which is characterized in that two gas supply parts alternately to
The mounting portion jet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721761129.XU CN207981781U (en) | 2017-12-14 | 2017-12-14 | Process removing residues equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721761129.XU CN207981781U (en) | 2017-12-14 | 2017-12-14 | Process removing residues equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207981781U true CN207981781U (en) | 2018-10-19 |
Family
ID=63817808
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721761129.XU Expired - Fee Related CN207981781U (en) | 2017-12-14 | 2017-12-14 | Process removing residues equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207981781U (en) |
-
2017
- 2017-12-14 CN CN201721761129.XU patent/CN207981781U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209520775U (en) | Grinding device is used in a kind of processing of sheet metal component | |
CN209260153U (en) | A kind of forging material quickly cooling device | |
CN1943973A (en) | Method for producing aluminum plate-fin heat exchanger | |
CN206652786U (en) | A kind of blast pipe cleaning machine for engine radiator | |
EP3223968B1 (en) | Industrial cleaning installation with vapour condensation and related methods | |
CN207981781U (en) | Process removing residues equipment | |
JP2007278586A (en) | Cooling/freezing device and method of setting cold air supply speed in the same | |
JP2007178096A (en) | Heat exchanger with cleaning device and its operation method | |
DE102004014822A1 (en) | Method for cleaning the tubes of a heat exchanger using a blasting medium and apparatus therefor | |
CN201586619U (en) | Treatment steam/waste liquid recovery device before coating | |
JP2000146401A (en) | Cooler | |
CN209077292U (en) | A kind of copper foil surface oil removing cleaning and drying device | |
JP4018618B2 (en) | Apparatus and method for cleaning internal passages | |
CN206420273U (en) | A kind of plastic extruder apparatus for drying | |
CN109465612A (en) | Welded type copper radiator manufacture craft | |
CN107983717A (en) | A kind of full-automatic demoulding line for being used to remove workpiece surface mucous membrane | |
CN209868106U (en) | Base and platform are placed to work piece | |
CN206936734U (en) | A kind of process and assemble equipment | |
CN209597516U (en) | A kind of efficient spraying equipment | |
CN104438381B (en) | Metal plate and belt surface cleaning wiping arrangement on-line cleaning system | |
CN209109669U (en) | A kind of cleaning device for bonding machine soldering tip | |
CN205133994U (en) | Cloth inspection machine cooling device | |
CN207741603U (en) | Interior cleaning finned heat exchanger | |
KR101085098B1 (en) | Multi-nozzle washing gun for heat exchanger and washing system using the same | |
CN211587375U (en) | Device surface spraying and drying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181019 Termination date: 20211214 |