CN207974699U - A kind of toilet threshold stone mounting structure - Google Patents
A kind of toilet threshold stone mounting structure Download PDFInfo
- Publication number
- CN207974699U CN207974699U CN201721922682.7U CN201721922682U CN207974699U CN 207974699 U CN207974699 U CN 207974699U CN 201721922682 U CN201721922682 U CN 201721922682U CN 207974699 U CN207974699 U CN 207974699U
- Authority
- CN
- China
- Prior art keywords
- threshold stone
- coat
- screed
- toilet
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of toilet threshold stone mounting structures, including floor leveling layer and threshold stone, the floor leveling layer includes toilet screed-coat and indoor screed-coat, and manger step face is formed with toilet screed-coat joint in the indoor screed-coat;Filled layer is equipped on the top surface of the indoor screed-coat, the filled layer is bonded in by glue line on the indoor screed-coat;The threshold stone includes threshold stone main body and threshold stone rib;The threshold stone main body is laid on the top surface of the filled layer, and the threshold stone main body is bonded in also by the glue line on the filled layer;The threshold stone rib is located at the top of the toilet screed-coat.It is not necessarily to Site cement, ensure that the clean and tidy of construction site, and toilet threshold stone is isolated with ground by glue line and filled layer in entire work progress, can be effectively prevented from steam and penetrate into threshold stone, good water-proof effect.
Description
Technical field
The utility model is related to interior decoration technology more particularly to a kind of toilet threshold stone mounting structures.
Background technology
In the prior art, it when mating formation to toilet threshold stone, needs to mat formation toilet threshold stone using cement mortar,
It also needs to be adjusted to the ground level in other indoor regions by cement layer and exceeds accomodation ground, cause construction scene dirty and messy
Difference, low construction efficiency.
In addition, since toilet threshold stone is mounted directly on the ground by cement, if having water or steam on ground,
Steam can be oozed out by cement on toilet threshold stone, cause the subregion moist, and be easy to cause wall skin and fall off.
Utility model content
Facilitate that installation, construction efficiency be high, bathroom door of good water-proof effect the purpose of this utility model is to provide a kind of
Sill stone paving structure.
Technical solutions of the utility model provide a kind of toilet threshold stone mounting structure, including floor leveling layer and threshold
Stone, the floor leveling layer include toilet screed-coat and indoor screed-coat, and the height of the interior screed-coat is defended higher than described
The height of screed-coat between life is formed with manger step face in the indoor screed-coat with toilet screed-coat joint;
Filled layer is equipped on the top surface of the indoor screed-coat, the filled layer is bonded in described by glue line
On indoor screed-coat;
The threshold stone includes threshold stone main body and the threshold stone rib for coordinating with toilet doorframe, the threshold stone
Rib is located at the rear end of the threshold stone main body, the either flush of the top surface of the threshold stone rib and the threshold stone main body,
The length of the threshold stone rib is more than the length of the threshold stone main body;
The threshold stone main body is laid on the top surface of the filled layer, and the threshold stone main body is also by the adhesive glue
Layer is bonded on the filled layer;
The threshold stone rib is located at the top of the toilet screed-coat.
Further, it is equipped at least one layer of waterproof layer on the manger step face.
Further, the threshold stone main body is integrally formed with the threshold stone rib.
Further, it is provided with skid resistant surface on the top surface of the toilet threshold stone, on the top of the skid resistant surface
Anti-skidding ripple is provided on face.
Further, the glue line is structural adhesive layer.
Further, the filled layer is plastic base layer or is wood-plastic board layer.
Further, also it is equipped with the waterproof on the top surface of the indoor screed-coat and the toilet screed-coat
Layer.
Further, the waterproof layer is water-proof sheet material, and the water-proof sheet material is viscous by least one layer of glue line
It ties on the top surface of the indoor screed-coat and the toilet screed-coat;Or,
The waterproof layer is waterproof material coating, and the waterproof material coating is coated in the indoor screed-coat and described defends
Between life on the top surface of screed-coat.
Further, it is offered on the side of the threshold stone main body for the edge closing bar clamping with around on floor
Card slot.
Further, it is provided at least one locating slot on the bottom surface of the threshold stone main body;
The positioning convex platform for coordinating with the locating slot is provided on the top surface of the filled layer;
The positioning convex platform is fastened in the locating slot;
The positioning convex platform is bonded together by the cell wall of the glue line and the locating slot.
Using above-mentioned technical proposal, have the advantages that:
By the way that the height of toilet screed-coat is adjusted to, less than the height of indoor screed-coat, the work of waterproof can be played
With.
By bonding filled layer on glue line indoors screed-coat, support and impermeable role are played, then again by threshold
Stone is bonded in by glue line on filled layer, easy for construction, is not necessarily to Site cement, be ensure that the clean and tidy of construction site,
And threshold stone is isolated with ground by glue line and filled layer, steam can be effectively prevented from and penetrate into toilet threshold
Shi Zhong, good water-proof effect.
Threshold stone paving structure in toilet provided by the utility model is produced in factory industry metaplasia, is only needed at finishing scene
Simply to be installed, scene realizes rapid construction without masterful technique worker without the too many construction time,
And avoid the messy situation in traditional fitment operation scene.
Description of the drawings
Fig. 1 is the schematic diagram for the toilet threshold stone paving structure that one embodiment of the utility model provides;
Fig. 2 is the schematic diagram that waterproof layer is equipped on the top surface of floor leveling layer;
Fig. 3 is the vertical view of toilet threshold stone;
Fig. 4 is the schematic diagram that card slot is offered on the side of threshold stone main body.
Specific implementation mode
Further illustrate specific embodiment of the present utility model below in conjunction with the accompanying drawings.Wherein identical parts phase
Same reference numeral indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "upper" and
"lower" refers to that the direction in attached drawing, word "inner" and "outside" refer respectively to the side towards or away from geometric center of specific component
To.
Threshold stone paving structure in toilet provided by the utility model, is mainly used in the paving of the threshold stone of indoor toilets
Dress.
As shown in Figs. 1-3, a kind of toilet threshold stone mounting structure that one embodiment of the utility model provides, including ground
Screed-coat 1 and threshold stone 3.
Wherein, floor leveling layer 1 includes toilet screed-coat 12 and indoor screed-coat 11, and the height of indoor screed-coat 11 is high
In the height of toilet screed-coat 12, screed-coat 11 and 12 joint of toilet screed-coat are formed with manger step face indoors
13。
Filled layer 2 is equipped on the top surface of screed-coat 11 indoors, filled layer 2 is looked for indoors by the bonding of glue line 4
On flat bed 11.
Threshold stone 3 includes threshold stone main body 31 and the threshold stone rib 32 for coordinating with toilet doorframe, threshold stone gear
Side 32 is located at the rear end of threshold stone main body 31, the either flush of the top surface and threshold stone main body 31 of threshold stone rib 32, threshold stone
The length of rib 32 is more than the length of threshold stone main body 31.
Threshold stone main body 31 is laid on the top surface of filled layer 2, and threshold stone main body 31 is bonded in also by glue line 4 fills out
It fills on layer 2, threshold stone rib 32 is located at the top of toilet screed-coat 12.
Floor leveling layer 1 is levelling for being carried out to ground, can be with plank, or concrete structure.Floor leveling
Layer 1 includes toilet screed-coat 12 and indoor screed-coat 11, and toilet screed-coat 12 is for looking for the ground in toilet
Flat, indoor screed-coat 11 is levelling for being carried out to the ground outside indoor or toilet, therefore indoor screed-coat 11 can also be referred to as
For screed-coat outside toilet.In order to realize water-proof function, the height setting of toilet screed-coat 12 is located at levelling less than indoor
The height of layer 11 is used for form manger step face 13 in toilet screed-coat 12 and 11 joint of indoor screed-coat
Water blocking.
Toilet threshold stone 3 includes threshold stone main body 31 and threshold stone rib 32, and threshold stone rib 32 is located at threshold stone master
The rear end of body 31.The rear end that the place refers to refers in threshold stone main body 31 close to one end of toilet screed-coat 12.
The either flush of the top surface and threshold stone main body 31 of threshold stone rib 32, to ensure that top surface plane is smooth.Threshold stone
The length of rib 32 is more than the length of threshold stone main body 31, and both ends stretch out in the both sides of threshold stone main body 31, is used for and health
Between doorframe coordinate, to be fixed.
Filled layer 2 is used to provide support to toilet threshold stone 3, also acts as Isolation Toilet threshold stone 3 and floor leveling
Contact between layer 1, avoiding the steam in ground from penetrating into toilet threshold stone 3 causes metope to be peeled.
In construction, filled layer 2 is bonded or fixed on screed-coat 11 indoors by glue line 4, also by bonding
Threshold stone main body 31 is bonded or is fixed on filled layer 2 by glue-line 4, and threshold stone rib 32 is made to be located at the upper of toilet screed-coat 12
Side, to be fixed with doorframe.
Whole installation process is not necessarily to Site cement, ensure that the clean and tidy of construction site.
Glue line 4 is the binder, such as structure glue, glass cement etc. bonded between capable of arbitrarily realizing two kinds of materials.
Specifically, in construction, one layer of bonding is respectively coated on the top surface of screed-coat 11 and the bottom surface of filled layer 2 indoors
Agent forms glue line after solidification.One layer of bonding is respectively coated on the top surface of filled layer 2 and the bottom surface of threshold stone main body 31
Agent forms glue line after solidification.
Glue line 4 also acts as the effect of isolation steam, and avoiding the steam in ground from penetrating into toilet threshold stone 3 causes
Metope is peeled.
Dual resisteance is carried out to toilet threshold stone and ground by glue line 4 and filled layer 2, water can be effectively prevented from
Vapour penetrates into threshold stone, good water-proof effect.
Preferably, as shown in Fig. 2, be equipped at least one layer of waterproof layer 14 on manger step face 13, can preferably rise
To waterproof effect.
Waterproof layer 14 can be water-proof sheet material or waterproof material coating.Water-proof sheet material can be steel plate, plastic plate etc., waterproof
Material coating can be bituminous coating, polyurethane waterproof material coating etc..
Water-proof sheet material can be bonded in by least one layer of glue line 4 on manger step face 13, facilitate construction, retentively
Face is clean and tidy.
Waterproof material coating can be applied directly on manger step face 13, facilitate construction, reduce structural thickness.
Preferably, threshold stone main body 31 is integrally formed with threshold stone rib 32, facilitate processing, and structural strength is high, makes
Use long lifespan.
Preferably, as shown in figures 1 and 3, skid resistant surface 33 is provided on the top surface of toilet threshold stone 3, anti-skidding
It is provided with anti-skidding ripple 34 on the top surface of face layer 33.
It is provided with skid resistant surface 33 on the top surface of threshold stone main body 31 and threshold stone rib 32, plays the role of anti-skidding, is kept away
Exempt to slip when walking on toilet threshold stone 3 and causes tumble injury.Skid resistant surface 33 can have the surface of anti-skidding effect, above
Matte surface, convex-concave surface etc. can be set.
Anti-skidding ripple 34 is provided on the top surface of skid resistant surface 33, anti-skidding ripple 34 is rough to be arranged in non slip surface
On layer 33, certain naked-eye observation skid resistant surface 33 or smooth.34 one side of anti-skidding ripple plays the role of anti-skidding, another party
Play aesthetic effect in face.
Preferably, glue line 4 is structural adhesive layer.Structure glue refers to the high (compressive strength of intensity>65MPa, steel-steel are just drawn
Adhesive strength>30MPa, shearing strength>18MPa), larger load can be born, and ageing-resistant, endurance, corrosion-resistant, in the expected longevity
Performance is stablized in life, the adhesive that the structural member suitable for bearing strength is bonded.
Preferably, filled layer 2 is plastic base layer or is wood-plastic board layer.Plastic base layer is the plate made of plastic plate
Layer, can be stacked by one or more plastic plate and be formed, support and good water-proof effect.Wood-plastic board layer is by wood-plastic board
Manufactured plate layer can be stacked by one or more wood-plastic board and be formed.Wood-plastic board is wood-plastic composite panel, is a kind of
It is mainly basic material and thermoplastic macromolecule material (plastics) and processing aid etc. by timber (lignose, plant cellulose)
Extrusion molding and the environmentally protective new decorative material of manufactured high-tech are heated through die apparatus again after mixing, has timber concurrently
With the performance and characteristic of plastics, support and good water-proof effect.
Preferably, as shown in Fig. 2, being also equipped with waterproof layer on the top surface of screed-coat 11 and toilet screed-coat 12 indoors
14, it can preferably play waterproof effect.
Preferably, waterproof layer 14 is water-proof sheet material, water-proof sheet material is bonded levelling indoors by least one layer of glue line 4
On the top surface of layer 11 and toilet screed-coat 12, facilitate construction, keeps ground clean and tidy.
Waterproof layer 14 or waterproof material coating, the coating of waterproof material coating indoors look for by screed-coat 11 and toilet
On the top surface of flat bed 12, facilitate construction, reduces structural thickness.
Preferably, as shown in figure 4, being offered for the edge closing bar with around on floor on the side of threshold stone main body 31
The card slot 35 of clamping, card slot 35 are used to be clamped with the edge closing bar in the timber floor or ceramic tile of surrounding, facilitate installation.
Preferably, being provided at least one locating slot on the bottom surface of threshold stone main body 31.
The positioning convex platform for coordinating with locating slot is provided on the top surface of filled layer 2.
Positioning convex platform is fastened in locating slot 6, and positioning convex platform is bonded in one by the cell wall of glue line 4 and locating slot
It rises.
When installation, positioning convex platform is fastened in locating slot, and positioning convex platform passes through the slot of glue line 4 and locating slot
Wall is bonded together, convenient to be pre-positioned when mounted to toilet threshold stone 3, and toilet threshold stone 3 is avoided to move, and
And contact area between threshold stone main body 31 and filled layer 2 is expanded, it is bonded by glue line 4, improves the two
Between the stability installed, extend service life.
As needed, above-mentioned each technical solution can be combined, to reach best-of-breed technology effect.
Above-described is only the principles of the present invention and preferred embodiment.It should be pointed out that for the general of this field
For logical technical staff, on the basis of the utility model principle, several other modifications can also be made, this practicality is also should be regarded as
Novel protection domain.
Claims (10)
1. a kind of toilet threshold stone mounting structure, including floor leveling layer and threshold stone, which is characterized in that the floor leveling
Layer includes toilet screed-coat and indoor screed-coat, and the height of the interior screed-coat is higher than the height of the toilet screed-coat
Degree is formed with manger step face in the indoor screed-coat with toilet screed-coat joint;
It is equipped with filled layer on the top surface of the indoor screed-coat, the filled layer is bonded in the interior by glue line
On screed-coat;
The threshold stone includes threshold stone main body and the threshold stone rib for coordinating with toilet doorframe, the threshold stone rib
Positioned at the rear end of the threshold stone main body, the either flush of the top surface of the threshold stone rib and the threshold stone main body is described
The length of threshold stone rib is more than the length of the threshold stone main body;
The threshold stone main body is laid on the top surface of the filled layer, and the threshold stone main body is viscous also by the glue line
Knot is on the filled layer;
The threshold stone rib is located at the top of the toilet screed-coat.
2. threshold stone mounting structure in toilet according to claim 1, which is characterized in that on manger step face upper berth
Equipped at least one layer of waterproof layer.
3. threshold stone mounting structure in toilet according to claim 1, which is characterized in that the threshold stone main body with it is described
Threshold stone rib is integrally formed.
4. threshold stone mounting structure in toilet according to any one of claim 1-3, which is characterized in that in the health
Between threshold stone top surface on be provided with skid resistant surface, anti-skidding ripple is provided on the top surface of the skid resistant surface.
5. threshold stone mounting structure in toilet according to any one of claim 1-3, which is characterized in that the adhesive glue
Layer is structural adhesive layer.
6. threshold stone mounting structure in toilet according to any one of claim 1-3, which is characterized in that the filled layer
For plastic base layer or it is wood-plastic board layer.
7. threshold stone mounting structure in toilet according to claim 2, which is characterized in that in the indoor screed-coat and institute
It states and is also equipped with the waterproof layer on the top surface of toilet screed-coat.
8. threshold stone mounting structure in toilet according to claim 7, which is characterized in that the waterproof layer is splash guard
Material, the water-proof sheet material are bonded in the indoor screed-coat and the toilet screed-coat by least one layer of glue line
Top surface on;Or,
The waterproof layer is waterproof material coating, and the waterproof material coating is coated in the indoor screed-coat and the toilet
On the top surface of screed-coat.
9. threshold stone mounting structure in toilet according to any one of claim 1-3, which is characterized in that in the threshold
It is offered on the side of stone main body for the card slot with the edge closing bar clamping on floor around.
10. threshold stone mounting structure in toilet according to any one of claim 1-3, which is characterized in that in the door
It is provided at least one locating slot on the bottom surface of sill stone main body;
The positioning convex platform for coordinating with the locating slot is provided on the top surface of the filled layer;
The positioning convex platform is fastened in the locating slot;
The positioning convex platform is bonded together by the cell wall of the glue line and the locating slot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721922682.7U CN207974699U (en) | 2017-12-30 | 2017-12-30 | A kind of toilet threshold stone mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721922682.7U CN207974699U (en) | 2017-12-30 | 2017-12-30 | A kind of toilet threshold stone mounting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207974699U true CN207974699U (en) | 2018-10-16 |
Family
ID=63768630
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721922682.7U Active CN207974699U (en) | 2017-12-30 | 2017-12-30 | A kind of toilet threshold stone mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207974699U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109594775A (en) * | 2018-12-25 | 2019-04-09 | 上海聚通装饰集团有限公司 | A kind of dust-proof conversion separation technique for door stone and skirting |
-
2017
- 2017-12-30 CN CN201721922682.7U patent/CN207974699U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109594775A (en) * | 2018-12-25 | 2019-04-09 | 上海聚通装饰集团有限公司 | A kind of dust-proof conversion separation technique for door stone and skirting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018700B (en) | The manufacture method on chassis between a kind of integral bathroom | |
JP2005510645A (en) | Grooved edge building panel and manufacturing method | |
CN207974468U (en) | A kind of toilet threshold stone connection structure | |
CN106284706A (en) | The construction method of external wall outer insulation rock cotton board | |
US10182684B2 (en) | Composite shower curb and self-sealing curb cap | |
KR101051256B1 (en) | Bathroom waterproof system using waterproof sheet | |
CN207974448U (en) | A kind of kitchen threshold stone connection structure | |
CN207974699U (en) | A kind of toilet threshold stone mounting structure | |
AU2010246910B2 (en) | Floor for a modular building | |
CN207974702U (en) | A kind of toilet threshold stone connection component | |
CN207999024U (en) | A kind of kitchen threshold stone connection component | |
CN109864644B (en) | Bathroom shower room chassis and construction method thereof | |
US20050252121A1 (en) | Crown molding with improved mounting surfaces | |
CN207974466U (en) | A kind of toilet threshold stone connecting elements | |
CN207974463U (en) | A kind of threshold stone paving structure | |
CN210767273U (en) | Node processing structure at separation position of shower room and washing room | |
CN207331995U (en) | A kind of toilet threshold stone waterproof construction | |
KR20120011135A (en) | Finishing material for building using natural stone | |
CN215858298U (en) | Aluminum alloy mounting structure | |
CN205907827U (en) | Passive building first floor wall body is at subaerial mounting structure | |
ES2364404T3 (en) | MULTI-COAT COATING. | |
KR20200103335A (en) | Waterproofing system for bathrooms | |
CN217975893U (en) | Threshold stone mounting structure | |
CN107905497A (en) | A kind of threshold closes up with floor and its manufacture craft | |
CN218623866U (en) | Moisture-proof and waterproof doorsill stone structure for dry area and wet area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |